Optimal Maintenance Clustering for Rail Track Components Subject to Possession Capacity Constraints
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33087
Optimal Maintenance Clustering for Rail Track Components Subject to Possession Capacity Constraints

Authors: Cuong D. Dao, Rob J.I. Basten, Andreas Hartmann

Abstract:

This paper studies the optimal maintenance planning of preventive maintenance and renewal activities for components in a single railway track when the available time for maintenance is limited. The rail-track system consists of several types of components, such as rail, ballast, and switches with different preventive maintenance and renewal intervals. To perform maintenance or renewal on the track, a train free period for maintenance, called a possession, is required. Since a major possession directly affects the regular train schedule, maintenance and renewal activities are clustered as much as possible. In a highly dense and utilized railway network, the possession time on the track is critical since the demand for train operations is very high and a long possession has a severe impact on the regular train schedule. We present an optimization model and investigate the maintenance schedules with and without the possession capacity constraint. In addition, we also integrate the social-economic cost related to the effects of the maintenance time to the variable possession cost into the optimization model. A numerical example is provided to illustrate the model.

Keywords: Rail-track components, maintenance, optimal clustering, possession capacity.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1130771

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 994

References:


[1] T. Lidén, “Railway Infrastructure Maintenance - A Survey of Planning Problems and Conducted Research,” Transp. Res. Procedia, vol. 10, pp. 574–583, 2015.
[2] G. Budai-Balke, Operations Research Models for Scheduling Railway Infrastructure Maintenance. Tinbergen Institute. Retrieved from http://hdl.handle.net/1765/16008, 2009.
[3] A. Higgins, “Scheduling of railway track maintenance activities and crews,” J. Oper. Res. Soc., vol. 49, no. 10, pp. 1026–1033, 1998.
[4] B. S. N. Cheung, K. P. Chow, L. C. K. Hui, and A. M. K. Yong, “Railway track possession assignment using constraint satisfaction,” Eng. Appl. Artif. Intell., vol. 12, no. 5, pp. 599–611, 1999.
[5] G. Budai, D. Huisman, and R. Dekker, “Scheduling preventive railway maintenance activities,” J. Oper. Res. Soc., vol. 57, no. 9, pp. 1035–1044, 2006.
[6] J. Zhao, A. H. C. Chan, and M. P. N. Burrow, “A genetic-algorithm-based approach for scheduling the renewal of railway track components,” Inst. Mech. Eng. Proc. Part F J. Rail Rapid Transit, vol. 223, no. 6, pp. 533–541, 2009.
[7] F Pargar, “A mathematical model for scheduling preventive maintenance and renewal projects of infrastructures,” in Safety and Reliability of Complex Engineered Systems, 0 vols., CRC Press, 2015, pp. 993–1000.
[8] F. Peng and Y. Ouyang, “Optimal Clustering of Railroad Track Maintenance Jobs,” Comput.-Aided Civ. Infrastruct. Eng., vol. 29, no. 4, pp. 235–247, 2014.
[9] T. Lidén and M. Joborn, “Dimensioning windows for railway infrastructure maintenance: Cost efficiency versus traffic impact,” J. Rail Transp. Plan. Manag., vol. 6, no. 1, pp. 32–47, 2016.