Search results for: road-building projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2155

Search results for: road-building projects

1975 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 165
1974 No Space for Subculture, No Space for Disruption: Taming Creativity in Urban Development Projects

Authors: Nadine Osbild

Abstract:

Recent urban development projects often try to cater to both high-tech innovation/start-up culture and local culture/sustainable living. In the process, the so-called “creative class” (Florida 2002) has become a focal point for innovative answers to increasing urban pressures. Our paper explores local subculture and art scenes as a place where current innovation policies and alternative approaches to urban future-making collide. We explore the (re-)making of prevalent understanding of creativity in the context of Munich – an economically successful and over-saturated city with a relatively conservative approach to innovation and disruption and no apparent need for the “creative class” remedy. In particular, we investigate the opportunities and manifestations of subculture in three urban development projects that are envisioned as collaborations between innovators and (sub)culturally oriented creativity. Following a co-production STS approach, we observe that these development projects serve as sites where understandings of innovation and creativity are configured and stabilized in keeping with broader socio-political and economic rationalities. What is more, the projects materialize a de-facto split between the two understandings of a “creative scene,” whereby alternative and potentially disruptive forms of creativity become sidelined or even prevented in Munich’s imagination of urban development in the name of innovation and economic growth. Thus taming the unruliness of creativity, Munich also manages to tame the disruptive threats of innovation, ensuring that the innovation-centered modes of future-making still leave socio-economic hierarchies intact while displacing (counter-)visions rooted in the subculture.

Keywords: creative districts, science and technology studies, public engagement, innovation studies

Procedia PDF Downloads 97
1973 Analysis of the Effects of Institutions on the Sub-National Distribution of Aid Using Geo-Referenced AidData

Authors: Savas Yildiz

Abstract:

The article assesses the performance of international aid donors to determine the sub-national distribution of their aid projects dependent on recipient countries’ governance. The present paper extends the scope from a cross-country perspective to a more detailed analysis by looking at the effects of institutional qualities on the sub-national distribution of foreign aid. The analysis examines geo-referenced aid project in 37 countries and 404 regions at the first administrative division level in Sub-Saharan Africa from the World Bank (WB) and the African Development Bank (ADB) that were approved between the years 2000 and 2011. To measure the influence of institutional qualities on the distribution of aid the following measures are used: control of corruption, government effectiveness, regulatory quality and rule of law from the World Governance Indicators (WGI) and the corruption perception index from Transparency International. Furthermore, to assess the importance of ethnic heterogeneity on the sub-national distribution of aid projects, the study also includes interaction terms measuring ethnic fragmentation. The regression results indicate a general skew of aid projects towards regions which hold capital cities, however, being incumbent presidents’ birth region does not increase the allocation of aid projects significantly. Nevertheless, with increasing quality of institutions aid projects are less skewed towards capital regions and the previously estimated coefficients loose significance in most cases. Higher ethnic fragmentation also seems to impede the possibility to allocate aid projects mainly in capital city regions and presidents’ birth places. Additionally, to assess the performance of the WB based on its own proclaimed goal to aim the poor in a country, the study also includes sub-national wealth data from the Demographic and Health Surveys (DSH), and finds that, even with better institutional qualities, regions with a larger share from the richest quintile receive significantly more aid than regions with a larger share of poor people. With increasing ethnic diversity, the allocation of aid projects towards regions where the richest citizens reside diminishes, but still remains high and significant. However, regions with a larger share of poor people still do not receive significantly more aid. This might imply that the sub-national distribution of aid projects increases in general with higher ethnic fragmentation, independent of the diverse regional needs. The results provide evidence that institutional qualities matter to undermine the influence of incumbent presidents on the allocation of aid projects towards their birth regions and capital regions. Moreover, even for countries with better institutional qualities the WB and the ADB do not seem to be able to aim the poor in a country with their aid projects. Even, if one considers need-based variables, such as infant mortality and child mortality rates, aid projects do not seem to be allocated in districts with a larger share of people in need. Therefore, the study provides further evidence using more detailed information on the sub-national distribution of aid projects that aid is not being allocated effectively towards regions with a larger share of poor people to alleviate poverty in recipient countries directly. Institutions do not have any significant influence on the sub-national distribution of aid towards the poor.

Keywords: aid allocation, georeferenced data, institutions, spatial analysis

Procedia PDF Downloads 118
1972 Inadequacy and Inefficiency of the Scoping Requirements in the Preparation of Environmental Impact Assessment Reports for Dam and Reservoir Projects in Thailand

Authors: Natsuda Rattamanee

Abstract:

Like other countries, Thailand continually experiences strong protests against dam and reservoir proposals, especially large-scale projects. The protestors are constantly worried about the potential significant adverse impacts of the projects on the environment and society. Although project proponents are required by laws to assess the environmental and social impacts of the dam proposals by making environmental impact assessment (EIA) reports and finding mitigation measures before implementing the plans, the outcomes of the assessments often do not lessen the affected people and public’s concerns about the potential negative effects of the projects. One of the main reasons is that Thailand does not have a proper and efficient law to regulate project proponents when determining the scope of environmental impact assessments. Scoping is the crucial second stage of the preparation of an EIA report. The appropriate scope of assessments will allow EIA studies to focus only on the significant effects of the proposed project on particular resources, areas, and communities. It will offer crucial and sufficient information to the decision-makers and the public. The decision to implement the dam and reservoir projects considered based on the assessments with a proper scoping will eventually be more widely accepted by the public and reduce community opposition. The research work seeks to identify flaws in the current requirements of scoping steps under Thai laws and regulations and proposes recommendations to improve the legal scheme. The paper explores the well-established United States laws and relevant rules regulating how lead agencies determine the scope of their environmental impact assessments and some guidelines concerning scoping published by dominant institutions. Policymakers and legislature will find the results of studies helpful in improving the scoping-step requirements of EIA for dam and reservoir projects and reducing the level of anti-dam protests in Thailand.

Keywords: dam and reservoir, EIA, environmental impact assessment, law, scoping, Thailand

Procedia PDF Downloads 88
1971 Examining the Extent to Which the Effects of HIV/AIDS Is Addressed in Low Cost Housing Projects in South Africa: The Case of RDP Golf Course Housing Project in Alice Town, Eastern

Authors: Tatenda Manomano

Abstract:

The chronic challenges presented by HIV/AIDS globally have come with extreme negative effects on individuals, families and communities as well as governments. Sub-Saharan Africa remains strongly challenged with South Africa bearing a huge brunt of these. The paper examines the extent to which the effects of HIV/AIDS are addressed in low cost housing projects in South Africa with a case of the RDP Golf Course Housing Project in Alice Town. The study used a triangulation of both qualitative and quantitative methods with the qualitative as the dominant method while the quantitative was less dominant. Findings revealed that infection rate was high; prostitution was high; alcohol abuse was also high; and rape and sexual abuse was also high and there was also lack of hospitals and social workers around the location. These findings prompted this researcher to recommend for proactive policy making that can bolster the challenges faced by these low cost housing projects in accessing health and social services as well as massive campaigns that can promote behavior modification among other things. It is hoped that this paper will be a platform to ring a bell to both government and non-government to augment the campaign against HIV/AIDS in South Africa.

Keywords: HIV/AIDS, RDP houses, low cost housing projects, campaigns

Procedia PDF Downloads 398
1970 Key Factors of Success and Deterrent of IT Projects, Case study: Islamic Azad University, Zahedan Branch

Authors: Mohammad Reza Abidi, Zahra Nourouz Pour, Mehdi Moudi

Abstract:

In this research, firstly critical success factors and deterrent factors in implementing projects and also the factors those cause information technology productivity (IT) paradox in Islamic Azad University, Zahedan branch examined. Research method of this paper is descriptive. In fact, the researcher by using survey, proposed useful solutions. In this research, subjects’ responders to questionnaires items were based on Likert scale. In the questionnaire, economic, technical, organizational and cultural factors in the university have been assessed in order to obtain the necessary validity. We used masters and technicians of IT department’s advices to realize reliability and consistency. For the reliability test we used Cronbach’s reliability test and validity has been obtained using SPSS software. Because of the research questions and objectives, t-student test is used for hypothesis testing. Finally we analyze the findings, we offer conclusions and suggestions.

Keywords: IT projects, Islamic Azad University, success factors, deterrent factors

Procedia PDF Downloads 314
1969 A Taxonomy Proposal on Criterion Structure for Evaluating Freight Village Concepts in Early-Stage Design Projects

Authors: Rıza Gürhan Korkut, Metin Çelik, Süleyman Özkaynak

Abstract:

The early-stage design and development projects for the freight village initiatives require a comprehensive analysis of both qualitative and quantitative data. Considering the literature review on structural and operational management requirements, this study proposed an original taxonomy on criterion structure to assess freight village conceptualization. The potential challenges and uncertainties of the developed taxonomy are extended. Besides requirement analysis, this study is also expected to contribute to forthcoming research on benchmarking of freight villages in different regions. The methodology used in this research is a systematic review on several articles as per their modelling approaches, sustainability, entities and decisions made together with the uncertainties and features of their models taken into consideration. The major findings of the study that are the categories for assessing the projects attributes on their environmental, socio-economical, accessibility and location aspects.

Keywords: logistics centers, freight village, operational management, taxonomy

Procedia PDF Downloads 178
1968 Sustainability Rating System for Infrastructure Projects in UAE

Authors: Amrutha Venugopal, Rabee Rustum

Abstract:

In spite of huge investments and the vital role infrastructure plays in the economy of UAE, the country has not yet developed an assessment scheme to measure the sustainability of infrastructure projects/development. The aim of this study was to develop a sustainability rating system for infrastructure projects in UAE using weighted indicator scoring. The identification of the list of 66 indicators was done by content analysis. The sources of content analysis were from government guidelines, research literature and sustainability rating system for infrastructure projects namely BCA Greenmark for Infrastructure (Singapore), ISCA (Australia) and Envision (USA). These indicators were shortlisted based on their relevance in the UAE. A mixture of qualitative and quantitative research methods is utilized to find the weightage to be applied to the indicators and to find suggestive measures to improve infrastructure sustainability in this region. Interviews and surveys were conducted with a good mix of experts from the industry. The data collected from the interviews were collated to provide suggestive measures for improving infrastructure sustainability. The collected survey data were analyzed using statistical analysis techniques to find the indicator weighing. The indicators were shortlisted by 75% to minimize the effort and investment into the process. The weighing of the deleted indicators was distributed among the critical clusters identified by Pareto analysis. Finally a simple Microsoft Excel tool was developed as the rating tool by using the calculated weighing for the indicators.

Keywords: infrastructure, rating system, suggestive measures, sustainability, UAE

Procedia PDF Downloads 302
1967 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 183
1966 A Case Study Approach to the Rate the Eco Sensitivity of Green Infrastructure Solutions

Authors: S. Saroop, D. Allopi

Abstract:

In the area of civil infrastructure, there is an urgent need to apply technologies that deliver infrastructure sustainably in a way that is cost-effective. Civil engineering projects can have a significant impact on ecological and social systems if not correctly planned, designed and implemented. It can impact climate change by addressing the issue of flooding and sustainability. Poor design choices now can result in future generations to live in a climate with depleted resources and without green spaces. The objectives of the research study were to rate the sensitivity of various greener infrastructure technologies that can be used in township infrastructure, at the various stages of the project. This paper discusses the Green Township Infrastructure Design Toolkit, that is used to rate the sustainability of infrastructure service projects. Various case studies were undertaken on a range of infrastructure projects to test the sensitivity of various design solution against sustainability criteria. The Green reporting tools ensure efficient, economical and sustainable provision of infrastructure services.

Keywords: eco-efficiency, green infrastructure, green technology, infrastructure design, sustainable development

Procedia PDF Downloads 378
1965 Assessing Knowledge Management Impacts: Challenges, Limits and Base for a New Framework

Authors: Patrick Mbassegue, Mickael Gardoni

Abstract:

In a market environment centered more and more on services and the digital economy, knowledge management becomes a framework that can help organizations to create value and to improve their overall performance. Based on an optimal allocation of scarce resources, managers are interested in demonstrating the added value generated by knowledge management projects. One of the challenges faced by organizations is the difficulty in measuring impacts and concrete results of knowledge management initiatives. The present article concerns the measure of concrete results coming from knowledge management projects based on balance scorecard model. One of the goals is to underline what can be done based on this model but also to highlight the limits associated. The present article is structured in five parts; 1-knowledge management projects and organizational impacts; 2- a framework and a methodology to measure organizational impacts; 3- application illustrated in two case studies; 4- limits concerning the proposed framework; 5- the proposal of a new framework to measure organizational impacts.

Keywords: knowledge management, project, balance scorecard, impacts

Procedia PDF Downloads 261
1964 Implementation of Big Data Concepts Led by the Business Pressures

Authors: Snezana Savoska, Blagoj Ristevski, Violeta Manevska, Zlatko Savoski, Ilija Jolevski

Abstract:

Big data is widely accepted by the pharmaceutical companies as a result of business demands create through legal pressure. Pharmaceutical companies have many legal demands as well as standards’ demands and have to adapt their procedures to the legislation. To manage with these demands, they have to standardize the usage of the current information technology and use the latest software tools. This paper highlights some important aspects of experience with big data projects implementation in a pharmaceutical Macedonian company. These projects made improvements of their business processes by the help of new software tools selected to comply with legal and business demands. They use IT as a strategic tool to obtain competitive advantage on the market and to reengineer the processes towards new Internet economy and quality demands. The company is required to manage vast amounts of structured as well as unstructured data. For these reasons, they implement projects for emerging and appropriate software tools which have to deal with big data concepts accepted in the company.

Keywords: big data, unstructured data, SAP ERP, documentum

Procedia PDF Downloads 269
1963 How Western Donors Allocate Official Development Assistance: New Evidence From a Natural Language Processing Approach

Authors: Daniel Benson, Yundan Gong, Hannah Kirk

Abstract:

Advancement in national language processing techniques has led to increased data processing speeds, and reduced the need for cumbersome, manual data processing that is often required when processing data from multilateral organizations for specific purposes. As such, using named entity recognition (NER) modeling and the Organisation of Economically Developed Countries (OECD) Creditor Reporting System database, we present the first geotagged dataset of OECD donor Official Development Assistance (ODA) projects on a global, subnational basis. Our resulting data contains 52,086 ODA projects geocoded to subnational locations across 115 countries, worth a combined $87.9bn. This represents the first global, OECD donor ODA project database with geocoded projects. We use this new data to revisit old questions of how ‘well’ donors allocate ODA to the developing world. This understanding is imperative for policymakers seeking to improve ODA effectiveness.

Keywords: international aid, geocoding, subnational data, natural language processing, machine learning

Procedia PDF Downloads 76
1962 Investigating the Feasibility of Promoting Safety in Civil Projects by BIM System Using Fuzzy Logic

Authors: Mohammad Reza Zamanian

Abstract:

The construction industry has always been recognized as one of the most dangerous available industries, and the statistics of accidents and injuries resulting from it say that the safety category needs more attention and the arrival of up-to-date technologies in this field. Building information modeling (BIM) is one of the relatively new and applicable technologies in Iran, that the necessity of using it is increasingly evident. The main purposes of this research are to evaluate the feasibility of using this technology in the safety sector of construction projects and to evaluate the effectiveness and operationality of its various applications in this sector. These applications were collected and categorized after reviewing past studies and researches then a questionnaire based on Delphi method criteria was presented to 30 experts who were thoroughly familiar with modeling software and safety guidelines. After receiving and exporting the answers to SPSS software, the validity and reliability of the questionnaire were assessed to evaluate the measuring tools. Fuzzy logic is a good way to analyze data because of its flexibility in dealing with ambiguity and uncertainty issues, and the implementation of the Delphi method in the fuzzy environment overcomes the uncertainties in decision making. Therefore, this method was used for data analysis, and the results indicate the usefulness and effectiveness of BIM in projects and improvement of safety status at different stages of construction. Finally, the applications and the sections discussed were ranked in order of priority for efficiency and effectiveness. Safety planning is considered as the most influential part of the safety of BIM among the four sectors discussed, and planning for the installation of protective fences and barriers to prevent falls and site layout planning with a safety approach based on a 3D model are the most important applications of BIM among the 18 applications to improve the safety of construction projects.

Keywords: building information modeling, safety of construction projects, Delphi method, fuzzy logic

Procedia PDF Downloads 166
1961 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 528
1960 Local Gambling Attitudes, Corporate R&D Investment and Long-Term Financial Performance

Authors: Hong Fan, Lifang Gao, Feng Zhan

Abstract:

This paper examines the influence of local gambling attitudes on a firm's long-term financial performance. Firms located in gambling-prone regions may be more willing to take risks, thus spending more on innovative projects. However, firms in such regions may also be likely to choose projects impulsively and allocate resources inefficiently. By studying Chinese publicly listed firms from 2010 to 2017, we find that firms in more gambling-prone regions invest more in R&D. Both local gambling attitudes and firms’ R&D spending are positively associated with firms’ long-term financial performance. More importantly, our study reveals that the positive impact of R&D spending on firms’ long-term financial performance is weakened by gambling-friendly attitudes, probably because firms in gambling-prone regions are more likely to overinvest in risky projects. This effect is stronger for larger firms, state-owned enterprises (SOEs), firms with more government subsidies, and firms with weaker internal control.

Keywords: regional gambling attitudes, long-term financial performance, R&D, risk, local bias

Procedia PDF Downloads 113
1959 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 323
1958 Acoustic and Thermal Compliance from the Execution Theory

Authors: Saou Mohamed Amine

Abstract:

The construction industry has been identified as a user of substantial amount of materials and energy resources that has an enormous impact on environment. The energy efficient in refurbishment project is being considered as one of the approaches to achieve sustainability in construction industry. The increasing concern for environment has made building owners and designers to incorporate the energy efficiency features into their building projects. However, an overwhelming issue of existing non-energy efficient buildings which exceeds the number of new building could be ineffective if the buildings are not refurbished through the energy efficient measures. Thus, energy efficient in refurbishment project is being considered as one of the approaches to achieve sustainability that offers significant opportunities for reducing global energy consumption and greenhouse gas emissions. However, the quality of design team attributes and the characteristics of the refurbishment building projects have been argued to be the main factors that determine the energy efficiency performance of the building.

Keywords: construction industry, design team attributes, energy efficient performance, refurbishment projects characteristics

Procedia PDF Downloads 366
1957 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects

Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius

Abstract:

Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.

Keywords: delays, external factors, funding, general factors, Internal factors

Procedia PDF Downloads 143
1956 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 151
1955 A Meta-Analysis towards an Integrated Framework for Sustainable Urban Transportation within the Concept of Sustainable Cities

Authors: Hande Aladağ, Gökçe Aydın

Abstract:

The world’s population is increasing continuously and rapidly. Moreover, there are other problems such as the decline of natural energy resources, global warming, and environmental pollution. These facts have made sustainability an important and primary topic from future planning perspective. From this perspective, constituting sustainable cities and communities can be considered as one of the key issues in terms of sustainable development goals. The concept of sustainable cities can be evaluated under three headings such as green/sustainable buildings, self – contained cities and sustainable transportation. This study only concentrates on how to form and support a sustainable urban transportation system to contribute to the sustainable urbanization. Urban transportation system inevitably requires many engineering projects with various sizes. Engineering projects generally have four phases, in the following order: Planning, design, construction, operation. The order is valid but there are feedbacks from every phase to every phase in its upstream. In this regard, engineering projects are iterative processes. Sustainability is an integrated and comprehensive concept thus it should be among the primary concerns in every phase of transportation projects. In the study, a meta-analysis will be performed on the related studies in the literature. It is targeted and planned that, as a result of the findings of this meta-analysis, a framework for the list of principles and actions for sustainable transport will be formed. The meta-analysis will be performed to point out and clarify sustainability approaches in every phase of the related engineering projects, with also paying attention to the iterative nature of the process and relative contribution of the action for the outcomes of the sustainable transportation system. However, the analysis will not be limited to the engineering projects, non-engineering solutions will also be included in the meta-analysis. The most important contribution of this study is a determination of the outcomes of a sustainable urban transportation system in terms of energy efficiency, resource preservation and related social, environmental and economic factors. The study is also important because it will give light to the engineering and management approaches to achieve these outcomes.

Keywords: meta-analysis, sustainability, sustainable cities, sustainable urban transportation, urban transportation

Procedia PDF Downloads 330
1954 Fighting the Crisis with 4.0 Competences: Higher Education Projects in the Times of Pandemic

Authors: Jadwiga Fila, Mateusz Jezowski, Pawel Poszytek

Abstract:

The outbreak of the global COVID-19 pandemic started the times of crisis full of uncertainty, especially in the field of transnational cooperation projects based on the international mobility of their participants. This is notably the case of Erasmus+ Program for higher education, which is the flagship European initiative boosting cooperation between educational institutions, businesses, and other actors, enabling students and staff mobility, as well as strategic partnerships between different parties. The aim of this abstract is to study whether competences 4.0 are able to empower Erasmus+ project leaders in sustaining their international cooperation in times of global crisis, widespread online learning, and common project disruption or cancellation. The concept of competences 4.0 emerged from the notion of the industry 4.0, and it relates to skills that are fundamental for the current labor market. For the aim of the study presented in this abstract, four main 4.0 competences were distinguished: digital, managerial, social, and cognitive competence. The hypothesis for the study stipulated that the above-mentioned highly-developed competences may act as a protective shield against the pandemic challenges in terms of projects’ sustainability and continuation. The objective of the research was to assess to what extent individual competences are useful in managing projects in times of crisis. For this purpose, the study was conducted, involving, among others, 141 Polish higher education project leaders who were running their cooperation projects during the peak of the COVID-19 pandemic (Mar-Nov 2020). The research explored the self-perception of the above-mentioned competences among Erasmus+ project leaders and the contextual data regarding the sustainability of the projects. The quantitative character of data permitted validation of scales (Cronbach’s Alfa measure), and the use of factor analysis made it possible to create a distinctive variable for each competence and its dimensions. Finally, logistic regression was used to examine the association of competences and other factors on project status. The study shows that the project leaders’ competence profile attributed the highest score to digital competence (4.36 on the 1-5 scale). Slightly lower values were obtained for cognitive competence (3.96) and managerial competence (3.82). The lowest score was accorded to one specific dimension of social competence: adaptability and ability to manage stress (1.74), which proves that the pandemic was a real challenge which had to be faced by project coordinators. For higher education projects, 10% were suspended or prolonged because of the COVID-19 pandemic, whereas 90% were undisrupted (continued or already successfully finished). The quantitative analysis showed a positive relationship between the leaders’ levels of competences and the projects status. In the case of all competences, the scores were higher for project leaders who finished projects successfully than for leaders who suspended or prolonged their projects. The research demonstrated that, in the demanding times of the COVID-19 pandemic, competences 4.0, to a certain extent, do play a significant role in the successful management of Erasmus+ projects. The implementation and sustainability of international educational projects, despite mobility and sanitary obstacles, depended, among other factors, on the level of leaders’ competences.

Keywords: Competences 4.0, COVID-19 pandemic, Erasmus+ Program, international education, project sustainability

Procedia PDF Downloads 90
1953 The Exploration on the Mode of Renovation and Reconstruction of Old Factory Buildings for Cultural and Creative Industrial Parks

Authors: Yu Pan, Jing Wu, Lingwan Shen

Abstract:

Since the reform and opening, China's cities have developed rapidly, and the industrial structure has been constantly adjusted and optimized. A large number of industrial plants have lost their production functions and become idle buildings. The renovation projects for the old factory buildings are important parts of the urban renewal, and most of them are the cultural and creative industrial park projects. In this paper, a statistical analysis of renovation projects of the representative cultural and creative industrial parks in recent years was conducted. According to the user's spatial experience satisfaction survey, the physical and spatial factors affecting the space regeneration of the old factory were concluded. Thus the relationship between space regeneration and material, structure, internal and external space design has been derived. Finally, we summarized the general spatial processing model in which the contradiction between ‘new’ and ‘old’ can be grafted and transformed.

Keywords: renovation of factory buildings, urban renewal, the cultural and creative industrial park, space regeneration, reconstruction mode

Procedia PDF Downloads 146
1952 Planning Urban Sprawl in Mining Areas in Africa: How to Ensure Coherent Development

Authors: Pascal Rey, Anaïs Weber

Abstract:

Many mining projects are being developed in Africa the last decades. Due to the economic opportunities they offer, these projects result in a massive and rapid influx of migrants to the surrounding area. In areas where central government representation is low and local administration lack financial resources, urban development is often anarchical, beyond all public control. It leads to socio-spatial segregation, insecurity and the risk of social conflicts rising. Aware that their economic development is very correlated with local situation, mining companies get more and more involved in regional planning in setting up tools and Strategic Directions document. One of the commonly used tools in this regard is the “Influx Management Plan”. It consists in looking at the region’s absorption capacities in order to ensure its coherent development and by developing several urban centers than one macrocephalic city. It includes many other measures such as urban governance support, skills transfer, creation of strategic guidelines, financial support (local taxes, mining taxes, development funds etc.) local development projects. Through various examples of mining projects in Guinea, A country that is host to many large mining projects, we will look at the implications of regional and urban planning of which mining companies are key playor as well as public authorities. While their investment capacity offers advantages and accelerates development, their actions raise questions of the unilaterality of interests and local governance. By interfering in public affairs are mining companies not increasing the risk of central and local government shirking their responsibilities in terms of regional development, or even calling their legitimacy into question? Is such public-private collaboration really sustainable for the region as a whole and for all stakeholders?

Keywords: Africa, guinea, mine, urban planning

Procedia PDF Downloads 497
1951 Priority Sites for Deforested and Degraded Mountain Restoration Projects in North Korea

Authors: Koo Ja-Choon, Seok Hyun-Deok, Park So-Hee

Abstract:

Even though developed countries have supported aid projects for restoring degraded and deforested mountain, recent North Korean authorities announced that North Korean forest is still very serious. Last 12 years, more than 16 thousand ha of forest were destroyed. Most of previous researches concluded that food and fuel problems should be solved for preventing people from deforesting and degrading forest in North Korea. It means that mountain restoration projects such as A/R(afforestation/reforestation) and REDD(Reducing Emissions from Deforestation and Forest Degradation) project should be implemented with the agroforestry and the forest tending project. Because agroforestry and the forest tending can provide people in the project area with foods and fuels, respectively. Especially, Agroforestry has been operated well with the support of Swiss agency of Development and cooperation since 2003. This paper aims to find the priority sites for mountain restoration project where all types of projects including agroforesty can be implemented simultaneously. We tried to find the primary counties where the areas of these activities were distributed widely and evenly. Recent spatial data of 186 counties representing altitude, gradient and crown density were collected from World Forest Watch. These 3 attributes were used to determine the type of activities; A/R, REDD, Agroforestry and forest tending project. Finally, we calculated the size of 4 activities in 186 counties by using GIS technique. Result shows that Chongjin in Hamgyeongbuk-do, Hoeryong in Hamgyeongbuk-do and Tongchang in Pyeonganbuk-do are on the highest priority of counties. Most of feasible counties whose value of richness and uniformity were greater than the average were located near the eastern coast of North Korea. South Korean government has not supported any aid projects in North Korea since 2010. Recently, South Korea is trying to continue the aid projects for North Korea. Forest project which is not affected by the political situation between North- and South- Korea can be considered as a priority activities. This result can be used when South Korean government determine the priority sites for North Korean mountain restoration project in near future.

Keywords: agroforestry, forest restoration project, GIS, North Korea, priority

Procedia PDF Downloads 318
1950 The Sectoral Differences in the Use of Construction Incentive

Authors: Qiuwen Ma, Sai On Cheung

Abstract:

Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.

Keywords: construction incentive, public/private projects, semi-structured interview, hong kong

Procedia PDF Downloads 101
1949 RASPE: Risk Advisory Smart System for Pipeline Projects in Egypt

Authors: Nael Y. Zabel, Maged E. Georgy, Moheeb E. Ibrahim

Abstract:

A knowledge-based expert system with the acronym RASPE is developed as an application tool to help decision makers in construction companies make informed decisions about managing risks in pipeline construction projects. Choosing to use expert systems from all available artificial intelligence techniques is due to the fact that an expert system is more suited to representing a domain’s knowledge and the reasoning behind domain-specific decisions. The knowledge-based expert system can capture the knowledge in the form of conditional rules which represent various project scenarios and potential risk mitigation/response actions. The built knowledge in RASPE is utilized through the underlying inference engine that allows the firing of rules relevant to a project scenario into consideration. This paper provides an overview of the knowledge acquisition process and goes about describing the knowledge structure which is divided up into four major modules. The paper shows one module in full detail for illustration purposes and concludes with insightful remarks.

Keywords: expert system, knowledge management, pipeline projects, risk mismanagement

Procedia PDF Downloads 309
1948 Clarification of the Essential of Life Cycle Cost upon Decision-Making Process: An Empirical Study in Building Projects

Authors: Ayedh Alqahtani, Andrew Whyte

Abstract:

Life Cycle Cost (LCC) is one of the goals and key pillars of the construction management science because it comprises many of the functions and processes necessary, which assist organisations and agencies to achieve their goals. It has therefore become important to design and control assets during their whole life cycle, from the design and planning phase through to disposal phase. LCCA is aimed to improve the decision making system in the ownership of assets by taking into account all the cost elements including to the asset throughout its life. Current application of LCC approach is impractical during misunderstanding of the advantages of LCC. This main objective of this research is to show a different relationship between capital cost and long-term running costs. One hundred and thirty eight actual building projects in United Kingdom (UK) were used in order to achieve and measure the above-mentioned objective of the study. The result shown that LCC is one of the most significant tools should be considered on the decision making process.

Keywords: building projects, capital cost, life cycle cost, maintenance costs, operation costs

Procedia PDF Downloads 545
1947 Cutting Propagation Studies in Pennisetum divisum and Tamarix aucheriana as Native Plant Species of Kuwait

Authors: L. Almulla

Abstract:

Native plants are better adapted to the local environment providing a more natural effect on landscape projects; their use will both conserve natural resources and produce sustainable greenery. Continuation of evaluation of additional native plants is essential to increase diversity of plant resources for greenery projects. Therefore, in this project an effort was made to study the mass multiplication of further native plants for greenery applications. Standardization of vegetative propagation methods is essential for conservation and sustainable utilization of native plants in restoration projects. Moreover, these simple propagation methods can be readily adapted by the local nursery sector in Kuwait. In the present study, various treatments were used to mass multiply selected plants using vegetative parts to secure maximum rooting and initial growth. Soft or semi-hardwood cuttings of selected native plants were collected from mother plants and subjected to different treatments. Pennisetum divisum can be vegetatively propagated by cuttings/off-shoots. However, Tamarix aucheriana showed maximum number of rooted cuttings and stronger vigor seedlings with the lowest growth hormone concentration. Standardizing the propagation techniques for the native plant species will add to the rehabilitation and landscape revegetation projects in Kuwait.

Keywords: Kuwait desert, landscape, rooting percentage, vegetative propagation

Procedia PDF Downloads 121
1946 Challenges and Proposed Solutions Toward Successful Dealing with E-Waste in Kuwait

Authors: Salem Alajmi, Bader Altaweel

Abstract:

Kuwait, like many parts of the world, has started facing the dangerous growth of electrical and electronic wastes. This growth has been noted last two decades, coming along with the development of mobile phones, computers, TVs, as well as other electronic devices and electrical equipment. Kuwait is already among the highest global producers of electronic waste (E-waste) in kg per capita. Furthermore, Kuwait is among the global countries that set high-level future targets in renewable energy projects. Accumulation of this electronic waste, as well as accelerated renewable energy projects, will lead to the increase of future threats to the country. In this research, factors that lead to the increase the e-waste in Kuwait are presented. Also, the current situations of dealing with e-waste in the country as well as current challenges are examined. The impact of renewable energy projects on future E-wastes accumulation is considered. Moreover, this research proposes the best strategies and practices toward successfully dealing with the waste of electronic devices and renewable energy technologies.

Keywords: Kuwait, e-waste, extended producer responsibility, environment, recycle, recovery

Procedia PDF Downloads 180