Search results for: construction workers
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4936

Search results for: construction workers

4816 Evaluation of the Effects of Lead on Some Physiological and Hormonal Biomarkeurs among Workers

Authors: Mansouri Ouarda, Adbdennour Cherif, Boukarma Ziad

Abstract:

Environmental and biological monitoring are used for the evaluation of exposure to industrial chemicals, and provide a tool for assessing workers’ exposure to chemicals. The organs or tissues where the first biological effects can be observed with increasing amounts of lead toxicity. This study aims at evaluating the effect of the metal element-trace; lead, on the sex hormones in male workers, exposed to this metal on the level of the manufacturing plant of lead accumulators. The results indicate a significant reduction of the testosterone concentration in exposed workers compared to the control. However, the rate of LH was strongly increased at the individuals exposed to Pb. A significant difference concerning the rate of FSH, the hormone Prolactin and cortisol was recorded. The indicators of the lead poisoning indicate a very highly significant increase in the value of Pbs which vary between (142-796 µg/L) among which 50% of the workers present a high lead poisoning and the value of PPZ which vary between (43-554µg/L). The biochemical parameters show a significant increase in the rate of the créatinine, the urea and the acid urique. The hepatic results show no significant differentiation in the rate of TGO and TGP between both groups of study. However the rates of the enzyme phosphatase alkaline, triglyceride, and cholesterol a significant difference were registered.

Keywords: hormons, parameters, physilogical, Pbs, PPZ

Procedia PDF Downloads 354
4815 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 109
4814 Challenges in Self-Managing Vitality: A Qualitative Study about Staying Vital at Work among Dutch Office Workers

Authors: Violet Petit-Steeghs, Jochem J. R. Van Roon, Jacqueline E. W. Broerse

Abstract:

Last decennia the retirement age in Europe is gradually increasing. As a result, people have to continue working for a longer period of time. Health problems due to increased sedentary behavior and mental conditions like burn-out, pose a threat in fulfilling employees’ working life. In order to stimulate the ability and willingness to work in the present and future, it is important to stay vital. Vitality is regarded in literature as a sense of energy, motivation and resilience. It is assumed that by increasing their vitality, employees will stay healthier and be more satisfied with their job, leading to a more sustainable employment and less absenteeism in the future. The aim of this project is to obtain insights into the experiences and barriers of employees, and specifically office workers, with regard to their vitality. These insights are essential in order to develop appropriate measures in the future. To get more insights in the experiences of office workers on their vitality, 8 focus group discussions were organized with 6-10 office workers from 4 different employers (an university, a national construction company and a large juridical and care service organization) in the Netherlands. The discussions were transcribed and analyzed via open coding. This project is part of a larger consortium project Provita2, and conducted in collaboration with University of Technology Eindhoven. Results showed that a range of interdependent factors form a complex network that influences office workers’ vitality. These factors can be divided in three overarching groups: (1) personal (2) organizational and (3) environmental factors. Personal intrinsic factors, relating to the office worker, comprise someone’s physical health, coping style, life style, needs, and private life. Organizational factors, relating to the employer, are the workload, management style and the structure, vision and culture of the organization. Lastly, environmental factors consist of the air, light, temperature at the workplace and whether the workplace is inspiring and workable. Office workers experienced barriers to improve their own vitality due to a lack of autonomy. On the one hand, because most factors were not only intrinsic but extrinsic, like work atmosphere or the temperature in the room. On the other hand, office workers were restricted in adapting both intrinsic as well as extrinsic factors. Restrictions to for instance the flexibility of working times and the workload, can set limitations for improving vitality through personal factors like physical activity and mental relaxation. In conclusion, a large range of interdependent factors influence the vitality of office workers. Office workers are often regarded to have a responsibility to improve their vitality, but are limitedly autonomous in adapting these factors. Measures to improve vitality should therefore not only focus on increasing awareness among office workers, but also on empowering them to fulfill this responsibility. A holistic approach that takes the complex mutual dependencies between the different factors and actors (like managers, employees and HR personnel) into account is highly recommended.

Keywords: occupational health, perspectives office workers, sustainable employment, vitality at work, work & wellbeing

Procedia PDF Downloads 113
4813 Uptake of Off-Site Construction: Benefit and Future Application

Authors: Faisal Alazzaz, Andrew Whyte

Abstract:

Off-site construction methods have played an important role in the construction sector in the past few decades. It is increasingly becoming a major alternative technique and strategic direction compared to traditional in-situ method. It produces a significant amount of value for the construction industry and the economy more generally. To date, an impressive number of studies have been lunched on the perceived perception of off-site construction. However, it seems that a quantifying benefit on the offsite construction area is lacking. Therefore, this paper examines the recent research literature on the benefits of off- site construction and provides future direction. In the beginning, this paper provides a brief history and current value of the off-site construction followed by a detailed discussion on the benefit of off-site construction. These benefits include but not limited to time saving, quality improvement, relieving skills shortages, cost reduction and productivity improvement. Toward this end, off-site construction should learn from other productive industry similar to services or manufacturing industry by applying operational management tools and techniques with extensive focus on employee empowerment will shed the light on future uptake of Off-site construction. This study is of value in providing scholars have a clear picture of perceived benefit of off-site construction research and give an opportunities for future uptake of off-site method.

Keywords: building projects, employer empowerment, off-site construction benefits, productivity

Procedia PDF Downloads 399
4812 Hospital Workers’ Psychological Resilience after 2015 Middle East Respiratory Syndrome Outbreak

Authors: Myoungsoon You, Heejung Son

Abstract:

During a pandemic, hospital workers should protect not only their vulnerable patients but also themselves from the consequences of rapidly spreading infection. However, the evidence on the psychological impact of an outbreak on hospital workers is limited. In this study, we aim to assess hospital workers’ psychological well-being and function at the workplace after an outbreak, by focusing on ‘psychological resilience’. Specifically, the effects of risk appraisal, emotional experience, and coping ability on resilience indicated by the likelihood of post-traumatic syndrome disorder and willingness to work were investigated. Such role and position of each factor were analyzed using a path model, and the result was compared between the healthcare worker and non-healthcare worker groups. In the investigation, 280 hospital workers who experienced the 2015 Middle East Respiratory Syndrome outbreak in South Korea have participated. The result presented, in both groups, the role of the appraisal of risk and coping ability appeared consistent with a previous research, that was, the former interrupted resilience while the latter facilitated it. In addition, the role of emotional experience was highlighted as, in both groups, emotional disruption not only directly associated with low resilience but mediated the effect of perceived risk on resilience. The differences between the groups were also identified, which were, the role of emotional experience and coping ability was more prominent in the non-HCW group in explaining resilience. From the results, implications on how to support hospital personnel during an outbreak in a way to facilitate their resilience after the outbreak were drawn.

Keywords: hospital workers, emotions, infectious disease outbreak, psychological resilience

Procedia PDF Downloads 216
4811 Labour-saving Construction Using Buildability Framework through Strengthening Designers in Delivering More Buildable Designs

Authors: Muhammad Lawal A., Abdullateef Abdulkarim Jimoh

Abstract:

This study is to appraise the labour-saving construction methods achievable using a buildability framework through an improved design system. Adoption of labour-efficient technology and construction techniques will be necessary to supplement good buildable designs. Increased usage of prefabricated, modular, and standardized construction components, simplicity in the design, and the number of integrated elements all work to advance buildable design. The objectives of the study include `determining a more efficient buildability framework for designers to achieve labour-saving construction’. 20 completed building projects in Birnin Kebbi, Nigeria, is used as a case study to buttress the proposition that `a more buildable design using buildability frame result in labour-saving in construction adopting a Singapore study approach.

Keywords: buildability framework, buildable designs, construction, labour-saving construction

Procedia PDF Downloads 66
4810 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 30
4809 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 434
4808 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 212
4807 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 477
4806 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 520
4805 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 414
4804 The Relation of Water Intake with Level of Knowledge Related to Water Intake in Workers of Food Production Unit, Nutrition Installation at Puspa Hospital, Jakarta

Authors: Siti Rahmah Fitrianti, Mela Milani

Abstract:

Inadequate of water intake has negative effects on the health of the body, which can cause kidney failure and death. One of the factors that can affect someone intake of water is level of knowledge about the importance of water intake itself. A good knowledge of the daily water intake can increase the awareness of daily needed of water intake. Therefore, researchers initiated a study on the relationship of water intake to the level of knowledge related with water intake in food workers, at “Puspa” Hospital. Type of this research is quantitative research with cross-sectional approach. The research data was collected by measuring the independent and dependent variable at a time. This study took place in the food production unit of Nutrition Installation in "Puspa" Hospital, Jakarta in October 2016. The population target in this study were workers in food production unit aged 30-64 years. The instrument was a questionnaire question regarding water intake and 24 hours food recall. The result is 78.6% of respondents have less knowledge about the importance of water intake. Meanwhile, as many as 85.7% of respondents have adequate water intake. Tested by Chi-Square test, showed that no significant relationship between water intake with the level of knowledge related to water intake in workers of food production unit. Adequate intake of water in food workers commonly may be not caused by the level of knowledge related to water intake, but it may be cause of work environment factor which has a high temperature.

Keywords: food production unit, food workers, level of knowledge, water intake

Procedia PDF Downloads 323
4803 Auditory Effects among 18-45 Years Old Workers of a Textile Plant in Seeduwa, Sri Lanka

Authors: P. G. S. Madushani, L. D. Illeperuma

Abstract:

Abstract Noise is one of the most common physical hazards in industrial settings. The prevalence of Noise Induced Hearing Loss (NIHL) is on the rise with increasedduration of exposure and the increase in the severity of hearing loss. The purpose of the study was to determine auditory effects among textile workers and to establish associations between the degree of hearing loss and exposure duration, degree of hearing loss and noise level and the proportion of hearing related complaints. A cross sectional descriptive study using purposive sampling was carried out. An interviewer administered questionnaire and Distortion Product Oto Acoustic Emission (DPOAE) hearing screening on 127 (72 female and 55 male) textile workers of the selected textile plant in Seeduwa, Sri Lanka was done (Age: M= 31.16, SD=7.75). Noise measurements were done in six sections of the factory and average noise levels were obtained. Diagnostic hearing evaluations were done for 60 (57.75%) subjects, referred from the DPOAE hearing screening test. The degree of hearing loss and the exposure duration had a significant association in the high frequency region of 4 kHz to 8 kHz (p < 0.05). Noise levels fluctuated between 90.3±0.8 dBA and 50.6. ±0.52 dBA. 30.83% of workers reported having NIHL. Most of the workers (33.9%) complained difficulty in conversing in noisy backgrounds. Other complaints as tinnitus, dizziness, ear fullness and headache were reported in less than 30%. workers who were exposed to noise for more than 15 years were affected with NIHL in the high frequency region. Administrative controls and engineering controls need to be implemented to manage hazardous noise levels in industrial settings. Hearing Conservation Programs should be initiated and implemented for textile workers.

Keywords: textile industry, NIHL, degree of hearing loss, noise levels, auditory effects

Procedia PDF Downloads 110
4802 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 567
4801 Needs Assessment of Barangay Health Workers in Delivering Health Care Services: Basis for Communication Planning

Authors: Ivan N. Gallegos, Merle Dawn Comidoy, Mira Sol Cabal, Paul Martin Acol, Arnie Polistico

Abstract:

Barangay Health Workers (BHWs) are the lead health advocates who provide basic health care services at the grass-roots level. Hence, adequate skills and training are needed to deliver these services effectively. The study aimed at identifying the communication needs of Barangay health workers situated at the dumpsite of Davao City, Philippines, gravitating towards designing a communication plan tailor-fitted to their needs. It employed a qualitative research design, particularly an in-depth interview of the health workers. Several communication problems were identified, including the lack of participation of BHWs in the Barangay development plan, the lack of a continuous skills enhancement program, ineffective communication strategies resulting in insufficient knowledge of proper personal hygiene, and the inactive participation of community members in health services. Based on these communication problems, the following activities and training were suggested: capacitating BHWs on writing proposals and plans; basic communication skills training; educational seminars for parents; and a sanitation campaign.

Keywords: communication planning, health care services, Barangay health workers, communication strategies

Procedia PDF Downloads 55
4800 Psychosocial Risks and Occupational Health in a Mexican Small and Medium-Sized Enterprises

Authors: Magdalena Escamilla Quintal, Thelma Cetina Canto, Cecilia Aguilar Ortega

Abstract:

Due to the importance that people represent for companies, the setting of a clear control of the risks that threaten the health and the material and financial resources of workers is essential. It is irrelevant if the company is a small and medium-sized enterprise (SME) or a large multinational, or if it is in the construction or service sector. The risk prevention importance is related to a constitutional and human right that all people have; working in a risk-free environment to prevent accidents or illnesses that may influence their quality of life and the tranquility of their family. Therefore, the objective of this study was to determine the level of psychosocial risks (physical and emotional) of the employees of an SME. The participants of this study were 186 employees of a productive sector SME; 151 men and 35 women, all with an average age of 31.77 years. Their seniority inside the SME was between one month and 19.91 years. Ninety-six workers were from the production area, 28 from the management area, as well as 25 from the sales area and 40 from the supplies area. Ninety-three workers were found in Uman, 78 in Playa del Carmen, 11 in Cancun and seven in Cd. del Carmen. We found a statistically significant relationship between the burnout variable and the engagement and psychosomatic complaints as well as between the variables of sex, burnout and psychosomatic complaints. We can conclude that, for benefit of the SME, that there are low levels of burnout and psychosomatic complaints, the women experience major levels of burnout and the men show major levels of psychosomatic complaints. The findings, contributions, limitations and future proposals will be analyzed.

Keywords: psychosocial risks, SME, burnout, engagement, psychosomatic complaints

Procedia PDF Downloads 323
4799 Utilization of Safety Measures in Prevention of Site Accidents in Nigerian Construction Industry

Authors: Samuel Opeyemi Williams, Razali Adul Hamid, Mohd Saidin Misman, Dominic Ileyemi Ajayi, Taki Eddine Seghier

Abstract:

Construction industry is famous with hazardous and high-risk environment with operatives facing a greater risk of work-related fatality or injury than operatives in other industries. It is characterised with different types of accident, ranging from electrocution, trip and slip, fall from height, struck-by, explosion, trench collapse, to scaffolding accidents, with each type being caused by different factors. However, accidents are unplanned, unforeseeable and unexpected events, but regardless of the high-risk nature of the industry, accidents are preventable. The aim of the paper is to determine the extent of the utilization of the safety measures, as well as identifying the factors underlining the non-usage. A research methodology consisting of a literature review was used to identify the types and causes of site accidents, while a well-structured questionnaire was used to determine the level of the usage of safety measures on site. The data were analysed with the results revealing the use of protective clothing, safety helmet, first aid, protective shoe, safety belt, and face shield to aid safety of workers, as well as ascribing non-usage of safety measures to cost, ignorance, lack of experts and non-inclusion in contract document. Recommendations are included in the paper suggesting the enforcement of the utilization of safety measures in reducing the spate of accident occurrence on construction sites.

Keywords: construction industry, safety measures, accident, prevention

Procedia PDF Downloads 289
4798 The Social Construction of the Family among the Survivors of Sex Trafficking

Authors: Nisha James, Shubha Ranganathan

Abstract:

Sex trafficking is a traumatic ongoing process which includes human rights violations against the victims. Majority of the trafficked individuals in India are from families with low socioeconomic status, from rural areas, unmarried or married off at a very young age. Many of the sex trafficked feel that it is necessary to make sacrifices, for the benefit of their families. The combination of these cultural family values with the stigma of rape and prostitution are manipulated and used as a tool in the abuse of power against the sex trafficked. The rescue, rehabilitation and reintegration of these individuals are usually difficult due to the stigma and social exclusion that they face. In these circumstances, social support is very effective in social inclusion of these individuals. The present study was a qualitative one, using semi-structured interviews with 29 Indian survivors of sex trafficking and a few sex workers. Thematic analysis was done on the data derived from the semi-structured interviews. The major findings indicate that the family can be seen as both the ‘cause’ for being sex trafficked, and the factor in victim continuing to be sex trafficked. At the same time, it can also become a driver for getting rescued, rehabilitated and reintegrated. The study also explores the social construction about ‘family’ among the survivors of sex trafficking, reflecting on who they refer to as ‘family’, what they mean by the term ‘family’ and how these families emerge. Therefore the analytic concept of ‘family’ is a crucial element in sex trafficking and cannot be defined only in terms of its conventional definition of a basic unit of society.

Keywords: sex-trafficking, survivor, family, social construction

Procedia PDF Downloads 558
4797 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 302
4796 Mental Well-Being and Quality of Life: A Comparative Study of Male Leather Tannery and Non-Tannery Workers of Kanpur City, India

Authors: Gyan Kashyap, Shri Kant Singh

Abstract:

Improved mental health can be articulated as a good physical health and quality of life. Mental health plays an important role in survival of any one’s life. In today’s time people living with stress in life due to their personal matters, health problems, unemployment, work environment, living environment, substance use, life style and many more important reasons. Many studies confirmed that the significant proportion of mental health people increasing in India. This study is focused on mental well-being of male leather tannery workers in Kanpur city, India. Environment at work place as well as living environment plays an important health risk factors among leather tannery workers. Leather tannery workers are more susceptible to many chemicals and physical hazards, just because they are liable to be affected by their exposure to lots of hazardous materials and processes during tanning work in very hazardous work environment. The aim of this study to determine the level of mental health disorder and quality of life among male leather tannery and non-tannery workers in Kanpur city, India. This study utilized the primary data from the cross- sectional household study which was conducted from January to June, 2015 on tannery and non-tannery workers as a part of PhD program from the Jajmau area of Kanpur city, India. The sample of 286 tannery and 295 non-tannery workers has been collected from the study area. We have collected information from the workers of age group 15-70 those who were working at the time of survey for at least one year. This study utilized the general health questionnaire (GHQ-12) and work related stress scale to test the mental wellbeing of male tannery and non-tannery workers. By using GHQ-12 and work related stress scale, Polychoric factor analysis method has been used for best threshold and scoring. Some of important question like ‘How would you rate your overall quality of life’ on Likert scale to measure the quality of life, their earnings, education, family size, living condition, household assets, media exposure, health expenditure, treatment seeking behavior and food habits etc. Results from the study revealed that around one third of tannery workers had severe mental health problems then non-tannery workers. Mental health problem shown the statistically significant association with wealth quintile, 56 percent tannery workers had severe mental health problem those belong to medium wealth quintile. And 42 percent tannery workers had moderate mental health problem among those from the low wealth quintile. Work related stress scale found the statistically significant results for tannery workers. Large proportion of tannery and non-tannery workers reported they are unable to meet their basic needs from their earnings and living in worst condition. Important result from the study, tannery workers who were involved in beam house work in tannery (58%) had severe mental health problem. This study found the statistically significant association with tannery work and mental health problem among tannery workers.

Keywords: GHQ-12, mental well-being, factor analysis, quality of life, tannery workers

Procedia PDF Downloads 361
4795 Physical and Psychosocial Risk Factors Associated with Occupational Lower Back/Neck Pain among Industrial Workers

Authors: Ghorbanali Mohammadi

Abstract:

Background: The objectives of this study were the association between physical and psychological risk factors for occupational lower back and neck pain among industrial workers. Methods: We conducted a cross-sectional study among 400 male workers of an industrial company over the previous 7days and 12 months. Data were collected using Nordic and third version of COPSOO questionnaires and QEC method for assessment of postures during the work. Results: The prevalence of LB and NP in the last 12 months is 58% and 52% respectively. The relationship between risk factors and low back/ neck pain in the last 12 months were cognitive demands (OR 995% CI 1.65) and (OR 995% CI 1.75); Influence at work (OR 995% CI 2.21) and (OR 995% CI 1.85); quality of leadership (OR 995% CI 2.42) and (OR 995% CI 2.09) was strongly correlated with complaints of low back and neck pains. Conclusion: Data of this study showed a higher prevalence of LBP and NP in the subjects. The results revealed that workers with work experience of more than 12 yrs. and who work more than 8 hrs. days with smoking habits had more probability to develop both LBP and NP.

Keywords: low back pain, neck pain, physical risk factors, psychological risk factors, QEC, COPSOQ III

Procedia PDF Downloads 64
4794 Safety Climate Assessment and Its Impact on the Productivity of Construction Enterprises

Authors: Krzysztof J. Czarnocki, F. Silveira, E. Czarnocka, K. Szaniawska

Abstract:

Research background: Problems related to the occupational health and decreasing level of safety occur commonly in the construction industry. Important factor in the occupational safety in construction industry is scaffold use. All scaffolds used in construction, renovation, and demolition shall be erected, dismantled and maintained in accordance with safety procedure. Increasing demand for new construction projects unfortunately still is linked to high level of occupational accidents. Therefore, it is crucial to implement concrete actions while dealing with scaffolds and risk assessment in construction industry, the way on doing assessment and liability of assessment is critical for both construction workers and regulatory framework. Unfortunately, professionals, who tend to rely heavily on their own experience and knowledge when taking decisions regarding risk assessment, may show lack of reliability in checking the results of decisions taken. Purpose of the article: The aim was to indicate crucial parameters that could be modeling with Risk Assessment Model (RAM) use for improving both building enterprise productivity and/or developing potential and safety climate. The developed RAM could be a benefit for predicting high-risk construction activities and thus preventing accidents occurred based on a set of historical accident data. Methodology/Methods: A RAM has been developed for assessing risk levels as various construction process stages with various work trades impacting different spheres of enterprise activity. This project includes research carried out by teams of researchers on over 60 construction sites in Poland and Portugal, under which over 450 individual research cycles were carried out. The conducted research trials included variable conditions of employee exposure to harmful physical and chemical factors, variable levels of stress of employees and differences in behaviors and habits of staff. Genetic modeling tool has been used for developing the RAM. Findings and value added: Common types of trades, accidents, and accident causes have been explored, in addition to suitable risk assessment methods and criteria. We have found that the initial worker stress level is more direct predictor for developing the unsafe chain leading to the accident rather than the workload, or concentration of harmful factors at the workplace or even training frequency and management involvement.

Keywords: safety climate, occupational health, civil engineering, productivity

Procedia PDF Downloads 286
4793 Social Work Profession in a Mirror of the Russian Immigrant Media in Israel

Authors: Natalia Khvorostianov, Nelly Elias

Abstract:

The present study seeks to analyze representation of social work in immigrant media, focusing on the case of online newspapers established by immigrants from the Former Soviet Union (FSU) in Israel. This immigrant population is particularly interesting because social work did not exist as a profession practiced in the USSR and hence most FSU immigrants arrive in Israel without a basic knowledge of the essence of social work, the services it provides and the logic behind its treatment methods. The sample of 37 items was built through a Google search of the Russian online newspapers and portals originated in Israel by using keywords such as “social worker,” “social work services” and the like. All items were analyzed by using qualitative content analysis. Principal analytical categories used for the analysis were: Assessment of social work services (negative, positive, neutral); social workers’ professionalism and effectiveness; goals and motives underlying their activity; cross-cultural contact with immigrants and methods used in working with immigrants. On this basis, four dominant images used to portray Israeli social work services and social workers were identified: Lack of professionalism, cultural gaps between FSU immigrants and Israeli social workers, repressive character of social work services and social workers’ involvement in corruption and crime.

Keywords: FSU immigrants, immigrant media, media images, social workers

Procedia PDF Downloads 334
4792 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 401
4791 Building a Performance Outline for Health Care Workers at Teaching Hospitals, Nigeria: The Role of Different Leadership Styles

Authors: Osuagwu Justine Ugochukwu

Abstract:

Investigating the effects of transformational and transactional leadership styles on the performance of healthcare employees at the University Teaching Hospital (UNTH) in Enugu, Nigeria, was the goal of the research. The respondents were asked to fill out a structured questionnaire. The respondents were chosen using a straightforward random sampling technique and consisted of 370 health workers at the hospital. The result of the analysis revealed that transactional and transformational leadership style has a positive while ambidextrous leadership has a negative effect on healthcare workers' performance in UNTH, Enugu. Therefore, the management of public hospitals that have the capacity to change their top management approach to leadership styles will gain substantial support from their employees’ thereby increasing organizational commitment and performance among health workers. This will have remarkable social implications, one of which is a change in the work culture and attitude of medical personnel from the seemingly anti-community of patients to friendly engagement and treatment of patients leading to a harmonious coexistence among these individuals in society. Investigating ambidextrous leadership and the use of nonparametric analysis is unique and has brought brand-new knowledge to leadership literature.

Keywords: workers performance, transformational leadership, transactional leadership, governance quality, ambidextrous leadership

Procedia PDF Downloads 51
4790 Use and Effects of Kanban Board from the Aspects of Brothers Furniture Limited

Authors: Kazi Rizvan, Yamin Rekhu

Abstract:

Due to high competitiveness in industries throughout the world, every industry is trying hard to utilize all their resources to keep their productivity as high as possible. Many tools have been being used to ensure smoother flow of an operation, to balance tasks, to maintain proper schedules for tasks, to maintain proper sequence for tasks, to reduce unproductive time. All of these tools are used to augment productivity within an industry. Kanban board is one of them and of the many important tools of lean production system. Kanban Board is a visual depiction of the status of tasks. Kanban board shows the actual status of the tasks. It conveys the progress and issues of tasks as well. Using Kanban Board, tasks can be distributed among workers and operation targets can be visually represented to them. In this paper, an example of Kanban board from the aspects of Brothers Furniture Limited was taken and how the Kanban board system was implemented, how the board was designed and how it was made easily perceivable for the less literate or illiterate workers. The Kanban board was designed for the packing section of Brothers Furniture Limited. It was implemented for the purpose of representing the tasks flow to the workers and to mitigate the time that was wasted while the workers remained wondering about what task they should start after they finish one. Kanban board subsumed seven columns and there was a column for comments where if any problem occurred during working on the tasks. Kanban board was helpful for the workers as the board showed the urgency of the tasks. It was also helpful for the store section as they could understand which products and how much of them could be delivered to store at any certain time. Kanban board had all the information centralized which is why the work-flow got paced up and idle time was minimized. Regardless of many workers being illiterate or less literate, Kanban board was still explicable for the workers as the Kanban cards were colored. Since the significance of colors can be conveniently interpretable to them, colored cards helped a great deal in that matter. Hence, the illiterate or less literate workers didn’t have to spend time wondering about the significance of the cards. Even when the workers weren’t told the significance of the colored cards, they could grow a feeling about their meaning as colors can trigger anyone’s mind to perceive the situation. As a result, the board elucidated the workers about what board required them to do, when to do and what to do next. Kanban board alleviated excessive time between tasks by setting day-plan for targeted tasks and it also reduced time during tasks as the workers were acknowledged of forthcoming tasks for a day. Being very specific to the tasks, Kanban board helped the workers become more focused on their tasks helped them do their job with more perfection. As a result, The Kanban board helped achieve a 8.75% increase in productivity than the productivity before the Kanban board was implemented.

Keywords: color, Kanban Board, Lean Tool, literacy, packing, productivity

Procedia PDF Downloads 209
4789 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 142
4788 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 161
4787 Effects of Poor Job Performance Practices on the Job Satisfaction of Workers

Authors: Prakash Singh, Thembinkosi Twalo

Abstract:

The sustainability of the Buffalo City Metropolitan Municipality (BCMM), in South Africa, is being threatened by the reported cases of poor administration, weak management of resources, inappropriate job performance, and inappropriate job behaviour of some of the workers. Since the structural-functionalists assume that formal education is a solution to societal challenges, it therefore means that the BCMM should not be experiencing this threat since many of its workers have various levels of formal education. Consequently, this study using the mixed method research approach, set out to investigate the paradoxical co-existence of inappropriate job behaviour and performance with formal education at the BCMM. Considering the impact of human factors in the labour process, this study draws attention to the divergent objectives of skill and skill bearer, with the application of knowledge subject to the knowledge bearer’s motives, will, attitudes, ethics and values. Consequently, inappropriate job behaviour and performance practices could be due to numerous factors such as lack of the necessary capabilities or refusal to apply what has been learnt due to racial or other prejudices. The role of the human factor in the labour process is a serious omission in human capital theory, which regards schooling as the only factor contributing to the ability to do a job. For this reason this study’s theoretical framework is an amalgamation of the four theories - human capital, social capital, cultural capital, and reputation capital – in an effort to obtain a broader view of the factors that shape job behaviour and performance. Since it has been established that human nature plays a crucial role in how workers undertake their responsibilities, it is important that this be taken into consideration in the BCMM’s monitoring and evaluation of the workers’ job performance practices. Hence, this exploratory study brings to the fore, the effects of poor job performance practices on the job satisfaction of workers.

Keywords: human capital, poor job performance practices, service delivery, workers’ job satisfaction

Procedia PDF Downloads 266