Search results for: rail project feasibility.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1621

Search results for: rail project feasibility.

1591 The Anti-Noise and Anti-Wear Systems for Railways

Authors: Brigita Altenbaher

Abstract:

In recent years there has been a continuous increase of axle loads, tonnage, train speed and train length which has increased both the productivity in the rail sector and the risk of rail breaks and derailments. On the other hand, the environmental requirements (e.g. noise reduction) for railway operations will become tighter in the future. In our research we developed a new composite material which does not change braking properties, is capable of taking extremely high pressure loads, reduces noise and is environmentally friendly. Part of our research was also the development of technology which will be able to apply this material to the rail. The result of our research was the system which reduces the wear out significantly and almost completely eliminates the squealing noise at the same time, and by using only one special material.

Keywords: Active protection, composite material, lubrication, noise reduction, reduction at source, railway.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2209
1590 Rail Corridors between Minimal Use of Train and Unsystematic Tightening of Population: A Methodological Essay

Authors: A. Benaiche

Abstract:

In the current situation, the automobile has become the main means of locomotion. It allows traveling long distances, encouraging urban sprawl. To counteract this trend, the train is often proposed as an alternative to the car. Simultaneously, the favoring of urban development around public transport nodes such as railway stations is one of the main issues of the coordination between urban planning and transportation and the keystone of the sustainable urban development implementation. In this context, this paper focuses on the study of the spatial structuring dynamics around the railway. Specifically, it is a question of studying the demographic dynamics in rail corridors of Nantes, Angers and Le Mans (Western France) basing on the radiation of railway stations. Consequently, the methodology is concentrated on the knowledge of demographic weight and gains of these corridors, the index of urban intensity and the mobility behaviors (workers’ travels, scholars' travels, modal practices of travels). The perimeter considered to define the rail corridors includes the communes of urban area which have a railway station and communes with an access time to the railway station is less than fifteen minutes by car (time specified by the Regional Transport Scheme of Travelers). The main tools used are the statistical data from the census of population, the basis of detailed tables and databases on mobility flows. The study reveals that the population is not tightened along rail corridors and train use is minimal despite the presence of a nearby railway station. These results lead to propose guidelines to make the train, a real vector of mobility across the rail corridors.

Keywords: Coordination between urban planning and transportation, Rail corridors, Railway stations, Travels.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1090
1589 High Speed Rail vs. Other Factors Affecting the Tourism Market in Italy

Authors: F. Pagliara, F. Mauriello

Abstract:

The objective of this paper is to investigate the relationship between the increase of accessibility brought by high speed rail (HSR) systems and the tourism market in Italy. The impacts of HSR projects on tourism can be quantified in different ways. In this manuscript, an empirical analysis has been carried out with the aid of a dataset containing information both on tourism and transport for 99 Italian provinces during the 2006-2016 period. Panel data regression models have been considered, since they allow modelling a wide variety of correlation patterns. Results show that HSR has an impact on the choice of a given destination for Italian tourists while the presence of a second level hub mainly affects foreign tourists. Attraction variables are also significant for both categories and the variables concerning security, such as number of crimes registered in a given destination, have a negative impact on the choice of a destination.

Keywords: Tourists, overnights, high speed rail, attractions, security.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 663
1588 Optimal Maintenance Clustering for Rail Track Components Subject to Possession Capacity Constraints

Authors: Cuong D. Dao, Rob J.I. Basten, Andreas Hartmann

Abstract:

This paper studies the optimal maintenance planning of preventive maintenance and renewal activities for components in a single railway track when the available time for maintenance is limited. The rail-track system consists of several types of components, such as rail, ballast, and switches with different preventive maintenance and renewal intervals. To perform maintenance or renewal on the track, a train free period for maintenance, called a possession, is required. Since a major possession directly affects the regular train schedule, maintenance and renewal activities are clustered as much as possible. In a highly dense and utilized railway network, the possession time on the track is critical since the demand for train operations is very high and a long possession has a severe impact on the regular train schedule. We present an optimization model and investigate the maintenance schedules with and without the possession capacity constraint. In addition, we also integrate the social-economic cost related to the effects of the maintenance time to the variable possession cost into the optimization model. A numerical example is provided to illustrate the model.

Keywords: Rail-track components, maintenance, optimal clustering, possession capacity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 947
1587 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: Wind energy project; uncertain resources; risks; Monte Carlo simulation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 744
1586 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: Building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2068
1585 Predicting Crack Initiation Due to Ratchetting in Rail Heads Using Critical Element Analysis

Authors: I. U. Wickramasinghe, D. J. Hargreaves, D. V. De Pellegrin

Abstract:

This paper presents a strategy to predict the lifetime of rails subjected to large rolling contact loads that induce ratchetting strains in the rail head. A critical element concept is used to calculate the number of loading cycles needed for crack initiation to occur in the rail head surface. In this technique the finite element method (FEM) is used to determine the maximum equivalent ratchetting strain per load cycle, which is calculated by combining longitudinal and shear stains in the critical element. This technique builds on a previously developed critical plane concept that has been used to calculate the number of cycles to crack initiation in rolling contact fatigue under ratchetting failure conditions. The critical element concept simplifies the analytical difficulties of critical plane analysis. Finite element analysis (FEA) is used to identify the critical element in the mesh, and then the strain values of the critical element are used to calculate the ratchetting rate analytically. Finally, a ratchetting criterion is used to calculate the number of cycles to crack initiation from the ratchetting rate calculated.

Keywords: Critical element analysis, finite element modeling (FEM), wheel/rail contact.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2888
1584 The "Project" Approach in Urban: A Response to Uncertainty

Authors: Nedjima Mouhoubi, Souad Sassi Boudemagh

Abstract:

In this paper, we will try to demonstrate the importance of the project approach in the urban to deal with uncertainty, the importance of the involvement of all stakeholders in the urban project process and that the absence of an actor can lead to project failure but also the importance of the urban project management. These points are handled through the following questions: Does the urban adhere to the theory of complexity? Does the project approach bring hope and solution to make urban planning "sustainable"? How converging visions of actors for the same project? Is the management of urban project the solution to support the urban project approach?

Keywords: Strategic planning, project, urban project stakeholders, management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1240
1583 Development of Logic Model for R&D Program Plan Analysis in Preliminary Feasibility Study

Authors: Hyun-Kyu Kang

Abstract:

The Korean Government has applied the preliminary feasibility study to new government R&D program plans as a part of an evaluation system for R&D programs. The preliminary feasibility study for the R&D program is composed of 3 major criteria such as technological, policy and economic analysis. The program logic model approach is used as a part of the technological analysis in the preliminary feasibility study. We has developed and improved the R&D program logic model. The logic model is a very useful tool for evaluating R&D program plans. Using a logic model, we can generally identify important factors of the R&D program plan, analyze its logic flow and find the disconnection or jump in the logic flow among components of the logic model.

Keywords: Preliminary feasibility study, R&D program logic model, technological analysis.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2105
1582 Designing for Sustainable Public Housing from Property Management and Financial Feasibility Perspectives

Authors: Kung-Jen Tu

Abstract:

Many public housing properties developed by local governments in Taiwan in the 1980s have deteriorated severely as these rental apartment buildings aged. The lack of building maintainability considerations during project design phase as well as insufficient maintenance funds have made it difficult and costly for local governments to maintain and keep public housing properties in good shape. In order to assist the local governments in achieving and delivering sustainable public housing, this paper intends to present a developed design evaluation method to be used to evaluate the presented design schemes from property management and financial feasibility perspectives during project design phase of public housing projects. The design evaluation results, i.e. the property management and financial implications of presented design schemes that could occur later during the building operation and maintenance phase, will be reported to the client (the government) and design schemes revised consequently. It is proposed that the design evaluation be performed from two main perspectives: (1) Operation and property management perspective: Three criteria such as spatial appropriateness, people and vehicle circulation and control, property management working spaces are used to evaluate the ‘operation and PM effectiveness’ of a design scheme. (2) Financial feasibility perspective: Four types of financial analyses are performed to assess the long term financial feasibility of a presented design scheme, such as operational and rental income analysis, management fund analysis, regular operational and property management service expense analysis, capital expense analysis. The ongoing Chung-Li Public Housing Project developed by the Taoyuan City Government will be used as a case to demonstrate how the presented design evaluation method is implemented. The results of property management assessment as well as the annual operational and capital expenses of a proposed design scheme are presented.

Keywords: Design evaluation method, management fund, operational and capital expenses, rental apartment buildings.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1104
1581 Effect of Cladding Direction on Residual Stress Distribution in Laser Cladded Rails

Authors: Taposh Roy, Anna Paradowska, Ralph Abrahams, Quan Lai, Michael Law, Peter Mutton, Mehdi Soodi, Wenyi Yan

Abstract:

In this investigation, a laser cladding process with a powder feeding was used to deposit stainless steel 410L (high strength, excellent resistance to abrasion and corrosion, and great laser compatibility) onto railhead (higher strength, heat treated hypereutectoid rail grade manufactured in accordance with the requirements of European standard EN 13674 Part 1 for R400HT grade), to investigate the development and controllability of process-induced residual stress in the cladding, heat-affected zone (HAZ) and substrate and to analyse their correlation with hardness profile during two different laser cladding directions (across and along the track). Residual stresses were analysed by neutron diffraction at OPAL reactor, ANSTO. Neutron diffraction was carried out on the samples in longitudinal (parallel to the rail), transverse (perpendicular to the rail) and normal (through thickness) directions with high spatial resolution through the thickness. Due to the thick rail and thin cladding, 4 mm thick reference samples were prepared from every specimen by Electric Discharge Machining (EDM). Metallography across the laser claded sample revealed four distinct zones: The clad zone, the dilution zone, HAZ and the substrate. Compressive residual stresses were found in the clad zone and tensile residual stress in the dilution zone and HAZ. Laser cladding in longitudinally cladding induced higher tensile stress in the HAZ, whereas transversely cladding rail showed lower tensile behavior.

Keywords: Laser cladding, residual stress, neutron diffraction, HAZ.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 961
1580 Project Objective Structure Model: An Integrated, Systematic and Balanced Approach in Order to Achieve Project Objectives

Authors: Mohammad Reza Oftadeh

Abstract:

The purpose of the article is to describe project objective structure (POS) concept that was developed on research activities and experiences about project management, Balanced Scorecard (BSC) and European Foundation Quality Management Excellence Model (EFQM Excellence Model). Furthermore, this paper tries to define a balanced, systematic, and integrated measurement approach to meet project objectives and project strategic goals based on a process-oriented model. In this paper, POS is suggested in order to measure project performance in the project life cycle. After using the POS model, the project manager can ensure in order to achieve the project objectives on the project charter. This concept can help project managers to implement integrated and balanced monitoring and control project work.

Keywords: Project objectives, project performance management, PMBOK, key performance indicators, integration management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 746
1579 Technology Trend and Level Assessment Using Patent Data for Preliminary Feasibility Study on R and D Program

Authors: Seongmin Yim

Abstract:

The Korean government has applied preliminary feasibility study for new and huge R&D programs since 2008.The study is carried out from the viewpoints of technology, policy, and Economics. Then integrate the separate analysis and finally arrive at a definite result; whether a program is feasible or unfeasible, This paper describes the concept and method of the feasibility analysis focused on technological viability assessment for technical analysis. It consists of technology trend assessment and technology level assessment. Through the analysis, we can determine the chance of schedule delay or cost overrun occurring in the proposed plan.

Keywords: Preliminary Feasibility Study, Technological viability, Technology Trend Assessment, Technology Level Assessment

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1751
1578 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine

Authors: Nedjima Mouhoubi, Souad Sassi Boudemagh

Abstract:

In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.

Keywords: Urban project, strategic management, operational management, the modernization project of Constantine.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1416
1577 Analysis of the CO2 Emissions of Public Passenger Transport in Tianjin City of China

Authors: Tao Zhao, Xianshuo Xu

Abstract:

Low-carbon public passenger transport is an important part of low carbon city. The CO2 emissions of public passenger transport in Tianjin from 1995 to 2010 are estimated with IPCC CO2 counting method, which shows that the total CO2 emissions of Tianjin public passenger transport have gradually become stable at 1,425.1 thousand tons. And then the CO2 emissions of the buses, taxies, and rail transits are calculated respectively. A CO2 emission of 829.9 thousand tons makes taxies become the largest CO2 emissions source among the public passenger transport in Tianjin. Combining with passenger volume, this paper analyzes the CO2 emissions proportion of the buses, taxies, and rail transits compare the passenger transport rate with the proportion of CO2 emissions, as well as the CO2 emissions change of per 10,000 people. The passenger volume proportion of bus among the three public means of transport is 72.62% which is much higher than its CO2 emissions proportion of 36.01%, with the minimum number of CO2 emissions per 10,000 people of 4.90 tons. The countermeasures to reduce CO2 emissions of public passenger transport in Tianjin are to develop rail transit, update vehicles and use alternative fuel vehicles.

Keywords: Public passenger transport, carbon emissions, countermeasures.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1018
1576 Project Management Success for Contractors

Authors: Hamimah Adnan, Norfashiha Hashim, Mohd Arif Marhani, Mohd Asri Yeop Johari

Abstract:

The aim of this paper is to provide a better understanding of the implementation of Project Management practices by UiTM contractors to ensure project success. A questionnaire survey was administered to 120 UiTM contractors in Malaysia. The purpose of this method was to gather information on the contractors- project background and project management skills. It was found that all of the contractors had basic knowledge and understanding of project management skills. It is suggested that a reasonable project plan and an appropriate organizational structure are influential factors for project success. It is recommended that the contractors need to have an effective program of work and up to date information system are emphasized.

Keywords: Project management, success, contractors.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3123
1575 Substantial Fatigue Similarity of a New Small-Scale Test Rig to Actual Wheel-Rail System

Authors: Meysam Naeimi, Zili Li, Roumen Petrov, Rolf Dollevoet, Jilt Sietsma, Jun Wu

Abstract:

The substantial similarity of fatigue mechanism in a new test rig for rolling contact fatigue (RCF) has been investigated. A new reduced-scale test rig is designed to perform controlled RCF tests in wheel-rail materials. The fatigue mechanism of the rig is evaluated in this study using a combined finite element-fatigue prediction approach. The influences of loading conditions on fatigue crack initiation have been studied. Furthermore, the effects of some artificial defects (squat-shape) on fatigue lives are examined. To simulate the vehicle-track interaction by means of the test rig, a threedimensional finite element (FE) model is built up. The nonlinear material behaviour of the rail steel is modelled in the contact interface. The results of FE simulations are combined with the critical plane concept to determine the material points with the greatest possibility of fatigue failure. Based on the stress-strain responses, by employing of previously postulated criteria for fatigue crack initiation (plastic shakedown and ratchetting), fatigue life analysis is carried out. The results are reported for various loading conditions and different defect sizes. Afterward, the cyclic mechanism of the test rig is evaluated from the operational viewpoint. The results of fatigue life predictions are compared with the expected number of cycles of the test rig by its cyclic nature. Finally, the estimative duration of the experiments until fatigue crack initiation is roughly determined.

Keywords: Fatigue, test rig, crack initiation, life, rail, squats.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2129
1574 Research on Rail Safety Security System

Authors: Cai Guoqiang, Jia Limin, Zhou Liming, Liang yu, Li xi

Abstract:

This paper analysis the integrated use of safety monitoring with the domestic and international latest research on rail safety protection system, and focus on the implementation of an organic whole system, with the monitoring and early warning, risk assessment, predictive control and emergency rescue system. The system framework, contents and system structure of Security system is proposed completely. It-s pointed out that the Security system is a negative feedback system composed of by safety monitoring and warning system, risk assessment and emergency rescue system. Safety monitoring and warning system focus on the monitoring target monitoring, early warning, tracking, integration of decision-making, for objective and subjective risks factors. Risk assessment system analysis the occurrence of a major Security risk mechanism, determines the standard of the future short, medium and long term safety conditions, and give prop for development of safety indicators, accident analysis and safety standards. Emergency rescue system is with the goal of rapid and effective rescue work for accident, to minimize casualties and property losses.

Keywords: rail safety protection, monitoring and early warning, risk assessment, emergency rescue.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3084
1573 Probabilistic Model Development for Project Performance Forecasting

Authors: Milad Eghtedari Naeini, Gholamreza Heravi

Abstract:

In this paper, based on the past project cost and time performance, a model for forecasting project cost performance is developed. This study presents a probabilistic project control concept to assure an acceptable forecast of project cost performance. In this concept project activities are classified into sub-groups entitled control accounts. Then obtain the Stochastic S-Curve (SS-Curve), for each sub-group and the project SS-Curve is obtained by summing sub-groups- SS-Curves. In this model, project cost uncertainties are considered through Beta distribution functions of the project activities costs required to complete the project at every selected time sections through project accomplishment, which are extracted from a variety of sources. Based on this model, after a percentage of the project progress, the project performance is measured via Earned Value Management to adjust the primary cost probability distribution functions. Then, accordingly the future project cost performance is predicted by using the Monte-Carlo simulation method.

Keywords: Monte Carlo method, Probabilistic model, Project forecasting, Stochastic S-curve

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2658
1572 Evaluation of External Costs of Traffic Accident in Slovak Republic

Authors: Anna Dolinayova, Jozef Danis, Juraj Camaj

Abstract:

The report deals with comparison of traffic accidents in Slovak republic in road and rail transport since 2009 until 2014, with evaluation of external costs and consequently with the possibilities of their internalization. The results of road traffic accidents analysis are realized in line with after-effects they have caused; in line with main cause, place of origin (within or out of town) and in accordance to age of accident´s victims and kind of injuries (easy, hard or fatal). Evaluation of individual after-effects is carried in terms of probability of traffic accidents occurrence.

Keywords: External costs, traffic accident, rail transport, road transport.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1313
1571 Estimation Method for the Construction of Hydrogen Society with Various Biomass Resources in Japan-Project of Cost Reductions in Biomass Transport and Feasibility for Hydrogen Station with Biomass-

Authors: Masaki Tajima, Kenji Imou, Shinya Yokoyama

Abstract:

It was determined that woody biomass and livestock excreta can be utilized as hydrogen resources and hydrogen produced from such sources can be used to fill fuel cell vehicles (FCVs) at hydrogen stations. It was shown that the biomass transport costs for hydrogen production may be reduced the costs for co-generation. In the Tokyo Metropolitan Area, there are only a few sites capable of producing hydrogen from woody biomass in amounts greater than 200 m3/h-the scale required for a hydrogen station to be operationally practical. However, in the case of livestock excreta, it was shown that 15% of the municipalities in this area are capable of securing sufficient biomass to be operationally practical for hydrogen production. The differences in feasibility of practical operation depend on the type of biomass.

Keywords: Biomass Resources, Hydrogen Production, Hydrogen Station, Transport Cost.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1354
1570 Optimizing the Project Delivery Time with Time Cost Trade-offs

Authors: Wei Lo, Ming-En Kuo

Abstract:

While to minimize the overall project cost is always one of the objectives of construction managers, to obtain the maximum economic return is definitely one the ultimate goals of the project investors. As there is a trade-off relationship between the project time and cost, and the project delivery time directly affects the timing of economic recovery of an investment project, to provide a method that can quantify the relationship between the project delivery time and cost, and identify the optimal delivery time to maximize economic return has always been the focus of researchers and industrial practitioners. Using genetic algorithms, this study introduces an optimization model that can quantify the relationship between the project delivery time and cost and furthermore, determine the optimal delivery time to maximize the economic return of the project. The results provide objective quantification for accurately evaluating the project delivery time and cost, and facilitate the analysis of the economic return of a project.

Keywords: Time-Cost Trade-Off, Genetic Algorithms, Resource Integration, Economic return.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1735
1569 Low Voltage Squarer Using Floating Gate MOSFETs

Authors: Rishikesh Pandey, Maneesha Gupta

Abstract:

A new low-voltage floating gate MOSFET (FGMOS) based squarer using square law characteristic of the FGMOS is proposed in this paper. The major advantages of the squarer are simplicity, rail-to-rail input dynamic range, low total harmonic distortion, and low power consumption. The proposed circuit is biased without body effect. The circuit is designed and simulated using SPICE in 0.25μm CMOS technology. The squarer is operated at the supply voltages of ±0.75V . The total harmonic distortion (THD) for the input signal 0.75Vpp at 25 KHz, and maximum power consumption were found to be less than 1% and 319μW respectively.

Keywords: Analog signal processing, floating gate MOSFETs, low-voltage, Spice, squarer.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1945
1568 Dynamic Analyses for Passenger Volume of Domestic Airline and High Speed Rail

Authors: Shih-Ching Lo

Abstract:

Discrete choice model is the most used methodology for studying traveler-s mode choice and demand. However, to calibrate the discrete choice model needs to have plenty of questionnaire survey. In this study, an aggregative model is proposed. The historical data of passenger volumes for high speed rail and domestic civil aviation are employed to calibrate and validate the model. In this study, different models are compared so as to propose the best one. From the results, systematic equations forecast better than single equation do. Models with the external variable, which is oil price, are better than models based on closed system assumption.

Keywords: forecasting, passenger volume, dynamic competition model, external variable, oil price

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1418
1567 Internal Node Stabilization for Voltage Sense Amplifiers in Multi-Channel Systems

Authors: Sanghoon Park, Ki-Jin Kim, Kwang-Ho Ahn

Abstract:

This paper discusses the undesirable charge transfer by the parasitic capacitances of the input transistors in a voltage sense amplifier. Due to its intrinsic rail-to-rail voltage transition, the input sides are inevitably disturbed. It can possible disturb the stabilities of the reference voltage levels. Moreover, it becomes serious in multi-channel systems by altering them for other channels, and so degrades the linearity of the systems. In order to alleviate the internal node voltage transition, the internal node stabilization technique is proposed by utilizing an additional biasing circuit. It achieves 47% and 43% improvements for node stabilization and input referred disturbance, respectively.

Keywords: Voltage sense amplifier, voltage transition, node stabilization, and biasing circuits.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2734
1566 Preparing Project Managers to Achieve Project Success - Human Management Perspective

Authors: E. Muneera, A. Anuar, A. S. Zulkiflee

Abstract:

The evolution in project management was triggered by the changes in management philosophy and practices in order to maintain competitive advantage and continuous success in the field. The purpose of this paper is to highlight the practicality of cognitive style and unlearning approach in influencing the achievement of project success by project managers. It introduces the concept of planning, knowing and creating style from cognitive style field in the light of achieving time, cost, quality and stakeholders appreciation in project success context. Further it takes up a discussion of the unlearning approach as a moderator in enhancing the relationship between cognitive style and project success. The paper bases itself on literature review from established disciplines like psychology, sociology and philosophy regarding cognitive style, unlearning and project success in general. The analysis and synthesis of literature in the subject area a conceptual paper is utilized as the basis of future research to form a comprehensive framework for project managers in enhancing the project management competency.

Keywords: Cognitive Style, Project Managers, Project Success, Unlearning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1983
1565 Stabilization Technique for Multi-Inputs Voltage Sense Amplifiers in Node Sharing Converters

Authors: Sanghoon Park, Ki-Jin Kim, Kwang-Ho Ahn

Abstract:

This paper discusses the undesirable charge transfer through the parasitic capacitances of the input transistors in a multi-inputs voltage sense amplifier. Its intrinsic rail-to-rail voltage transitions at the output nodes inevitably disturb the input sides through the capacitive coupling between the outputs and inputs. Then, it can possible degrade the stabilities of the reference voltage levels. Moreover, it becomes more serious in multi-channel systems by altering them for other channels, and so degrades the linearity of the overall systems. In order to alleviate the internal node voltage transition, the internal node stabilization techniques are proposed. It achieves 45% and 40% improvements for node stabilization and input referred disturbance, respectively.

Keywords: Voltage sense amplifier, multi-inputs, voltage transition, node stabilization, and biasing circuits.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2425
1564 Structure Improvement of Aluminothermic Welding Joints by Using Modifiers

Authors: Mihai Brânzei, Tudor Coman

Abstract:

Aluminothermic rail welding was from the beginning a great success because its low price even in 1895 in Germany. This method is now, widely used all over the world for the railways construction, maintenance and modernization. Instructions give you guidelines for preparing papers for conferences or journals. After 1989, the welding needs of the potentials beneficiaries (Romanian Railways, Urban Transportation Companies) keep raise because of the railways maintenance and modernization necessity. The main materials that determine the Thermit (T) composition result from manufacturing scraps all over the country. This can help the environment by consuming these scraps. The Romanian need for alumino-thermic welding is now by 11300 per year, and in a favourable economical environment, this amount can reach 30000 units. This paper tries to show the effect of two types of modifiers introduced in the T composition on the structure and properties of an alumino-thermic welding.

Keywords: aluminothermic rail welding, modifier, Thermit.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2173
1563 Roles and Responsibilities to Success of IT Project in an Organization

Authors: Vahhab Attar Olyaee, Fouad Attar Olyaee

Abstract:

Many IT projects come to failure because of having technical approach, focusing on the final product and lack of proper attention to strategic alignment. Project management models quite often have technical management view [4], [8], [13], [14]. These models focus greatly on the finalization of the project product and the delivery of the product to the customer. However, many project problems are due to lack of attention to the needs and capabilities of the organizations or disregarding how to deploy and use the product in the organization. In this regard, in the current research we are trying to present a solution with the purpose of raising the value of the project in an organization. This way, the project outputs will be properly deployed in the organization. Therefore, a comprehensive model is presented which takes into account the whole processes from initial step of project definition to the deployment of the final outputs in the organization and then the definition of all roles and responsibilities to put the model into practice. Taking into account the opinions of experts and project managers, to prove the performance of the model, the project problems were recognized and based on the model, categorized and analyzed. And at the end it is made clear that ignoring the proper definition of the project and not having a proper understanding of the expected value on the one hand and not supervising the emerged value in the process of production and installment are among the most important factors that bring a project to failure.

Keywords: IT Governance, Project Model, Roles and Responsibilities of Project

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1557
1562 A Case Study of Al-Shifa: A Healthcare Information System in Oman

Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi

Abstract:

The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.

Keywords: Al-Shifa, Information system, Healthcare, Oman, Project Management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5307