World Academy of Science, Engineering and Technology
[Industrial and Manufacturing Engineering]
Online ISSN : 1307-6892
364 Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures
Authors: Jae-Min Yu, Hyoung-Ho Doh, Ji-Su Kim, Dong-Ho Lee, Sung-Ho Nam
Abstract:
A reconfigurable manufacturing system (RMS) is an advanced system designed at the outset for rapid changes in its hardware and software components in order to quickly adjust its production capacity and functionally. Among various operational decisions, this study considers the scheduling problem that determines the input sequence and schedule at the same time for a given set of parts. In particular, we consider the practical constraints that the numbers of pallets/fixtures are limited and hence a part can be released into the system only when the fixture required for the part is available. To solve the integrated input sequencing and scheduling problems, we suggest a priority rule based approach in which the two sub-problems are solved using a combination of priority rules. To show the effectiveness of various rule combinations, a simulation experiment was done on the data for a real RMS, and the test results are reported.Keywords: Reconfigurable manufacturing system, scheduling, priority rules, multiple process plans, pallets/fixtures
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1896363 A Proposed Information Extraction Technique in Engineering Drawing for Reuse Design
Authors: Mohd Fahmi Mohamad Amran, Riza Sulaiman, Saliyah Kahar, Suziyanti Marjudi, Muhammad FairuzAbd Rauf
Abstract:
The extensive number of engineering drawing will be referred for planning process and the changes will produce a good engineering design to meet the demand in producing a new model. The advantage in reuse of engineering designs is to allow continuous product development to further improve the quality of product development, thus reduce the development costs. However, to retrieve the existing engineering drawing, it is time consuming, a complex process and are expose to errors. Engineering drawing file searching system will be proposed to solve this problem. It is essential for engineer and designer to have some sort of medium to enable them to search for drawing in the most effective way. This paper lays out the proposed research project under the area of information extraction in engineering drawing.
Keywords: Computer aided design, information extraction, engineering drawing, reuse design.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2309362 A Particle Swarm Optimization Approach for the Earliness-Tardiness No-Wait Flowshop Scheduling Problem
Authors: Sedighe Arabameri, Nasser Salmasi
Abstract:
In this researcha particle swarm optimization (PSO) algorithm is proposedfor no-wait flowshopsequence dependent setuptime scheduling problem with weighted earliness-tardiness penalties as the criterion (|, |Σ " ).The smallestposition value (SPV) rule is applied to convert the continuous value of position vector of particles in PSO to job permutations.A timing algorithm is generated to find the optimal schedule and calculate the objective function value of a given sequence in PSO algorithm. Twodifferent neighborhood structures are applied to improve the solution quality of PSO algorithm.The first one is based on variable neighborhood search (VNS) and the second one is a simple one with invariable structure. In order to compare the performance of two neighborhood structures, random test problems are generated and solved by both neighborhood approaches.Computational results show that the VNS algorithmhas better performance than the other one especially for the large sized problems.Keywords: minimization of summation of weighed earliness and tardiness, no-wait flowshop scheduling, particle swarm optimization, sequence dependent setup times
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1626361 A Branch and Bound Algorithm for Resource Constrained Project Scheduling Problem Subject to Cumulative Resources
Authors: A. Shirzadeh Chaleshtari, Sh. Shadrokh
Abstract:
Renewable and non-renewable resource constraints have been vast studied in theoretical fields of project scheduling problems. However, although cumulative resources are widespread in practical cases, the literature on project scheduling problems subject to these resources is scant. So in order to study this type of resources more, in this paper we use the framework of a resource constrained project scheduling problem (RCPSP) with finish-start precedence relations between activities and subject to the cumulative resources in addition to the renewable resources. We develop a branch and bound algorithm for this problem customizing precedence tree algorithm of RCPSP. We perform extensive experimental analysis on the algorithm to check its effectiveness and performance for solving different instances of the problem in question.
Keywords: Resource constrained project scheduling problem, cumulative resources, branch and bound algorithm, precedence tree.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2906360 Study of the Effect of Project Management on Manufacturing and Production Projects
Authors: S.B. Ahmadi, Z. Moradpour, Gh. Liaghat
Abstract:
In this article the accumulated results out of the effects and length of the manufacture and production projects in the university and research standard have been settled with the usefulness definition of the process of project management for the accessibility to the proportional pattern in the “time and action" stages. Studies show that many problems confronted by the researchers in these projects are connected to the non-profiting of: 1) autonomous timing for gathering the educational theme, 2) autonomous timing for planning and pattern, presenting before the construction, and 3) autonomous timing for manufacture and sample presentation from the output. The result of this study indicates the division of every manufacture and production projects into three smaller autonomous projects from its kind, budget and autonomous expenditure, shape and order of the stages for the management of these kinds of projects. In this case study real result are compared with theoretical results.Keywords: Project management, Manufacturing, production.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1671359 Performance Comparison of Two Assembly Line Concepts: Conveyor Line and Box Assembly Line
Authors: Kezia Amanda Kurniadi, Emre Islamoglu, Kwangyeol Ryu
Abstract:
As there has been a recognizable transition in automotive industry from mass production to mass customization, automobile manufacturers and their suppliers have been seeking ways for more flexible and efficient processes. Eventually, modular production is currently being applied to manage the changing orders of the industry. In this paper, two different modular assembly line concepts were studied: conveyor line and box assembly line. Mathematical model for two assembly line concepts were developed and their production line efficiency were compared as a performance measure to improve their assembly line balancing.Keywords: Line Efficiency, Box assembly line, Conventional conveyor line
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2963358 Quality Monitoring and Dynamic Pricing in Cold Chain Management
Authors: Myo Min Aung, Yoon Seok Chang, Woo Ram Kim
Abstract:
This paper presents a cold chain monitoring system which focuses on assessment of quality and dynamic pricing information about food in cold chain. Cold chain is composed of many actors and stages; however it can be seen as a single entity since a breakdown in temperature control at any stage can impact the final quality of the product. In a cold chain, the shelf life, quality, and safety of perishable food throughout the supply chain is greatly impacted by environmental factors especially temperature. In this paper, a prototype application is implemented to retrieve timetemperature history, the current quality and the dynamic price setting according to changing quality impacted by temperature fluctuations in real-time.
Keywords: Cold chain, monitoring, quality, temperature, traceability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3064357 A Flexible Flowshop Scheduling Problem with Machine Eligibility Constraint and Two Criteria Objective Function
Authors: Bita Tadayon, Nasser Salmasi
Abstract:
This research deals with a flexible flowshop scheduling problem with arrival and delivery of jobs in groups and processing them individually. Due to the special characteristics of each job, only a subset of machines in each stage is eligible to process that job. The objective function deals with minimization of sum of the completion time of groups on one hand and minimization of sum of the differences between completion time of jobs and delivery time of the group containing that job (waiting period) on the other hand. The problem can be stated as FFc / rj , Mj / irreg which has many applications in production and service industries. A mathematical model is proposed, the problem is proved to be NPcomplete, and an effective heuristic method is presented to schedule the jobs efficiently. This algorithm can then be used within the body of any metaheuristic algorithm for solving the problem.Keywords: flexible flowshop scheduling, group processing, machine eligibility constraint, mathematical modeling.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1833356 Surface Roughness and MRR Effect on Manual Plasma Arc Cutting Machining
Authors: R. Bhuvenesh, M.H. Norizaman, M.S. Abdul Manan
Abstract:
Industrial surveys shows that manufacturing companies define the qualities of thermal removing process based on the dimension and physical appearance of the cutting material surface. Therefore, the roughness of the surface area of the material cut by the plasma arc cutting process and the rate of the removed material by the manual plasma arc cutting machine was importantly considered. Plasma arc cutter Selco Genesis 90 was used to cut Standard AISI 1017 Steel of 200 mm x100 mm x 6 mm manually based on the selected parameters setting. The material removal rate (MRR) was measured by determining the weight of the specimens before and after the cutting process. The surface roughness (SR) analysis was conducted using Mitutoyo CS-3100 to determine the average roughness value (Ra). Taguchi method was utilized to achieve optimum condition for both outputs studied. The microstructure analysis in the region of the cutting surface is performed using SEM. The results reveal that the SR values are inversely proportional to the MRR values. The quality of the surface roughness depends on the dross peak that occurred after the cutting process.Keywords: Material removal rate, plasma arc cutting, surface roughness, Taguchi method
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5677355 Mechanical Structure Design Optimization by Blind Number Theory: Time-dependent Reliability
Authors: Zakari Yaou, Lirong Cui
Abstract:
In a product development process, understanding the functional behavior of the system, the role of components in achieving functions and failure modes if components/subsystem fails its required function will help develop appropriate design validation and verification program for reliability assessment. The integration of these three issues will help design and reliability engineers in identifying weak spots in design and planning future actions and testing program. This case study demonstrate the advantage of unascertained theory described in the subjective cognition uncertainty, and then applies blind number (BN) theory in describing the uncertainty of the mechanical system failure process and the same time used the same theory in bringing out another mechanical reliability system model. The practical calculations shows the BN Model embodied the characters of simply, small account of calculation but betterforecasting capability, which had the value of macroscopic discussion to some extent.
Keywords: Mechanical structure Design, time-dependent stochastic process, unascertained information, blind number theory.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1471354 Mathematical Model and Solution Algorithm for Containership Operation/Maintenance Scheduling
Authors: Hun Go, Ji-Su Kim, Dong-Ho Lee
Abstract:
This study considers the problem of determining operation and maintenance schedules for a containership equipped with components during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies work time of each component, determines the due-date of each maintenance activity, and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are component requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the problem complexity, we suggest a heuristic for the objective of minimizing the sum of earliness and tardiness between the due-date and the starting time of each maintenance activity. Computational experiments were done on various test instances and the results are reported.Keywords: Containerships, operation and preventive maintenance schedules, integer programming, heuristic
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1615353 A TRIZ-based Approach to Generation of Service-supporting Product Concepts
Authors: Seungkyum Kim, Yongtae Park
Abstract:
Recently, business environment and customer needs have become rapidly changing, hence it is very difficult to fulfill sophisticated customer needs by product or service innovation only. In practice, to cope with this problem, various manufacturing companies have developed services to combine with their products. Along with this, many academic studies on PSS (Product Service System) which is the integrated system of products and services have been conducted from the viewpoint of manufacturers. On the other hand, service providers are also attempting to develop service-supporting products to increase their service competitiveness and provide differentiated value. However, there is a lack of research based on the service-centric point of view. Accordingly, this paper proposes a concept generation method for service-supporting product development from the service-centric point of view. This method is designed to be executed in five consecutive steps: situation analysis, problem definition, problem resolution, solution evaluation, and concept generation. In the proposed approach, some tools of TRIZ (Theory of Solving Inventive Problem) such as ISQ (Innovative Situation Questionnaire) and 40 inventive principles are employed in order to define problems of the current services and solve them by generating service-supporting product concepts. This research contributes to the development of service-supporting products and service-centric PSSs.Keywords: TRIZ, PSS (Product Service System), service-supporting product, concept generation
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1928352 Steam Assisted Gravity Drainage: A Recipe for Success
Authors: Mohsen Ebrahimi
Abstract:
In this paper, Steam Assisted Gravity Drainage (SAGD) is introduced and its advantages over ordinary steam injection is demonstrated. A simple simulation model is built and three scenarios of natural production, ordinary steam injection, and SAGD are compared in terms of their cumulative oil production and cumulative oil steam ratio. The results show that SAGD can significantly enhance oil production in quite a short period of time. However, since the distance between injection and production wells is short, the oil to steam ratio decreases gradually through time.Keywords: Thermal recovery, Steam injection, SAGD, Enhanced oil recovery
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2186351 Calculation of Reorder Point Level under Stochastic Parameters: A Case Study in Healthcare Area
Authors: Serap Akcan, Ali Kokangul
Abstract:
We consider a single-echelon, single-item inventory system where both demand and lead-time are stochastic. Continuous review policy is used to control the inventory system. The objective is to calculate the reorder point level under stochastic parameters. A case study is presented in Neonatal Intensive Care Unit.Keywords: Inventory control system, reorder point level, stochastic demand, stochastic lead time
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3535350 Flux Cored Arc Welding Parameter Optimization of AISI 316L (N) Austenitic Stainless Steel
Authors: D.Katherasan, Madana Sashikant, S.Sandeep Bhat, P.Sathiya
Abstract:
Bead-on-plate welds were carried out on AISI 316L (N) austenitic stainless steel (ASS) using flux cored arc welding (FCAW) process. The bead on plates weld was conducted as per L25 orthogonal array. In this paper, the weld bead geometry such as depth of penetration (DOP), bead width (BW) and weld reinforcement (R) of AISI 316L (N) ASS are investigated. Taguchi approach is used as statistical design of experiment (DOE) technique for optimizing the selected welding input parameters. Grey relational analysis and desirability approach are applied to optimize the input parameters considering multiple output variables simultaneously. Confirmation experiment has also been conducted to validate the optimized parameters.Keywords: bead-on-plate welding, bead profiles, desirability approach, grey relational analysis
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2398349 Arrival and Departure Scheduling at Hub Airports Considering Airlines Level
Authors: A. Nourmohammadzadeh, R. Tavakkoli- Moghaddam
Abstract:
As the air traffic increases at a hub airport, some flights cannot land or depart at their preferred target time. This event happens because the airport runways become occupied to near their capacity. It results in extra costs for both passengers and airlines because of the loss of connecting flights or more waiting, more fuel consumption, rescheduling crew members, etc. Hence, devising an appropriate scheduling method that determines a suitable runway and time for each flight in order to efficiently use the hub capacity and minimize the related costs is of great importance. In this paper, we present a mixed-integer zero-one model for scheduling a set of mixed landing and departing flights (despite of most previous studies considered only landings). According to the fact that the flight cost is strongly affected by the level of airline, we consider different airline categories in our model. This model presents a single objective minimizing the total sum of three terms, namely 1) the weighted deviation from targets, 2) the scheduled time of the last flight (i.e., makespan), and 3) the unbalancing the workload on runways. We solve 10 simulated instances of different sizes up to 30 flights and 4 runways. Optimal solutions are obtained in a reasonable time, which are satisfactory in comparison with the traditional rule, namely First- Come-First-Serve (FCFS) that is far apart from optimality in most cases.Keywords: Arrival and departure scheduling, Airline level, Mixed-integer model
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1829348 User Experience Evolution Lifecycle Framework
Authors: Maissom Qanber Abbasi, Philip Lew, Irfan Rafique, Zhang Li
Abstract:
Perceptions of quality from both designers and users perspective have now stretched beyond the traditional usability, incorporating abstract and subjective concepts. This has led to a shift in human computer interaction research communities- focus; a shift that focuses on achieving user experience (UX) by not only fulfilling conventional usability needs but also those that go beyond them. The term UX, although widely spread and given significant importance, lacks consensus in its unified definition. In this paper, we survey various UX definitions and modeling frameworks and examine them as the foundation for proposing a UX evolution lifecycle framework for understanding UX in detail. In the proposed framework we identify the building blocks of UX and discuss how UX evolves in various phases. The framework can be used as a tool to understand experience requirements and evaluate them, resulting in better UX design and hence improved user satisfaction.Keywords: Usability, user experience lifecycle, user satisfaction
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2630347 A Bi-Objective Preventive Healthcare Facility Network Design with Incorporating Cost and Time Saving
Authors: Mehdi Seifbarghy, Keyvan Roshan
Abstract:
Main goal of preventive healthcare problems are at decreasing the likelihood and severity of potentially life-threatening illnesses by protection and early detection. The levels of establishment and staffing costs along with summation of the travel and waiting time that clients spent are considered as objectives functions of the proposed nonlinear integer programming model. In this paper, we have proposed a bi-objective mathematical model for designing a network of preventive healthcare facilities so as to minimize aforementioned objectives, simultaneously. Moreover, each facility acts as M/M/1 queuing system. The number of facilities to be established, the location of each facility, and the level of technology for each facility to be chosen are provided as the main determinants of a healthcare facility network. Finally, to demonstrate performance of the proposed model, four multi-objective decision making techniques are presented to solve the model.Keywords: Preventive healthcare problems, Non-linear integer programming models, Multi-objective decision making techniques
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1769346 Parametric Analysis in the Electronic Sensor Frequency Adjustment Process
Authors: Rungchat Chompu-Inwai, Akararit Charoenkasemsuk
Abstract:
The use of electronic sensors in the electronics industry has become increasingly popular over the past few years, and it has become a high competition product. The frequency adjustment process is regarded as one of the most important process in the electronic sensor manufacturing process. Due to inaccuracies in the frequency adjustment process, up to 80% waste can be caused due to rework processes; therefore, this study aims to provide a preliminary understanding of the role of parameters used in the frequency adjustment process, and also make suggestions in order to further improve performance. Four parameters are considered in this study: air pressure, dispensing time, vacuum force, and the distance between the needle tip and the product. A full factorial design for experiment 2k was considered to determine those parameters that significantly affect the accuracy of the frequency adjustment process, where a deviation in the frequency after adjustment and the target frequency is expected to be 0 kHz. The experiment was conducted on two levels, using two replications and with five center-points added. In total, 37 experiments were carried out. The results reveal that air pressure and dispensing time significantly affect the frequency adjustment process. The mathematical relationship between these two parameters was formulated, and the optimal parameters for air pressure and dispensing time were found to be 0.45 MPa and 458 ms, respectively. The optimal parameters were examined by carrying out a confirmation experiment in which an average deviation of 0.082 kHz was achieved.Keywords: Design of Experiment, Electronic Sensor, Frequency Adjustment, Parametric Analysis
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1397345 A Proposed Performance Prediction Approach for Manufacturing Processes using ANNs
Authors: M. S. Abdelwahed, M. A. El-Baz, T. T. El-Midany
Abstract:
this paper aims to provide an approach to predict the performance of the product produced after multi-stages of manufacturing processes, as well as the assembly. Such approach aims to control and subsequently identify the relationship between the process inputs and outputs so that a process engineer can more accurately predict how the process output shall perform based on the system inputs. The approach is guided by a six-sigma methodology to obtain improved performance. In this paper a case study of the manufacture of a hermetic reciprocating compressor is presented. The application of artificial neural networks (ANNs) technique is introduced to improve performance prediction within this manufacturing environment. The results demonstrate that the approach predicts accurately and effectively.Keywords: Artificial neural networks, Reciprocating compressor manufacturing, Performance prediction, Quality improvement
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1782344 A Case Study on Product Development Performance Measurement
Authors: Liv Gingnell, Evelina Ericsson, Joakim Lilliesköld, Robert Langerström
Abstract:
In recent years, an increased competition and lower profit margins have necessitated a focus on improving the performance of the product development process, an area that traditionally have been excluded from detailed steering and evaluation. A systematic improvement requires a good understanding of the current performance, wherefore the interest for product development performance measurement has increased dramatically. This paper presents a case study that evaluates the performance of the product development performance measurement system used in a Swedish company that is a part of a global corporate group. The study is based on internal documentation and eighteen in-depth interviews with stakeholders involved in the product development process. The results from the case study includes a description of what metrics that are in use, how these are employed, and its affect on the quality of the performance measurement system. Especially, the importance of having a well-defined process proved to have a major impact on the quality of the performance measurement system in this particular case.
Keywords: Outcome metric, Performance driver, Performance measurement, Product development process.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1574343 Fast and Accurate Reservoir Modeling: Genetic Algorithm versus DIRECT Method
Authors: Mohsen Ebrahimi, Milad M. Rabieh
Abstract:
In this paper, two very different optimization algorithms, Genetic and DIRECT algorithms, are used to history match a bottomhole pressure response for a reservoir with wellbore storage and skin with the best possible analytical model. No initial guesses are available for reservoir parameters. The results show that the matching process is much faster and more accurate for DIRECT method in comparison with Genetic algorithm. It is furthermore concluded that the DIRECT algorithm does not need any initial guesses, whereas Genetic algorithm needs to be tuned according to initial guesses.Keywords: DIRECT algorithm, Genetic algorithm, Analytical modeling, History match
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1756342 Proposing a Pareto-based Multi-Objective Evolutionary Algorithm to Flexible Job Shop Scheduling Problem
Authors: Seyed Habib A. Rahmati
Abstract:
During last decades, developing multi-objective evolutionary algorithms for optimization problems has found considerable attention. Flexible job shop scheduling problem, as an important scheduling optimization problem, has found this attention too. However, most of the multi-objective algorithms that are developed for this problem use nonprofessional approaches. In another words, most of them combine their objectives and then solve multi-objective problem through single objective approaches. Of course, except some scarce researches that uses Pareto-based algorithms. Therefore, in this paper, a new Pareto-based algorithm called controlled elitism non-dominated sorting genetic algorithm (CENSGA) is proposed for the multi-objective FJSP (MOFJSP). Our considered objectives are makespan, critical machine work load, and total work load of machines. The proposed algorithm is also compared with one the best Pareto-based algorithms of the literature on some multi-objective criteria, statistically.Keywords: Scheduling, Flexible job shop scheduling problem, controlled elitism non-dominated sorting genetic algorithm
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1936341 Development and Optimization of Automated Dry-Wafer Separation
Authors: Tim Giesen, Christian Fischmann, Fabian Böttinger, Alexander Ehm, Alexander Verl
Abstract:
In a state-of-the-art industrial production line of photovoltaic products the handling and automation processes are of particular importance and implication. While processing a fully functional crystalline solar cell an as-cut photovoltaic wafer is subject to numerous repeated handling steps. With respect to stronger requirements in productivity and decreasing rejections due to defects the mechanical stress on the thin wafers has to be reduced to a minimum as the fragility increases by decreasing wafer thicknesses. In relation to the increasing wafer fragility, researches at the Fraunhofer Institutes IPA and CSP showed a negative correlation between multiple handling processes and the wafer integrity. Recent work therefore focused on the analysis and optimization of the dry wafer stack separation process with compressed air. The achievement of a wafer sensitive process capability and a high production throughput rate is the basic motivation in this research.Keywords: Automation, Photovoltaic Manufacturing, Thin Wafer, Material Handling
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1671340 Determining the Criteria and their Importance Level of Calibration Supplier Selection
Authors: Ayse Gecer, Nihal Erginel
Abstract:
Quality control is the crucial step for ISO 9001 Quality System Management Standard for companies. While measuring the quality level of both raw material and semi product/product, the calibration of the measuring device is an essential requirement. Calibration suppliers are in the service sector and therefore the calibration supplier selection is becoming a worthy topic for improving service quality. This study presents the results of a questionnaire about the selection criteria of a calibration supplier. The questionnaire was applied to 103 companies and the results are discussed in this paper. The analysis was made with MINITAB 14.0 statistical programs. “Competence of documentations" and “technical capability" are defined as the prerequisites because of the ISO/IEC17025:2005 standard. Also “warranties and complaint policy", “communication", “service features", “quality" and “performance history" are defined as very important criteria for calibration supplier selection.Keywords: Calibration, criteria of calibration supplier selection, calibration supplier selection, questionnaire
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2008339 Application of Tacit Knowledge from Professional Packaging Designer for Teaching Packaging Design
Authors: Somsri Binraman, Boonliang Kaewnapan, Krittika Tanprasert
Abstract:
In the package design industry, there are a lot of tacit knowledge resided within each designer. The objectives are to capture them and compile it to be used as a teaching resource and to create a video clip of package design process as well as to evaluate its quality and learning effectiveness. Interview were used as a technique for capturing knowledge in brand design concept, differentiation, recognition, rank of recognition factor, consumer survey, knowledge about marketing, research, graphic design, the effect of color, and law and regulation. Video clip about package design were created. The clip consisted of both the speech and clip of actual process. The quality of the video in term of media was ranked as good while the content was ranked as excellent. The students- score on post-test was significantly greater than that of pretest (p>0.001).
Keywords: Tacit knowledge, interview, video, packaging, design.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1484338 Effect of Information System Strategies on Supply Chain Strategies and Supply Chain Performance
Authors: M. Torabizadeh, M. Khatami Rad, A. Noshadi
Abstract:
In order to achieve competitive advantage and better performance of firm, supply chain management (SCM) strategy should support and drive forward business strategy. It means that supply chain should be aligned with business strategy, at the same time supply chain (SC) managers need to use appropriate information system (IS) solution to support their strategy, which would lead to stay competitive. There are different kinds of IS strategies which enable managers to meet the SC requirement by selecting the best IS strategy. Therefore, it is important to align IS strategies and practices with SC strategies and practices, which could help us to plan for an IS application that supports and enhances a SCMS. In this study, aligning IS with SC in strategy level is considered. The main aim of this paper is to align the various IS strategies with SCM strategies and demonstrate their impact on SC and firm performance.Keywords: Information system strategy, alignment, firm performance, supply chain strategy.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1840337 Hybrid Minimal Repair for a Serial System
Authors: Ellysa Nursanti, Anas Ma'ruf, Tota Simatupang, Bermawi P. Iskandar
Abstract:
This study proposes a hybrid minimal repair policy which combines periodic maintenance policy with age-based maintenance policy for a serial production system. Parameters of such policy are defined as and which indicate as hybrid minimal repair time and planned preventive maintenance time respectively . Under this hybrid policy, the system is repaired minimally if it fails during ,. A perfect repair is conducted on the first failure after at any machines. At the same time, we take opportunity to advance the preventive maintenance of other machines simultaneously. If the system is still operating properly up to , then the preventive maintenance is carried out as its predetermined schedule. For a given , we obtain the optimal value which minimizes the expected cost per time unit. Numerical example is presented to illustrate the properties of the optimal solution.Keywords: Hybrid minimal repair, opportunistic maintenance, preventive maintenance, series system
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1661336 Applying 5S Lean Technology: An Infrastructure for Continuous Process Improvement
Authors: Raid A. Al-Aomar
Abstract:
This paper presents an application of 5S lean technology to a production facility. Due to increased demand, high product variety, and a push production system, the plant has suffered from excessive wastes, unorganized workstations, and unhealthy work environment. This has translated into increased production cost, frequent delays, and low workers morale. Under such conditions, it has become difficult, if not impossible, to implement effective continuous improvement studies. Hence, the lean project is aimed at diagnosing the production process, streamlining the workflow, removing/reducing process waste, cleaning the production environment, improving plant layout, and organizing workstations. 5S lean technology is utilized for achieving project objectives. The work was a combination of both culture changes and tangible/physical changes on the shop floor. The project has drastically changed the plant and developed the infrastructure for a successful implementation of continuous improvement as well as other best practices and quality initiatives.
Keywords: 5S Technique, Continuous Improvement, Kaizen, Lean Technology, Work Methods, Work Standards
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4907335 On the Dynamic Model of Service Innovation in Manufacturing Industry
Authors: Yongyoon Suh, Chulhyun Kim, Moon-soo Kim
Abstract:
As the trend of manufacturing is being dominated depending on services, products and processes are more and more related with sophisticated services. Thus, this research starts with the discussion about integration of the product, process, and service in the innovation process. In particular, this paper sets out some foundations for a theory of service innovation in the field of manufacturing, and proposes the dynamic model of service innovation related to product and process. Two dynamic models of service innovation are suggested to investigate major tendencies and dynamic variations during the innovation cycle: co-innovation and sequential innovation. To structure dynamic models of product, process, and service innovation, the innovation stages in which two models are mainly achieved are identified. The research would encourage manufacturers to formulate strategy and planning for service development with product and process.
Keywords: dynamic model, service innovation, service innovation models, innovation cycle, manufacturing industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2019