Search results for: public/private projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8071

Search results for: public/private projects

8071 Non-Cooperative Game Theory Approach for Ensuring Community Satisfaction on Public-Private Partnership Projects

Authors: Jason Salim, Zhouyang Lu

Abstract:

Private sector involvement in Public Private Partnership (PPP) projects may raise public suspicion, as PPP is often mistaken as merely a partnership between private and government agencies without consideration for greater “public” (community). This public marginalization is crucial to be dealt with because undermining opinion of majority may cause problems such as protests and/ or low demand. Game theory approach applied in this paper shows that probability of public acceptance towards a project is affected by overall public’s perception on Private sectors’ possible profit accumulation from the project. On the contrary, goodwill of the government and private coalition alone is not enough to minimize the probability of public opposition towards a PPP project. Additionally, the threat of loss or damage raised from public opposition does not affect the profit-maximization behavior of Private sectors.

Keywords: community satisfaction, game theory, non-cooperative, PPP, public policy

Procedia PDF Downloads 663
8070 An Exploratory Study on Challenges of Public Private Partnership Projects in Oman

Authors: Omar Amoudi, Mariya Khalid

Abstract:

The limitation of the public funds for the infrastructure projects and with the deterioration of international oil prices and the negative consequences on the economies of oil producing and exporting countries, Oman has encouraged the partnership between the public and private sectors. As the private sector has a role in planning, financing, designing, operating and the maintenance of the public services. There is no doubt that, the adoption of Public Private Partnership (PPP) strategy faces many challenges which might affect the project seriously if it is not overcome in earlier time. These challenges depend on the level of understanding of the strategy, the roles and regulations and the availability of resources as well. This research aims at identifying the challenges facing the PPP infrastructure projects in Oman based on the similar previous studies supported by questionnaire survey and semi structured interviews. It also seeks to discuss the rationale for adoption in Oman and uncover the current status of PPP strategy. The identified challenges were ranked according to the importance index of each challenge. After analysis of data, it has observed that, the main challenges facing PPPs projects in Oman are high participation cost, high projects cost and regulation changes. The PPP strategy has to be adopted well and with a high level of experience in order to ensure a successful implementation of PPP projects in Oman.

Keywords: public private partnership (PPP), challenges, infrastructure, Oman

Procedia PDF Downloads 260
8069 The Sectoral Differences in the Use of Construction Incentive

Authors: Qiuwen Ma, Sai On Cheung

Abstract:

Incentive contracting has been developed to push the agent team for extra effort. Generally, there are three types of incentive arrangement, namely incentive/penalty for super performance/underperformance, risk/reward sharing and future business opportunities. It is found that there are significant differences in the use of incentive arrangement in private and public projects. In Hong Kong, very few public projects have used future business as incentivizer whereas private developers often signal repeated business coupled with heavy penalty. This study was conducted to identify various attributes affecting the use of I/D in both private and public engineering sectors of Hong Kong. The diverging preferences were unveiled with reference to a literature review and semi-structured interviews with industry experts. The findings reveal the public/private sectors would consider the implementation issues regarding the various performance targets. The most deterministic factor for the public sector is about accountability. The private sector is in general skeptical about the need to provide extra for the contractors for what they have already contracted to perform.

Keywords: construction incentive, public/private projects, semi-structured interview, hong kong

Procedia PDF Downloads 58
8068 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants

Authors: Samuel Capintero, Ole H. Petersen

Abstract:

This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.

Keywords: wastewater, treatment plants, PPP, construction

Procedia PDF Downloads 611
8067 Public-Private Partnership Transportation Projects: An Exploratory Study in the US

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.

Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation

Procedia PDF Downloads 139
8066 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks

Authors: Julinda Keçi

Abstract:

In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public-private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and user-oriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: Construction, Design, Economic, Legal, Market, Natural, Operation, Political, Project finance, Project selection and Relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.

Keywords: construction, infrastructure, public private partnerships, risks

Procedia PDF Downloads 401
8065 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 249
8064 Factors Leading to the Renegotiation of Private Finance Initiative Design-Build-Finance-Operate Road Projects in the UK

Authors: Ajibola Fatokun, Akintola Akintoye, Champika Liyanage

Abstract:

The issue of renegotiation has not received public sector applause because of the outcomes recorded over years. Numerous reasons have been adduced by the stakeholders for the renegotiation of PPP road projects. In some instances, the reason can also be the factor leading to the renegotiation of PFI (DBFO) road projects. Thus, a number of factors inform the decision of the primary stakeholders to renegotiate the contract. This paper, therefore, evaluates and assesses the factors leading to the renegotiation of PFI (DBFO) road projects in the UK. Qualitative interviews involving both public and private stakeholders were extensively adopted on five PFI (DBFO) case study road projects in order to address the aim of this study. This serves to complement the findings of the literature with respect to the factors leading to the renegotiation of PPP road projects. The findings of this research reveal the respective factors leading to the renegotiations of PFI (DBFO) road projects in the UK. However, the prominent factors are a change in scope of the works necessitating works removal and an addition of assets, change in standards and obsolete specification occasioned by the long duration of the PFI road project concession among others.

Keywords: renegotiation, factors, Private Finance Initiative (PFI), design-build-finance-operate (DBFO) road projects

Procedia PDF Downloads 312
8063 Realizing the National Disaster Management Policy of Sri Lanka through Public Private Partnerships

Authors: K. W. A. M. Kokila, Matsui Kenichi

Abstract:

Sri Lanka’s disaster management policy aims to protect lives and developments in disaster affected areas by effectively using resources for disaster risk reduction, emergency management, and community awareness. However, funding for these action programs has posed a serious challenge to the country’s economy. This paper examines the extent to which private-public partnerships (PPPs) can facilitate and expedite disaster management works. In particular, it discusses the results of the questionnaire survey among policymakers, government administrators, NGOs, and private businesses. This questionnaire was conducted in 2017. All respondents were selected based on their experience in PPP projects in the past. The survey focused on clarifying the effectiveness of past PPP projects as well as their efficiency and transparency. The respondents also provided their own opinions and suggestions to improve the future PPP projects in Sri Lanka. The questionnaire was distributed to fifteen persons. The results show that almost all respondents think that PPP projects are beneficial and important for future disaster risk management in Sri Lanka. The respondents, however, showed some reservation about effectiveness and transparency of the PPP process. This paper also discusses the results on the respondents’ perceptions about their capacity regarding human resources and management. This paper, overall, sheds light on technological, financial and human resource management practices in developed countries as well as policy and legislation provisions regarding PPP projects.

Keywords: disaster management, policy, private public partnership, projects

Procedia PDF Downloads 133
8062 A Study of the Costs and Benefits of Smart City Projects Including the Scenario of Public-Private Partnerships

Authors: Patrick T. I. Lam, Wenjing Yang

Abstract:

A smart city project embraces benefits and costs which can be classified under direct and indirect categories. Externalities come into the picture, but they are often difficult to quantify. Despite this barrier, policy makers need to carry out cost-benefit analysis to justify the huge investments needed to make a city smart. The recent trend is towards the engagement of the private sector to utilize their resources and expertise, especially in the Information and Communication Technology (ICT) areas, where innovations blossom. This study focuses on the identification of costs (on a life cycle basis) and benefits associated with smart city project developments based on a comprehensive literature review and case studies, where public-private partnerships would warrant consideration, the related costs and benefits are highlighted. The findings will be useful for policy makers of cities.

Keywords: smart city projects, costs and benefits, identification, public-private partnerships

Procedia PDF Downloads 303
8061 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 152
8060 PPPs as Panacea to Delivery of Public Sector Construction Project in Zimbabwe

Authors: Ringisai Abigail Mawondo-Dhliwayo, Kahilu Kajimo-Shakantu

Abstract:

Due to financial challenges which governments in general face, it is becoming more difficult for many to continually use their limited resources to undertake infrastructural development. Governments increasingly now need other delivery approaches, in particular, the Public-Private Partnerships which make it possible for the public sector to achieve infrastructural development without incurring any/minimum cost. The literature reviewed outlined that benefits of PPPs include timely delivery of quality projects with cost limits. The methodology utilized for the empirical study comprised six interviews and sixty questionnaires which were undertaken and administered by construction consultants and government officials involved in PPPs projects. The results obtained showed that PPPs are not widely used in Zimbabwe although the need for their use exists. The study also found some challenges which prevent or derail the rate at which PPPs are utilized, of which the primary one was a political influence. It is concluded that despite limitations, PPPs remain the most effective and viable option for the delivery of government projects. The study recommends that policy and framework for the implementation of PPPs be developed. More useful information could have been obtained if final users of PPPs projects were included in the sample for data collection.

Keywords: construction projects, procurement, public private partnerships, public sector

Procedia PDF Downloads 225
8059 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)

Procedia PDF Downloads 516
8058 Evaluation of Critical Success Factors in Public-Private Partnership Projects Based on Structural Equation Model

Authors: Medya Fathi

Abstract:

Today, success in the construction industry is not merely about project completion in a timely manner within an established budget and meeting required quality considerations. Management practices and partnerships need to be emphasized as well. In this regard, critical success factors (CSFs) cover necessary considerations for a successful project beyond the traditional success definition, which vary depending on project outcomes, delivery methods, project types, and partnering processes. Despite the extensive research on CSFs, there is a paucity of studies that examine CSFs for public-private partnership (PPP); the delivery method, which has gained increasing attention from researchers and practitioners over the last decade with a slow but growing adoption in the transportation infrastructure, particularly, highway industry. To fill this knowledge gap, data are collected through questionnaire surveys among private and public parties involved in PPP transportation projects in the United States. Then, the collected data are analyzed to explore the causality relationships between CSFs and PPP project success using structural equation model and provide a list of factors with the greatest influence. This study advocates adopting a critical success factor approach to enhance PPP success in the U.S. transportation industry and identify elements essential for public and private organizations to achieve this success.

Keywords: project success, critical success factors, public-private partnership, transportation

Procedia PDF Downloads 57
8057 Does Citizens’ Involvement Always Improve Outcomes: Procedures, Incentives and Comparative Advantages of Public and Private Law Enforcement

Authors: Avdasheva Svetlanaa, Kryuchkova Polinab

Abstract:

Comparative social efficiency of private and public enforcement of law is debated. This question is not of academic interest only, it is also important for the development of the legal system and regulations. Generally, involvement of ‘common citizens’ in public law enforcement is considered to be beneficial, while involvement of interest groups representatives is not. Institutional economics as well as law and economics consider the difference between public and private enforcement to be rather mechanical. Actions of bureaucrats in government agencies are assumed to be driven by the incentives linked to social welfare (or other indicator of public interest) and their own benefits. In contrast, actions of participants in private enforcement are driven by their private benefits. However administrative law enforcement may be designed in such a way that it would become driven mainly by individual incentives of alleged victims. We refer to this system as reactive public enforcement. Citizens may prefer using reactive public enforcement even if private enforcement is available. However replacement of public enforcement by reactive version of public enforcement negatively affects deterrence and reduces social welfare. We illustrate the problem of private vs pure public and private vs reactive public enforcement models with the examples of three legislation subsystems in Russia – labor law, consumer protection law and competition law. While development of private enforcement instead of public (especially in reactive public model) is desirable, replacement of both public and private enforcement by reactive model is definitely not.

Keywords: public enforcement, private complaints, legal errors, competition protection, labor law, competition law, russia

Procedia PDF Downloads 451
8056 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 534
8055 Public and Private Spaces Producing Social Connectedness in Traditional Environment: A Study on Old Medina District of Casablanca

Authors: Asmaa Sokrat, Aykut Karaman

Abstract:

Public and private spaces are major components of the morphology of the city. This research aims to study the interactions between public and private domains in terms of urban space in Casablanca. The research focuses on a general vision of a socio-spatial issue. It plans to identify the public, private, and transition (semi-public, semi-private) spaces as the constituent of the urban space. Moreover, the study investigates the link between public and private spaces with the social dimensions. Additionally, the research argues that the public space is a place of social interaction; as a reflection, this interaction is the intersection between urban space and social connectedness. Besides, social interaction can be the key to distinguishing between the public and private spheres. The methodological approach of the research is based on the literature review and field study. The article is targeting a case study on the old Medina of Casablanca, from daily use of the public and private spaces, the urban tissue, and the urban space types. In conclusion, the research exhibits that a public space could influence the privacy of the residents of a local urban area; thus, this privacy is inverted on the social interaction. This social interaction is the link between the urban space and social connectedness. Hence, this equation affects the typology of the private space.

Keywords: public sphere, private sphere, social connectedness, old Medina of Casablanca

Procedia PDF Downloads 102
8054 Challenges and Opportunities for Implementing Integrated Project Delivery Method in Public Sector Construction

Authors: Ahsan Ahmed, Ming Lu, Syed Zaidi, Farhan Khan

Abstract:

The Integrated Project Delivery (IPD) method has been proposed as the solution to tackle complexity and fragmentation in the real world while addressing the construction industry’s growing needs for productivity and sustainability. Although the private sector has taken the initiative in implementing IPD and taken advantage of new technology such as building information modeling (BIM) in delivering projects, IPD remains less known and rarely used in public sector construction. The focus of this paper is set on the use of IPD in projects in public sector, which is potentially complemented by the use of analytical functionalities for workface planning and construction oriented design enabled by recent research advances in BIM. Experiences and lessons learned from implementing IPD in the private sector and in BIM-based construction automation research would play a vital role in reducing barriers and eliminating issues in connection with project delivery in the public sector. The paper elaborates issues challenges, contractual relationships and the interactions throughout the planning, design and construction phases in the context of implementing IPD on construction projects in the public sector. A slab construction case is used as a ‘sandbox’ model to elaborate (1) the ideal way of communication, integration, and collaboration among all the parties involved in project delivery in planning and (2) the execution of projects by using IDP principles and optimization, simulation analyses.

Keywords: integrated project delivery, IPD, building information modeling, BIM

Procedia PDF Downloads 151
8053 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.

Keywords: arriers, feasibility studies, public construction, South Africa.

Procedia PDF Downloads 58
8052 The Organizational Structure of the Special Purpose Vehicle in Public-Private Partnership Projects

Authors: Samuel Capintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. During the last decade, the Spanish companies have dominated the international market of PPP projects in Latin America, Western Europe and North America, particularly in the transportation sector. Arguably, one of the most influential factors has been the organizational structure of the concessionaire implemented by the Spanish consortiums. The model followed by most Spanish groups has been a bundled model, where the concessionaire integrates the functions of concessionaire, construction and operator companies. This paper examines this model and explores how it has provided the Spanish companies with a comparative advantage in the international PPP market.

Keywords: PPP, project management, concessionaire, concession, infrastructure, construction

Procedia PDF Downloads 349
8051 Trends of Public-Private Partnership Infrastructure in Thailand

Authors: Wasaporn Techapeeraparnich

Abstract:

Bringing private investor involving in providing public infrastructure have been increasingly used worldwide, and there is no exception for developing countries like Thailand. Recently, there is a huge investment opportunity for public-private partnership (PPP) in Thailand, especially in the transportation sector. This paper analyses the development of the PPP since the early beginning of PPP in different service sectors. It also summarizes the development of PPP and its application in terms of usage, opportunities and trends particularly in the transport sector. The results are aimed to draw some lessons learned for future development.

Keywords: case study, public-private partnership, transportation, Thailand

Procedia PDF Downloads 402
8050 Legal Issues of Implementing Public Projects through Civic Crowdfunding

Authors: Mahdieh Dehghan Nayeri, Hani Arbabi, Seid Pooyan Ghafoori

Abstract:

Civic crowdfunding- crowdfunding public projects- which goes beyond people management- as a significant part of public projects stakeholders- and requires the active engagement of the public in both the financing and decision-making processes of public projects, is expanding. However, in most countries of the world, no specific legal framework has been approved for governing and managing the implementation of projects through this method. Through a systematic literature review, following the Preferred Reporting Items for Systematic Reviews (PRISMA), this article has studied and discussed the legal issues of civic crowdfunded projects in the countries leading the use of this method, in four themes; one related to the legal environment and three related to three leading players in civic crowdfunded projects include the investor, the platform, and the investee. The review showed that despite the increasing attention to people's engagement in public projects -financial and non-financial- not much scientific research has been done to formulate fully structured legal structures. Finally, neglected areas in research have been discussed as a guide for future research.

Keywords: civic crowdfunding, equity crowdfunding, public projects, legal issues, crowdsourcing

Procedia PDF Downloads 191
8049 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 215
8048 New Public Management at Public Administration in Bangladesh: An Exploratory Study

Authors: Biback Das

Abstract:

New Public Management, a phenomenal tool, which is used to enforcing in public administration in different country’s to enhance the capacities. Since the 1980s, New Public Management (NPM) is primarily focusing to modernize the public sector. From the initial period, many developed countries such as UK, New Zealand, Australia, and the USA are applied in their administration to modernize. Almost 1990s, it has been applied in many developing countries. This study can describe the real situations of NPM based administration. Bangladesh Government has taken many projects to reform the public sector under NPM. Even many Development Agencies like UN, UNDP, World Bank, Asian Development Bank and so on, along with many developed countries also invested and prescribed to take NPM based reform that can to restructure the public sector so that it can maximize the efforts to provide the better service. This study examines using many factors that effects work on Public Administration in Bangladesh and also assessing its endeavor to adopt in it. Although Government has taken such initiatives to implement NPM originated reform, it’s not effectively been implemented to bring positive change about as per NPM objectives. This study mainly examines some initiatives in Bangladesh that have the influence of NPM as well as some drawbacks that can’t help the satisfaction of these initiatives. This article help to identify the efforts of many development agencies providing a fund to enhance the NPM based projects with their specific conditions that are prescribed by them helping to get fund. Therefore, to establish effective public management or to follow NPM model, Bangladesh need having an institutional framework, sound rule of law, proper structure, effective civil service system, appropriate checks, and balances to restructure the public sector help along with donor agencies ad implement in it. Bangladesh Government has applied its recent days to enhance the capabilities in its Public Administration. Moreover, this study mainly identifies how the designing strategies, program formulating, its implementation in various sector such as education, health sector etc. and how to reduce the backdrop the during problem by smooth functioning. This paper is also assessing the influence of many projects like PPP (Public-Private and Partnership) to work along with private organizations for smooth service delivery. Accordingly, this paper briefly reviews how it applies in a global context following the taken many initiatives and the consequences of Bangladesh context.

Keywords: new public management, capacity building, conditionalities, service delivery, public-private-partnership

Procedia PDF Downloads 109
8047 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have emerged all around the world as a response to infrastructure deficits and the need to refurbish existing infrastructure. The motivations of governments for embarking on PPPs for the delivery of public infrastructure are manifold, and include on-time and on-budget delivery as well as access to private project management expertise. The PPP formula has been used by some State governments in United States and Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transport sector. On the one hand, this paper examines the various ways used in these two countries in the implementation of PPP arrangements, with a particular focus on risk transfer. The examination of risk transfer in this paper is carried out with reference to the following key PPP risk categories: construction risk, revenue risk, operating risk and availability risk. The main difference between both countries is that in Canada the demand risk remains usually within the public sector whereas in the United States this risk is usually transferred to the private concessionaire. The aim is to explore which lessons can be learnt from both models than might be useful for other countries. On the other hand, the paper also analyzes why the Spanish companies have been so successful in winning PPP contracts in North America during the past decade. Contrary to the Latin American PPP market, the Spanish companies do not have any cultural advantage in the case of the United States and Canada. Arguably, some relevant reasons for the success of the Spanish groups are their extensive experience in PPP projects (that dates back to the late 1960s in some cases), their high technical level (that allows them to be aggressive in their bids), and their good position and track-record in the financial markets. The article’s empirical base consists of data provided by official sources of both countries as well as information collected through face-to-face interviews with public and private representatives of the stakeholders participating in some of the PPP schemes. Interviewees include private project managers of the concessionaires, representatives of banks involved as financiers in the projects, and experts in the PPP industry with close knowledge of the North American market. Unstructured in-depth interviews have been adopted as a means of investigation for this study because of its powers to achieve honest and robust responses and to ensure realism in the collection of an overall impression of stakeholders’ perspectives.

Keywords: PPP, concession, infrastructure, construction

Procedia PDF Downloads 270
8046 A Qualitative Study for Establishing Critical Success Factors for PPPs in Research Reactors

Authors: Khalid Almarri

Abstract:

The UAE is currently developing a peaceful nuclear energy program as part of its low Carbon energy strategy to meet future energy demands. Research of nuclear energy technologies is required to support nuclear energy generation projects and maximize their performance. Research of this type will require building an operating a research reactor (RR), a costly undertaking in most circumstances. Collaboration between government and private parties through public, private partnerships (PPP) can maximize the benefits expected from the adoption of an RR project. The aim of this research is to establish the critical success factors (CSF) for developing an RR project for newcomer countries, with the UAE taken as a case study, through the utilization of public, private partnerships (PPP). The results of this study were arrived at through the use of semi-structured interviews conducted with ten experts in the field of research reactors, using grounded theory method. Underutilization was identified as the main stumbling block that impairs the success of research reactors.

Keywords: public private partnerships, research reactors, grounded theory, critical success factors

Procedia PDF Downloads 250
8045 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 714
8044 Differential Item Functioning in the Vocabulary Test of Grade 7 Students in Public and Private Schools

Authors: Dave Kenneth Tayao Cayado, Carlo P. Magno

Abstract:

The most common source of bias detected are those of gender and socioeconomic status. The present study investigated the Differential Item Functioning (DIF) or item bias between public and private school students in a vocabulary test. Studies on DIF were expanded by using the type of school as a source of bias. There were 200 participants in this study. 100 came from a public secondary school and 100 came from a private secondary school. The vocabulary skills of students were measured using a standardized vocabulary test for grade 7 students. Using DIF, specifically the Rasch-Welch approach, it was found that out of 24 items, 12 were biased for a specific group. The vocabulary skills on the use of slang, idiomatic expression, personification, collocations, and partitive relations were biased for private schools while the use of slang and homonymous words were biased for public school students. The analysis debunked the trend that private school students are outperforming public school students in terms of academic achievement. It was revealed that there are some competencies that private school students are having difficulty and vice versa.

Keywords: differential item functioning, item bias, public school students, private school students, vocabulary

Procedia PDF Downloads 134
8043 Effects of the Macro-Scale Investments/Projects to Planning System in Izmir

Authors: Neslihan Karatas, Sibel Ecemis Kilic

Abstract:

This paper aims to examine macro-scale plans and projects/investments which have been prepared for İzmir since The Republican Period. Macro projects that were proposed by central government, local government, industry and urban actors such as the chamber of commerce will be discussed and these projects and its reflections to the city's macro scale planning decisions will be evaluated based on existing development. Effects of macro plans, the related private and public investments, the developments of unplanned/specific projects to the current city form will be discussed. The factors and plans which determine urban form and the problems caused by unanticipated/uncontrolled developments will be evaluated. The proposals will be developed about more efficient planning process.

Keywords: Izmir, macro projects, macro investments, planning

Procedia PDF Downloads 563
8042 Functions of Public Policy in Private International Law

Authors: Fedorova Elena

Abstract:

In this article, we draw a distinction between two important functions of public policy in private international law. The first function is widely recognized and relates to the prevention of application of foreign laws and enforcement of foreign court judgments whenever their effects are incompatible with the domestic legal system of the forum. This effectively protects sovereign rights of the forum state as it allows to resist against the undesirable effects of foreign law-making and law-enforcement policies. The second function is less obvious, but not less important. As the internal private legal relationships, international private relationships are usually governed by rules of public policy, to which the parties can not derogate by mutual agreement. Thefore, for international private law relations public policy has a different function than previously mentioned: in this case, the public policy acts as a defense against unacceptable effects of the party autonomy. Thus, this second function of public policy consists in the limitation of the party autonomy wich effects would be unacceptable for the local legal system. In the frame of this second function the author will analyse two types of public policy which can limit the party autonomy: « substantial » public policy (which regulates the substance of international legal relationship) and « conflictual » public policy (which regulates the party autonomy to choose the law applicable for the substance of relationship). The author provides an analysis of these functions of the public policy in the field of international contract law because of the important role of the principle of party autonomy for international contract relations.

Keywords: public policy, general theory of private international law, substantial public policy, conflictual public policy

Procedia PDF Downloads 545