	%T Scheduling for a Reconfigurable Manufacturing System with Multiple Process Plans and Limited Pallets/Fixtures
	%U https://publications.waset.org/pdf/16007
	%V 62
	%X A reconfigurable manufacturing system (RMS) is an
advanced system designed at the outset for rapid changes in its hardware
and software components in order to quickly adjust its production
capacity and functionally. Among various operational decisions, this
study considers the scheduling problem that determines the input
sequence and schedule at the same time for a given set of parts. In
particular, we consider the practical constraints that the numbers of
pallets/fixtures are limited and hence a part can be released into the
system only when the fixture required for the part is available. To
solve the integrated input sequencing and scheduling problems, we
suggest a priority rule based approach in which the two sub-problems
are solved using a combination of priority rules. To show the effectiveness
of various rule combinations, a simulation experiment was
done on the data for a real RMS, and the test results are reported.