3 Factors Responsible for Delays in the Execution of Adequately Funded Construction Projects

Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius

Abstract:

Several research report on the factors responsible for the delays in the completion of construction projects has identified the issue of funding as a critical factor; insufficient funding, low cash-flow or lack of funds. Indeed, adequate funding plays pivotal role in the effective execution of construction projects. In the last twenty years (or so), there has been increase in the funds available for infrastructure development in tertiary institution in Nigeria, especially, through the Tertiary Education Trust Fund. This funding body ensures that there is enough fund for each approved project, which is released in three stages during the life of the construction project. However, a random tour of many of the institutions reveals striking evidence of projects not delivered on schedule, to quality and sometime out rightly abandoned. This suggests, therefore, that there are other latent factors, responsible for project delays, that should be investigated. Thus, this research, a pilot scheme, is aimed at unearthing the possible reasons for the delays being experienced in the execution of construction projects for infrastructure upgrade in public tertiary institutions in Nigeria, funded by Tertiary Education Trust Fund. The multiple site case study of qualitative research was adopted. The respondents were the Directors of Physical Planning and the Directors of Works of four Nigerian Public Universities. The findings reveal that delays can be situated within three entities, namely, the funding body, the institutions and others. Therefore, the emerging factors have been classified as external factors (haven to do with the funding body), internal factors (these concern the operations within the institutions) and general factors. The outcome of this pilot exercise provides useful information to guide the Directors as they interact with the funding body as well as challenges themselves to address the loopholes in their internal operations.

Keywords: delays, external factors, funding, general factors, Internal factors

Procedia PDF Downloads 117
2 Reducing the Negative Effects of Infrastructure Deficit through Continuity in Governance

Authors: Edoghogho Ogbeifun, Charles Mbohwa, J. H. C. Pretorius

Abstract:

Effective infrastructure development scheme planned and executed has positive influence on the quantity of available stock of infrastructure to meet the immediate and expansion needs of an organization, as well as contribute to the overall economic development of a nation, community or the local entity where the infrastructure is hosted. It is noteworthy, however, that infrastructure development scheme spans a long time frame, usually longer than the political life of the administration that initiates the scheme. In the majority of circumstances, execution may start and achieve different levels of completion; at best, only limited numbers are completed and put into functional use during the life of the administration that initiated the infrastructure scheme. When there is a change in leadership, many of the uncompleted projects are usually abandoned. The new administration repeats the circle of its predecessors and develops another set of infrastructure scheme which will suffer similar fate as the ones developed by their predecessors; thus doting the landscape with many uncompleted projects, which leads to infrastructure deficit. These circle will continue unless each succeeding leader sees governance as single continuum. Therefore, infrastructure projects not completed by one administration should be continued by succeeding administration, in order to increase the stock of relevant infrastructure available for the smooth operations organization and enhance the needed developments, as well as reduce the negative effects of infrastructure deficit. The single case study of qualitative research method was adopted to investigate the actions of the administration of three successive Vice-Chancellors, in a higher education institution in Nigeria, over a longitudinal period of twelve years. This is with a view to exploring the effects of each administration on the development and execution of infrastructure projects, with particular interest on abandoned projects. The findings revealed that although two of Vice-Chancellors were committed to infrastructure upgrade, they executed more new projects than completing abandoned ones, while the current leader has shown more pragmatism in completing abandoned projects alongside constructing new ones; thus demonstrating the importance of the continuity of governance. In this regard, there is a steady increase in the stock of infrastructure to accommodate the expansion of existing academic programmes, host new ones as well as reduce the negative effects of infrastructure deficit caused by abandoned projects.

Keywords: abandoned projects, continuity of governance, infrastructure development scheme, long time frame

Procedia PDF Downloads 153
1 Agronomic Response of Fluted Pumpkin (Telfairia occidentalis Hook. f.) to Planting Densities and Fertilizer Application

Authors: Falodun E. J., Ogbeifun S. O.

Abstract:

The objectives of this study were to investigate the yield, nutrient concentration, and uptake of fluted pumpkin (Telfairia occidentalis Hook. f.) in response to spacing and fertilizer application. Two fluted pumpkin plant populations (10,000 and 20,000 plants ha⁻¹), D1 and D2, were evaluated at three levels of NPK fertilizer (F₁, 20 t ha⁻¹ poultry manure, F₂, 300 kg ha⁻¹ NPK 15:15:15 and F₃, 10 t ha⁻¹ poultry manure + 150 kg ha⁻¹ NPK 15:15:15) using a factorial arrangement in a randomized complete block design (RCBD) with three replications. Leaf length, breadth, and the number of leaves were significantly increased at a lower plant population of 10,000 plants ha⁻¹ while herbage yield increased with a higher plant population of 20,000 plants ha⁻¹ using 300 kg ha⁻¹ inorganic NPK 15:15:15 or a combination of 10 t ha⁻¹ poultry manure + 150 kg ha⁻¹ inorganic NPK 15:15:15. Potassium (K) concentration was significantly (p < 0.05) higher at 10,000 plants ha⁻¹ and Iron (Fe) uptake was higher with combine application of organic and inorganic fertilizer (F3). To maximize the good herbage yield of fluted pumpkins, farmers in this locality should adopt a plant population of 20,000 plants ha⁻¹ using 300 kg ha⁻¹ inorganic NPK 15:15:15 (D2F2) or a combination of 10 t ha⁻¹ poultry manure + 150 kg ha⁻¹ inorganic NPK 15:15:15 (D2F3).

Keywords: fertilizers, fluted pumpkin, herbage yield, plant population

Procedia PDF Downloads 150