Search results for: direct cost
9077 Manufacturing Process and Cost Estimation through Process Detection by Applying Image Processing Technique
Authors: Chalakorn Chitsaart, Suchada Rianmora, Noppawat Vongpiyasatit
Abstract:
In order to reduce the transportation time and cost for direct interface between customer and manufacturer, the image processing technique has been introduced in this research where designing part and defining manufacturing process can be performed quickly. A3D virtual model is directly generated from a series of multi-view images of an object, and it can be modified, analyzed, and improved the structure, or function for the further implementations, such as computer-aided manufacturing (CAM). To estimate and quote the production cost, the user-friendly platform has been developed in this research where the appropriate manufacturing parameters and process detections have been identified and planned by CAM simulation.Keywords: image processing technique, feature detections, surface registrations, capturing multi-view images, Production costs and Manufacturing processes
Procedia PDF Downloads 2519076 Evaluating the Performance of Passive Direct Methanol Fuel Cell under Varying Operating and Structural Conditions
Authors: Rahul Saraswat
Abstract:
More recently, a focus is given on replacing machined stainless steel metal flow-fields with inexpensive wiremesh current collectors. The flow-fields are based on simple woven wiremesh screens of various stainless steels, which are sandwiched between a thin metal plate of the same material to create a bipolar plate/flow-field configuration for use in a stack. Major advantages of using stainless steel wire screens include the elimination of expensive raw materials as well as machining and/or other special fabrication costs. Objective of the project is to improve the performance of the passive direct methanol fuel cell without increasing the cost of the cell and to make it as compact and light as possible. From the literature survey, it was found that very little is done in this direction & the following methodology was used. 1.) The passive DMFC cell can be made more compact, lighter and less costly by changing the material used in its construction. 2.) Controlling the fuel diffusion rate through the cell improves the performance of the cell. A passive liquid feed direct methanol fuel cell ( DMFC ) was fabricated using given MEA( Membrane Electrode Assembly ) and tested for different current collector structure. Mesh current collectors of different mesh densities, along with different support structures, were used, and the performance was found to be better. Methanol concentration was also varied. Optimisation of mesh size, support structure and fuel concentration was achieved. Cost analysis was also performed hereby. From the performance analysis study of DMFC, we can conclude with the following points : Area specific resistance (ASR) of wiremesh current collectors is lower than ASR of stainless steel current collectors. Also, the power produced by wiremesh current collectors is always more than that produced by stainless steel current collectors. Low or moderate methanol concentrations should be used for better and stable DMFC performance. Wiremesh is a good substitute of stainless steel for current collector plates of passive DMFC because of lower cost( by about 27 %), flexibility and light in weight characteristics of wiremesh.Keywords: direct methanol fuel cell, membrane electrode assembly, mesh, mesh size, methanol concentration and support structure
Procedia PDF Downloads 689075 Low Cost Technique for Measuring Luminance in Biological Systems
Abstract:
In this work, the relationship between the melanin content in a tissue and subsequent absorption of light through that tissue was determined using a digital camera. This technique proved to be simple, cost effective, efficient and reliable. Tissue phantom samples were created using milk and soy sauce to simulate the optical properties of melanin content in human tissue. Increasing the concentration of soy sauce in the milk correlated to an increase in melanin content of an individual. Two methods were employed to measure the light transmitted through the sample. The first was direct measurement of the transmitted intensity using a conventional lux meter. The second method involved correctly calibrating an ordinary digital camera and using image analysis software to calculate the transmitted intensity through the phantom. The results from these methods were then graphically compared to the theoretical relationship between the intensity of transmitted light and the concentration of absorbers in the sample. Conclusions were then drawn about the effectiveness and efficiency of these low cost methods.Keywords: tissue phantoms, scattering coefficient, albedo, low-cost method
Procedia PDF Downloads 2719074 Chaotic Dynamics of Cost Overruns in Oil and Gas Megaprojects: A Review
Authors: O. J. Olaniran, P. E. D. Love, D. J. Edwards, O. Olatunji, J. Matthews
Abstract:
Cost overruns are a persistent problem in oil and gas megaprojects. Whilst the extant literature is filled with studies on incidents and causes of cost overruns, underlying theories to explain their emergence in oil and gas megaprojects are few. Yet, a way to contain the syndrome of cost overruns is to understand the bases of ‘how and why’ they occur. Such knowledge will also help to develop pragmatic techniques for better overall management of oil and gas megaprojects. The aim of this paper is to explain the development of cost overruns in hydrocarbon megaprojects through the perspective of chaos theory. The underlying principles of chaos theory and its implications for cost overruns are examined and practical recommendations proposed. In addition, directions for future research in this fertile area provided.Keywords: chaos theory, oil and gas, cost overruns, megaprojects
Procedia PDF Downloads 5599073 Identification of Factors Influencing Costs in Green Projects
Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi
Abstract:
Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.Keywords: green project, factors influencing cost, hard cost, soft cost
Procedia PDF Downloads 3459072 Socioeconomic Burden of Life Long Disease: A Case of Diabetes Care in Bangladesh
Authors: Samira Humaira Habib
Abstract:
Diabetes has profound effects on individuals and their families. If diabetes is not well monitored and managed, then it leads to long-term complications and a large and growing cost to the health care system. Prevalence and socioeconomic burden of diabetes and relative return of investment for the elimination or the reduction of the burden are much more important regarding its cost burden. Various studies regarding the socioeconomic cost burden of diabetes are well explored in developed countries but almost absent in developing countries like Bangladesh. The main objective of the study is to estimate the total socioeconomic burden of diabetes. It is a prospective longitudinal follow up study which is analytical in nature. Primary and secondary data are collected from patients who are undergoing treatment for diabetes at the out-patient department of Bangladesh Institute of Research & Rehabilitation in Diabetes, Endocrine & Metabolic Disorders (BIRDEM). Of the 2115 diabetic subjects, females constitute around 50.35% of the study subject, and the rest are male (49.65%). Among the subjects, 1323 are controlled, and 792 are uncontrolled diabetes. Cost analysis of 2115 diabetic patients shows that the total cost of diabetes management and treatment is US$ 903018 with an average of US$ 426.95 per patient. In direct cost, the investigation and medical treatment at hospital along with investigation constitute most of the cost in diabetes. The average cost of a hospital is US$ 311.79, which indicates an alarming warn for diabetic patients. The indirect cost shows that cost of productivity loss (US$ 51110.1) is higher among the all indirect item. All constitute total indirect cost as US$ 69215.7. The incremental cost of intensive management of uncontrolled diabetes is US$ 101.54 per patient and event-free time gained in this group is 0.55 years and the life years gain is 1.19 years. The incremental cost per event-free year gained is US$ 198.12. The incremental cost of intensive management of the controlled group is US$ 89.54 per patient and event-free time gained is 0.68 years, and the life year gain is 1.12 years. The incremental cost per event-free year gained is US$ 223.34. The EuroQoL difference between the groups is found to be 64.04. The cost-effective ratio is found to be US$ 1.64 cost per effect in case of controlled diabetes and US$ 1.69 cost per effect in case of uncontrolled diabetes. So management of diabetes is much more cost-effective. Cost of young type 1 diabetic patient showed upper socioeconomic class, and with the increase of the duration of diabetes, the cost increased also. The dietary pattern showed macronutrients intake and cost are significantly higher in the uncontrolled group than their counterparts. Proper management and control of diabetes can decrease the cost of care for the long term.Keywords: cost, cost-effective, chronic diseases, diabetes care, burden, Bangladesh
Procedia PDF Downloads 1479071 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model
Authors: Boukelkoul Lahcen
Abstract:
The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.Keywords: cost, finite state, Markov model, operation and maintenance
Procedia PDF Downloads 5339070 The Effect of Collapse Structure on Economic Growth and Influence of Soil Investigation
Authors: Fatai Shola Afolabi
Abstract:
The study identified and evaluates the causes of building failure and examined the effects of building failure with respect to cost in Lagos State, Nigeria. The method employed in the collection of data includes the administration of questionnaire to professionals in the construction industry and case studies for the sites. A purposive sampling technique was used for selecting the sites visited, and selecting the construction professionals. Descriptive statistical techniques such as frequency distribution and percentages and mean response analysis were used to analyze data. The study revealed that the major causes of building failures were bad design, faulty construction, over loading, non-possession of approved drawings, Possession of approved drawings but non-compliance, and the use of quarks. In the two case studies considered, the total direct loss to the building owners was thirty eight million three hundred and eight five thousand, seven hundred and twenty one naira (38,385,721) which is about One hundred and ninety four thousand, eighty hundred and fifty one dollars ($194,851) at one hundred and ninety seven naira to one US dollars, central bank Nigeria of exchange rate as at 14th March, 2015.Keywords: building structures, building failure, building collapse, structural failure, cost, direct loss
Procedia PDF Downloads 2639069 Energy Use and Econometric Models of Soybean Production in Mazandaran Province of Iran
Authors: Majid AghaAlikhani, Mostafa Hojati, Saeid Satari-Yuzbashkandi
Abstract:
This paper studies energy use patterns and relationship between energy input and yield for soybean (Glycine max (L.) Merrill) in Mazandaran province of Iran. In this study, data were collected by administering a questionnaire in face-to-face interviews. Results revealed that the highest share of energy consumption belongs to chemical fertilizers (29.29%) followed by diesel (23.42%) and electricity (22.80%). Our investigations showed that a total energy input of 23404.1 MJ.ha-1 was consumed for soybean production. The energy productivity, specific energy, and net energy values were estimated as 0.12 kg MJ-1, 8.03 MJ kg-1, and 49412.71 MJ.ha-1, respectively. The ratio of energy outputs to energy inputs was 3.11. Obtained results indicated that direct, indirect, renewable and non-renewable energies were (56.83%), (43.17%), (15.78%) and (84.22%), respectively. Three econometric models were also developed to estimate the impact of energy inputs on yield. The results of econometric models revealed that impact of chemical, fertilizer, and water on yield were significant at 1% probability level. Also, direct and non-renewable energies were found to be rather high. Cost analysis revealed that total cost of soybean production per ha was around 518.43$. Accordingly, the benefit-cost ratio was estimated as 2.58. The energy use efficiency in soybean production was found as 3.11. This reveals that the inputs used in soybean production are used efficiently. However, due to higher rate of nitrogen fertilizer consumption, sustainable agriculture should be extended and extension staff could be proposed substitution of chemical fertilizer by biological fertilizer or green manure.Keywords: Cobbe Douglas function, economical analysis, energy efficiency, energy use patterns, soybean
Procedia PDF Downloads 3349068 An Attempt of Cost Analysis of Heart Failure Patients at Cardiology Department at Kasr Al Aini Hospitals: A Micro-Costing Study from Social Perspective
Authors: Eman Elsebaie, A. Sedrak, R. Ziada
Abstract:
Introduction: In the recent decades, heart failure (HF) has become one of the most prevalent cardio-vascular disease (CVDs), especially in the elderly and the main cause of hospitalization in Egypt cardiology departments. By 2030, the prevalence of HF is expected to increase by 25%. Total direct costs will increase to $818 billion, and the total indirect cost in terms of lost productivity is close to $275 billion. The current study was conducted to estimate the economic costs of services delivered for heart failure patients at the cardiology department in Cairo University Hospitals (CUHs). Aim: To gain an understanding of the cost of heart failure disease and its main drivers aiming to minimize associated health care costs. Subjects and Methods: Economic cost analysis study was conducted for a prospective group of all cases of HF admitted to the cardiology department in CUHs from end of March till end of April 2016 and another retrospective randomized sample from patients with HF, during the first 3 months of 2016 to measure estimated average cost per patient per day. Results: The mean age of the prospective group was 48.6 ± 17.16 years versus 52.3 ± 11.5 years for the retrospective group. The median (IQR) of Length of stay was 15 (15) days in the prospective group versus 9 (16) days in the retrospective group. The average HF inpatient cost/day in the cardiology department during April 2016 was 362.32 (255.5) L.E. versus 391.2(255.9) L.E. during January and February 2016. Conclusion: Up to 70% of expenditure in the management of HF is related to hospital admission. The average cost of such an admission was 5540.03 (IQR=7507.8) L.E. and 4687.4 (IQR=7818.8) L.E. with the average cost per day estimated at 362.32 (IQR=255.5) L.E. and 386.2(IQR=255.9) L.E. in prospective and retrospective groups respectively.Keywords: health care cost, heart failure, hospitalization, inpatient
Procedia PDF Downloads 2429067 Family Treatment Drug Court Cost Analysis: An In-depth Look At The Cost And Savings Of A Southeastern Family Treatment Drug Court
Authors: Ashley R. Logsdon, Becky F. Antle, Cynthia M. Kamer
Abstract:
This study examines the cost and benefits of a family treatment drug court in an urban county in a southeastern state. Additionally, this cost analysis will provide a detailed description of the type and cost of activities to produce the services provided to child welfare families. This study utilized return-on-investment analysis, which uses child welfare practices, disaggregates them into separate activities and estimates costs for these activities including child-level placement data for total cost of care for the child. Direct and indirect costs were considered as well as saving calculations what costs would be associated with child welfare outcomes both short and long term. The costs included were general program costs (salaries, drug screens, transportation, childcare, parent education, program evaluation, visitation, incentives) or personnel costs for other team members (judges, court administrators, child welfare workers, child welfare supervisors, and community mental health provider). The savings that were used in the study were length of time in out of home care, Medicaid costs, substance exposed births, emergency room utilization and jail/probation costs. This study documents an overall savings of between $168,993.30 and $837,993.30. The total savings per family divided by the 40 families who have participated in the program was between $4,224.83 to $20,949.83 per family. The results of this cost benefit analysis are consistent with prior research documenting savings associated with out of home care and jail/probation; however, there are also unique contributions of this study to the literature on cost effectiveness of family treatment drug courts. We will present recommendations for further utilization of family treatment drug courts and how to expand the current model.Keywords: child welfare, cost analysis, family drug court, family treatment drug court
Procedia PDF Downloads 1859066 Comparison between Classical and New Direct Torque Control Strategies of Induction Machine
Authors: Mouna Essaadi, Mohamed Khafallah, Abdallah Saad, Hamid Chaikhy
Abstract:
This paper presents a comparative analysis between conventional direct torque control (C_DTC), Modified direct torque control (M_DTC) and twelve sectors direct torque control (12_DTC).Those different strategies are compared by simulation in term of torque, flux and stator current performances. Finally, a summary of the comparative analysis is presented.Keywords: C_DTC, M_DTC, 12_DTC, torque dynamic, stator current, flux, performances
Procedia PDF Downloads 6199065 A Systematic Review on Development of a Cost Estimation Framework: A Case Study of Nigeria
Authors: Babatunde Dosumu, Obuks Ejohwomu, Akilu Yunusa-Kaltungo
Abstract:
Cost estimation in construction is often difficult, particularly when dealing with risks and uncertainties, which are inevitable and peculiar to developing countries like Nigeria. Direct consequences of these are major deviations in cost, duration, and quality. The fundamental aim of this study is to develop a framework for assessing the impacts of risk on cost estimation, which in turn causes variabilities between contract sum and final account. This is very important, as initial estimates given to clients should reflect the certain magnitude of consistency and accuracy, which the client builds other planning-related activities upon, and also enhance the capabilities of construction industry professionals by enabling better prediction of the final account from the contract sum. In achieving this, a systematic literature review was conducted with cost variability and construction projects as search string within three databases: Scopus, Web of science, and Ebsco (Business source premium), which are further analyzed and gap(s) in knowledge or research discovered. From the extensive review, it was found that factors causing deviation between final accounts and contract sum ranged between 1 and 45. Besides, it was discovered that a cost estimation framework similar to Building Cost Information Services (BCIS) is unavailable in Nigeria, which is a major reason why initial estimates are very often inconsistent, leading to project delay, abandonment, or determination at the expense of the huge sum of money invested. It was concluded that the development of a cost estimation framework that is adjudged an important tool in risk shedding rather than risk-sharing in project risk management would be a panacea to cost estimation problems, leading to cost variability in the Nigerian construction industry by the time this ongoing Ph.D. research is completed. It was recommended that practitioners in the construction industry should always take into account risk in order to facilitate the rapid development of the construction industry in Nigeria, which should give stakeholders a more in-depth understanding of the estimation effectiveness and efficiency to be adopted by stakeholders in both the private and public sectors.Keywords: cost variability, construction projects, future studies, Nigeria
Procedia PDF Downloads 2099064 Budget Impact Analysis of a Stratified Treatment Cascade for Hepatitis C Direct Acting Antiviral Treatment in an Asian Middle-Income Country through the Use of Compulsory and Voluntary Licensing Options
Authors: Amirah Azzeri, Fatiha H. Shabaruddin, Scott A. McDonald, Rosmawati Mohamed, Maznah Dahlui
Abstract:
Objective: A scaled-up treatment cascade with direct-acting antiviral (DAA) therapy is necessary to achieve global WHO targets for hepatitis C virus (HCV) elimination in Malaysia. Recently, limited access to Sofosbuvir/Daclatasvir (SOF/DAC) is available through compulsory licensing, with future access to Sofosbuvir/Velpatasvir (SOF/VEL) expected through voluntary licensing due to recent agreements. SOF/VEL has superior clinical outcomes, particularly for cirrhotic stages, but has higher drug acquisition costs compared to SOF/DAC. It has been proposed that a stratified treatment cascade might be the most cost-efficient approach for Malaysia whereby all HCV patients are treated with SOF/DAC except for patients with cirrhosis who are treated with SOF/VEL. This study aimed to conduct a five-year budget impact analysis from the provider perspective of the proposed stratified treatment cascade for HCV treatment in Malaysia. Method: A disease progression model that was developed based on model-predicted HCV epidemiology data in Malaysia was used for the analysis, where all HCV patients in scenario A were treated with SOF/DAC for all disease stages while in scenario B, SOF/DAC was used only for non-cirrhotic patients and SOF/VEL was used for the cirrhotic patients. The model projections estimated the annual numbers of patients in care and the numbers of patients to be initiated on DAA treatment nationally. Healthcare costs associated with DAA therapy and disease stage monitoring was included to estimate the downstream cost implications. For scenario B, the estimated treatment uptake of SOF/VEL for cirrhotic patients were 25%, 50%, 75%, 100% and 100% for 2018, 2019, 2020, 2021 and 2022 respectively. Healthcare costs were estimated based on standard clinical pathways for DAA treatment described in recent guidelines. All costs were reported in US dollars (conversion rate US$1=RM4.09, the price year 2018). Scenario analysis was conducted for 5% and 10% reduction of SOF/VEL acquisition cost anticipated from the competitive market pricing of generic DAA in Malaysia. Results: The stratified treatment cascade with SOF/VEL in Scenario B was found to be cost-saving compared to Scenario A. A substantial portion of the cost reduction was due to the costs associated with DAA therapy which resulted in USD 40 thousand (year 1) to USD 443 thousand (year 5) savings annually, with cumulative savings of USD 1.1 million after 5 years. Cost reductions for disease stage monitoring were seen in year three onwards which resulted in cumulative savings of USD 1.1 thousand. Scenario analysis estimated cumulative savings of USD 1.24 to USD 1.35 million when the acquisition cost of SOF/VEL was reduced. Conclusion: A stratified treatment cascade with SOF/VEL was expected to be cost-saving and can results in a budget impact reduction in overall healthcare expenditure in Malaysia compared to treatment with SOF/DAC. The better clinical efficacy with SOF/VEL is expected to halt patients’ HCV disease progression and may reduce downstream costs of treating advanced disease stages. The findings of this analysis may be useful to inform healthcare policies for HCV treatment in Malaysia.Keywords: Malaysia, direct acting antiviral, compulsory licensing, voluntary licensing
Procedia PDF Downloads 1649063 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits
Authors: Min-Tsai Lai, Taqwa Hariguna
Abstract:
This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy
Procedia PDF Downloads 3659062 Faults in the Projects, Deviation in the Cost
Authors: S. Ahmed, P. Dlask, B. Hasan
Abstract:
There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.Keywords: construction projects, building, cost, estimating costs, delay, overrun
Procedia PDF Downloads 2949061 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 759060 Direct Translation vs. Pivot Language Translation for Persian-Spanish Low-Resourced Statistical Machine Translation System
Authors: Benyamin Ahmadnia, Javier Serrano
Abstract:
In this paper we compare two different approaches for translating from Persian to Spanish, as a language pair with scarce parallel corpus. The first approach involves direct transfer using an statistical machine translation system, which is available for this language pair. The second approach involves translation through English, as a pivot language, which has more translation resources and more advanced translation systems available. The results show that, it is possible to achieve better translation quality using English as a pivot language in either approach outperforms direct translation from Persian to Spanish. Our best result is the pivot system which scores higher than direct translation by (1.12) BLEU points.Keywords: statistical machine translation, direct translation approach, pivot language translation approach, parallel corpus
Procedia PDF Downloads 4879059 An Analytical Method for Maintenance Cost Estimating Relationships of Helicopters Using Linear Programming
Authors: Meesun Sun, Yongmin Kim
Abstract:
Estimating maintenance cost is crucial in defense management because it affects military budgets and availability of equipment. When it comes to estimating maintenance cost of the deployed equipment, time series forecasting can be applied with the actual historical cost data. It is more difficult issue to estimate maintenance cost of new equipment for which the actual costs are not provided. In this underlying context, this study proposes an analytical method for maintenance cost estimating relationships (CERs) development of helicopters using linear programming. The CERs can be applied to a new helicopter because they use non-cost independent variables such as the number of engines, the empty weight and so on. In the Republic of Korea, the maintenance cost of new equipment has been usually estimated by reflecting maintenance cost to unit price ratio of the legacy equipment. This study confirms that the CERs perform well for the 10 types of airmobile helicopters in terms of mean absolute percentage error by applying leave-one-out cross-validation. The suggested method is very useful to estimate the maintenance cost of new equipment and can help in the affordability assessment of acquisition program portfolios for total life cycle systems management.Keywords: affordability analysis, cost estimating relationship, helicopter, linear programming, maintenance cost
Procedia PDF Downloads 1399058 Economic Valuation of Environmental Services Sustained by Flamboyant Park in Goiania-Go, Brazil
Authors: Brenda R. Berca, Jessica S. Vieira, Lucas G. Candido, Matheus C. Ferreira, Paulo S. A. Lopes Filho, Rafaella O. Baracho
Abstract:
This study aims to estimate the economic value environmental services sustained by Flamboyant Lourival Louza Municipal Park in Goiânia, Goiás, Brazil. The Flamboyant Park is one of the most relevant urban parks, and it is located near a stadium, a shopping center, and two supercenters. In order to define the methods used for the valuation of Flamboyant Park, the first step was carrying out bibliographical research with the view to better understand which method is most feasible to valuate the Park. Thus, the following direct methods were selected: travel cost, hedonic pricing, and contingent valuation. In addition, an indirect method (replacement cost) was applied at Flamboyant Park. The second step was creating and applying two surveys. The first survey aimed at the visitors of the park, addressing socio-economic issues, the use of the Park, as well as its importance and the willingness the visitors, had to pay for its existence. The second survey was destined to the existing trade in the Park, in order to collect data regarding the profits obtained by them. In the end, the characterization of the profile of the visitors and the application of the methods of contingent valuation, travel cost, replacement cost and hedonic pricing were obtained, thus monetarily valuing the various ecosystem services sustained by the park. Some services were not valued due to difficulties encountered during the process.Keywords: contingent valuation, ecosystem services, economic environmental valuation, hedonic pricing, travel cost
Procedia PDF Downloads 2269057 Matrix Completion with Heterogeneous Cost
Authors: Ilqar Ramazanli
Abstract:
The matrix completion problem has been studied broadly under many underlying conditions. The problem has been explored under adaptive or non-adaptive, exact or estimation, single-phase or multi-phase, and many other categories. In most of these cases, the observation cost of each entry is uniform and has the same cost across the columns. However, in many real-life scenarios, we could expect elements from distinct columns or distinct positions to have a different cost. In this paper, we explore this generalization under adaptive conditions. We approach the problem under two different cost models. The first one is that entries from different columns have different observation costs, but within the same column, each entry has a uniform cost. The second one is any two entry has different observation cost, despite being the same or different columns. We provide complexity analysis of our algorithms and provide tightness guarantees.Keywords: matroid optimization, matrix completion, linear algebra, algorithms
Procedia PDF Downloads 1099056 Productive Efficiency in Asean Banking
Authors: Suhartono Suhartono
Abstract:
Issue of cost efficiency is then becoming pivotal point because public expect cost of banking operation reducing and benefited of consumers. This study examines the determinants of cost efficiency of banks operating in 8 member countries of the Association of Southeast Asian Nations (ASEAN). This study uses economics theory approach to examine the existence of economies of scale in the ASEAN Banking market especially on its impact on cost efficiency. We apply concept of average cost (AC) as a proxy for the cost efficiency. We find that economies of scale is existing in the banking market indicating scale and scope economies should be considered in the industrial policy. The stronger capital position is also positive to efficiency means stronger capitalized banks are more efficient. Bank that remunerates better tend to be more efficient as result economic capital effect.Keywords: cost efficiency, ASEAN, economies of scale, issue of cost
Procedia PDF Downloads 3799055 Comparison of Direct and Indirect Tensile Strength of Brittle Materials and Accurate Estimate of Tensile Strength
Authors: M. Etezadi, A. Fahimifar
Abstract:
In many geotechnical designs in rocks and rock masses, tensile strength of rock and rock mass is needed. The difficulties associated with performing a direct uniaxial tensile test on a rock specimen have led to a number of indirect methods for assessing the tensile strength that in the meantime the Brazilian test is more popular. Brazilian test is widely applied in rock engineering because specimens are easy to prepare, the test is easy to conduct and uniaxial compression test machines are quite common. This study compares experimental results of direct and Brazilian tensile tests carried out on two rock types and three concrete types using 39 cylindrical and 28 disc specimens. The tests are performed using Servo-Control device. The relationship between direct and indirect tensile strength of specimens is extracted using linear regression. In the following, tensile strength of direct and indirect test is evaluated using finite element analysis. The results are analyzed and effective factors on results are studied. According to the experimental results Brazilian test is shown higher tensile strength than direct test. Because of decreasing the contact surface of grains and increasing the uniformity in concrete specimens with fine aggregate (largest grain size= 6mm), higher tensile strength in direct test is shown. The experimental and numerical results of tensile strength are compared and empirical relationship witch is obtained from experimental tests is validated.Keywords: tensile strength, brittle materials, direct and indirect tensile test, numerical modeling
Procedia PDF Downloads 5489054 Damage Cost for Private Property by Extreme Wind over the past 10 Years in Korea
Authors: Gou-Moon Choi, Woo-Young Jung, Chan-Young Yune
Abstract:
Recently, the natural disaster has increased worldwide. In Korea, the damage to life and property caused by a typhoon, heavy rain, heavy snow, and an extreme wind also increases every year. Among natural disasters, the frequency and the strength of wind have increased because sea surface temperature has risen due to the increase of the average temperature of the Earth. In the case of extreme wind disaster, it is impossible to control or reduce the occurrence, and the recovery cost always exceeds the damage cost. Therefore, quantitative estimation of the damage cost for extreme wind needs to be established beforehand to install proactive countermeasures. In this study, the damage cost for private properties was analyzed based on the data for the past 10 years in Korea. The damage cost curve was also suggested for the metropolitan cities and provinces. The result shows the possibility for the regional application of the damage cost curve because the damage cost of the regional area is estimated based on the cost of cities and provinces.Keywords: damage cost, extreme wind, natural disaster, private property
Procedia PDF Downloads 3059053 Analysis of Behavior and Determinants of Cost Stickiness in Manufacturing Companies in Indonesia
Authors: Farizy Yunaz, Catur Sasongko
Abstract:
This research aims to provide the empirical evidence regarding cost stickiness behavior and its determinants on listed manufacturing companies. Hypothesis testing is performed using pooled least square method. The result concludes that there is cost stickiness behavior in selling, general and administrative costs. In term of determinants, firm-specific adjustment costs measured by asset intensity and employee intensity have significant positive impact on the level of cost stickiness. Meanwhile, earnings target and leverage have significant negative impact on the level of cost stickiness. However, the management empire building incentives measured by free cash flow has no significant positive impact.Keywords: adjustment cost, cost behavior, cost stickiness, earnings target, leverage, management empire building incentive
Procedia PDF Downloads 3639052 Cost Effectiveness and Performance Study of Perpetual Pavement Using ABAQUS
Authors: Mansour Fakhri, Monire Zokaei
Abstract:
Where there are many demolitions on conventional asphalt pavements, heavy costs are paid to repair and reconstruct the pavement roads annually. Recently some research has been done in order to increase the pavement life. Perpetual pavement is regarded as one of them which can improve the pavement life and minimize the maintenance activity and cost. In this research, ABAQUS which is a finite element software is implemented for analyzing and simulation of perpetual pavement. Viscoelastic model of material is used and loading wheel is considered to be dynamic. Effect of different parameters on pavement function has been considered. Because of high primary cost these pavements are not widely used. In this regard, life cost analysis was also carried out to compare perpetual pavement to conventional asphalt concrete pavement. It was concluded that although the initial cost of perpetual pavement is higher than that of conventional asphalt pavement, life cycle cost analysis during 50 years of service life showed that the performance of this pavement is better and the whole life cost of that is less.Keywords: ABAQUS, lifecycle cost analysis, mechanistic empirical, perpetual pavement
Procedia PDF Downloads 3839051 Optimal Type and Installation Time of Wind Farm in a Power System, Considering Service Providers
Authors: M. H. Abedi, A. Jalilvand
Abstract:
The economic development benefits of wind energy may be the most tangible basis for the local and state officials’ interests. In addition to the direct salaries associated with building and operating wind projects, the wind energy industry provides indirect jobs and benefits. The optimal planning of a wind farm is one most important topic in renewable energy technology. Many methods have been implemented to optimize the cost and output benefit of wind farms, but the contribution of this paper is mentioning different types of service providers and also time of installation of wind turbines during planning horizon years. Genetic algorithm (GA) is used to optimize the problem. It is observed that an appropriate layout of wind farm can cause to minimize the different types of cost.Keywords: renewable energy, wind farm, optimization, planning
Procedia PDF Downloads 5249050 Application Methodology for the Generation of 3D Thermal Models Using UAV Photogrammety and Dual Sensors for Mining/Industrial Facilities Inspection
Authors: Javier Sedano-Cibrián, Julio Manuel de Luis-Ruiz, Rubén Pérez-Álvarez, Raúl Pereda-García, Beatriz Malagón-Picón
Abstract:
Structural inspection activities are necessary to ensure the correct functioning of infrastructures. Unmanned Aerial Vehicle (UAV) techniques have become more popular than traditional techniques. Specifically, UAV Photogrammetry allows time and cost savings. The development of this technology has permitted the use of low-cost thermal sensors in UAVs. The representation of 3D thermal models with this type of equipment is in continuous evolution. The direct processing of thermal images usually leads to errors and inaccurate results. A methodology is proposed for the generation of 3D thermal models using dual sensors, which involves the application of visible Red-Blue-Green (RGB) and thermal images in parallel. Hence, the RGB images are used as the basis for the generation of the model geometry, and the thermal images are the source of the surface temperature information that is projected onto the model. Mining/industrial facilities representations that are obtained can be used for inspection activities.Keywords: aerial thermography, data processing, drone, low-cost, point cloud
Procedia PDF Downloads 1439049 Copula-Based Estimation of Direct and Indirect Effects in Path Analysis Model
Authors: Alam Ali, Ashok Kumar Pathak
Abstract:
Path analysis is a statistical technique used to evaluate the strength of the direct and indirect effects of variables. One or more structural regression equations are used to estimate a series of parameters in order to find the better fit of data. Sometimes, exogenous variables do not show a significant strength of their direct and indirect effect when the assumption of classical regression (ordinary least squares (OLS)) are violated by the nature of the data. The main motive of this article is to investigate the efficacy of the copula-based regression approach over the classical regression approach and calculate the direct and indirect effects of variables when data violates the OLS assumption and variables are linked through an elliptical copula. We perform this study using a well-organized numerical scheme. Finally, a real data application is also presented to demonstrate the performance of the superiority of the copula approach.Keywords: path analysis, copula-based regression models, direct and indirect effects, k-fold cross validation technique
Procedia PDF Downloads 729048 Application of Knowledge Discovery in Database Techniques in Cost Overruns of Construction Projects
Authors: Mai Ghazal, Ahmed Hammad
Abstract:
Cost overruns in construction projects are considered as worldwide challenges since the cost performance is one of the main measures of success along with schedule performance. To overcome this problem, studies were conducted to investigate the cost overruns' factors, also projects' historical data were analyzed to extract new and useful knowledge from it. This research is studying and analyzing the effect of some factors causing cost overruns using the historical data from completed construction projects. Then, using these factors to estimate the probability of cost overrun occurrence and predict its percentage for future projects. First, an intensive literature review was done to study all the factors that cause cost overrun in construction projects, then another review was done for previous researcher papers about mining process in dealing with cost overruns. Second, a proposed data warehouse was structured which can be used by organizations to store their future data in a well-organized way so it can be easily analyzed later. Third twelve quantitative factors which their data are frequently available at construction projects were selected to be the analyzed factors and suggested predictors for the proposed model.Keywords: construction management, construction projects, cost overrun, cost performance, data mining, data warehousing, knowledge discovery, knowledge management
Procedia PDF Downloads 370