Search results for: project management practices
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 16328

Search results for: project management practices

15848 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 106
15847 Regulation Aspects for a Radioisotope Production Installation in Brazil

Authors: Rian O. Miranda, Lidia V. de Sa, Julio C. Suita

Abstract:

The Brazilian Nuclear Energy Commission (CNEN) is the main manufacturer of radiopharmaceuticals in Brazil. The Nuclear Engineering Institute (IEN), located at Rio de Janeiro, is one of its main centers of research and production, attending public and private hospitals in the state. This radiopharmaceutical production is used in diagnostic and therapy procedures and allows one and a half million nuclear medicine procedures annually. Despite this, the country is not self-sufficient to meet national demand, creating the need for importation and consequent dependence on other countries. However, IEN facilities were designed in the 60's, and today its structure is inadequate in relation to the good manufacturing practices established by sanitary regulator (ANVISA) and radiological protection leading to the need for a new project. In order to adapt and increase production in the country, a new plant will be built and integrated to the existing facilities with a new 30 MeV Cyclotron that is actually in project detailing process. Thus, it is proposed to survey current CNEN and ANVISA standards for radiopharmaceutical production facilities, as well as the radiological protection analysis of each area of the plant, following good manufacturing practices recommendations adopted nationally besides licensing exigencies for radioactive facilities. In this way, the main requirements for proper operation, equipment location, building materials, area classification, and maintenance program have been implemented. The access controls, interlocks, segregation zones and pass-through boxes integrated into the project were also analyzed. As a result, IEN will in future have the flexibility to produce all necessary radioisotopes for nuclear medicine application, more efficiently by simultaneously bombarding two targets, allowing the simultaneous production of two different radioisotopes, minimizing radiation exposure and saving operating costs.

Keywords: cyclotron, legislation, norms, production, radiopharmaceuticals

Procedia PDF Downloads 135
15846 Risk Assessment on Construction Management with “Fuzzy Logy“

Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi

Abstract:

Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.

Keywords: fuzzy logy, risk, prioritization, assessment

Procedia PDF Downloads 594
15845 Application of Seismic Isolators in Kutahya City Hospital Project Utilizing Double Friction Pendulum Type Devices

Authors: Kaan Yamanturk, Cihan Dogruoz

Abstract:

Seismic isolators have been utilized around the world to protect the structures, nonstructural components and contents from the damaging effects of earthquakes. In Structural Engineering, seismic isolation is used for protecting buildings and its vibration-sensitive contents from earthquakes. Seismic isolation is a passive control system that lowers effective earthquake forces by utilizing flexible bearings. One of the most significant isolation systems is seismic isolators. In this paper, double pendulum type Teflon coated seismic isolators utilized in a city hospital project by Guris Construction and Engineering Co. Inc, located in Kutahya, Turkey, have been investigated. Totally, 498 seismic isolators were applied in the project. These isolators are double friction pendulum type seismic isolation devices. The review of current practices is also examined in this study. The focus of this study is related to the application of passive seismic isolation systems for buildings as practiced in Kutahya City Hospital Project. Based on the study, the acceleration at the top floor will be 0.18 g and it will decrease 0.01 g in every floor. Therefore, seismic isolators are very important for buildings located in earthquake zones.

Keywords: maximum considered earthquake, moment resisting frame, seismic isolator, seismic design

Procedia PDF Downloads 154
15844 NENU2PHAR: PHA-Based Materials from Micro-Algae for High-Volume Consumer Products

Authors: Enrique Moliner, Alba Lafarga, Isaac Herraiz, Evelina Castellana, Mihaela Mirea

Abstract:

NENU2PHAR (GA 887474) is an EU-funded project aimed at the development of polyhydroxyalkanoates (PHAs) from micro-algae. These biobased and biodegradable polymers are being tested and validated in different high-volume market applications including food packaging, cosmetic packaging, 3D printing filaments, agro-textiles and medical devices, counting on the support of key players like Danone, BEL Group, Sofradim or IFG. At the moment the project has achieved to produce PHAs from micro-algae with a cumulated yield around 17%, i.e. 1 kg PHAs produced from 5.8 kg micro-algae biomass, which in turn capture 11 kg CO₂ for growing up. These algae-based plastics can therefore offer the same environmental benefits than current bio-based plastics (reduction of greenhouse gas emissions and fossil resource depletion), using a 3rd generation biomass feedstock that avoids the competition with food and the environmental impacts of agricultural practices. The project is also dealing with other sustainability aspects like the ecodesign and life cycle assessment of the plastic products targeted, considering not only the use of the biobased plastics but also many other ecodesign strategies. This paper will present the main progresses and results achieved to date in the project.

Keywords: NENU2PHAR, Polyhydroxyalkanoates, micro-algae, biopolymer, ecodesign, life cycle assessment

Procedia PDF Downloads 90
15843 Project Management and International Development: Competencies for International Assignment

Authors: M. P. Leroux, C. Coulombe

Abstract:

Projects are popular vehicles through which international aid is delivered in developing countries. To achieve their objectives, many northern organizations develop projects with local partner organizations in the developing countries through technical assistance projects. International aid and international development projects precisely have long been criticized for poor results although billions are spent every year. Little empirical research in the field of project management has the focus on knowledge transfer in international development context. This paper focuses particularly on personal dimensions of international assignees participating in project within local team members in the host country. We propose to explore the possible links with a human resource management perspective in order to shed light on the less research problematic of knowledge transfer in development cooperation projects. The process leading to capacity building being far complex, involving multiple dimensions and far from being linear, we propose here to assess if traditional research on expatriate in multinational corporations pertain to the field of project management in developing countries. The following question is addressed: in the context of international development project cooperation, what personal determinants should the selection process focus when looking to fill a technical assistance position in a developing country? To answer that question, we first reviewed the literature on expatriate in the context of inter organizational knowledge transfer. Second, we proposed a theoretical framework combining perspectives of development studies and management to explore if parallels can be draw between traditional international assignment and technical assistance project assignment in developing countries. We conducted an exploratory study using case studies from technical assistance initiatives led in Haiti, a country in Central America. Data were collected from multiple sources following qualitative study research methods. Direct observations in the field were allowed by local leaders of six organization; individual interviews with present and past international assignees, individual interview with local team members, and focus groups were organized in order to triangulate information collected. Contrary from empirical research on knowledge transfer in multinational corporations, results tend to show that technical expertise rank well behind many others characteristics. Results tend to show the importance of soft skills, as a prerequisite to succeed in projects where local team have to collaborate. More importantly, international assignees who were talking knowledge sharing instead of knowledge transfer seemed to feel more satisfied at the end of their mandate than the others. Reciprocally, local team members who perceived to have participated in a project with an expat looking to share instead of aiming to transfer knowledge seemed to describe the results of project in more positive terms than the others. Results obtained from this exploratory study open the way for a promising research agenda in the field of project management. It emphasises the urgent need to achieve a better understanding on the complex set of soft skills project managers or project chiefs would benefit to develop, in particular, the ability to absorb knowledge and the willingness to share one’s knowledge.

Keywords: international assignee, international project cooperation, knowledge transfer, soft skills

Procedia PDF Downloads 142
15842 A Method for Allocation of Smart Intersections Using Traffic Information

Authors: Sang-Tae Ji, Jeong-Woo Park, Jun-Ho Park, Kwang-Woo Nam

Abstract:

This study aims is to suggest the basic factors by considering the priority of intersection in the diffusion project of Smart intersection. Busan Metropolitan City is conducting a smart intersection project for efficient traffic management. The smart intersection project aims to make breakthrough improvement of the intersection congestion by optimizing the signal system using CCTV (closed-circuit television camera) image analysis technology. This study investigated trends of existing researches and analyzed by setting three things of traffic volume, characteristics of intersection road, and whether or not to conduct the main arterial road as factors for selecting new intersection when spreading smart intersection. Using this, we presented the priority of the newly installed intersection through the present situation and analysis for the Busan Metropolitan City which is the main destination of the spreading project of the smart intersection. The results of this study can be used as a consideration in the implementation of smart intersection business.

Keywords: CCTV, GIS, ICT, Smart City, smart intersection

Procedia PDF Downloads 386
15841 Evidence-Based Practices in Education: A General Review of the Literature on Elementary Classroom Setting

Authors: Carolina S. Correia, Thalita V. Thomé, Andersen Boniolo, Dhayana I. Veiga

Abstract:

Evidence-based practices (EBP) in education is a set of principles and practices used to raise educational policy, it involves the integration of professional expertise in education with the best empirical evidence in making decisions about how to deliver instruction. The purpose of this presentation is to describe and characterize studies about EBP in education in elementary classroom setting. Data here presented is part of an ongoing systematic review research. Articles were searched and selected from four academic databases: ProQuest, Scielo, Science Direct and Capes. The search terms were evidence-based practices or program effectiveness, and education or teaching or teaching practices or teaching methods. Articles were included according to the following criteria: The studies were explicitly described as evidence-based or discussed the most effective practices in education, they discussed teaching practices in classroom context in elementary school level. Document excerpts were extracted and recorded in Excel, organized by reference, descriptors, abstract, purpose, setting, participants, type of teaching practice, study design and main results. The total amount of articles selected were 1.185, 569 articles from Proquest Research Library; 216 from CAPES; 251 from ScienceDirect and 149 from Scielo Library. The potentially relevant references were 178, from which duplicates were removed. The final number of articles analyzed was 140. From 140 articles, are 47 theoretical studies and 93 empirical articles. The following research design methods were identified: longitudinal intervention study, cluster-randomized trial, meta-analysis and pretest-posttest studies. From 140 articles, 103 studies were about regular school teaching and 37 were on special education teaching practices. In several studies, used as teaching method: active learning, content acquisition podcast (CAP), precision teaching (PT), mediated reading practice, speech therapist programs and peer-assisted learning strategies (PALS). The countries of origin of the studies were United States of America, United Kingdom, Panama, Sweden, Scotland, South Korea, Argentina, Chile, New Zealand and Brunei. The present study in is an ongoing project, so some representative findings will be discussed, providing further acknowledgment on the best teaching practices in elementary classroom setting.

Keywords: best practices, children, evidence-based education, elementary school, teaching methods

Procedia PDF Downloads 334
15840 Dietary Practices of Adult Type 2 Diabetes Mellitus Patients Attending Kitui Out Patient Clinic at Kitui County, Kenya

Authors: Alice W. Theuri, Anselimo O. Makokha, Florence M. Kyallo

Abstract:

Type 2 diabetes mellitus (T2DM) is a serious metabolic disorder whose prevalence among adults has been increasing in the last decade. It is estimated that by 2030, the number of cases in Africa will almost double. Diet and lifestyle modifications are considered the cornerstone for the treatment and management of T2DM. Despite this, there is minimum literature assessing the dietary practices and glycemic control in a semi arid region context in Kenya. The objective of this study was to determine the dietary practices of adult T2DM patients attending Kitui out patient clinic in Kitui County. This was a cross sectional study design where every consenting second patient attending diabetic clinic was interviewed. A total of 138 T2DM patients were interviewed using a structured interview guide on socio-economic and dietary practices administered. The study was carried out in April and May 2017. There were more female (64%) than male (36%) in this study with majority being unemployed (38.4%). Forty seven percent (47.6%) had elevated HbA1c. Majority took three meals per day while DDS was 4.3 ± 1.09. The mean energy intake for men and women was 2823.8 ± 82.45 and 2766.3.30 ± 76.74 respectively. There was a non significant positive relationship (r= 131; P value = 0.124) between amount energy consumed and glycemic control. There were suboptimal dietary practices leading to poor glycemic control among T2DM patients attending diabetic clinic at Kitui District Hospital.

Keywords: adults, dietary practices, semi arid region, T2DM

Procedia PDF Downloads 152
15839 Driving Performance Improvement in Mini Markets: The Impact of Talent Management, Business Skills, and Technology Adoption in Johannesburg and Cape Town, South Africa

Authors: Fedil Jemal Ahmed

Abstract:

This conference abstract paper presents a study that aimed to explore the impact of talent management and business skills on performance improvement in mini markets located in Johannesburg and Cape Town, South Africa. Mini markets are small retail stores that play a crucial role in providing essential goods and services to communities. However, due to their small size, they often face significant challenges in terms of resources and management. The study conducted interviews with mini market owners and managers in Johannesburg and Cape Town to understand their approach to talent management, business skills, and their impact on business performance. The results showed that effective talent management practices, including recruitment, training, and retention, along with strong business skills, had a significant positive impact on business performance in mini markets. Furthermore, the study found that the use of technology, such as point of sale systems and inventory management software, can also contribute to business performance improvement in mini markets. The results suggest that mini market owners and managers should prioritize talent management, business skills, and invest in technology to improve their business performance. Comparing the improvements made by mini markets in Johannesburg and Cape Town to those made by others, the study found that the adoption of effective talent management practices and strong business skills were key factors in driving performance improvement. Mini market owners and managers who invested in these areas were better equipped to manage their resources, enhance their customer service, and increase their profitability. When comparing the personal experiences of the fedil jemal who improved their business performance from a small market to a large one, they found that effective talent management practices and strong business skills were crucial in achieving success. Through the adoption of effective talent management practices, the fedil was able to attract and retain top talent, ensuring that the business was managed effectively. Furthermore, the fedil invested in improving their business skills, such as financial management, marketing, and customer service, which helped to increase their revenue and profitability. In terms of technology adoption, the author found that the use of point-of-sale systems and inventory management software were essential in managing their inventory and improving their customer service. By investing in technology, the fedil was able to streamline their operations and enhance their overall business performance. In conclusion, this study provides valuable insights into the importance of talent management, business skills, and technology adoption in improving business performance in mini markets. It highlights the need for mini market owners and managers to prioritize these areas and invest in them to enhance their business performance. The findings of this study have practical implications for mini market owners and managers who are looking to improve their business performance and compete in a highly competitive market. By adopting effective talent management practices, developing strong business skills, and investing in technology, mini market owners and managers can improve their operations and increase their profitability.

Keywords: talent management, business skills, technology adoption, mini markets

Procedia PDF Downloads 101
15838 Impact of Integrated Watershed Management Programme Based on Four Waters Concept: A Case Study of Sali Village, Rajasthan State of India

Authors: Garima Sharma, R. N. Sharma

Abstract:

Integrated watershed management programme based on 'Four Water Concept' was implemented in Sali village, in Jaipur District, Rajasthan State of India . The latitude 26.7234486 North and longitude 75.023876 East are the geocoordinate of the Sali. 'Four Waters Concept' is evolved by integrating the 'Four Waters', viz. rain water, soil moisture, ground water and surface water This methodology involves various water harvesting techniques to prevent the runoff of water by treatment of catchment, proper utilization of available water harvesting structures, renovation of the non-functional water harvesting structures and creation of new water harvesting structures. The case study included questionnaire survey from farmers and continuous study of village for two years. The total project area is 6153 Hac, and the project cost is Rs. 92.25 million. The sanctioned area of Sali Micro watershed is 2228 Hac with an outlay of Rs. 10.52 million. Watershed treatment activities such as water absorption trench, continuous contour trench, field bunding, check dams, were undertaken on agricultural lands for soil and water conservation. These measures have contributed in preventing runoff and increased the perennial availability of water in wells. According to the survey, water level in open wells in the area has risen by approximately 5 metres after the introduction of water harvesting structures. The continuous availability of water in wells has increased the area under irrigation and helped in crop diversification. Watershed management activities have brought the changes in cropping patterns and crop productivity. It helped in transforming 567 Hac culturable waste land into culturable arable land in the village. The farmers of village have created an additional income from the increased crop production. The programme also assured the availability of water during peak summers for the day to day activities of villagers. The outcomes indicate that there is positive impact of watershed management practices on the water resource potential as well the crop production of the area. This suggests that persistent efforts in this direction may lead to sustainability of the watershed.

Keywords: four water concept, groundwater potential, irrigation potential, watershed management

Procedia PDF Downloads 357
15837 Biologic Materials- Ecological Living Network

Authors: Ina Dajci

Abstract:

Biologic Materials presents groundbreaking transdisciplinary research aimed at fostering new collaborative models across the Built Environment, Forestry, and Agriculture sectors. This initiative seeks to establish innovative paradigms for local and global material flows by developing a biocompatible, regenerative material economy. The project focuses on creating materials derived from biowaste and silvicultural practices, ensuring the preservation of endangered indigenous and vernacular techniques through the integration of emerging biosciences. By utilizing biomaterials sourced from agricultural waste and forest byproducts, the initiative incorporates fabrication methods recognized by UNESCO as ‘intangible cultural heritage of humanity,’ which are currently at risk. The structural, mechanical, and environmental properties of these materials are enhanced through advanced CAD-CAM fabrication, along with energy-efficient biochemical and bacterial processes that promote healthy indigo coloration. Furthermore, the integration of AI technologies in species selection facilitates a novel partnership model, enabling designers to collaborate effectively with forest managers and silviculture practitioners. This collaborative approach not only optimizes the use of plant-based materials but also enhances biodiversity and climate resilience in regional ecosystems. Overall, this project embodies a holistic strategy for addressing environmental challenges while revitalizing traditional practices and fostering sustainable innovation.

Keywords: material, architecture, culture, heritage, ecology, environment

Procedia PDF Downloads 10
15836 On-Site Management from Reactive to Proactive

Authors: Yu-Tzu Chen, Luh-Maan Chang

Abstract:

Construction is an inherently risky industry. The projects have been dominated by reactive actions owing to non-routine in nature. The on-site activities are especially crucial for successful project control. In order to alter actions from reactive to proactive, this paper presents an on-site data collection system utilizing advanced technology RFID and GPS in assisting on-site management with near real time progress monitoring.

Keywords: On-Site management, progress monitoring, RFID, GPS

Procedia PDF Downloads 568
15835 The Role of Time Management Skills in Academic Performance of the University Lecturers

Authors: Thuduwage Lasanthika Sajeevanie

Abstract:

Success is very important, and there are many factors affecting the success of any situation or a person. In Sri Lankan Context, it is hardly possible to find an empirical study relating to time management and academic success. Globally many organizations, individuals practice time management to be effective. Hence it is very important to examine the nature of time management practice. Thus this study will fill the existing gap relating to achieving academic success through proper time management practices. The research problem of this study is what is the relationship exist among time management skills and academic success of university lecturers in state universities. The objective of this paper is to identify the impact of time management skills for academic success of university lecturers. This is a conceptual study, and it was done through a literature survey by following purposive sampling technique for the selection of literature. Most of the studies have found that time management is highly related to academic performance. However, most of them have done on the academic performance of the students, and there were very few studies relating to academic performance of the university lecturers. Hence it can be further suggested to conduct a study relating to identifying the relationship between academic performance and time management skills of university lecturers.

Keywords: academic success, performance, time management skills, university lecturers

Procedia PDF Downloads 357
15834 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 318
15833 Malaria Management among Dispensers in Drug Retail Outlets in Buea Community: An Assessment of Knowledge of Malaria and Antimalarial Drug Prescription and Dispensing Practices

Authors: Marcelus U. Ajonina, Deodata B. Ngonga, Kenric B. Ware, Carine K. Nfor

Abstract:

Background: Lack of knowledge of rational use of antimalarial drugs among dispensers is a serious problem, especially in areas of intense transmission, thus increasing the risk of resistance and adverse drug reactions. This study was aimed at assessing the knowledge of malaria as well as perception and dispensing practices of antimalarials among vendors in Buea community. Methods: A community-based cross-sectional survey of a random sample of 140 drug vendors living within the Buea community was conducted between March and June 2017. A questionnaire was designed to obtain information from drug vendors on the general knowledge of malaria as well as dispensing practices. Data were analyzed using SPSS Statistics 20.0 and were considered significant at p ≤ 0.05. Results: Knowledge of malaria symptoms, transmission, and prevention was reasonable among 55.8% (77) of the respondents. Only 33.6% (47) of the respondents could attribute the cause of malaria to protozoan of genus Plasmodium species. Of the 140 vendors, 115 (82.7%) prescribe antimalarial drugs. The knowledge of the national protocol was malaria case management among dispensers was 35.0%. Vendors in hospital/community pharmacies were 2.4 times (OR = 3.14, 95% CI: 4.14 - 8.74, p < 0.001) more knowledgeable about malaria treatment protocol than those of in drugstores. The prevalence of self-prescription of antimalarials was 39.3%. Self-prescription was significantly higher in drugstores than hospital/community pharmacies (p=0.004). In all, 56 (40.6%) of vendors showed good practices regarding antimalarial drug dispensing with the majority (51.7%) from community pharmacies (OR=2.27,95% CI: 1.13-4.56). Conclusion: Findings reveal moderate knowledge of malaria but poor prescription and dispensing practices of antimalarial drugs among vendors, thus indicating a need for routine monitoring and evaluation to prevent the emergence of resistant strains to current efficacious antimalarials.

Keywords: antimalarials, drug retail outlets, dispensing, drug resistance, prescription

Procedia PDF Downloads 136
15832 Effect of Recruitment and Selection on Employee Performance in Hospitality Industries

Authors: Yusuf A. Bako, Olubunmi O. Kolawole

Abstract:

This study sought to establish the effect of recruitment and selection on the employee performance in hospitality industries. The success of any organization in this modern business environment depends on the caliber of the manpower that steer the affairs of the organization. History has shown that recruitment and selection as a function of human resources management practices have a pivotal role in determining the level of employee performance in an organization. The hospitality industries have been faced with challenges of performance due to unconventional selection and placement practices in terms of poor policy in selecting candidate, inconsistency in selection process, sidetracking employment test and interview, godfatherism and regional selection process etc. The overall objective of the study was to determine how recruitment and selection affect employee performance in hospitality industry in Ogun State, Nigeria. This study adopts descriptive and inferential research design while population was drawn from leading hotels in Ogun State, Nigeria. The samples size was 100 employees and questionnaire was used to collect data while Cronbach alpha was used to test the instrument. The result of the study reveals that correlation between employee performance and recruitment and selection were highly significant.

Keywords: employee performance, human resources management, practices, recruitment, selection

Procedia PDF Downloads 379
15831 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project

Authors: A. Kourou, M. Panoutsopoulou

Abstract:

Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.

Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material

Procedia PDF Downloads 123
15830 Deployment of a Product Lifecyle Management (PLM) Solution Towards Digital Transformation

Authors: Asmae Chraibi, Rachid Lghoul, Nabil Rhiati

Abstract:

In the era of Industry 4.0, enterprises are increasingly employing digital technologies in order to improve their product development processes. This research focuses on the strategic deployment of Product Lifecycle Management (PLM) solutions during production as a key tracker of traceability and digital transformation activities. The study explores the integration of PLM within a larger organizational framework, examining its impact on product lifecycle efficiency, corporation, and innovation. Through a comprehensive analysis of a real case study from the automotive industry, this project evaluates the critical success factors and challenges associated with implementing PLM solutions for digital transformation. Moreover, it explores the synergic relationship between PLM and emerging technologies such as 3D experience and SOLIDWORKS, elucidating their combined potential in optimizing production workflows and enabling data-driven decision-making. The study's findings provide global approaches for firms looking to embark on a digital transformation journey by implementing PLM technologies. This research contributes to a better understanding of how PLM can be effectively used to foster innovation and competitiveness in the changing landscape of modern industry by shining light on best practices, critical considerations, and potential obstacles.

Keywords: product lifecyle management (PLM), industry 4.0, traceability, digital transformation, solution, innovation, 3D experience, SOLIDWORKS

Procedia PDF Downloads 73
15829 An Estimation Process for Progress Rate Based on Labor-Quantity in Republic of Korea

Authors: Dong-Ho Kim, Zheng-Xun Jin, Yong-Woon Cha, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

As construction is a labor-intensive industry, it is important to identify and manage labor quantities for accurate progress management of the construction project. However, the progress management that focuses on construction cost calculated based on materials rather than labor quantities has led to a difference in the implementation of cost and progress of the actual construction. In addition, since it is not easy to predict accurate labor quantities in the estimation of labor quantity-based progress rate, there have been limited researches into the progress rate estimation based on labor quantity. Accordingly, this study proposed a process for labor quantity-based progress rate estimation using a standard of estimate to predict accurate progress rate of the construction project in Republic Korea. It is expected that the utilization of the proposed process will help to identify the progress rate closer to that of the actual site management and adjust the workforce in each construction type, thereby contributing to improving construction efficiency.

Keywords: labor based, labor cost, progress management, progress rate, progress payment

Procedia PDF Downloads 344
15828 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: supervision software, risk management, industrial supervision, project management

Procedia PDF Downloads 355
15827 Human Resource Information System: Role in HRM Practices and Organizational Performance

Authors: Ejaz Ali M. Phil

Abstract:

Enterprise Resource Planning (ERP) systems are playing a vital role in effective management of business functions in large and complex organizations. Human Resource Information System (HRIS) is a core module of ERP, providing concrete solutions to implement Human Resource Management (HRM) Practices in an innovative and efficient manner. Over the last decade, there has been considerable increase in the studies on HRIS. Nevertheless, previous studies relatively lacked to examine the moderating role of HRIS in performing HRM practices that may affect the firms’ performance. The current study was carried out to examine the impact of HRM practices (training, performance appraisal) on perceived organizational performance, with moderating role of HRIS, where the system is in place. The study based on Resource Based View (RBV) and Ability Motivation Opportunity (AMO) Theories, advocating that strengthening of human capital enables an organization to achieve and sustain competitive advantage which leads to improved organizational performance. Data were collected through structured questionnaire based upon adopted instruments after establishing reliability and validity. The structural equation modeling (SEM) were used to assess the model fitness, hypotheses testing and to establish validity of the instruments through Confirmatory Factor Analysis (CFA). A total 220 employees of 25 firms in corporate sector were sampled through non-probability sampling technique. Path analysis revealing that HRM practices and HRIS have significant positive impact on organizational performance. The results further showed that the HRIS moderated the relationships between training, performance appraisal and organizational performance. The interpretation of the findings and limitations, theoretical and managerial implications are discussed.

Keywords: enterprise resource planning, human resource, information system, human capital

Procedia PDF Downloads 396
15826 Documentation Project on Boat Models from Saqqara, in the Grand Egyptian Museum

Authors: Ayman Aboelkassem, Mohamoud Ali, Rezq Diab

Abstract:

This project aims to document and preserve boat models which were discovered in the Saqqara by Czech Institute of Egyptology archeological mission at Saqqara (GEM numbers, 46007, 46008, 46009). These boat models dates back to Egyptian Old Kingdom and have been transferred to the Conservation Center of the Grand Egyptian Museum, to be displayed at the new museum.The project objectives making such boat models more visible to visitors through the use of 3D reconstructed models and high resolution photos which describe the history of using the boats during the Ancient Egyptian history. Especially, The Grand Egyptian Museum is going to exhibit the second boat of King Khufu from Old kingdom. The project goals are to document the boat models and arrange an exhibition, where such Models going to be displayed next to the Khufu Second Boat. The project shows the importance of using boats in Ancient Egypt, and connecting their usage through Ancient Egyptian periods till now. The boat models had a unique Symbolized in ancient Egypt and connect the public with their kings. The Egyptian kings allowed high ranked employees to put boat models in their tombs which has a great meaning that they hope to fellow their kings in the journey of the afterlife.

Keywords: archaeology, boat models, 3D digital tools for heritage management, museums

Procedia PDF Downloads 137
15825 Information Technology (IT) Outsourcing and the Challenges of Implementation in Financial Industries: A Case Study of Guarantee Trust Assurance PLC

Authors: Salim Ahmad, Ahamed Sani Kazaure, Haruna Musa

Abstract:

Outsourcing had been the contractual relationship in which the responsibility for a function or task is handed over to an outside firm for a fixed period of time which is not the same as contracting where a specific one-off task is allocated to an external business; therefore in information technology a specialist area such as maintenance of web servers is controlled by an outside firm or if the department is not a critical factor the whole IT section may be outsourced. Organisation contracts is frequently a major area in successful outsourcing relationship, whereby the contracts specify the right, liability and expectation of the vendor and contracts are mostly of high value and last for very long. Therefore, in this research one particular project that is been outsourced for the financial industry (Guarantee Trust Assurance PlC) is been discussed along with the approach used and the various problems encountered, though Outsourcing is not necessarily a perfect and easy way out for business. It is extremely critical for a company to look at all the aspect of outsourcing before deciding to use it as an instrument for development. Moreover, critical analysis of the management issues encountered while implementing the outsourcing project have been fully discussed in the paper.

Keywords: outsourcing, techniques used in outsourcing, challenges of outsourcing implementation, management issues during implementation of outsourcing project

Procedia PDF Downloads 382
15824 Ensuring Continuity in Subcutaneous Depot Medroxy Progesterone Acetate (DMPA-SC) Contraception Service Provision Using Effective Commodity Management Practices

Authors: Oluwaseun Adeleke, Samuel O. Ikani, Fidelis Edet, Anthony Nwala, Mopelola Raji, Simeon Christian Chukwu

Abstract:

Background: The Delivering Innovations in Selfcare (DISC) project aims to increase access to self-care options for women of reproductive age, starting with self-inject subcutaneous depot medroxyprogesterone acetate (DMPA-SC) contraception services. However, the project has faced challenges in ensuring the continuous availability of the commodity in health facilities. Although most states in the country rely on the federal ministry of Health for supplies, some are gradually funding the procurement of Family Planning (FP) commodities. This attempt is, however, often accompanied by procurement delays and purchases inadequate to meet demand. This dilemma was further exacerbated by the commencement of demand generation activities by the project in supported states which geometrically increased commodity utilization rates and resulted in receding stock and occasional service disruptions. Strategies: The project deployed various strategies were implemented to ensure the continuous availability of commodities. These include facilitating inter-facility transfer, monthly tracking of commodity utilization, and alerting relevant authorities when stock levels reach a minimum. And supporting state-level procurement of DMPA-SC commodities through catalytic interventions. Results: Effective monitoring of commodity inventory at the facility level and strategic engagement with federal and state-level logistics units have proven successful in mitigating stock-out of commodities. It has helped secure up to 13,000 units of DMPA-SC commodities from federal logistics units and enabled state units to prioritize supported sites. This has ensured the continuity of DMPA-SC services and an increasing trend in the practice of self-injection. Conclusion: A functional supply chain is crucial to achieving commodity security, and without it, health programs cannot succeed. Stakeholder engagement, stock management and catalytic interventions have provided both short- and long-term measures to mitigate stock-outs and ensured a consistent supply of commodities to clients.

Keywords: family planning, contraception, DMPA-SC, self-care, self-injection, commodities, stock-out

Procedia PDF Downloads 89
15823 A Principal-Agent Model for Sharing Mechanism in Integrated Project Delivery Context

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasingly attention from construction industry because of its efficiency of solving adversarial problems and reliability to deliver high-performing buildings. However, some evidence showed that some project participants obtained less profit from IPD projects than the typical projects. They attributed it to the unfair IPD sharing mechanism, which resulted in additional time and cost of negotiation on the sharing fractions among project participants. The study is aimed to investigate the reward distribution by constructing a principal-agent model. Based on cooperative game theory, it is examined how to distribute the shared project rewards between client and non-client parties, and identify the sharing fractions among non-client parties. It is found that at least half of the project savings should be allocated to the non-client parties to motivate them to create more project value. Second, the client should raise his sharing fractions when the integration among project participants is efficient. In addition, the client should allocate higher sharing fractions to the non-client party who is more able. This study can help the IPD project participants make fair and motivated sharing mechanisms.

Keywords: cooperative game theory, IPD, principal agent model, sharing mechanism

Procedia PDF Downloads 292
15822 PlayTrain: A Research and Intervention Project for Early Childhood Teacher Education

Authors: Dalila Lino, Maria Joao Hortas, Carla Rocha, Clarisse Nunes, Natalia Vieira, Marina Fuertes, Kátia Sa

Abstract:

The value of play is recognized worldwide and is considered a fundamental right of all children, as defined in Article 31 of the United Nations Children’s Rights. It is consensual among the scientific community that play, and toys are of vital importance for children’s learning and development. Play promotes the acquisition of language, enhances creativity and improves social, affective, emotional, cognitive and motor development of young children. Young children ages 0 to 6 who have had many opportunities to get involved in play show greater competence to adapt to new and unexpected situations and more easily overcome the pain and suffering caused by traumatic situations. The PlayTrain Project aims to understand the places/spaces of play in the education of children from 0 to 6 years and promoting the training of preschool teachers to become capable of developing practices that enhance children’s agency, experimentation in the physical and social world and the development of imagination and creativity. This project follows the Design-Based-Research (DBR) and has two dimensions: research and intervention. The participants are 120 students from the Master in Pre-school Education of the Higher School of Education, Polytechnic Institute of Lisbon enrolled in the academic year 2018/2019. The development of workshops focused on the role of play and toys for young children’s learning promotes the participants reflection and the development of skills and knowledge to construct developmentally appropriated practices in early childhood education. Data was collected through an online questionnaire and focal groups. Results show that the PlayTrain Project contribute to the development of a body of knowledge about the role of play for early childhood education. It was possible to identify the needs of preschool teacher education and to enhance the discussion among the scientific and academic community about the importance of deepening the role of play and toys in the study plans of the masters in pre-school education.

Keywords: children's learning, early childhood education, play, teacher education, toys

Procedia PDF Downloads 144
15821 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 60
15820 Project Management at University: Towards an Evaluation Process around Cooperative Learning

Authors: J. L. Andrade-Pineda, J.M. León-Blanco, M. Calle, P. L. González-R

Abstract:

The enrollment in current Master's degree programs usually pursues gaining the expertise required in real-life workplaces. The experience we present here concerns the learning process of "Project Management Methodology (PMM)", around a cooperative/collaborative mechanism aimed at affording students measurable learning goals and providing the teacher with the ability of focusing on the weaknesses detected. We have designed a mixed summative/formative evaluation, which assures curriculum engage while enriches the comprehension of PMM key concepts. In this experience we converted the students into active actors in the evaluation process itself and we endowed ourselves as teachers with a flexible process in which along with qualifications (score), other attitudinal feedback arises. Despite the high level of self-affirmation on their discussion within the interactive assessment sessions, they ultimately have exhibited a great ability to review and correct the wrong reasoning when that was the case.

Keywords: cooperative-collaborative learning, educational management, formative-summative assessment, leadership training

Procedia PDF Downloads 169
15819 HRD Practices in IT Industry – A Study of Select Companies

Authors: Shireesha Devraj, Vishwanath Kokkonda

Abstract:

Information Technology Industry is one of the fastest up-and-coming, knowledge and skill concentrated industries in India. India preserves its position as the world’s notable global sourcing terminus for IT services. The swift progress in the competitive age is possible only through effective human resource development practices. In the IT industry attracting, nurturing talent, retaining and managing human resources have been the principal issues. The sustenance and growth of IT companies worldwide depends on the intellectual capital it possesses. The IT sector cannot be effectively managed through traditional human resource development practices. In order to stay competitive in future, the IT sector in India has to enrich the skilled talent pool through pertinent HRD practices. An attempt is made in this paper to study the trends in Indian IT Industry.

Keywords: HRD practices, IT industry, India, competitive age

Procedia PDF Downloads 356