8666 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 157
8665 Strengthening Social and Psychological Resources - Project "Herausforderung" as a (Sports-) Pedagogical Concept in Adolescence

Authors: Kristof Grätz

Abstract:

Background: Coping with crisis situations (e.g., the identity crisis in adolescence) is omnipresent in today's socialization and should be encouraged as a child. For this reason, students should be given the opportunity to create, endure and manage these crisis situations in a sporting context within the project “Herausforderung.” They should prove themselves by working on a self-assigned task, accompanied by ‚coaches’ in a place outside of their hometown. The aim of the project is to observe this process from a resource-oriented perspective. Health promotion, as called for by the WHO in the Ottawa Charter since 1986, includes strengthening psychosocial resources. These include cognitive, emotional, and social potentials that contribute to improving the quality of life, provide favourable conditions for coping with health burdens and enable people to influence their physical performance and well-being self-confidently and actively. A systematic strengthening of psychosocial resources leads to an improvement in mental health and contributes decisively to the regular implementation and long-term maintenance of this health behavior. Previous studies have already shown significant increases in self-concept following experiential educational measures [Fengler, 2007; Eberle & Fengler, 2018] and positive effects of experience-based school trips on the social competence of students [Reuker, 2009]. Method: The research project examines the influence of the project “Herausforderung” on psychosocial resources such as self-efficacy, self-concept, social support, and group cohesion. The students participating in the project will be tested in a pre-post design in the context of the challenge. This test includes specific questions to capture the different psychosocial resources. For the measurement, modifications of existing scales with good item selectivity and reliability are used to a large extent, so that acceptable item and scale values can be expected. If necessary, the scales were adapted or shortened to the specific context in order to ensure a balanced relationship between reliability and test economy. Specifically, these are already tested scales such as FRKJ 8-16, FSKN, GEQ, and F-SozU. The aim is to achieve a sample size of n ≥ 100. Conclusion: The project will be reviewed with regard to its effectiveness, and implications for a resource-enhancing application in sports settings will be given. Conclusions are drawn as to which extent to specific experiential educational content in physical education can have a health-promoting effect on the participants.

Keywords: children, education, health promotion, psychosocial resources

Procedia PDF Downloads 146
8664 An Approach to Specify Software Requirements in Semantic Form

Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy

Abstract:

Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.

Keywords: functional requirement, ontology, requirements management, semantics

Procedia PDF Downloads 364
8663 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 104
8662 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 127
8661 Intelligent Quality Management System on the Example оf Bread Baking

Authors: Irbulat Utepbergenov, Lyazzat Issabekova, Shara Toybayeva

Abstract:

This article discusses quality management using the bread baking process as an example. The baking process must be strictly controlled and repeatable. Automation and monitoring of quality management systems can help. After baking bread, quality control of the finished product should be carried out. This may include an evaluation of appearance, weight, texture, and flavor. It is important to continuously work to improve processes and products based on data and feedback from the quality management system. A method and model of automated quality management and an intelligent automated management system based on intelligent technologies are proposed, which allow to automate the processes of QMS implementation and support and improve the validity, efficiency, and effectiveness of management decisions by automating a number of functions of decision makers and staff. This project is supported by the grant of the Ministry of Education and Science of the Republic of Kazakhstan (Zhas Galym project No. AR 13268939 Research and development of digital technologies to ensure consistency of the carriers of normative documents of the quality management system).

Keywords: automated control system, quality management, efficiency evaluation, bakery oven, intelligent system

Procedia PDF Downloads 38
8660 A Critical Review of Risk-Based Approach for Project Management Office Development

Authors: Alin Veronika, Yusuf Latief

Abstract:

This critical review meticulously delineates and elucidates the considerable deficiencies and voids that exist within the extant body of literature concerning the development strategies associated with risk-based Project Management Offices (PMOs). Although the advantages and positive outcomes linked to the establishment and functioning of PMOs are regularly articulated and acknowledged in various academic discourses, the empirical evidence that supports these claims frequently demonstrates a significant shortfall in methodological rigor and often encounters challenges when attempting to distinctly isolate and delineate the unique contributions and impacts of PMOs in contrast to other multifaceted organizational factors that may also play a role. This comprehensive review systematically scrutinizes and evaluates the current research landscape pertaining to the critical success factors that include, but are not limited to, strategic alignment, organizational structure, human capital, operational efficiency, technology, and the overarching influence of organizational culture, thereby identifying notable limitations within this research domain and proposing targeted areas for further scholarly investigation. Furthermore, the analysis accentuates the imperative need for the development and implementation of more sophisticated, nuanced risk assessment and mitigation frameworks that are specifically designed to cater to the unique operational characteristics of PMOs while simultaneously advocating for an elevated focus on the profound influence exerted by organizational culture and its various subcultures on the overall effectiveness and success of PMOs.

Keywords: organizational culture, project management office, risk management, risk-based PMO development

Procedia PDF Downloads 12
8659 Relevance of the Tokyo Trial: A Comparative Perspective

Authors: Nalanda Roy

Abstract:

The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.

Keywords: Tokyo trial, third world, judgment, international law

Procedia PDF Downloads 91
8658 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 436
8657 Investigating the Influences of Preschool Teachers’ Self-Efficacy on Their Perceptions of National Preschool Standard Curriculum (NPSC) Implementation in Selangor and Kuala Lumpur

Authors: Pei Xin Ker

Abstract:

The purpose of this study is to examine the influence of teachers’ self-efficacy (TSE) on teachers’ perceptions of the levels of implementation of the NPSC. A total of 187 respondents were selected by using purposive homogeneous sampling to represent preschool teachers in Selangor and Kuala Lumpur. This study involved a cross-sectional survey in which quantitative data were collected and analysed using descriptive statistics. The survey was containing 74 questionnaire items created using Google Form and distributed through online platforms such as WhatsApp, Telegram, and Facebook Messenger. The results indicated a high level of overall self-efficacy among the preschool teachers and the overall teachers' perceived level of NPSC. The findings also showed a significant and positive relationship at a high level between TSE and teachers' perceptions of the level of implementation of NPSC. Student involvement was one of the TSE factors that had the greatest influence in shaping teachers' perceptions of the level of implementation of NPSC. The findings of the predictors to teachers' perceptions of the implementation of NPSC within this study can be used as an indication to the researchers to reassure the validity of this study by repeating with similar research settings. Further studies to include other factors are also encouraged to explore the possible factors that may influence the teachers' perceptions of the implementation of NPSC.

Keywords: teachers’ self-efficacy, national preschool standard curriculum, preschool teachers, preschool education

Procedia PDF Downloads 193
8656 Evaluation of Environmental Management System Implementation of Construction Projects in Turkey

Authors: Aydemir Akyürek, Osman Nuri Ağdağ

Abstract:

Construction industry is in a rapid development for many years around the world and especially in Turkey. In the last three years sector has 10% growth and provides significant support on Turkey’s national economy. Many construction projects are on-going at urban and rural areas of Turkey which have substantial environmental impacts. Environmental impacts during construction phase are quite diversified and widespread. Environmental impacts of construction industry cannot be inspected properly in all cases and negative impacts may occur frequently in many projects in Turkey. In this study, implementation of ISO 14001 Environmental Management System (EMS) in construction plants is evaluated. In the beginning stage quality management systems generally reviewed and ISO 14001 EMS is selected for implementation. Standard requirements are examined first and implementation of every standard requirement is elaborated for the selected construction plant in the following stage. Key issues and common problems, gained benefits by execution of this type of international EMS standard are examined. As can be seen in sample projects, construction projects are being completed very fast and contractors are working in a highly competitive environment with low profit ratios in our country and mostly qualified work force cannot be accessible. Addition to this there are deficits on waste handling and environmental infrastructure. Besides construction companies which have substantial investments on EMSs can be faced with difficulties on competitiveness in domestic market, however professional Turkish contractors which implementing managements systems in larger scale at international projects are gaining successful results. Also the concept of ‘construction project management’ which is being implemented in successful projects worldwide cannot be implemented except larger projects in Turkey. In case of nonexistence of main management system (quality) implementation of EMSs cannot be managed. Despite all constraints, EMSs that will be implemented in this industry with commitment of top managements and demand of customers will be an enabling, facilitating tool to determine environmental aspects and impacts of construction sites, will provide higher compliance levels for environmental legislation, to establish best available methods for operational control on waste management, chemicals management etc. and to plan monitoring and measurement, to prioritize environmental aspects for investment schedules and waste management.

Keywords: environmental management system, construction projects, ISO 14001, quality

Procedia PDF Downloads 362
8655 Efficacy of Remote Sensing Application in Monitoring the Effectiveness of Afforestation Project in Northern Nigeria

Authors: T. Garba, Y. Y. Babanyara, K. G. Ilellah, M. A. Modibbo, T. O. Quddus, M. J. Sani

Abstract:

After the United Nation Convention on Desertification (UNCD) in 1977 which was preceded by extensive, regional, and local studies, and consultations with numerous scientists, decision-makers, and relevant institutions. Global Plan of Action to Combat Desertification (PACD) was formulated, endorsed by member Countries. The role of implementing PACD was vested with Governments of countries affected by desertification. The Federal Government of Nigeria as a signatory and World Bank funded and implement afforestation project aimed at combating desertification between 1988 and 1999. This research, therefore, applied remote sensing techniques to assess the effectiveness of the project. To achieve that a small portion of about 143,609 hectares was curved out from the project area. Normalized Difference of the Vegetative Index (NDVI) and Land Use Land Cover were derived from Landsat TM 1986, Landsat ETM 1999 and Nigeria Sat 1, 2007 of the project area. The findings show that there was an increase in cultivated area due to the project from 1986 through 1999 and 2007. This is further buttressed by the three NDVI imageries due to their high positive pixel value from 0.04 in 1986 to 0.22 in 1999 and to 0.32 in 2007 These signifies the gradual physical development of Afforestation project in the area. In addition, it was also verified by histograms of changes in vegetation which indicated an increased vegetative cover from 60,192 in 1986, to 102,476 in 1999 and then to 88,343 in 2007. The study concluded that Remote Sensing approach has actually confirmed that the project was indeed successful and effective.

Keywords: afforestation, desertification, landsat, vegetative index, remote sensing

Procedia PDF Downloads 316
8654 Advancing Sustainable Development in the Construction Industry: A Theoretical Framework for Integrating Sustainable Project Management

Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Nelly Bondinuba

Abstract:

Purpose: The study proposes a theoretical framework for integrating sustainable project management in the construction sector, addressing the need for sustainable development practices. Methodology: The study adopts a theoretical approach by reviewing existing literature on sustainable development and project management in the construction industry. It analyses various concepts, theories, and frameworks to develop a comprehensive theoretical framework for integrating sustainable project management. Findings: The study emphasizes the importance of incorporating sustainable development practices into construction project management, focusing on collaboration, stakeholder engagement, and continuous improvement to achieve environmental conservation, social responsibility, and economic viability. Conclusion: Sustainable Project Management (SPM) in Ghana's construction industry is challenging due to lack of awareness, regulatory frameworks, financial constraints, and skill shortages, despite its benefits in promoting social inclusivity, job creation, and environmental resilience. Recommendation: The construction industry in Ghana should adopt a comprehensive approach involving local communities, government bodies, and environmental organizations. It should utilize green materials and technologies and effectively manage waste. Originality: This study presents a theoretical framework for sustainable project management in construction. It emphasizes collaboration and stakeholder engagement for long-term sustainable outcomes and considers environmental, social, and economic aspects.

Keywords: construction industry, theoretical framework, integration, project management, sustainable development

Procedia PDF Downloads 32
8653 An Economic Study for Fish Production in Egypt

Authors: Manal Elsayed Elkheshin, Rasha Saleh Mansour, Mohamed Fawzy Mohamed Eldnasury, Mamdouh Elbadry Mohamed

Abstract:

This research Aims to identify the main factors affecting the production and the fish consumption in Egypt, through the econometric estimation for various forms functions of fish production and fish consumption during the period (1991-2014), as the aim of this research to forecast the production and the fish consumption in Egypt until 2020, through determine the best standard methods using (ARIMA).This research also aims to the economic feasibility of the production of fish in aquaculture farms study; investment cost and represents the value of land, buildings, equipment and irrigation. Aquaculture requires three types of fish (Tilapia, carp fish, and mullet fish), and the total area of the farm, about an acre. The annual Fish production from this project about 3.5 tons. The annual investment costs of about 50500 pounds, Find conclude that the project can repay the cost of their investments after about 4 years and 5 months, and therefore recommend the implementation of the project, and internal rate of return reached (IRR) of about 22.1%, where it is clear that the rate of large internal rate of return, and achieves pound invested in this project annual return is estimated at 22.1 pounds, more than the opportunity cost, so we recommend the need to implement the project.Recommendations:1. Increasing the fish agriculture to decrease the gap of animal protein. 2.Increasing the number of mechanism fishing boats, and the provision of transport equipped to maintain the quality of fish production. 3.Encourage and attract the local and foreign investments, providing advice to the investor on the aquaculture field. 4. Action newsletters awareness of the importance of these projects where these projects resulted in a net profit after recovery in less than five years, IRR amounted to about 23%, which is much more than the opportunity cost of a bank interest rate is about 7%, helping to create work and graduates opportunities, and contribute to the reduction of imports of the fish, and improve the performance of the food trade balance.

Keywords: equation model, individual share, red meat, consumption, production, endogenous variable, exogenous variable, financial performance evaluates fish culture, feasibility study, fish production, aquaculture

Procedia PDF Downloads 369
8652 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 217
8651 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 416
8650 The Prospects and Challenges of Adopting an Environmental Management System by Higher Education Institutions in Lebanon

Authors: May A. Massoud, R. Harissi

Abstract:

The fundamental principle and overall goal of an Environmental Management System is the concept of continual improvement. The implementation of such a system reveals a commitment to compliance and sustainable development. This research project aims at identifying and evaluating the prospects and challenges facing the adoption of ISO 14001 standard in the higher education system of Lebanon. It examines the corresponding barriers, drivers and incentives associated with the implementation of the standard. For this purpose, primary data were collected using quantitative method. The results revealed a significant lack of knowledge and sense of responsibility towards ISO 14001 standard and environmental accountability. Improving educational and social responsibility, improving environmental performance and enhancing institution image are the most noticeable drivers to adopt ISO 14001. The main perceived barriers for acquiring the standard are unclear benefits of ISO 14001, the lack of government support and the fact that the standard is not seen as a priority by top management. Lebanese Higher Education institutions are far likely to consider ISO 14001 before having proper accreditation programs or until ISO 14001 become widely-known in the Lebanese economic sectors.

Keywords: ISO 14001, higher education institution, environmental management, system

Procedia PDF Downloads 431
8649 The Urgency of Berth Deepening at the Port of Durban

Authors: Rowen Naicker, Dhiren Allopi

Abstract:

One of the major problems the Port of Durban is experiencing is addressing shallow spots aggravated by megaships that berth. In the recent years, the vessels that call at the Port have increased in size which calls for draughts that are much deeper. For this reason, these larger vessels can only berth under high tide to avoid the risk of running aground. In addition to this, the ships cannot sail in fully laden which does not make it feasible for ship owners. Further during the berthing materials are displaced from the seabed which result in shallow spots being developed. The permitted draft (under-keel allowance) for the Durban Container Terminal (DCT) is currently 12.2 m. Transnet National Ports Authority (TNPA) are currently investing in a dredging fleet worth almost two billion rand. One of the highlights of this investment would be the building of grab hopper dredger that would be dedicated to the Port by 2017. TNPA are trying various techniques to dissolve the reduction of draughts by implementing dredging maintenance projects but is this sufficient? The ideal resolution would be the deepening and widening of the berths. Plans for this project is in place, but the implementation process is a matter of urgency. The intention of this project will be to accommodate three big vessels rather than two which in turn will improve the turnaround time in the port. The berthing will then no longer depend on high tide to avoid ships running aground. The aim of this paper is to prove the implementation of deepening and widening of the Port of Durban is a matter of urgency. If the plan to deepen and widen the berths at DCT is delayed it will mean a loss of business for the South African economy. If larger vessels cannot be accommodated in the Port of Durban, it will bypass the busiest container handling facility in the Southern hemisphere. Shipping companies are compelled to use larger ships as opposed to smaller vessels to lower port and fuel costs. A delay in the expansion of DCT could also result in an escalation of costs.

Keywords: DCT, deepening, berth, port

Procedia PDF Downloads 400
8648 Home Garden: A Food-Based Strategy to Achieve Sustainable Impact on Household Nutrition of Resource-Poor Families in Nepal

Authors: Purushottam P. Khatiwada, Bikash Paudel, Ram B. Rana, Parshuram Biswakarma, Roshan Pudasaini

Abstract:

Nepal has been putting its efforts into securing food and nutrition security for its citizens adopting different models and approaches. Home Garden approach, that integrates vegetables, fruits, small livestock, poultry along with other components like fish, honeybee, mushroom, spices for the promotion of nutritional security of resource-poor and disadvantaged groups was implemented during March 2009 to July 2013 spreading over 16 districts of Nepal covering 115 farmers groups, directly working with 3500 households. Sustained long-term impact of development interventions targeted to the resource-poor and disadvantaged groups has been a recurrent issue for donors, policymakers and practitioners alike. Considering the issue, a post-project evaluation was carried out in a selected project group (Dangibari of Jhapa) after four years of project completion in 2017 in order to evaluate the impact and understand the factors associated with its success. Qualitative information was collected through focus group discussion with group members and associated local institutions. For quantitative information, a quick survey was carried out to the same group members only selecting few indicators. The results are compared with the data obtained from the baseline study conducted by the project in March 2009. The impact of project intervention was evident as compared to the benchmarks established during the baseline, even after four years of project completion. The area under home garden is increased to 729 m² from 386 m² and average food self-sufficiency months increased to 10.22 from 8.11. Seven to eleven fruit species are maintained in the home gardens. An average number of vegetable species grown increased to 15.85 from 9.86. It has resulted in an increase in vegetables self-sufficient month to 8.74 from 4.74 and a huge increase in cash income NPR 6142.8 (USD 59.6) from NPR 385.7 (USD 3.9) from the sale of surplus vegetables. Coaching and mentoring including nutrition sensitization by the project staff at the beginning, inputs and technical support during the project implementation phase and projects effort on the institutional building of disadvantaged farmers were the key drivers of home garden sustainability and expansion. Specifically, package of home garden management trainings provided by the project staff, availability of group funds for buying inputs even after the project, uniting home garden group members in a cooperative, resource leveraging by local institutions through group lobbying, farmers innovations for maintaining home garden diversity and continuous backstopping support by few active members as local resource persons to other members are some additional factors contributing to sustain and/or improve the home garden status by the resource-poor and disadvantaged group.

Keywords: food-based nutrition, home garden, resource-poor and disadvantaged group, sustained impact

Procedia PDF Downloads 145
8647 Effectiveness of European Active Labor Market Policies

Authors: Marwa Sahnoun, Chokri Abdennadher

Abstract:

This article comes, very timely, to look at the effectiveness of active labor market policies (ALMP) in improving labor market outcomes. Using panel data estimates for 19 European countries during the period 2000-2012, this article showed the role of institutional factors, especially the role of employment policies implementation based on three variables: the allocation of resources for the implementation of policies, continuity and timing in the implementation of policies to capture their effectiveness on the labor market. Empirical results shows favor effect of training, employment incentives, sheltered employment and rehabilitation and direct job creation on the entire population employment growth. Results shows also that start-up incentives seems to be more effective in increasing employment than other types of policies. Importantly, two aspects are important in terms of implementation: public expenditure on program administration, e.g. (PES) watches the most favorable aspect and the continuity of policies implemented.

Keywords: active labor market policies, implementation, public expenditure on program administration, start-up incentives, training

Procedia PDF Downloads 398
8646 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 128
8645 Framework to Organize Community-Led Project-Based Learning at a Massive Scale of 900 Indian Villages

Authors: Ayesha Selwyn, Annapoorni Chandrashekar, Kumar Ashwarya, Nishant Baghel

Abstract:

Project-based learning (PBL) activities are typically implemented in technology-enabled schools by highly trained teachers. In rural India, students have limited access to technology and quality education. Implementing typical PBL activities is challenging. This study details how Pratham Education Foundation’s Hybrid Learning model was used to implement two PBL activities related to music in 900 remote Indian villages with 46,000 students aged 10-14. The activities were completed by 69% of groups that submitted a total of 15,000 videos (completed projects). Pratham’s H-Learning model reaches 100,000 students aged 3-14 in 900 Indian villages. The community-driven model engages students in 20,000 self-organized groups outside of school. The students are guided by 6,000 youth volunteers and 100 facilitators. The students partake in learning activities across subjects with the support of community stakeholders and offline digital content on shared Android tablets. A training and implementation toolkit for PBL activities is designed by subject experts. This toolkit is essential in ensuring efficient implementation of activities as facilitators aren’t highly skilled and have limited access to training resources. The toolkit details the activity at three levels of student engagement - enrollment, participation, and completion. The subject experts train project leaders and facilitators who train youth volunteers. Volunteers need to be trained on how to execute the activity and guide students. The training is focused on building the volunteers’ capacity to enable students to solve problems, rather than developing the volunteers’ subject-related knowledge. This structure ensures that continuous intervention of subject matter experts isn’t required, and the onus of judging creativity skills is put on community members. 46,000 students in the H-Learning program were engaged in two PBL activities related to Music from April-June 2019. For one activity, students had to conduct a “musical survey” in their village by designing a survey and shooting and editing a video. This activity aimed to develop students’ information retrieval, data gathering, teamwork, communication, project management, and creativity skills. It also aimed to identify talent and document local folk music. The second activity, “Pratham Idol”, was a singing competition. Students participated in performing, producing, and editing videos. This activity aimed to develop students’ teamwork and creative skills and give students a creative outlet. Students showcased their completed projects at village fairs wherein a panel of community members evaluated the videos. The shortlisted videos from all villages were further evaluated by experts who identified students and adults to participate in advanced music workshops. The H-Learning framework enables students in low resource settings to engage in PBL and develop relevant skills by leveraging community support and using video creation as a tool. In rural India, students do not have access to high-quality education or infrastructure. Therefore designing activities that can be implemented by community members after limited training is essential. The subject experts have minimal intervention once the activity is initiated, which significantly reduces the cost of implementation and allows the activity to be implemented at a massive scale.

Keywords: community supported learning, project-based learning, self-organized learning, education technology

Procedia PDF Downloads 186
8644 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 334
8643 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 150
8642 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 475
8641 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 314
8640 An Estimation Process for Progress Rate Based on Labor-Quantity in Republic of Korea

Authors: Dong-Ho Kim, Zheng-Xun Jin, Yong-Woon Cha, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

As construction is a labor-intensive industry, it is important to identify and manage labor quantities for accurate progress management of the construction project. However, the progress management that focuses on construction cost calculated based on materials rather than labor quantities has led to a difference in the implementation of cost and progress of the actual construction. In addition, since it is not easy to predict accurate labor quantities in the estimation of labor quantity-based progress rate, there have been limited researches into the progress rate estimation based on labor quantity. Accordingly, this study proposed a process for labor quantity-based progress rate estimation using a standard of estimate to predict accurate progress rate of the construction project in Republic Korea. It is expected that the utilization of the proposed process will help to identify the progress rate closer to that of the actual site management and adjust the workforce in each construction type, thereby contributing to improving construction efficiency.

Keywords: labor based, labor cost, progress management, progress rate, progress payment

Procedia PDF Downloads 344
8639 Design and Implementation of 2D Mesh Network on Chip Using VHDL

Authors: Boudjedra Abderrahim, Toumi Salah, Boutalbi Mostefa, Frihi Mohammed

Abstract:

Nowadays, using the advancement of technology in semiconductor device fabrication, many transistors can be integrated to a single chip (VLSI). Although the growth chip density potentially eases systems-on-chip (SoCs) integrating thousands of processing element (PE) such as memory, processor, interfaces cores, system complexity, high-performance interconnect and scalable on-chip communication architecture become most challenges for many digital and embedded system designers. Networks-on-chip (NoCs) becomes a new paradigm that makes possible integrating heterogeneous devices and allows many communication constraints and performances. In this paper, we are interested for good performance and low area for implementation and a behavioral modeling of network on chip mesh topology design using VHDL hardware description language with performance evaluation and FPGA implementation results.

Keywords: design, implementation, communication system, network on chip, VHDL

Procedia PDF Downloads 378
8638 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 507
8637 Assessment of Master's Program in Technology

Authors: Niaz Latif, Joy L. Colwell

Abstract:

Following implementation of a master’s level graduate degree program in technology, a research-based assessment of the program was undertaken to determine how well the program met its goals and objectives, and the impact of the degree program on the objectives and the needs of its graduates. Upon review of the survey data, it was concluded that the program was meeting its goals and objectives and that the directed project option should be encouraged.

Keywords: master’s degree, graduate program, assessment, master's program in technology

Procedia PDF Downloads 408