Preparing Project Managers to Achieve Project Success - Human Management Perspective
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33087
Preparing Project Managers to Achieve Project Success - Human Management Perspective

Authors: E. Muneera, A. Anuar, A. S. Zulkiflee

Abstract:

The evolution in project management was triggered by the changes in management philosophy and practices in order to maintain competitive advantage and continuous success in the field. The purpose of this paper is to highlight the practicality of cognitive style and unlearning approach in influencing the achievement of project success by project managers. It introduces the concept of planning, knowing and creating style from cognitive style field in the light of achieving time, cost, quality and stakeholders appreciation in project success context. Further it takes up a discussion of the unlearning approach as a moderator in enhancing the relationship between cognitive style and project success. The paper bases itself on literature review from established disciplines like psychology, sociology and philosophy regarding cognitive style, unlearning and project success in general. The analysis and synthesis of literature in the subject area a conceptual paper is utilized as the basis of future research to form a comprehensive framework for project managers in enhancing the project management competency.

Keywords: Cognitive Style, Project Managers, Project Success, Unlearning.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1058873

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2029

References:


[1] W. A. W. Maimun, Critical Factors In Project Success : A Study Of Public Sector Construction Projects In Malaysia, PhD Thesis, University Malaya, Kuala Lumpur, May 2010.
[2] K. B. Boal and R. Hooijberg, "Strategic leadership research: Moving On," The Leadership Quarterly Yearly Review of Leadership, vol.11,no. 4,pp. 515-550, 2001.
[3] J. Hayes, W. C. Allinson, "The Implications Of Learning Styles For Training and Development: A Discussion Of The Matching Hypothesis", Brit. J. Manage, vol.7,pp. 63-73, 1996.
[4] W. C. Allinson J. Hayes, " Cross-National Differences In Cognitive Style: Implications For Management", Int. J. Hum. Resour. Man., vol.11,no.1,pp. 161-170, 2000.
[5] M.Savvas, G.El-Kot and E.Sadler-Smith, "Comparative Study Of Cognitive Styles In Egypt, Greece, Hong Kong and the UK", International Journal Of Training & Development, vol.5,no.1,pp. 64-73, 2001.
[6] S.Leybourne, and E.Sadler-Smith, " The Role Of Intuition and Improvisation In Project Magement", Int. J. Proj. Manage, vol.24,pp. 483-492, 2006.
[7] F.T. Azmi, "Mapping The Learn-Unlearn-Relearn Model Imperatives For Strategic Management" European Business Review, vol.20, no.3, pp.240-259,2008.
[8] B.R. Hergenhahn and M.H.Olson, " An Introduction To Theories Of Learning", 6th ed., New Jersey: Prentice-Hall Inc.,2001.
[9] E.Cools, "The Influence Of Cognitive Style On Managerial Behaviour and Attitudes" unpublished.
[10] G.Hinton, " The Ups and Dowms of Hebb Synopses", Canadian Psychology, vol. 44, no.1, pp.10-13, 2003.
[11] R.Linsker, " Local Synaptic Learning Rules Suffice to Maximize Mutual Information in A Linear Network", Neutral Computation, vol.4,no.5, pp.691-702,1992.
[12] A.Robins and S.McCallum, " The Consolidation of Learning During Sleep: Comparing The Pseudorehearsal and Unlearning Accounts", Neutral Networks, vol.12, no.7-8,pp.1191-1206, 1999.
[13] R.Shadmehr and T.Brashers-Krug, " Functional Stages in the Formation of Human Long-Term Memory", Journal of Neuroscience, vol.17,no.1,pp.409-419, 1997.
[14] K.L. Becker, "Unlearning at Workplace: A mixed method study. Faculty of Education", PhD Thesis, Queensland University of Technology, Queensland, 2007.
[15] L.A. Ika, " Project Success As A Topic In Project Management Journals", Project Management Journal, vol.40, no.4,pp.16-19,2009.
[16] R.Atkinson, "Project Management: Cost, Time And Quality, Two Best Guesses and A Phenomenon It-s Time To Accept Other Success Criteria", Int. J. Proj. Manage, vol.17,pp. 337-342,1999.
[17] E.Westerveld, "The Project Excellence Model1: Linking Success Criteria and Critical Success Factors", Int. J. Proj. Manage,vol.21, pp.411-418,2003.
[18] K.Schmidt and A.Preschoff, "Status And Trend In Project Management In A Global Context" in 2006 Proc. IPMI Institute For Project Management and Innovation.
[19] N.Madter, A.D.Bower, B.Aritua, "Projects And Personalities: A Framework For Individualising Project Management Career Development In The Construction Industry", Int. J. Proj. Manage, vol.30,no.3, pp.273-281,2012.
[20] Jr.L.M.Spencer and S.M.Spencer, " Competence at Work: Models for Superior Performance", New York: John Wiley & Sons, 1993.
[21] A.K.Munns and B.F.Bjeirmi, " The Role Of Project Management In Achieving Project Success" Int. J. Proj. Manage,vol.14,no.2,pp.81- 87,1996.
[22] I.Pant,B.Baroudi, " Project Management Education: The Human Skill Imperative" Int. J. Proj. Manage, vol.26,no.2,pp.124-128,2008.
[23] M.Winter, C.Smith, P.Morris, S.Cicmil, " Directions For Future Research In Project Management: The Main Findings Of A Uk Government funded Research Network", Int. J. Proj. Manage, vol.24,no.8, pp.638-349,2006.
[24] I.Avots, "Why Does Project Management Fail?",California Management Review, no.24,no.4, pp.77-88,1996.
[25] W.Belassi, O.I.Tukel, " A New Framework For Determining Critical Success/Failure Factors In Projects", Int. J. Proj. Manage, vol.14,no.3, pp.141-151,1996.
[26] L.Crawford, "Project Management Competence For The New Millenium" in 2000 Proc. Of 15th World Congress On Project Management, London.
[27] L.R.Sayles and M.K.Chandler, "Managing Large Systems", New York: Harper & Row,1971.
[28] D.K.Ahadzie, A Model for Predicting the Performance of Project Managers in Mass House Building Projects in Ghana, PhD Thesis, University of Wolverhampton, United Kingdom,2007.
[29] B.G.Hwang, W.J.Ng, "Project Management Knowledge And Skills For Green Construction: Overcoming Challenges", Int. J. Proj. Manage, to be published.
[30] T.Frank, "The superior project manager" Marcel Dekker : New York,2002.
[31] H.T.Ong, "Effective Project Management - Essential Elements For Successful Projects" , in 2007 Proc. Of The Inaugural Construction Conference, Singapore.
[32] P.Wong, "Revitalising The Construction Industry Through 9mp" Master Builders Journal, vol.3,2006.
[33] J.Thomas and T.Mengel, "Preparing Project Managers To Deal With Complexity - Advanced Project Management Education", Int. J. Proj. Manage, vol.26,pp.304-315,2008.
[34] K.D.Strang, "Achieving Organizational Learning Across Projects", in 2003 Proc. Of PMI North America Global Congress, Texas.
[35] R.I.Katz, "Skills Of An Effective Administer" Harvard Business Review,1991.
[36] S.El-Sabaa, "The Skills And Career Path Of An Effective Project Manager", Int. J. Proj. Manage,vol. 19,no.1,pp. 1-7,2001.
[37] A.H.A.Bakar, A.A.Razak,S.Abdullah, and A.Awang, "Project Management Success Factors For Sustainable Housing: A Framework", unpublished.
[38] H.A.Witkin, C.S.Moore, D.R. Goodenough,P.W. Cox,"Field-Dependent And Field-Independent Conitive Styles and Their Educational Implications", Review Of Educational Research,pp.1-64,1977.
[39] S.Epstein,R.Pacini,D.V.Raj and H.Heier, "Individual Differences In Intuitive- Experiential And Analytical-Rational Thinking Styles" Journal Of Personality And Social Psychology, vol.71,no.2,pp. 390-405,1996.
[40] P.G.Hodgkinson, E.Sadler-Smith, A.L. Burke, G.Claxton, and P.R.Sparrow, "Intuition In Organizations: Implications For Strategic Management", Long Range Planning, vol.42,pp. 277 - 297,2009.
[41] C.W.Allinson and J.Hayes, "The Cognitive Style Index: A Measure Of Intuition Analysis For Organizational Research", Journal Of Management Education Studies, vol.33,no.1, pp.119-135,1996.
[42] A.Kantrow, "Why history matters to managers?", Harvard Business Review, pp.81-87, 1986.
[43] K.A.D.Windeknecht and L.Brian (2004). "A Model Of Individual And Organisational Unlearning" in 2004 Proc. 18th Annual Conference Of The Australian And New Zealand Academy Of Management, Dunedin, Nz.
[44] P.M.Senge, C.O.Schamer,J. Jowarski and B.S. Flowers, "Presence: Human Purpose and the Field of the Future", : Doubleday Business,2008.
[45] T.Bendell, L.Boulter, and J.Kelly, "Benchmarking for Competitive Advantage", Pitman Publishing: London,1998.
[46] D.Baccarini,"The logical framework method for determining critical success/failure factors in projects", Int. J. Proj. Manage, vol.14,pp. 141- 151,1999.
[47] A.Mobey and D.Parker, "Risk evaluation and its importance to project implementation", Int. J. Proj. Manage, vol.14,pp.141-151.
[48] D.K.H.Chua, Y.C. Kog and P.K.Loh, " Critical Success Factors For Different Project Objectives" Journal Of Construction Engineering And Management, pp.142-150,1999.
[49] R. Bayliss, "Project partneringÔÇöa case study on MTRC Corporation Ltd-s Tseung Kwan O Extension", HKIE Transactions, vol.9,no.3,pp.1- 6,2002.
[50] A.P.C.Chan,D.Scott, and E.W.M.Lam, " Framework of Success Criteria for Design/Build Projects", Journal of Management in Engineering, vol. 18,no.3, pp. 122-128,2002.