Search results for: city railway construction
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6964

Search results for: city railway construction

5824 A Method for Allocation of Smart Intersections Using Traffic Information

Authors: Sang-Tae Ji, Jeong-Woo Park, Jun-Ho Park, Kwang-Woo Nam

Abstract:

This study aims is to suggest the basic factors by considering the priority of intersection in the diffusion project of Smart intersection. Busan Metropolitan City is conducting a smart intersection project for efficient traffic management. The smart intersection project aims to make breakthrough improvement of the intersection congestion by optimizing the signal system using CCTV (closed-circuit television camera) image analysis technology. This study investigated trends of existing researches and analyzed by setting three things of traffic volume, characteristics of intersection road, and whether or not to conduct the main arterial road as factors for selecting new intersection when spreading smart intersection. Using this, we presented the priority of the newly installed intersection through the present situation and analysis for the Busan Metropolitan City which is the main destination of the spreading project of the smart intersection. The results of this study can be used as a consideration in the implementation of smart intersection business.

Keywords: CCTV, GIS, ICT, Smart City, smart intersection

Procedia PDF Downloads 373
5823 Analyzing Competition in Public Construction Projects

Authors: Khaled Hesham Hyari, Amjad Almani

Abstract:

Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.

Keywords: construction projects, competitive bidding, public construction, competition

Procedia PDF Downloads 315
5822 Investigating the Accessibility of Physically Disabled Individuals in Corporate Offices: A Case of Dhaka City

Authors: Ishrar Tabassum, Jay Andrew Saptok, Khalid Raihan Kabir, Elmee Tabassum

Abstract:

The purpose of this study is to bring light to the current state of the working environments in the corporate environment and other such institutions with a particular focus on the Bangladesh National Building Code (BNBC) and its guidelines for accommodating the physically disabled. Data were collected via semi-formal interviews, site visits and focus groups conducted using a preset questionnaire as the guidelines. After conducting surveys at corporate offices of 20 organizations from major commercial sectors in Dhaka city, the auditing showed many inadequacies, as aside from the larger corporate offices, the offices have little to no accessibility for the physically disabled. This study hopes to shed light on the fact that the existing BNBCs lack of emphasis on ensuring the accessibility of the handicapped in corporate buildings in the hope that, in the future, the physically disabled will have greater opportunities at being productive members of the workforce.

Keywords: person with disability, PWD, corporate buildings, Dhaka City

Procedia PDF Downloads 181
5821 Comprehensive Strategy for Healthy City from Local Practice Networking among Citizens, Industry, University and Municipality

Authors: Yuki Hara

Abstract:

Healthy assets are recognized as important for all people in the world through experiencing COVID-19. Each part of life and work is important to be changed against the preceding wide-spreading of COVID-19. Furthermore, it is necessary to innovate the whole structure of a city upon the sum of the parts. This study aims at creating a comprehensive strategy from a small practice of making healthier lives with collaborating local actors for a city. This paper employs action research as the research framework. The core practice is the 'Ken’iku Festival' at Ken’iku Festival Committee. The field locates the urban-rural fringe in the northwest part of Fujisawa city, Kanagawa prefecture, Japan. The data is collected through the author's practices for three years from the observations and interviews at meetings and discussions among stakeholders, texts in municipal reports, books, and movies, 3 questionnaires for customers and stakeholders at the Ken’iku Festival. These data are analysed by qualitative methods. The results show that couples in their 40s with children and couples or friends over the 70s are at the heart of promoting healthy lifestyles. In contrast, 40% of the visitors at the festival are the people who have no idea or no interest in healthier actions, which the committee has to suggest healthy activities through more pleasing services. The committee could organize staff and local actors as the core parties involved through gradually expanding its tasks relating to the local practices. This private sectoral activity from health promotion is covering a part of the whole-city planning of Fujisawa municipality by including many people over organisations into one community. This paper concludes from local practice networking through the festival that a comprehensive strategy for a healthy city is both a practical approach easily applied to each partner and one of the holistic services.

Keywords: communal practice network, healthy cities, health & development, health promotion, with and after COVID-19

Procedia PDF Downloads 113
5820 The Impact of Artificial Intelligence on Rural Life

Authors: Triza Edwar Fawzi Deif

Abstract:

In the process of urbanization in China, new rural construction is on the ascendant, which is becoming more and more popular. Under the driving effect of rural urbanization, the house pattern and tectonic methods of traditional vernacular houses have shown great differences from the family structure and values of contemporary peasant families. Therefore, it is particularly important to find a prototype, form and strategy to make a balance between the traditional memory and modern functional requirements. In order for research to combine the regional culture with modern life, under the situation of the current batch production of new rural residences, Badie village, in Zhejiang province, is taken as the case. This paper aims to put forward a prototype which can not only meet the demand of modern life but also ensure the continuation of traditional culture and historical context for the new rural dwellings design. This research not only helps to extend the local context in the construction of the new site but also contributes to the fusion of old and new rural dwellings in the old site construction. Through the study and research of this case, the research methodology and results can be drawn as reference for the new rural construction in other areas.

Keywords: steel slag, co-product, primary coating, steel aggregate capital, rural areas, rural planning, rural governance village, design strategy, new rural dwellings, regional context, regional expression

Procedia PDF Downloads 22
5819 Examining the Relational Approach Elements in City Development Strategy of Qazvin 2031

Authors: Majid Etaati, Hamid Majedi

Abstract:

Relational planning approach proposed by Patsy Healey goes beyond the physical proximity and emphasizes social proximity. This approach stresses the importance of nodes and flows between nodes. Current plans in European cities have incrementally incorporated this approach, but urban plans in Iran have still stayed very detailed and rigid. In response to the weak evaluation results of the comprehensive planning approach in Qazvin, the local authorities applied the City Development Strategy (CDS) to cope with new urban challenges. The paper begins with an explanation of relational planning and suggests that Healey gives urban planners about spatial strategies and then it surveys relational factors in CDS of Qazvin. This study analyzes the extent which CDS of Qazvin have highlighted nodes, flows, and dynamics. In the end, the study concludes that there is a relational understanding of urban dynamics in the plan, but it is weak.

Keywords: relational, dynamics, city development strategy, urban planning, Qazvin

Procedia PDF Downloads 125
5818 Cars in a Neighborhood: A Case of Sustainable Living in Sector 22 Chandigarh

Authors: Maninder Singh

Abstract:

The Chandigarh city is under the strain of exponential growth of car density across various neighborhood. The consumerist nature of society today is to be blamed for this menace because everyone wants to own and ride a car. Car manufacturers are busy selling two or more cars per household. The Regional Transport Offices are busy issuing as many licenses to new vehicles as they can in order to generate revenue in the form of Road Tax. The car traffic in the neighborhoods of Chandigarh has reached a tipping point. There needs to be a more empirical and sustainable model of cars per household, which should be based on specific parameters of livable neighborhoods. Sector 22 in Chandigarh is one of the first residential sectors to be established in the city. There is scope to think, reflect, and work out a method to know how many cars we need to sell our citizens before we lose the argument to traffic problems, parking problems, and road rage. This is where the true challenge of a planner or a designer of the city lies. Currently, in Chandigarh city, there are no clear visible answers to this problem. The way forward is to look at spatial mapping, planning, and design of car parking units to address the problem, rather than suggesting extreme measures of banning cars (short-term) or promoting plans for citywide transport (very long-term). This is a chance to resolve the problem with a pragmatic approach from a citizen’s perspective, instead of an orthodox development planner’s methodology. Since citizens are at the center of how the problem is to be addressed, acceptable solutions are more likely to emerge from the car and traffic problem as defined by the citizens. Thus, the idea and its implementation would be interesting in comparison to the known academic methodologies. The novel and innovative process would lead to a more acceptable and sustainable approach to the issue of number of car parks in the neighborhood of Chandigarh city.

Keywords: cars, Chandigarh, neighborhood, sustainable living, walkability

Procedia PDF Downloads 126
5817 Use of Cyber-Physical Devices for the Implementation of Virtual and Augmented Realities in Bridge Construction

Authors: Muhammmad Fawad

Abstract:

The bridge construction industry has been revolutionized by the applications of Virtual Reality (VR) and Augmented Reality (AR). In this article, the author has focused on the field applications of digital technologies in structural, especially in bridge engineering. This research analyzed the use of VR/AR for the assessment of bridge concepts. For this purpose, the author has used Cyber-Physical Devices, i.e., Oculus Quest (OQ) for the implementation of VR, Trimble Microsoft HoloLens (THL), and Trimble Site Vision (TSV) for the implementation of AR/MR by visualizing the models of bridge planned to be constructed in Poland. The visualization of the models in Extended Reality (XR) is based on the development of BIM models of the bridge, which are further uploaded to the platforms required to implement these models in XR. This research helped to implement the models in MR so a bridge with a 1:1 scale at the exact location was placed, and authorities were presented with the possibility to visualize the exact scale and location of the bridge before its construction.

Keywords: augmented reality, virtual reality, HoloLens, BIM, bridges

Procedia PDF Downloads 106
5816 Research on the Mode and Strategy of Urban Renewal in the Old Urban Area of China: A Case Study of Chongqing City

Authors: Sun Ailu, Zhao Wanmin

Abstract:

In the process of rapid urbanization, old urban renewal is an important task in China's urban construction. This study, using status survey and Analytic Hierarchy Process (AHP) method, taking Chongqing of China as an example, puts forward the problems faced by the old urban area from the aspects of function, facilities and environment. Further, this study summarizes the types of the old urban area and proposes space renewal strategies for three typical old urban areas, such as old residential area, old factory and old market. These old urban areas are confronted with the problems of functional layout confounding, lack of infrastructure and poor living environment. At last, this paper proposes spatial strategies for urban renewal, which are hoped to be useful for urban renewal management in China.

Keywords: old urban renewal, renewal mode, renewal strategy, Chongqing, China

Procedia PDF Downloads 173
5815 Fatigue Evaluation of Link Slab for Continuous Girder-Type Precast Modular Bridges

Authors: Jae-Joon Song, Sang-Yoon Lee, Bong-Chul Joo

Abstract:

The girder-type precast modular bridge has been developed as a simply supported bridge. The girder-type precast modular bridge could be applied to the multi-span bridges through the continuity method. The continuity of the girder-type precast modular bridge is achieved by using the link slab which is easy to construction and appropriate to the rapid construction. In this study, the link slab with transition zone was used for the continuity of the precast modular bridges, and the construction detail of link slab was modified. In addition, the modified iterative design method of link slab was proposed in this study. To verify the proposed design method, the fatigue test using the mock-up specimen was conducted with cycle loading condition up to two million cycles.

Keywords: precast, modular bridge, link slab

Procedia PDF Downloads 426
5814 Sustainable Urban Mobility: Rethinking the Bus Stop Infrastructures of Dhaka South

Authors: Hasnun Wara Khondker, M. Tarek Morad

Abstract:

Bangladesh is one of the most populous countries of the world in terms of density. Dhaka, the capital of Bangladesh currently has a population of approximately 15-16 million of which around 9 million people are accommodated in Dhaka South City Corporation (DSCC) within around 109 square kilometer area. Despite having various urban issues, country is at its pick of economic progress and Dhaka is the core of this economic growth. To ensure the proper economic development and citizens wellbeing, city needs an ingenious, congestion-free public transportation network. Bus stop/bus bay is an essential infrastructure for ensuring efficient public transportation flow within the city along with enhancing accessibility, user comfort, and safety through public amenities. At present, there is no established Mass Rapid Transit or Bus Rapid Transit network within the city and therefore these private owned buses are the only major mode of mass transportation of Dhaka city. DSCC has undertaken a project to re-design several bus stops and bus bays according to the universal standard for better urban mobility and user satisfaction. This paper will analyze the design approach of the bus stop/bay infrastructure within Dhaka South, putting the research lens on sustainable urban mobility with case studies of similar kind of urban context. The paper will also study the design process with setting several parameters, i.e., accessibility, passenger safety, comfort, sustainability, etc. Moreover, this research will recommend a guideline for designing a bus stop based on the analysis of the design methods.

Keywords: bus stop, Dhaka, public transportation, sustainable urban mobility, universal accessibility, user safety

Procedia PDF Downloads 355
5813 Transforming Construction Companies into Full-Fledged Project-Based Organizations: Case of Ethiopia

Authors: Henok Asfaw Hailu, P. D. Rwelamila

Abstract:

Creating a suitable environment for successful projects needs a rethink of the organisational design of the parent organisations. A Project-based organisation (PBO) is a unique organizational form suitable for implementing and managing business activities around projects. A construction firm is inherently a PBO as it executes most of its activities through projects. PBO design and development require an empirical foundation. This study aimed to fill this gap by developing a conceptual model to help transform Ethiopian construction firms (ECFs) into full-fledged PBOs by assimilating the required PBO characteristics. The study used an exploratory QUAL-quant research design approach. A thematic content analysis was performed to analyse the qualitative (Interviews) research data. Means, standard deviations, frequencies, percentages, one-way ANOVA, and Pearson correlation were used to analyse the quantitative data. A transformational conceptual model was proposed and illustrated that transformation needs to begin by assessing the environment, strategic documents, and PBO characteristics. Assimilating missing PBO characteristics into ECFs is vital to realise organisations’ transformation into full-fledged PBOs.

Keywords: project-based organization, organizational design, dimensions, construction firms

Procedia PDF Downloads 56
5812 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 91
5811 Cybersecurity Assessment of Decentralized Autonomous Organizations in Smart Cities

Authors: Claire Biasco, Thaier Hayajneh

Abstract:

A smart city is the integration of digital technologies in urban environments to enhance the quality of life. Smart cities capture real-time information from devices, sensors, and network data to analyze and improve city functions such as traffic analysis, public safety, and environmental impacts. Current smart cities face controversy due to their reliance on real-time data tracking and surveillance. Internet of Things (IoT) devices and blockchain technology are converging to reshape smart city infrastructure away from its centralized model. Connecting IoT data to blockchain applications would create a peer-to-peer, decentralized model. Furthermore, blockchain technology powers the ability for IoT device data to shift from the ownership and control of centralized entities to individuals or communities with Decentralized Autonomous Organizations (DAOs). In the context of smart cities, DAOs can govern cyber-physical systems to have a greater influence over how urban services are being provided. This paper will explore how the core components of a smart city now apply to DAOs. We will also analyze different definitions of DAOs to determine their most important aspects in relation to smart cities. Both categorizations will provide a solid foundation to conduct a cybersecurity assessment of DAOs in smart cities. It will identify the benefits and risks of adopting DAOs as they currently operate. The paper will then provide several mitigation methods to combat cybersecurity risks of DAO integrations. Finally, we will give several insights into what challenges will be faced by DAO and blockchain spaces in the coming years before achieving a higher level of maturity.

Keywords: blockchain, IoT, smart city, DAO

Procedia PDF Downloads 91
5810 Materiality of Gender Roles in Gede City State

Authors: David Maina Muthegethi

Abstract:

For decades, archaeological work of Swahili Civilization has mainly concentrated on exploration of economic and political dynamics of City states. This paper moves further and explore how gender roles were formed, maintained, negotiated and re-negotiated through time and space in Gede City. Unlike other Swahili city states, Gede was located around two miles away from the shores of Indian Ocean. Nonetheless, the city was characterized by security walls, stone houses, mosques and tombs typical of Swahili City states such as Kilwa. The study employed several methods of data collection namely: archival research, survey, re-examination of collected materials and excavation of Gede archaeological site. Since, the study aimed to examine gender roles across different social class, a total of three houses were excavated based on their social hierarchy. Thus, the houses were roughly categorized as belonging to elites, middle class and lower class. The house were located in the inner wall, second inner wall and the outer wall of Gede City respectively. Key findings shows that gender roles differed considerably along classes in Gede archaeological site. For instance, the women of the elite and middle class were active participants in Gede international trade through production and consumption of imported goods. This participation corresponded with commercialization of Gede households especially in elite’ areas where they hosted international traders. On the other hand, the middle class houses, women concentrated on running of light industries aimed at supplying goods for the urban community. Thus, they were able to afford exotic goods as their elites counterparts. Lastly, the gender roles of lower class entailed subsistence gender roles with little participation in Gede formal commerce. Interestingly, gender roles in Gede were dynamic in nature and response to cultural diffusion, spread of Islam, intensification of trade, diversification of subsistence patterns and urbanization. Therefore, this findings, demonstrate centrality of gender in reconstruction of social lives of Swahili Civilization.

Keywords: gender roles, Islam, Swahili civilization, urbanization

Procedia PDF Downloads 76
5809 Impact of Individual Resilience on Organizational Resilience: An Exploratory Study

Authors: Mitansha, Suzanne Wilkinson, Regan Potangaroa

Abstract:

The built environment is designed, maintained, operated, and decommissioned by construction organisations, which play a significant role in providing physical resources and rebuilding infrastructures during major crises and disasters. It is evident that enhancing the resilience of construction organisations allows better responding ability and speedy recovery from disasters and acts as a boon for the nation in the face of significant disruptions. As individuals are the integral component of any organisation, hence, individual resilience is considered a critical aspect, which may boost organisational resilience of construction sector. It has been observed that individual resilience is indirectly supported by organisation’s citizenship behaviour, job performance, and career success. Not only this, it also tends to hold a directly proportional relation with job satisfaction, physical and emotional well-being affected by organisation’s work culture, whereas the resilience of organisation increases as a result of positive adaption, growth and collective learning of the employees as an entity. Moreover, indicators like Situation awareness in staff and crisis related issues, effective vulnerability management, organisational leadership and culture ensured by approachable, encouraging and people-oriented leaders, are prominent for achieving organisational resilience. It, thus, becomes perceptible that both, organisational and individual resiliencies have the potential to influence each other. Consequently, it arises a major question that how these characteristics are associated and tend to behave with respect to each other The study, thus, aims to explore the overlapping dimensions of organisational and individual resilience to determine the impact boundaries. The research methodology of the paper would be based on systematic literature review specifically focused on the resilience of construction industry. This would provide a direct comparison of characteristics influencing individual and organisational resilience and will present the most significant indicators of individual resilience, that can eventually help to enhance the resilience of construction organisations amidst any disaster or crisis.

Keywords: construction industry, individual resilience, organizational resilience, overlapping dimension

Procedia PDF Downloads 81
5808 Structural-Geotechnical Effects of the Foundation of a Medium-Height Structure

Authors: Valentina Rodas, Luis Almache

Abstract:

The interaction effects between the existing soil and the substructure of a 5-story building with an underground one were evaluated in such a way that the structural-geotechnical concepts were validated through the method of impedance factors with a program based on the method of the finite elements. The continuous wall-type foundation had a constant thickness and followed inclined and orthogonal directions, while the ground had homogeneous and medium-type characteristics. The soil considered was type C according to the Ecuadorian Construction Standard (NEC) and the corresponding foundation comprised a depth of 4.00 meters and a basement wall thickness of 40 centimeters. This project is part of a mid-rise building in the city of Azogues (Ecuador). The hypotheses raised responded to the objectives in such a way that the model implemented with springs had a variation with respect to the embedded base, obtaining conservative results.

Keywords: interaction, soil, substructure, springs, effects, modeling , embedment

Procedia PDF Downloads 203
5807 An Analysis of Gender Competencies of Project Managers in National Capital Region, Philippines using the Mann-Whitney U Test

Authors: Ryan Vincent Teodoro, Adrian Paul Virador, Jan Christopher Cardenas

Abstract:

In the field of construction, managerial positions are completely dominated by males. The researchers conducted this study to see if there is a significant difference between the competencies of male and female project managers in the construction field. To see if there is a significant difference, they subdivided the competency of project managers into three components; decision making, organizing skills, and resiliency. The researchers conducted a five-point Likert scale survey of 28 project managers in the construction field, 18 of them are males and 10 are females. The researchers used Cronbach’s alpha to translate the raw scores of the respondents into competency scores. Then, the competency scores are analyzed using the Mann-Whitney U Test to see if there is a significant difference between the male’s and female’s competency scores. A p-value of 0.808 was calculated, which is greater than 0.05, which means that the null hypothesis is accepted. Therefore, the researchers concluded that there is no significant difference between the competencies of male and female project managers in terms of decision making, organizing skills, and resiliency in the construction field in the National Capital Region, Philippines.

Keywords: competency, resiliency, project managers, Mann-Whitney U test

Procedia PDF Downloads 106
5806 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 34
5805 Glimpses into the History of Makkah in the Light of Archaeological Finds

Authors: Heba Aboul-Enein

Abstract:

The blessed Mecca (Makkah) has been attacked as a city without a pre-Islamic history. Many claims have been posited denying the historicity of this holy city, and mythicizing Arabic historical records. Hence, the current paper attempted to shed light on this controversial history of Makkah. To achieve the intended objective, the study recoursed to archaeological, historical, and linguistic evidence, to prove that the holy city existed since the dawn of human history. The data under study include the results of recent excavations; archaeological surveys in Saudi Arabia, academic works of archaeologists, newspaper reports of the latest archaeological discoveries, and the findings of Saudi explorers. In addition, the study examined ancient and contemporary references; western accounts of Makkah, the bible, Jewish, Christian, Islamic, and Arabic references, in an effort to reconcile these texts with the archeological findings. The paper also reviewed the latest results of aerial archeology of the region. The study proved based on archaeological finds, and contrary to fallacious claims, that Makkah is an ancient city that existed and was inhabited by humans in varied historical eras.

Keywords: aerial archaeology, archaeological finds in the Makkan region, archaeological surveys, Western, Jewish and Islamic accounts of Makkah

Procedia PDF Downloads 444
5804 Developing Community-Based Ecotourism Framework for Sustainability in Kota Kinabalu, Sabah, Malaysia

Authors: Fauziahtion A. G. Samad, Imelda Albert Gisip

Abstract:

Community-Based Ecotourism (CBET) is one of the most significant parts of the sustainability in tourism. To achieve the goal of sustainability, the Framework for Sustainable Community Based Ecotourism (FSCBE) was developed from the experience in setting and implementing Community-Based Ecotourism (CBE) under IMPAK (Community-Based Tourism Development Initiative, Kota Kinabalu City Hall) program. Desa Cinta Kobuni located in Inanam, a sub-district of Kota Kinabalu city was the first project under this program. The goal was to transform the village into a sustainable tourism destination. After five years of the program, there are three tourism destination were established included Homestay Id Kalangadan and Homestay Darau Wetland. They currently are still in the growth stage and now becoming a model for other inspiring villages to emulate. There are three major impacts to the villages, which are 1) the increment of secondary income; 2) the advancement of women’s empowerment; and 3) the enhanced sustainability initiatives of the villagers. The experience in developing the CBET has resulted the Kota Kinabalu City Hall to produce the Framework for Sustainable Community Based Ecotourism (FSCBE) that integrates Sustainable Development Goals and Global Sustainable Tourism Criteria (GSTC) for future CBET development in other villages in the city.

Keywords: community-based ecoturism, sustainability, Sabah, Malaysia

Procedia PDF Downloads 32
5803 Application of Value Engineering Approach for Improving the Quality and Productivity of Ready-Mixed Concrete Used in Construction and Hydraulic Projects

Authors: Adel Mohamed El-Baghdady, Walid Sayed Abdulgalil, Ahmad Asran, Ibrahim Nosier

Abstract:

This paper studies the effectiveness of applying value engineering to actual concrete mixtures. The study was conducted in the State of Qatar on a number of strategic construction projects with international engineering specifications for the 2022 World Cup projects. The study examined the concrete mixtures of Doha Metro project and the development of KAHRAMAA’s (Qatar Electricity and Water Company) Abu Funtas Strategic Desalination Plant, in order to generally improve the quality and productivity of ready-mixed concrete used in construction and hydraulic projects. The application of value engineering to such concrete mixtures resulted in the following: i) improving the quality of concrete mixtures and increasing the durability of buildings in which they are used; ii) reducing the waste of excess materials of concrete mixture, optimizing the use of resources, and enhancing sustainability; iii) reducing the use of cement, thus reducing CO₂ emissions which ensures the protection of environment and public health; iv) reducing actual costs of concrete mixtures and, in turn, reducing the costs of construction projects; and v) increasing the market share and competitiveness of concrete producers. This research shows that applying the methodology of value engineering to ready-mixed concrete is an effective way to save around 5% of the total cost of concrete mixtures supplied to construction and hydraulic projects, improve the quality according to the technical requirements and as per the standards and specifications for ready-mixed concrete, improve the environmental impact, and promote sustainability.

Keywords: value management, cost of concrete, performance, optimization, sustainability, environmental impact

Procedia PDF Downloads 330
5802 The Failed Criminalization of Homelessness: The Need for New Interventions and the Implementation of Salt Lake City’s Kayak Court

Authors: Stephen Fanale

Abstract:

Criminalization creates sizable barriers to housing and perpetuates the cycle of homelessness. Not only does criminalization leave people on the streets and in shelters indefinitely, but it also unnecessarily costs the taxpayers. Homelessness is a growing issue throughout the world, and criminalizing these human beings is a violation of basic human rights. While this may seem like an insurmountable obstacle, there is something that can be done while fighting that battle. While they are under-researched as a whole, specialty courts, specifically homeless courts, are a growing vessel that can address some of the barriers associated with the criminalization of homelessness. They divert individuals away from jail while connecting them to services that will help their situation instead of hindering it. The model being used in Salt Lake City, while similar to others throughout the United States, stands alone in its outreach efforts and should be paving the way for the rest of the world. The following will look at criminalization and different ways of addressing it, and, finally, Salt Lake City’s current operations, including the unique outreach court: Kayak Court.

Keywords: barriers to housing, criminalization, cycle of homelessness, homeless court, diversion, kayak court

Procedia PDF Downloads 52
5801 Observation and Analysis of Urban Micro-Climate and Urban Morphology on Block Scale in Zhengzhou City

Authors: Linlin Guo, Baofeng Li

Abstract:

Zhengzhou is a typical plain city with a high population density and a permanent population of 10 million, located in central China. The scale of this city is constantly expanding, and the urban form has changed dramatically by the accelerating process of urbanization, which makes a great effect on the urban microclimate. In order to study the influence of block morphology on urban micro-climate, air temperature, humidity, wind velocity and so on in three typical types of blocks in the center of Zhengzhou were collected, which was chosen to perform the fixed and mobile observation. After data handling and analysis, a series of graphs and diagrams were obtained to reflect the differences in the influence of different types of block morphology on the urban microclimate. These can provide targeted strategies for urban design to improve and regulate urban micro-climate.

Keywords: urban micro-climate, block morphology, fixed and mobile observation, urban design

Procedia PDF Downloads 219
5800 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 193
5799 Managing the Architectural Heritage of Tripoli-Libya: The Red Castle as a Case Study

Authors: Eman Mohamed Ali Elalwani

Abstract:

The Libyan heritage buildings are currently facing a number of crises that pose a threat to their structural integrity, functionality, and overall performance. One of the challenges pertains to the loss of community identity, which has arisen due to the lack of awareness and unconscious behavior of the residents. An additional issue arises from inadequate site management practices, including the implementation of modern techniques and innovative building materials that are incompatible with structural elements, resulting in the deformation of certain sections of the buildings. The security concerns of the city, along with the ongoing civil conflict, fostered a conducive environment for violations, resulting in the vandalism of certain monuments in the city. However, the degradation of this valuable heritage is mainly attributed to the city's neglect and pollution. The elevated groundwater level resulting from pollution has led to erosion in the building's foundations. Mitigating these negative consequences through strategic interventions and rehabilitation is required to preserve this treasure. In order to assist the local community in recovering from those crises, this paper stated a viable strategy for promoting preservation efforts that aimed at safeguarding the heritage sites while also providing guidance to decision-makers and the local community on how to avoid these crises, preserve, enhance, and recognize the significance of the Libyan heritage.

Keywords: cultural heritage, historical buildings, Tripoli’s old city, Red Castle, crises, preservation

Procedia PDF Downloads 106
5798 The Challenges of Implementing Building Information Modeling in Small-Medium Enterprises Architecture Firms in Indonesia

Authors: Furry A. Wilis, Dewi Larasati, Suhendri

Abstract:

Around 96% of architecture firms in Indonesia are classified as small-medium enterprises (SME). This number shows that the SME firms have an important role in architecture, engineering, and construction (AEC) industry in Indonesia. Some of them are still using conventional system (2D based) in arranging construction project documents. This system is fragmented and not fully well-coordinated, so causes many changes in the whole project cycle. Building information modeling (BIM), as a new developed system in Indonesian construction industry, has been assumed can decrease changes in the project. But BIM has not fully implemented in Indonesian AEC industry, especially in SME architecture firms. This article identifies the challenges of implementing BIM in SME architecture firms in Indonesia. Quantitative-explorative research with questionnaire was chosen to achieve the goal of this article. The scarcity of skilled BIM user, low demand from client, high investment cost, and the unwillingness of the firm to switch into BIM were found as the result of this paper.

Keywords: architecture consultants, BIM, SME, Indonesia

Procedia PDF Downloads 316
5797 The Management of Urban Facilities in the City of Chlef

Authors: Belakhdar Salah Brahim

Abstract:

The Urban management is a major element of social control of public space and thus the functioning of society. As such, it is a key element of a social conception of sustainable development. Also, it is a cross-cutting sector that relies on land management, infrastructure management, habitat management, management of social services, the management of economic development, etc. This study aims to study how urban management focusing on the study of problems related to urban waste management in developing countries. It appears from the study that the city management is to improve infrastructure and urban services in order to increase the city's development and improve living conditions in cities. It covers various aspects including management of urban space, economic management, administrative management, asset management or infrastructure and finally waste management. Environmental management is important because it solves the pollution problems of life and preserve resources for future generations. Changing perceptions of waste has led to the definition of new policies for integrated waste management requirements appropriate to the urban site.

Keywords: urbanization, urban management, environmental management, waste management

Procedia PDF Downloads 413
5796 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach

Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis

Abstract:

The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.

Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company

Procedia PDF Downloads 95
5795 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 298