1346 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits

Authors: Min-Tsai Lai, Taqwa Hariguna

Abstract:

This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.

Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy

Procedia PDF Downloads 337
1345 Replacement Time and Number of Preventive Maintenance Actions for Second-Hand Device

Authors: Wen Liang Chang

Abstract:

In this study, the optimal replacement time and number of preventive maintenance (PM) actions were investigated for a second-hand device. Suppose that a user intends to use a second-hand device for manufacturing products, and that the device is replaced with a new one. Any device failure is rectified through minimal repair, thereby incurring a fixed repair cost to the user. If the new device fails within the FRW period, minimal repair is performed at no cost to the user. After the FRW expires, a failed device is repaired and the cost of repair is incurred by the user. In this study, two profit models were developed, and the optimal replacement time and number of PM actions were determined to maximize profits. Finally, the influence of the optimal replacement time and number of PM actions were elaborated on, using numerical examples.

Keywords: second-hand device, preventive maintenance, replacement time, device failure

Procedia PDF Downloads 442
1344 A Current Problem for Steel Bridges: Fatigue Assessment of Seams´ Repair

Authors: H. Pasternak, A. Chwastek

Abstract:

The paper describes the results from a research project about repair of welds. The repair was carried out by grinding the flawed seams and re-welding them. The main task was to determine the FAT classes of original state and after repair of seams according to the assessment procedures, such as nominal, structural and effective notch stress approach. The first part shows the results of the tests, the second part encloses numerical analysis and evaluation of results to determine the fatigue strength classes according to three assessment procedures.

Keywords: cyclic loading, fatigue crack, post-weld treatment, seams’ repair

Procedia PDF Downloads 237
1343 Retrofitting of Historical Structures in Van City

Authors: Eylem Güzel, Mustafa Gülen

Abstract:

Historical structures are the most important symbols of a country that link the past with the future. In order to transfer them in their present conditions to the next generations, maintaining these historical structures are one of our main tasks. Seismic performance of historical structures damaged by the earthquake effects can be enhanced by repair and retrofitting applications. However, repair and retrofitting applications of historical structures are more complicated compared with the traditional structures. For this reason, they need much more attention in repair and retrofitting applications to preserve the spirit of historical structures. In this study, the present condition of selected historical structures built up in Van city that has a very rich historical heritage is given and the necessity of repair and retrofitting applications of historical structures are debated in detail.

Keywords: historical structures, repair, retrofitting, Van city

Procedia PDF Downloads 328
1342 Structural Rehabilitation, Retrofitting and Strengthening of Reinforced Concrete Structures

Authors: Manish Kumar

Abstract:

Reinforced cement concrete is getting extensively used for construction of different type of structures for the last one century. During this period, we have constructed many structures like buildings, bridges, industrial structures, pavement, water tanks etc. using this construction material. These structures have been created with huge investment of resources. It is essential to maintain those structures in functional condition. Since deterioration in RCC Structures is a common and natural phenomenon it is required to have a detailed plan, methodology for structural repair and rehabilitation shall be in place for dealing such issues. It is important to know exact reason of distress, type of distress and correct method of repair concrete structures. The different methods of repair are described in paper according to distress category which can be refereed for repair. Major finding of the study is that to protect our structure we need to have maintenance frequency and correct material to be chosen for repair. Also workmanship during repair needs to be taken utmost care for quality repair.

Keywords: deterioration, functional condition, reinforced cement concrete, resources

Procedia PDF Downloads 223
1341 A Case Study on the Field Surveys and Repair of a Marine Approach-Bridge

Authors: S. H. Park, D. W. You

Abstract:

This study is about to the field survey and repair works in a marine approach-bride. In order to evaluate the stability of the ground and the structure, field surveys such as exterior inspection, non-destructive inspection, measurement, and geophysical exploration are carried out. Numerical analysis is conducted to investigate the cause of the abutment displacement at the same time. In addition, repair works are practiced to the region damaged with intent to sustain long-term safety.

Keywords: field survey, expansion joint, repair, maintenance

Procedia PDF Downloads 271
1340 Assertion-Driven Test Repair Based on Priority Criteria

Authors: Ruilian Zhao, Shukai Zhang, Yan Wang, Weiwei Wang

Abstract:

Repairing broken test cases is an expensive and challenging task in evolving software systems. Although an automated repair technique with intent preservation has been proposed, but it does not take into account the association between test repairs and assertions, leading to a large number of irrelevant candidates and decreasing the repair capability. This paper proposes an assertion-driven test repair approach. Furthermore, an intent-oriented priority criterion is raised to guide the repair candidate generation, making the repairs closer to the intent of the test. In more detail, repair targets are determined through post-dominance relations between assertions and the methods that directly cause compilation errors. Then, test repairs are generated from the target in a bottom-up way, guided by the intent-oriented priority criteria. Finally, the generated repair candidates are prioritized to match the original test intent. The approach is implemented and evaluated on the benchmark of 4 open-source programs and 91 broken test cases. The result shows that the approach can fix 89% (81/91) of broken test cases, which is more effective than the existing intentpreserved test repair approach, and our intent-oriented priority criteria work well.

Keywords: test repair, test intent, software test, test case evolution

Procedia PDF Downloads 91
1339 Preventative Maintenance, Impact on the Optimal Replacement Strategy of Secondhand Products

Authors: Pin-Wei Chiang, Wen-Liang Chang, Ruey-Huei Yeh

Abstract:

This paper investigates optimal replacement and preventative maintenance policies of secondhand products under a Finite Planning Horizon (FPH). Any consumer wishing to replace their product under FPH would have it undergo minimal repairs. The replacement provided would be required to undergo periodical preventive maintenance done to avoid product failure. Then, a mathematical formula for disbursement cost for products under FPH can be derived. Optimal policies are then obtained to minimize cost. In the first of two segments of the paper, a model for initial product purchase of either new or secondhand products is used. This model is built by analyzing product purchasing price, surplus value of product, as well as the minimal repair cost. The second segment uses a model for replacement products, which are also secondhand products with no limit on usage. This model analyzes the same components as the first as well as expected preventative maintenance cost. Using these two models, a formula for the expected final total cost can be developed. The formula requires four variables (optimal preventive maintenance level, preventive maintenance frequency, replacement timing, age of replacement product) to find minimal cost requirement. Based on analysis of the variables using the expected total final cost model, it was found that the purchasing price and length of ownership were directly related. Also, consumers should choose the secondhand product with the higher usage for replacement. Products with higher initial usage upon acquisition require an earlier replacement schedule. In this case, replacements should be made with a secondhand product with less usage. In addition, preventative maintenance also significantly reduces cost. Consumers that plan to use products for longer periods of time replace their products later. Hence these consumers should choose the secondhand product with lesser initial usage for replacement. Preventative maintenance also creates significant total cost savings in this case. This study provides consumers with a method of calculating both the ideal amount of usage of the products they should purchase as well as the frequency and level of preventative maintenance that should be conducted in order to minimize cost and maintain product function.

Keywords: finite planning horizon, second hand product, replacement, preventive maintenance, minimal repair

Procedia PDF Downloads 451
1338 An Overview of Corroded Pipe Repair Techniques Using Composite Materials

Authors: Lim Kar Sing, Siti Nur Afifah Azraai, Norhazilan Md Noor, Nordin Yahaya

Abstract:

Polymeric composites are being increasingly used as repair material for repairing critical infrastructures such as building, bridge, pressure vessel, piping and pipeline. Technique in repairing damaged pipes is one of the major concerns of pipeline owners. Considerable researches have been carried out on the repair of corroded pipes using composite materials. This article attempts a short review of the subject matter to provide insight into various techniques used in repairing corroded pipes, focusing on a wide range of composite repair systems. These systems including pre-cured layered, flexible wet lay-up, pre-impregnated, split composite sleeve and flexible tape systems. Both advantages and limitations of these repair systems were highlighted. Critical technical aspects have been discussed through the current standards and practices. Research gaps and future study scopes in achieving more effective design philosophy are also presented.

Keywords: composite materials, pipeline, repair technique, polymers

Procedia PDF Downloads 486
1337 Transperineal Repair Is Ideal for the Management of Rectocele with Faecal Incontinence

Authors: Tia Morosin, Marie Shella De Robles

Abstract:

Rectocele may be associated with symptoms of both obstructed defecation and faecal incontinence. Currently, numerous operative techniques exist to treat patients with rectocele; however, no single technique has emerged as the optimal approach in patients with post-partum faecal incontinence. The purpose of this study was to evaluate the clinical outcome in a consecutive series of patients who underwent transperineal repair of rectocele for patients presenting with faecal incontinence as the predominant symptom. Twenty-three consecutive patients from April 2000 to July 2015 with symptomatic rectocele underwent transperineal repair by a single surgeon. All patients had a history of vaginal delivery, with or without evidence of associated anal sphincter injury at the time. The median age of the cohort was 53 years (range 21 to 90 years). The median operating time and length of hospital stay were 2 hours and 7 days, respectively. Two patients developed urinary retention post-operatively, which required temporary bladder catheterization. One patient had wound dehiscence, which was managed by absorbent dressing applied by the patient and her carer. There was no operative mortality. In all patients with rectocele, there was a concomitant anal sphincter disruption. All patients had satisfactory improvement with regard to faecal incontinence on follow-up. This study suggests this method provides excellent anatomic and physiologic results with minimal morbidity. However, because none of the patients gained full continence postoperatively, pelvic floor rehabilitation might be also needed to achieve better sphincter function in patients with incontinence.

Keywords: anal sphincter defect, faecal incontinence, rectocele, transperineal repair

Procedia PDF Downloads 100
1336 Results of Twenty Years of Laparoscopic Hernia Repair Surgeries

Authors: Arun Prasad

Abstract:

Introduction: Laparoscopic surgery of hernia started in early 1990 and has had a mixed acceptance across the world, unlike laparoscopic cholecystectomy that has become a gold standard. Laparoscopic hernia repair claims to have less pain, less recurrence, and less wound infection compared to open hernia repair leading to early recovery and return to work. Materials and Methods: Laparoscopic hernia repair has been done in 2100 patients from 1995 till now with a follow-up data of 1350 patients. Data was analysed for results and satisfaction. Results: There is a recurrence rate of 0.1%. Early complications include bleeding, trocar injury and nerve pain. Late complications were rare. Conclusion: Laparoscopic inguinal hernia repair has a steep learning curve but after that the results and patient satisfaction are very good. It should be the procedure of choice in all bilateral and recurrent hernias.

Keywords: laparoscopy, hernia, mesh, surgery

Procedia PDF Downloads 223
1335 Repair of Cracked Aluminum Plate by Composite Patch

Authors: S. Lecheb, A. Nour, A. Chellil, H. Mechakra, A. Zeggane, H. Kebir

Abstract:

In this work, repaired crack in 6061-T6 aluminum plate with composite patches presented, firstly we determine the displacement, strain, and stress, also the first six mode shape of the plate, secondly we took the same model adding central crack initiation, which is located in the center of the plate, its size vary from 20 mm to 60 mm and we compare the first results with second. Thirdly, we repair various cracks with the composite patch (carbon/epoxy) and for (2 layers, 4 layers). Finally, the comparison of stress, strain, displacement and six first natural frequencies between un-cracked specimen, crack propagation and composite patch repair.

Keywords: composite patch repair, crack growth, aluminum alloy plate, stress

Procedia PDF Downloads 570
1334 A Radiographic Survey of Eggshell Powder Effect on Tibial Bone Defect Repair Tested in Dog

Authors: M. Yadegari, M. Nourbakhsh, N. Arbabzadeh

Abstract:

The skeletal system injuries are of major importance. In addition, it is recommended to use materials for hard tissue repair in open or closed fractures. It is important to use complex minerals with a beneficial effect on hard tissue repair, stimulating cell growth in the bone. Materials that could help avoid bone fracture inflammatory reaction and speed up bone fracture repair are of utmost importance in the treatment of bone fractures. Similar to minerals, the inner eggshell membrane consists of carbohydrates, lipids, proteins with the high pH, high calcium absorptive capacity and with faster bone fracture repair ability. In the present radiographic survey, eggshell-derived bone graft substitutes were used for bone defect repair in 8 dog tibia, measuring bone density on the day of implant placement and 30 and 60 days after placement. In fact, the result of this study shows the difference in bone growth and misshapen bones between treatment and control sites. Cell growth was adequate in treatment sites and misshapen bones were less frequent here than in control sites.

Keywords: bone repair, eggshell powder, implant, radiography

Procedia PDF Downloads 289
1333 Optimal Sequential Scheduling of Imperfect Maintenance Last Policy for a System Subject to Shocks

Authors: Yen-Luan Chen

Abstract:

Maintenance has a great impact on the capacity of production and on the quality of the products, and therefore, it deserves continuous improvement. Maintenance procedure done before a failure is called preventive maintenance (PM). Sequential PM, which specifies that a system should be maintained at a sequence of intervals with unequal lengths, is one of the commonly used PM policies. This article proposes a generalized sequential PM policy for a system subject to shocks with imperfect maintenance and random working time. The shocks arrive according to a non-homogeneous Poisson process (NHPP) with varied intensity function in each maintenance interval. As a shock occurs, the system suffers two types of failures with number-dependent probabilities: type-I (minor) failure, which is rectified by a minimal repair, and type-II (catastrophic) failure, which is removed by a corrective maintenance (CM). The imperfect maintenance is carried out to improve the system failure characteristic due to the altered shock process. The sequential preventive maintenance-last (PML) policy is defined as that the system is maintained before any CM occurs at a planned time Ti or at the completion of a working time in the i-th maintenance interval, whichever occurs last. At the N-th maintenance, the system is replaced rather than maintained. This article first takes up the sequential PML policy with random working time and imperfect maintenance in reliability engineering. The optimal preventive maintenance schedule that minimizes the mean cost rate of a replacement cycle is derived analytically and determined in terms of its existence and uniqueness. The proposed models provide a general framework for analyzing the maintenance policies in reliability theory.

Keywords: optimization, preventive maintenance, random working time, minimal repair, replacement, reliability

Procedia PDF Downloads 243
1332 Soap Film Enneper Minimal Surface Model

Authors: Yee Hooi Min, Mohdnasir Abdul Hadi

Abstract:

Tensioned membrane structure in the form of Enneper minimal surface can be considered as a sustainable development for the green environment and technology, it also can be used to support the effectiveness used of energy and the structure. Soap film in the form of Enneper minimal surface model has been studied. The combination of shape and internal forces for the purpose of stiffness and strength is an important feature of membrane surface. For this purpose, form-finding using soap film model has been carried out for Enneper minimal surface models with variables u=v=0.6 and u=v=1.0. Enneper soap film models with variables u=v=0.6 and u=v=1.0 provides an alternative choice for structural engineers to consider the tensioned membrane structure in the form of Enneper minimal surface applied in the building industry. It is expected to become an alternative building material to be considered by the designer.

Keywords: Enneper, minimal surface, soap film, tensioned membrane structure

Procedia PDF Downloads 514
1331 Optimal Continuous Scheduled Time for a Cumulative Damage System with Age-Dependent Imperfect Maintenance

Authors: Chin-Chih Chang

Abstract:

Many manufacturing systems suffer failures due to complex degradation processes and various environment conditions such as random shocks. Consider an operating system is subject to random shocks and works at random times for successive jobs. When successive jobs often result in production losses and performance deterioration, it would be better to do maintenance or replacement at a planned time. A preventive replacement (PR) policy is presented to replace the system before a failure occurs at a continuous time T. In such a policy, the failure characteristics of the system are designed as follows. Each job would cause a random amount of additive damage to the system, and the system fails when the cumulative damage has exceeded a failure threshold. Suppose that the deteriorating system suffers one of the two types of shocks with age-dependent probabilities: type-I (minor) shock is rectified by a minimal repair, or type-II (catastrophic) shock causes the system to fail. A corrective replacement (CR) is performed immediately when the system fails. In summary, a generalized maintenance model to scheduling replacement plan for an operating system is presented below. PR is carried out at time T, whereas CR is carried out when any type-II shock occurs and the total damage exceeded a failure level. The main objective is to determine the optimal continuous schedule time of preventive replacement through minimizing the mean cost rate function. The existence and uniqueness of optimal replacement policy are derived analytically. It can be seen that the present model is a generalization of the previous models, and the policy with preventive replacement outperforms the one without preventive replacement.

Keywords: preventive replacement, working time, cumulative damage model, minimal repair, imperfect maintenance, optimization

Procedia PDF Downloads 332
1330 An Improved Lower Bound for Minimal-Area Convex Cover for Closed Unit Curves

Authors: S. Som-Am, B. Grechuk

Abstract:

Moser’s worm problem is the unsolved problem in geometry which asks for the minimal area of a convex region on the plane which can cover all curves of unit length, assuming that curves may be rotated and translated to fit inside the region. We study a version of this problem asking for a minimal convex cover for closed unit curves. By combining geometric methods with numerical box’s search algorithm, we show that any such cover should have an area at least 0.0975. This improves the best previous lower bound of 0.096694. In fact, we show that the minimal area of convex hull of circle, equilateral triangle, and rectangle of perimeter 1 is between 0.0975 and 0.09763.

Keywords: Moser’s worm problem, closed arcs, convex cover, minimal-area cover

Procedia PDF Downloads 185
1329 Analysis of Arthroscopic Rotator Cuff Repair

Authors: Prakash Karrun, M. Manoj Deepak, Mathivanan, K. Venkatachalam

Abstract:

Our study aims to evaluate the rates of healing and the efficacy of the arthroscopic repair of the rotator cuff tears. 40 patients who had rotator cuff tears were taken up for the study and arthroscopic repair was done with double row technique.They were evaluated and followed up for a minimum of 2 years minimum.The functional status,range of motion and healing rates were compared post operatively. All the patients were followed up with serial questionnaires and MRI at the end of 2 years. There was significant improvement in the functional status of the patient. The MRI showed better rates of healing in these patients.Thus our study effectively proves the efficacy of our operating technique.

Keywords: rotator cuff tear, arthroscopic repair, double stich, healing

Procedia PDF Downloads 323
1328 Comparative Study of Non-Identical Firearms with Priority to Repair Subject to Inspection

Authors: A. S. Grewal, R. S. Sangwan, Dharambir, Vikas Dhanda

Abstract:

The purpose of this paper is to develop and analyze two reliability models for a system of non-identical firearms – one is standard firearm (called as original unit) and the other is a country-made firearm (called as duplicate /substandard unit). There is a single server who comes immediately to do inspection and repair whenever needed. On the failure of standard firearm, the server inspects the operative country-made firearm to see whether the unit is capable of performing the desired function well or not. If country-made firearm is not capable to do so, the operation of the system is stopped and server starts repair of the standard firearms immediately. However, no inspection is done at the failure of the country-made firearm as the country-made firearm alone is capable of performing the given task well. In model I, priority to repair the standard firearm is given in case system fails completely and country-made firearm is already under repair, whereas in model II there is no such priority. The failure and repair times of each unit are assumed to be independent and uncorrelated random variables. The distributions of failure time of the units are taken as negative exponential while that of repair and inspection times are general. By using semi-Markov process and regenerative point technique some econo-reliability measures are obtained. Graphs are plotted to compare the MTSF (mean time to system failure), availability and profit of the models for a particular case.

Keywords: non-identical firearms, inspection, priority to repair, semi-Markov process, regenerative point

Procedia PDF Downloads 403
1327 Advanced Techniques in Robotic Mitral Valve Repair

Authors: Abraham J. Rizkalla, Tristan D. Yan

Abstract:

Purpose: Durable mitral valve repair is preferred to a replacement, avoiding the need for anticoagulation or re-intervention, with a reduced risk of endocarditis. Robotic mitral repair has been gaining favour globally as a safe, effective, and reproducible method of minimally invasive valve repair. In this work, we showcase the use of the Davinci© Xi robotic platform to perform several advanced techniques, working synergistically to achieve successful mitral repair in advanced mitral disease. Techniques: We present the case of a Barlow type mitral valve disease with a tall and redundant posterior leaflet resulting in severe mitral regurgitation and systolic anterior motion. Firstly, quadrangular resection of P2 is performed to remove the excess and redundant leaflet. Secondly, a sliding leaflet plasty of P1 and P3 is used to reconstruct the posterior leaflet. To anchor the newly formed posterior leaflet to the papillary muscle, CV-4 Goretex neochordae are fashioned using the innovative string, ruler, and bulldog technique. Finally, mitral valve annuloplasty and closure of a patent foramen ovale complete the repair. Results: There was no significant residual mitral regurgitation and complete resolution of the systolic anterior motion of the mitral valve on post operative transoesophageal echocardiography. Conclusion: This work highlights the robotic approach to complex repair techniques for advanced mitral valve disease. Familiarity with resection and sliding plasty, neochord implantation, and annuloplasty allows the modern cardiac surgeon to achieve a minimally-invasive and durable mitral valve repair when faced with complex mitral valve pathology.

Keywords: robotic mitral valve repair, Barlow's valve, sliding plasty, neochord, annuloplasty, quadrangular resection

Procedia PDF Downloads 50
1326 The Impact of Urethral Plate Width on Surgical Outcomes After Distal Hypospadias Repair in Children

Authors: Andrey Boyko

Abstract:

Nowadays, there is no consensus about the influence of urethral plate (UP) width on the surgical outcomes after distal hypospadias repair. The purpose of the research was to study the association between UP width and surgical outcomes after distal hypospadias repair in children. Materials and methods: The study included 138 patients with distal hypospadias. The mean age at the time of surgery was 4.6 years (6 months – 16 years). We measured UP width at the “midpoint within the glans” and used the HOSE scale to assess postoperative outcomes. The patients were divided into 2 groups: group 1 – the patients (107) with UP < 8mm, group 2 – patients (31) with UP > 8mm. All boys underwent TIP repair. Preincision means UP width after incision means UP width, and the UP ratio was analyzed. Statistical data were obtained using Statistica 10. Results: The findings were preincision mean UP width - 5.4 mm and 9.4 mm; after incision mean UP width - 13mm and 17.5 mm; UP ratio - 0.41 and 0.53 in group 1 and group 2, respectively. Most postoperative complications (fistula, meatal stenosis, and stricture) happened in patients with UP width < 8 mm versus ≥ 8 mm (7/107 versus 2/31, respectively). HOSE results were 15.77 (group 1), 15.65 (group 2). The follow up lasted up to 12 months. Statistical analysis proved the absence of correlation between UP width and postoperative complications. Conclusions: In conclusion, it should be noted that the success of surgical repair mostly depended on the surgical technique.

Keywords: children, distal hypospadias, tip repair, urethral plate width

Procedia PDF Downloads 94
1325 Computation of Thermal Stress Intensity Factor for Bonded Composite Repairs in Aircraft Structures

Authors: Fayçal Benyahia, Abdelmohsen Albedah, Bel Abbes Bachir Bouiadjra

Abstract:

In this study the Finite element method is used to analyse the effect of the thermal residual stresses resulting from adhesive curing on the performances of the bonded composite repair in aircraft structures. The stress intensity factor at the crack tip is chosen as fracture criterion in order to estimate the repair performances. The obtained results show that the presence of the thermal residual stresses reduces considerably the repair performances and consequently decreases the fatigue life of cracked structures. The effects of the curing temperature, the adhesive properties and the adhesive thickness on the Stress Intensity Factor (SIF) variation with thermal stresses are also analysed.

Keywords: bonded composite repair, residual stress, adhesion, stress transfer, finite element analysis

Procedia PDF Downloads 382
1324 AI-Driven Strategies for Sustainable Electronics Repair: A Case Study in Energy Efficiency

Authors: Badiy Elmabrouk, Abdelhamid Boujarif, Zhiguo Zeng, Stephane Borrel, Robert Heidsieck

Abstract:

In an era where sustainability is paramount, this paper introduces a machine learning-driven testing protocol to accurately predict diode failures, merging reliability engineering with failure physics to enhance repair operations efficiency. Our approach refines the burn-in process, significantly curtailing its duration, which not only conserves energy but also elevates productivity and mitigates component wear. A case study from GE HealthCare’s repair center vividly demonstrates the method’s effectiveness, recording a high prediction of diode failures and a substantial decrease in energy consumption that translates to an annual reduction of 6.5 Tons of CO2 emissions. This advancement sets a benchmark for environmentally conscious practices in the electronics repair sector.

Keywords: maintenance, burn-in, failure physics, reliability testing

Procedia PDF Downloads 26
1323 Comparative Study of Outcomes of Nonfixation of Mesh versus Fixation in Laparoscopic Total Extra Peritoneal (TEP) Repair of Inguinal Hernia: A Prospective Randomized Controlled Trial

Authors: Raman Sharma, S. K. Jain

Abstract:

Aims and Objectives: Fixation of the mesh during laparoscopic total extraperitoneal (TEP) repair of inguinal hernia is thought to be necessary to prevent recurrence. However, mesh fixation may increase surgical complications and postoperative pain. Our objective was to compare the outcomes of nonfixation with fixation of polypropylene mesh by metal tacks during TEP repair of inguinal hernia. Methods: Forty patients aged 18 to72 years with inguinal hernia were included who underwent laparoscopic TEP repair of inguinal hernia with (n=20) or without (n=20) fixation of the mesh. The outcomes were operative duration, postoperative pain score, cost, in-hospital stay, time to return to normal activity, and complications. Results: Patients in whom the mesh was not fixed had shorter mean operating time (p < 0.05). We found no difference between groups in the postoperative pain score, incidence of recurrence, in-hospital stay, time to return to normal activity and complications (P > 0.05). Moreover, a net cost savings was realized for each hernia repair performed without stapled mesh. Conclusions: TEP repair without mesh fixation resulted in the shorter operating time and lower operative cost with no difference between groups in the postoperative pain score, incidence of recurrence, in-hospital stay, time to return to normal activity and complications. All this contribute to make TEP repair without mesh fixation a better choice for repair of uncomplicated inguinal hernia, especially in developing nations with scarce resources.

Keywords: postoperative pain score, inguinal hernia, nonfixation of mesh, total extra peritoneal (TEP)

Procedia PDF Downloads 314
1322 Presentation of the Model of Reliability of the Signaling System with Emphasis on Determining Best Time Schedule for Repairments and Preventive Maintenance in the Iranian Railway

Authors: Maziar Yazdani, Ahmad Khodaee, Fatemeh Hajizadeh

Abstract:

The purpose of this research was analysis of the reliability of the signaling system in the railway and planning repair and maintenance of its subsystems. For this purpose, it will be endeavored to introduce practical strategies for activities control and appropriate planning for repair and preventive maintenance by statistical modeling of reliability. Therefore, modeling, evaluation, and promotion of reliability of the signaling system appear very critical. Among the key goals of the railway is provision of quality service for passengers and this purpose is gained by increasing reliability, availability, maintainability and safety of (RAMS). In this research, data were analyzed, and the reliability of the subsystems and entire system was calculated and with emphasis on preservation of performance of each of the subsystems with a reliability of 80%, a plan for repair and preventive maintenance of the subsystems of the signaling system was introduced.

Keywords: reliability, modeling reliability, plan for repair and preventive maintenance, signaling system

Procedia PDF Downloads 146
1321 Examination of State of Repair of Buildings in Private Housing Estates in Enugu Metropolis, Enugu State Nigeria

Authors: Umeora Chukwunonso Obiefuna

Abstract:

The private sector in housing provision continually take steps towards addressing part of the problem of cushioning the effect of the housing shortage in Nigeria by establishing housing estates since the government alone cannot provide housing for everyone. This research examined and reported findings from research conducted on the state of repair of buildings in private housing estates in Enugu metropolis, Enugu state Nigeria. The objectives of the study were to examine the physical conditions of the building fabrics and appraise the performance of infrastructural services provided in the buildings. The questionnaire was used as a research instrument to elicit data from respondents. Stratified sampling of the estates based on building type was adopted as a sampling method for this study. Findings from the research show that the state of repair of most buildings require minor repairs to make them fit for habitation and sound to ensure the well-being of the residents. In addition, four independent variables from the nine independent variables investigated significantly explained residual variation in the dependent variable - state of repair of the buildings in the study area. These variables are: Average Monthly Income of Residents (AMIR), Length of Stay of the Residents in the estates (LSY), Type of Wall Finishes on the buildings (TWF), and Time Taken to Respond to Resident’s complaints by the estate managers (TTRC). With this, the linear model was established for predicting the state of repair of buildings in private housing estates in the study area. This would assist in identifying variables that are lucid in predicting the state of repair of the buildings.

Keywords: building, housing estate, private, repair

Procedia PDF Downloads 116
1320 Strategy and Coarctation of the Aorta Repair

Authors: Shirin Jalili, Ramin Ghasemi Shayan

Abstract:

Coarctation of the aorta (CoA) may be a common (CHD), which is the seventh most common sort of CHD. Still, this is often likely a think little off since the determination may be deferred, indeed within the pediatric populace. The choice for surgical repair incorporates resection of the contracted section with end-to-end or end-to-side anastomosis, subclavian fold aortoplasty, resection, and join the intervention, or prosthetic fix aortoplasty. Drastically expanded end-to-end repair or switched subclavian fold aortoplasty can be utilized when the coarctation expands to the distal arch. Swell angioplasty can be a palliative choice sometime recently the conclusive redress. Its objective is to stabilize high-risk patients that cannot be submitted to quick surgical intercession, such as untimely newborns. For disconnected and discrete coarctations, it can, as a rule, be drawn nearer and repaired by means of cleared out thoracotomy, extraction of the infected aorta (coarctectomy), and remaking, ordinarily by amplified end-to-end anastomosis. In this article, we need to supply a diagram of current proposals and strategies utilized to picture coarctations of the aorta.

Keywords: coarctation of the aorta, congenital heart disease, strategies, surgical repair

Procedia PDF Downloads 135
1319 Research and Development of Lightweight Repair Mortars with Focus on Their Resistance to High Temperatures

Authors: Tomáš Melichar, Jiří Bydžovský, Vít Černý

Abstract:

In this article our research focused on study of basic physical and mechanical parameters of polymer-cement repair materials is presented. Namely the influence of applied aggregates in combination with active admixture is specially considered. New formulas which were exposed in ambient with temperature even to 1000°C were suggested. Subsequently densities and strength characteristics including their changes were evaluated. Selected samples were analyzed using electron microscope. The positive influence of porous aggregates based on sintered ash was definitely demonstrated. Further it was found than in terms of thermal resistance the effective micro silica amount represents 5% to 7.5% of cement weight.

Keywords: aggregate, ash, high, lightweight, microsilica, mortar, polymer-cement, repair, temperature

Procedia PDF Downloads 400
1318 Availability Analysis of Process Management in the Equipment Maintenance and Repair Implementation

Authors: Onur Ozveri, Korkut Karabag, Cagri Keles

Abstract:

It is an important issue that the occurring of production downtime and repair costs when machines fail in the machine intensive production industries. In the case of failure of more than one machine at the same time, which machines will have the priority to repair, how to determine the optimal repair time should be allotted for this machines and how to plan the resources needed to repair are the key issues. In recent years, Business Process Management (BPM) technique, bring effective solutions to different problems in business. The main feature of this technique is that it can improve the way the job done by examining in detail the works of interest. In the industries, maintenance and repair works are operating as a process and when a breakdown occurs, it is known that the repair work is carried out in a series of process. Maintenance main-process and repair sub-process are evaluated with process management technique, so it is thought that structure could bring a solution. For this reason, in an international manufacturing company, this issue discussed and has tried to develop a proposal for a solution. The purpose of this study is the implementation of maintenance and repair works which is integrated with process management technique and at the end of implementation, analyzing the maintenance related parameters like quality, cost, time, safety and spare part. The international firm that carried out the application operates in a free region in Turkey and its core business area is producing original equipment technologies, vehicle electrical construction, electronics, safety and thermal systems for the world's leading light and heavy vehicle manufacturers. In the firm primarily, a project team has been established. The team dealt with the current maintenance process again, and it has been revised again by the process management techniques. Repair process which is sub-process of maintenance process has been discussed again. In the improved processes, the ABC equipment classification technique was used to decide which machine or machines will be given priority in case of failure. This technique is a prioritization method of malfunctioned machine based on the effect of the production, product quality, maintenance costs and job security. Improved maintenance and repair processes have been implemented in the company for three months, and the obtained data were compared with the previous year data. In conclusion, breakdown maintenance was found to occur in a shorter time, with lower cost and lower spare parts inventory.

Keywords: ABC equipment classification, business process management (BPM), maintenance, repair performance

Procedia PDF Downloads 166
1317 Adhesion Study of Repair Mortar Based in Dune and Crushed Limestone Sand

Authors: Krobba Benharzallah, Kenai Said, Bouhicha Mohamed, Lakhdari Mohammed Fatah, Merah Ahmed

Abstract:

In recent years, great interest has been directed towards the use of local materials and natural resources in building and public works. This is to satisfy the enormous need for these materials and contribute to sustainable development. Among these resources, dune sand and limestone crushed sand, which can be an interesting alternative to the replacement of siliceous alluvial sands for the formulation of a repair mortar. The results found show that the particle size correction of dune sand by limestone sand and the addition of a superplasticizer are very beneficial in terms of adhesion and mechanical strength.

Keywords: repair mortar, dune sand, crushed limestone sand, adhesion, mechanical strength

Procedia PDF Downloads 129