Seyed Habib A. Rahmati, Proposing a Pareto-based Multi-Objective Evolutionary Algorithm to Flexible Job Shop Scheduling Problem. journal = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology. January 2012, vol. 61(1). 316 - 321 [viewed 19 September 2024]. Available from: https://publications.waset.org/pdf/13872.