Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project
Authors: Debasis Sarkar
Abstract:
Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.
Keywords: Building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1125853
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2134References:
[1] J. V. Kumar, and M. Mukherjee, “Scope of Building Information Modelling (BIM) in India”. Journal of Engineering Science and Technology, vol. 2, no.1, pp. 165-169, 2009.
[2] S. Azhar, M. Hein, and B. Sketo, “Building Information Modelling (BIM): Benefits, Risks and Challenges” McWhorter School of Building Science Auburn University, Auburn, Alabama, 2008.
[3] H. Eastman, P Teicholz, R. Sacks, and K. Liston, BIM Handbook: Guide to Building Information Modelling, Second Edition, John Wiley & Sons, New Jersey, 2011.
[4] J.D. Goedert, and P. Meadati, “Integrating Construction Process Documentation into Building Information Modelling” Journal of Construction Engineering and Management ASCE. vol. 134, no. 7, pp. 509–516, 2008.
[5] D. Sarkar, H.B. Raghavendra, and M. Ruparelia, M. “Role of Key Performance Indicators for evaluating the usage of BIM as tool for Facility Management of Construction Projects”, International Journal of Civil and Structural Engineering, vol. 5, no.4, pp. 370-378,2015.
[6] D. Sarkar and R. Modi “Applications of Building Information Modeling (BIM) to Real Estate Projects of Ahmedabad”, International Adv Research J in Science, Engg & Tech, vol. 2, no. 9, pp. 54-58.
[7] W. Roetzheim. Structured Computer Project Management, New Jersy Prentice Hall, 1988.
[8] J.M. Nicholas, Project Management for Business and Technology: Principles and Practice, New Delhi Second edition, Pearson Prentice Hall, 2007.
[9] D. Sarkar, and G. Dutta, “A framework for project risk management for underground corridor construction of metro rail” International Journal of Construction Project Management, vol 4, no.1, pp. 21-38, 2011.
[10] B. Mulholland, J. Christan,“Risk assessment in construction schedules” Journal of Construction Engineering & Management, vol.125, no1, pp.8 – 15,1999.