Search results for: cost
6075 Reliability-Based Life-Cycle Cost Model for Engineering Systems
Authors: Reza Lotfalian, Sudarshan Martins, Peter Radziszewski
Abstract:
The effect of reliability on life-cycle cost, including initial and maintenance cost of a system is studied. The failure probability of a component is used to calculate the average maintenance cost during the operation cycle of the component. The standard deviation of the life-cycle cost is also calculated as an error measure for the average life-cycle cost. As a numerical example, the model is used to study the average life cycle cost of an electric motor.Keywords: initial cost, life-cycle cost, maintenance cost, reliability
Procedia PDF Downloads 6056074 Effect of Cost Control and Cost Reduction Techniques in Organizational Performance
Authors: Babatunde Akeem Lawal
Abstract:
In any organization, the primary aim is to maximize profit, but the major challenges facing them is the increase in cost of operation because of this there is increase in cost of production that could lead to inevitable cost control and cost reduction scheme which make it difficult for most organizations to operate at the cost efficient frontier. The study aims to critically examine and evaluate the application of cost control and cost reduction in organization performance and also to review budget as an effective tool of cost control and cost reduction. A descriptive survey research was adopted. A total number of 40 respondent retrieved were used for the study. The analysis of data collected was undertaken by applying appropriate statistical tools. Regression analysis was used to test the hypothesis with the use of SPSS. Based on the findings; it was evident that cost control has a positive impact on organizational performance and also the style of management has a positive impact on organizational performance.Keywords: organization, cost reduction, cost control, performance, budget, profit
Procedia PDF Downloads 6046073 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management
Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan
Abstract:
During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.Keywords: aircraft maintenance, downtime, downtime cost, maintenance cost
Procedia PDF Downloads 3546072 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia
Authors: Kaleem Ullah, Abd Halid Bin Abdullah
Abstract:
This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun
Procedia PDF Downloads 2826071 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy
Abstract:
Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.Keywords: fuzzy sets, uncertainty, qualitative factors, decision making
Procedia PDF Downloads 6526070 A Prediction of Electrical Cost for High-Rise Building Construction
Authors: Picha Sriprachan
Abstract:
The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.Keywords: high-rise building construction, electrical cost, construction phase, architectural phase
Procedia PDF Downloads 3906069 Cost Overrun Causes in Public Construction Projects in Saudi Arabia
Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni
Abstract:
This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors
Procedia PDF Downloads 4756068 Chaotic Dynamics of Cost Overruns in Oil and Gas Megaprojects: A Review
Authors: O. J. Olaniran, P. E. D. Love, D. J. Edwards, O. Olatunji, J. Matthews
Abstract:
Cost overruns are a persistent problem in oil and gas megaprojects. Whilst the extant literature is filled with studies on incidents and causes of cost overruns, underlying theories to explain their emergence in oil and gas megaprojects are few. Yet, a way to contain the syndrome of cost overruns is to understand the bases of ‘how and why’ they occur. Such knowledge will also help to develop pragmatic techniques for better overall management of oil and gas megaprojects. The aim of this paper is to explain the development of cost overruns in hydrocarbon megaprojects through the perspective of chaos theory. The underlying principles of chaos theory and its implications for cost overruns are examined and practical recommendations proposed. In addition, directions for future research in this fertile area provided.Keywords: chaos theory, oil and gas, cost overruns, megaprojects
Procedia PDF Downloads 5596067 Identification of Factors Influencing Costs in Green Projects
Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi
Abstract:
Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.Keywords: green project, factors influencing cost, hard cost, soft cost
Procedia PDF Downloads 3456066 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model
Authors: Boukelkoul Lahcen
Abstract:
The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.Keywords: cost, finite state, Markov model, operation and maintenance
Procedia PDF Downloads 5336065 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits
Authors: Min-Tsai Lai, Taqwa Hariguna
Abstract:
This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy
Procedia PDF Downloads 3656064 Faults in the Projects, Deviation in the Cost
Authors: S. Ahmed, P. Dlask, B. Hasan
Abstract:
There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.Keywords: construction projects, building, cost, estimating costs, delay, overrun
Procedia PDF Downloads 2946063 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 756062 An Analytical Method for Maintenance Cost Estimating Relationships of Helicopters Using Linear Programming
Authors: Meesun Sun, Yongmin Kim
Abstract:
Estimating maintenance cost is crucial in defense management because it affects military budgets and availability of equipment. When it comes to estimating maintenance cost of the deployed equipment, time series forecasting can be applied with the actual historical cost data. It is more difficult issue to estimate maintenance cost of new equipment for which the actual costs are not provided. In this underlying context, this study proposes an analytical method for maintenance cost estimating relationships (CERs) development of helicopters using linear programming. The CERs can be applied to a new helicopter because they use non-cost independent variables such as the number of engines, the empty weight and so on. In the Republic of Korea, the maintenance cost of new equipment has been usually estimated by reflecting maintenance cost to unit price ratio of the legacy equipment. This study confirms that the CERs perform well for the 10 types of airmobile helicopters in terms of mean absolute percentage error by applying leave-one-out cross-validation. The suggested method is very useful to estimate the maintenance cost of new equipment and can help in the affordability assessment of acquisition program portfolios for total life cycle systems management.Keywords: affordability analysis, cost estimating relationship, helicopter, linear programming, maintenance cost
Procedia PDF Downloads 1396061 Matrix Completion with Heterogeneous Cost
Authors: Ilqar Ramazanli
Abstract:
The matrix completion problem has been studied broadly under many underlying conditions. The problem has been explored under adaptive or non-adaptive, exact or estimation, single-phase or multi-phase, and many other categories. In most of these cases, the observation cost of each entry is uniform and has the same cost across the columns. However, in many real-life scenarios, we could expect elements from distinct columns or distinct positions to have a different cost. In this paper, we explore this generalization under adaptive conditions. We approach the problem under two different cost models. The first one is that entries from different columns have different observation costs, but within the same column, each entry has a uniform cost. The second one is any two entry has different observation cost, despite being the same or different columns. We provide complexity analysis of our algorithms and provide tightness guarantees.Keywords: matroid optimization, matrix completion, linear algebra, algorithms
Procedia PDF Downloads 1096060 Productive Efficiency in Asean Banking
Authors: Suhartono Suhartono
Abstract:
Issue of cost efficiency is then becoming pivotal point because public expect cost of banking operation reducing and benefited of consumers. This study examines the determinants of cost efficiency of banks operating in 8 member countries of the Association of Southeast Asian Nations (ASEAN). This study uses economics theory approach to examine the existence of economies of scale in the ASEAN Banking market especially on its impact on cost efficiency. We apply concept of average cost (AC) as a proxy for the cost efficiency. We find that economies of scale is existing in the banking market indicating scale and scope economies should be considered in the industrial policy. The stronger capital position is also positive to efficiency means stronger capitalized banks are more efficient. Bank that remunerates better tend to be more efficient as result economic capital effect.Keywords: cost efficiency, ASEAN, economies of scale, issue of cost
Procedia PDF Downloads 3806059 Direct Cost of Anesthesia in Traumatic Patients with Massive Bleeding: A Prospective Micro-Costing Study
Authors: Asamaporn Puetpaiboon, Sunisa Chatmongkolchart, Nalinee Kovitwanawong, Osaree Akaraborworn
Abstract:
Traumatic patients with massive bleeding require intensive resuscitation. The actual cost of anesthesia per case has never been clarified, so our study aimed to quantify the direct cost, and cost-to-charge ratio of anesthetic care in traumatic patients with intraoperative massive bleeding. This study was a prospective, observational, cost analysis study, conducted in Prince of Songkla University hospital, Thailand, with traumatic patients, of any mechanisms being recruited. Massive bleeding was defined as estimated blood loss of at least one blood volume in 24 hours, or a half of blood volume in 3 hours. The cost components were identified by the micro-costing method, and valued by the bottom-up approach. The direct cost was divided into 4 categories: the labor cost, the capital cost, the material cost and the cost of drugs. From September 2017 to August 2018, 10 patients with multiple injuries were included. Seven patients had motorcycle accidents, two patients fell from a height and another one was in a minibus accident. Two patients died on the operating table, and another two died within 48 hours. The median Sequential Organ Failure Assessment (SOFA) score was 8. The median intraoperative blood loss was 3,500 ml. The median direct cost, per case, was 250 United States Dollars (2017 exchange rate), and the cost-to-charge ratio was 0.53. In summary, the direct cost was nearly half of the hospital charge, for these traumatic patients with massive bleeding. However, our study did not analyze the indirect cost.Keywords: cost, cost-to-charge ratio, micro-costing, trauma
Procedia PDF Downloads 1486058 Damage Cost for Private Property by Extreme Wind over the past 10 Years in Korea
Authors: Gou-Moon Choi, Woo-Young Jung, Chan-Young Yune
Abstract:
Recently, the natural disaster has increased worldwide. In Korea, the damage to life and property caused by a typhoon, heavy rain, heavy snow, and an extreme wind also increases every year. Among natural disasters, the frequency and the strength of wind have increased because sea surface temperature has risen due to the increase of the average temperature of the Earth. In the case of extreme wind disaster, it is impossible to control or reduce the occurrence, and the recovery cost always exceeds the damage cost. Therefore, quantitative estimation of the damage cost for extreme wind needs to be established beforehand to install proactive countermeasures. In this study, the damage cost for private properties was analyzed based on the data for the past 10 years in Korea. The damage cost curve was also suggested for the metropolitan cities and provinces. The result shows the possibility for the regional application of the damage cost curve because the damage cost of the regional area is estimated based on the cost of cities and provinces.Keywords: damage cost, extreme wind, natural disaster, private property
Procedia PDF Downloads 3056057 Analysis of Behavior and Determinants of Cost Stickiness in Manufacturing Companies in Indonesia
Authors: Farizy Yunaz, Catur Sasongko
Abstract:
This research aims to provide the empirical evidence regarding cost stickiness behavior and its determinants on listed manufacturing companies. Hypothesis testing is performed using pooled least square method. The result concludes that there is cost stickiness behavior in selling, general and administrative costs. In term of determinants, firm-specific adjustment costs measured by asset intensity and employee intensity have significant positive impact on the level of cost stickiness. Meanwhile, earnings target and leverage have significant negative impact on the level of cost stickiness. However, the management empire building incentives measured by free cash flow has no significant positive impact.Keywords: adjustment cost, cost behavior, cost stickiness, earnings target, leverage, management empire building incentive
Procedia PDF Downloads 3656056 Cost Effectiveness and Performance Study of Perpetual Pavement Using ABAQUS
Authors: Mansour Fakhri, Monire Zokaei
Abstract:
Where there are many demolitions on conventional asphalt pavements, heavy costs are paid to repair and reconstruct the pavement roads annually. Recently some research has been done in order to increase the pavement life. Perpetual pavement is regarded as one of them which can improve the pavement life and minimize the maintenance activity and cost. In this research, ABAQUS which is a finite element software is implemented for analyzing and simulation of perpetual pavement. Viscoelastic model of material is used and loading wheel is considered to be dynamic. Effect of different parameters on pavement function has been considered. Because of high primary cost these pavements are not widely used. In this regard, life cost analysis was also carried out to compare perpetual pavement to conventional asphalt concrete pavement. It was concluded that although the initial cost of perpetual pavement is higher than that of conventional asphalt pavement, life cycle cost analysis during 50 years of service life showed that the performance of this pavement is better and the whole life cost of that is less.Keywords: ABAQUS, lifecycle cost analysis, mechanistic empirical, perpetual pavement
Procedia PDF Downloads 3836055 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects
Authors: Mai Ghazal, Ahmed Hammad
Abstract:
Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management
Procedia PDF Downloads 3716054 Analysing the Cost of Immigrants to the National Health System in Eastern Macedonia and Thrace
Authors: T. Theodosiou, P. Polychronidou, A. G. Karasavvoglou
Abstract:
The latest years the number of immigrants at Greece has increased dramatically. Their impact on the National Health System (NHS) has not been yet thoroughly investigated. This paper analyses the cost of immigrants to the NHS hospitals of the region of Eastern Macedonia and Thrace. The data are collected from 2005 to 2011 from five different hospitals and are analysed using linear mixed effects models in order to investigate the effects of nationality and year on the cost of hospitalization and treatment. The results show that generally the Greek nationality patients have a higher mean cost of hospitalization compared to the immigrants and that there is an increasing trend for the cost except for the year 2010.Keywords: cost, Eastern Macedonia and Thrace, immigrants, national health system
Procedia PDF Downloads 2456053 Contributing to Accuracy of Bid Cost Estimate in Construction Projects
Authors: Abdullah Alhomidan
Abstract:
This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.Keywords: cost estimate, accuracy, pretender, estimating, bid estimate
Procedia PDF Downloads 5576052 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory
Authors: V. S. S. Kumar, B. Vikram
Abstract:
The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems
Procedia PDF Downloads 3566051 Marketing Factors Influencing the Decision to Choose Low Cost Airlines
Authors: Noppadol Sritragool
Abstract:
The objectives of this research were to investigate the decision of passengers who choose to fry with low cost airlines and to study marketing factors which have the influence to the decision to choose each low cost airlines. This paper was a quantitative research technique. A total of 400 low cost airlines’ passengers were interviewed via English questionnaire to collect the respondents’ opinions. The findings revealed that respondents were male and female at a similar proportion. The majority had at least an undergraduate degree, have a lower management level jobs, and had income in the range of 25,000 -35,000 baht per month.. In addition, the findings also revealed that the first three marketing factors influencing the decision of the respondents to choose low-cost airlines were low price, direct flight, and online system.Keywords: decision to choose, marketing factors, low-cost airlines
Procedia PDF Downloads 4286050 Evaluation of Earthquake Induced Cost for Mid-Rise Buildings
Authors: Gulsah Olgun, Ozgur Bozdag, Yildirim Ertutar
Abstract:
This paper mainly focuses on performance assessment of buildings by associating the damage level with the damage cost. For this purpose a methodology is explained and applied to the representative mid-rise concrete building residing in Izmir. In order to consider uncertainties in occurrence of earthquakes, the structural analyses are conducted for all possible earthquakes in the region through the hazard curve. By means of the analyses, probability of the structural response being in different limit states are obtained and used to calculate expected damage cost. The expected damage cost comprises diverse cost components related to earthquake such as cost of casualties, replacement or repair cost of building etc. In this study, inter-story drift is used as an effective response variable to associate expected damage cost with different damage levels. The structural analysis methods performed to obtain inter story drifts are response spectrum method as a linear one, accurate push-over and time history methods to demonstrate the nonlinear effects on loss estimation. Comparison of the results indicates that each method provides similar values of expected damage cost. To sum up, this paper explains an approach which enables to minimize the expected damage cost of buildings and relate performance level to damage cost.Keywords: expected damage cost, limit states, loss estimation, performance based design
Procedia PDF Downloads 2696049 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan
Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat
Abstract:
This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.Keywords: cost, overrun, building construction projects, Jordan
Procedia PDF Downloads 1086048 Development of Work Breakdown Structure for EVMS in South Korea
Authors: Dong-Ho Kim, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun
Abstract:
In the construction site, the cost and schedules are the most important management elements. Despite efforts to integrated management the cost and schedule, WBS classification is struggling to differ from each other. The cost and schedule can be integrated and can be managed due to the characteristic of the detail system in the case of Korea around the axis of pressure and official fixture system. In this research, the Work Breakdown Structure (WBS) integrating the cost and schedules around in government office construction, WBS which can be used in common was presented in order to analyze the detail system of the public institution construction and improve. As to this method, the efficient administration of not only the link application of the cost and schedule but also construction project is expected.Keywords: WBS, EVMS, integrated cost and schedule, Korea case
Procedia PDF Downloads 3856047 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques
Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah
Abstract:
Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.Keywords: BIM, construction projects, cost estimation, NRM, ontology
Procedia PDF Downloads 5516046 Final Costs of Civil Claims
Authors: Behnam Habibi Dargah
Abstract:
The economics of cost-benefit theory seeks to monitor claims and determine their final price. The cost of litigation is important because it is a measure of the efficiency of the justice system. From an economic point of view, the cost of litigation is considered to be the point of equilibrium of litigation, whereby litigation is regarded as a high-risk investment and is initiated when the costs are less than the probable and expected benefits. Costs are economically separated into private and social costs. Private cost includes material (direct and indirect) and spiritual costs. The social costs of litigation are also subsidized-centric due to the public and governmental nature of litigation and cover both types of bureaucratic bureaucracy and the costs of judicial misconduct. Macroeconomic policy in the economics of justice is the reverse engineering of controlling the social costs of litigation by employing selective litigation and working on the judicial culture to achieve rationality in the monopoly system. Procedures for controlling and managing court costs are also circumscribed to economic patterns in the field. Rational cost allocation model and cost transfer model. The rational allocation model deals with cost-tolerance systems, and the transfer model also considers three models of transferability, including legal, judicial and contractual transferability, which will be described and explored in the present article in a comparative manner.Keywords: cost of litigation, economics of litigation, private cost, social cost, cost of litigation
Procedia PDF Downloads 129