Search results for: construction industrial park
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7446

Search results for: construction industrial park

7386 Environmental Degradation of Natural Resources in Broghil National Park in the High Mountains of Pakistan – Empirical Evidence From Local Community and Geoinformatics

Authors: Siddique Ullah Baig, Alisha Manzoor

Abstract:

The remotest, mountainous, and icy Broghil Valley is a high-profile protected area as a national park, which hosts one of the highest altitude permanent human settlements on the earth. This park hosts a distributed but diverse range of habitats. Due to a lack of infrastructures, higher altitudes, and harsh environmental conditions, poverty-stricken inhabitants mostly rely on its resources, causing ecological dis-balance. This study aims to investigate the environmental degradation of natural resources of the park based on empirical evidence from stakeholders and geoinformatics. The result shows that one-fourth of the park is a gently undulating basin dotted with water bodies / grass, and agricultural land and three fourth is entirely rugged with steep mountains and glaciers. There are virtually no forests as the arid cold tundra climate and high altitude prevent tree growth. Rapid three-decadal land cover changes have led to ecological disequilibrium of the park, narrowing the traditional diverse food base, decreasing the resilience of biodiversity and local livelihoods as crop-land has shifted towards fallow, alpine-grass to peat-land and snow/glacial ice area to bare-soil/rocks. The local community believes in exploiting whatever vegetation or organic material is available for use as food, fodder, and fuel. The permanent presence of the community and limited cost-effective options in the park will be a challenge forever to maintain undisturbed natural processes as the objective of a national park.

Keywords: Broghil National Park, natural resources, environmental degradation, land cover

Procedia PDF Downloads 37
7385 Revisiting Ecotourism Development Strategy of Cuc Phuong National Park in Vietnam: Considering Residents’ Perception and Attitudes

Authors: Bui Duc Sinh

Abstract:

Ecotourism in national parks seemed to be one of the options in the conservation of the natural resources and to improve the living condition of local communities. However, ecotourism development will be useless if it lacks the perception and support of local communities and appropriate ecotourism strategies. The aims of this study were to measure residents’ perception and satisfaction towards ecotourism impacts and their attitudes for ecotourism development in Cuc Phuong National Park; to assess the current ecotourism strategies based on ecotourism criteria and then to provide recommendations on ecotourism development strategies. The primary data were collected through personal observations, in-depth interviews with residents and national park staffs, and from surveys on households in all of the five communes in the Cuc Phuong National Park. The results depicted that local communities were aware of ecotourism impacts and had positive attitudes toward ecotourism development, and were satisfied of ecotourism development. However, higher perception rate was found on specific groups such as the young, the high income and educated, and those with jobs related to ecotourism. The study revealed the issues of concerns about the current ecotourism development strategies in Cuc Phuong National Park. The major hindrances for ecotourism development were lack of local participation and unattractive ecotourism services. It was also suggested that Cuc Phuong National Park should use ecotourism criteria to implement ecotourism activities sustainably and to harmonize the sharing of benefits amongst the stakeholders. The approaches proposed were to: create local employment through reengineering, improve the ecotourism quality, appropriate tourism benefits to the stakeholders, and carry out education and training programs. Furthermore, the results of the study helped tour operators and tourism promoters aware the real concerns, issues on current ecotourism activities in Cuc Phuong National Park.

Keywords: ecotourism, ecotourism impact, local community, national park

Procedia PDF Downloads 305
7384 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment

Procedia PDF Downloads 171
7383 Adhesion Performance According to Lateral Reinforcement Method of Textile

Authors: Jungbhin You, Taekyun Kim, Jongho Park, Sungnam Hong, Sun-Kyu Park

Abstract:

Reinforced concrete has been mainly used in construction field because of excellent durability. However, it may lead to reduction of durability and safety due to corrosion of reinforcement steels according to damage of concrete surface. Recently, research of textile is ongoing to complement weakness of reinforced concrete. In previous research, only experiment of longitudinal length were performed. Therefore, in order to investigate the adhesion performance according to the lattice shape and the embedded length, the pull-out test was performed on the roving with parameter of the number of lateral reinforcement, the lateral reinforcement length and the lateral reinforcement spacing. As a result, the number of lateral reinforcement and the lateral reinforcement length did not significantly affect the load variation depending on the adhesion performance, and only the load analysis results according to the reinforcement spacing are affected.

Keywords: adhesion performance, lateral reinforcement, pull-out test, textile

Procedia PDF Downloads 332
7382 Study on Connecting Method of Box Pontoons

Authors: Young-Jun You, Youn-Ju Jeong, Min-Su Park, Du-Ho Lee

Abstract:

Due to a lot of limited conditions, a large box type floating structure is inevitably constructed by connecting many pontoons. When a floating structure is made with concrete, concrete shear key with saw-teeth shape is often used to carry shear force. Match casting for the shear key and precise construction on a sea are very important for making separated two pontoons as one body but those are not easy work and may increase construction time and cost. To solve this problem, one-way shear key is studied in this paper for a connected part where there is some difference between upward and downward shear force. It has only one inclined plane and can resist shear force in one direction. Big shear force is resisted by concrete which forms an inclined plane and small shear force is resisted by steel bar. This system can reduce manufacturing cost of individual pontoon and construction time and cost for constructing a floating structure on a sea. In this paper, the feasibility study about one-way shear key system is performed by comparing with design example.

Keywords: connection, floating container terminal, pontoon, pre-stressing, shear key

Procedia PDF Downloads 298
7381 Thematic Redesign of “Nah Al Balaghe” Riverside Park: Constructing the First Cultural Tourism Center in City of Tehran

Authors: Faraz Nikpour Arani, Shahin Haghi Navand

Abstract:

After Two years of operation, the “Nahj Al Balaghe” riverside park, redesigning research was ordered by second region of Tehran municipality, the goal was to construct the first cultural tourism center in city of Tehran. After Pathological and analytical studies of existing situation, that made by field work research’s and interviews, the main problems was identified as lack of thematic design and some physical problems that reduced the activity and livability ratio of the park. The main approach of this project was thematic physical redesign and redefinition of activities in order to the “Nahj Al Balaghe’s” ideas, cultural days in “shamsi calendar”, the “7 artistic dimensions” and “four classical elements”. This paper is the abstraction of a full research that was done by writers.

Keywords: thematic redesign, Nah Al Balaghe riverside park, cultural tourism center, Tehran

Procedia PDF Downloads 612
7380 The Challenges for Engineers to Change the Construction Method in Brazil

Authors: Yuri B. Cesarino, Vinícius R. Domingues, Darym J. F. Campos

Abstract:

Developing countries have some restrains towards the adoption of new technologies and construction methods. Some nations, such as Brazil, still use conventional construction methodologies, knowing its lesser cost-effectiveness. This research has been conducted to demonstrate how industrialized construction methods should be implemented in Brazil, especially in times of need. Using the common sense among different authors with different perspectives, it is clear that the second method is more suitable for construction development because of its great advantages. However, it is unlikely for this process to be adopted in the country as a result of several social-economic restraints. Nonetheless, Brazilian engineers have a major challenge ahead of them, and it will take more than creativity to solve such an issue.

Keywords: Brazilian engineers, construction methods, industrialized construction, infrastructure

Procedia PDF Downloads 253
7379 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 516
7378 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
7377 Reflection on the Resilience Construction of Megacities Under the Background of Territorial Space Governance

Authors: Xin Jie Li

Abstract:

Due to population agglomeration, huge scale, and complex activities, megacities have become risk centers. To resist the risks brought by development uncertainty, the construction of resilient cities has become a common strategic choice for megacities. As a key link in promoting the modernization of the national governance system and governance capacity, optimizing the layout of national land space that focuses on ecology, production, and life and improving the rationality of spatial resource allocation are conducive to fundamentally promoting the resilience construction of megacities. Therefore, based on the perspective of territorial space governance, this article explores the potential risks faced by the territorial space of megacities and proposes possible paths for the resilience construction of megacities from four aspects: promoting the construction of a resilience system throughout the entire life cycle, constructing a disaster prevention and control system with ecological resilience, creating an industrial spatial pattern with production resilience, and enhancing community resilience to anchor the front line of risk response in megacities.

Keywords: mega cities, potential risks, resilient city construction, territorial and spatial governance

Procedia PDF Downloads 9
7376 Applying Big Data to Understand Urban Design Quality: The Correlation between Social Activities and Automated Pedestrian Counts in Dilworth Park, Philadelphia

Authors: Jae Min Lee

Abstract:

Presence of people and intensity of activities have been widely accepted as an indicator for successful public spaces in urban design literature. This study attempts to predict the qualitative indicators, presence of people and intensity of activities, with the quantitative measurements of pedestrian counting. We conducted participant observation in Dilworth Park, Philadelphia to collect the total number of people and activities in the park. Then, the participant observation data is compared with detailed pedestrian counts at 10 exit locations to estimate the number of park users. The study found that there is a clear correlation between the intensity of social activities and automated pedestrian counts.

Keywords: automated pedestrian count, computer vision, public space, urban design

Procedia PDF Downloads 368
7375 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 251
7374 Knowledge Integration from Concept to Practice: An Exploratory Study of Designing a Flood Resilient Urban Park in Viet Nam

Authors: To Quyen Le, Oswald Devisch, Tu Anh Trinh, Els Hannes

Abstract:

Urban centres worldwide are affected differently by flooding. In Vietnam this impact is increasingly negative caused by a process of rapid urbanisation. Traditional spatial planning and flood mitigation planning are not able to deal with this growing threat. This article therefore proposes to focus on increasing the participation of local communities in flood control and management. It explores, on the basis of a design studio exercise, how lay knowledge on flooding can be integrated within planning processes. The article presents a theoretical basis for the structured criterion for site selection for a flood resilient urban park from the perspective of science, then discloses the tacit and explicit knowledge of the flood-prone area and finally integrates this knowledge into the design strategies for flood resilient urban park design.

Keywords: analytic hierarchy process, AHP, design resilience, flood resilient urban park, knowledge integration

Procedia PDF Downloads 148
7373 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 193
7372 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products

Authors: Su-Hyun Cho, Chang-U Chae

Abstract:

Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment

Procedia PDF Downloads 437
7371 Professional Management on Ecotourism and Conservation to Ensure the Future of Komodo National Park

Authors: Daningsih Sulaeman, Achmad Sjarmidi, Djoko T. Iskandar

Abstract:

Komodo National Park can be associated with the implementation of ecotourism program. The result of Principal Components Analysis is synthesized, tested, and compared to the basic concept of ecotourism with some field adjustments. Principal aspects of professional management should involve ecotourism and wildlife welfare. The awareness should be focused on the future of the Natural Park as 7th Wonder Natural Heritage and its wildlife components, free from human wastes and beneficial to wildlife and local people. According to perceptions and expectations of visitors from various results of tourism programs, the visitor’s perceptions showed that the tourism management in Komodo National Park should pay more attention to visitor's satisfaction and expectation and gives positive impact directly to the ecosystem sustainability, local community and transparency to the conservation program.

Keywords: 7th wonders of nature, ecotourism, Komodo dragon, visitor’s perceptions, wildlife management

Procedia PDF Downloads 176
7370 Real-Time Compressive Strength Monitoring for NPP Concrete Construction Using an Embedded Piezoelectric Self-Sensing Technique

Authors: Junkyeong Kim, Seunghee Park, Ju-Won Kim, Myung-Sug Cho

Abstract:

Recently, demands for the construction of Nuclear Power Plants (NPP) using high strength concrete (HSC) has been increased. However, HSC might be susceptible to brittle fracture if the curing process is inadequate. To prevent unexpected collapse during and after the construction of HSC structures, it is essential to confirm the strength development of HSC during the curing process. However, several traditional strength-measuring methods are not effective and practical. In this study, a novel method to estimate the strength development of HSC based on electromechanical impedance (EMI) measurements using an embedded piezoelectric sensor is proposed. The EMI of NPP concrete specimen was tracked to monitor the strength development. In addition, cross-correlation coefficient was applied in sequence to examine the trend of the impedance variations more quantitatively. The results confirmed that the proposed technique can be applied successfully monitoring of the strength development during the curing process of HSC structures.

Keywords: concrete curing, embedded piezoelectric sensor, high strength concrete, nuclear power plant, self-sensing impedance

Procedia PDF Downloads 485
7369 Strategic Redesign of Public Spaces with a Sustainable Approach: Case Study of Parque Huancavilca, Guayaquil

Authors: Juan Carlos Briones Macias

Abstract:

Currently, the Huancavilca City Park in Guayaquil is an abandoned public space that is discovering a growing problem of insecurity, where various problems have been perceived, such as the lack of green areas, deteriorating furniture, insufficient lighting, the use of inadequate cladding materials and very sunny areas due to the lack of planning in the design of green areas. The objective of this scientific article is to redesign Huancavilca Park through public space design strategies for more attractive and comfortable areas, becoming a point of interaction in a safe and accessible way. A mixed methodology (qualitative and quantitative) was applied, obtaining information based on surveys, interviews, field observations, and systematizing the data in the traditional weighting of the structuring aspects of the park. The results were obtained from the methodological design scheme of iterative analysis of public spaces by Jan Güell. It is concluded that the use of urban strategies in the structuring elements of the park, such as vegetation, furniture, generating new activities, and security interventions, will specifically solve all the problems of the Huancavilca Park tested in a Pareto 80/20 Diagram.

Keywords: public space, green areas, vegetation, street furniture, urban analysis

Procedia PDF Downloads 103
7368 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 313
7367 Seasons and Saproxylic Beetles Biodiversity in an Urban Park in Tunisia

Authors: Zina Nasr, Faiek Errouissi

Abstract:

Forest ecosystems are known for its ability to contain a large diversity of fauna especially insects that represent a huge taxonomic group. A portion of forest insects are recognized as saproxylic including the group of organisms that ‘depend on dead or dying wood’ about them, 20% are beetles. We focused our study on saproxylic beetles in an old urban park ‘the park of Belvedere’, located in the north west of Tunis (36° 49'21’ N 10°10'24’ W). The vegetation is dominated by old trees (Eucalyptus, Olea, Aberia, Pinus) and many fallen wood exist. Saproxylic beetles were collected using three interception traps set in the park over one year (from June 2014 to May 2015) and recovered monthly. In total, we collected 189 beetles belonging to 20 families and 57 species. Several saproxylic families (Bostrichidae, Cerambycidae, Curculionidae, Melyridae, Nitidulidae, Staphylinidae), and well known genus (Rhizopertha, Thrychoplerus, Otiorhychus, Dolichosoma, Epuraea, Anotylus) are recorded. We have retained the largest activity of beetles in spring and a very low richness in winter with zero insect per traps. This result was certainly caused by the variation of meteorological factors that mainly influenced the activity of these organisms. Therefore, we were interested on the saproxylic diversity in an urban ‘forest’, and these results will be more interesting when they are compared in the future with other works from natural forest.

Keywords: saproxylic beetles, seasons, urban park, wood

Procedia PDF Downloads 314
7366 Optimization for Autonomous Robotic Construction by Visual Guidance through Machine Learning

Authors: Yangzhi Li

Abstract:

Network transfer of information and performance customization is now a viable method of digital industrial production in the era of Industry 4.0. Robot platforms and network platforms have grown more important in digital design and construction. The pressing need for novel building techniques is driven by the growing labor scarcity problem and increased awareness of construction safety. Robotic approaches in construction research are regarded as an extension of operational and production tools. Several technological theories related to robot autonomous recognition, which include high-performance computing, physical system modeling, extensive sensor coordination, and dataset deep learning, have not been explored using intelligent construction. Relevant transdisciplinary theory and practice research still has specific gaps. Optimizing high-performance computing and autonomous recognition visual guidance technologies improves the robot's grasp of the scene and capacity for autonomous operation. Intelligent vision guidance technology for industrial robots has a serious issue with camera calibration, and the use of intelligent visual guiding and identification technologies for industrial robots in industrial production has strict accuracy requirements. It can be considered that visual recognition systems have challenges with precision issues. In such a situation, it will directly impact the effectiveness and standard of industrial production, necessitating a strengthening of the visual guiding study on positioning precision in recognition technology. To best facilitate the handling of complicated components, an approach for the visual recognition of parts utilizing machine learning algorithms is proposed. This study will identify the position of target components by detecting the information at the boundary and corner of a dense point cloud and determining the aspect ratio in accordance with the guidelines for the modularization of building components. To collect and use components, operational processing systems assign them to the same coordinate system based on their locations and postures. The RGB image's inclination detection and the depth image's verification will be used to determine the component's present posture. Finally, a virtual environment model for the robot's obstacle-avoidance route will be constructed using the point cloud information.

Keywords: robotic construction, robotic assembly, visual guidance, machine learning

Procedia PDF Downloads 54
7365 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.

Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry

Procedia PDF Downloads 151
7364 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 271
7363 Human-Tiger Conflict in Chitwan National Park, Nepal

Authors: Abishek Poudel

Abstract:

Human-tiger conflicts are serious issues of conflicts between local people and park authority and the conflicting situation potentially play negative role in park management. The study aimed (1) To determine the trend and nature of human-tiger conflicts (2) To understand people's perception and mitigation measures towards tiger conservation. Both primary and secondary information were used to determine human- tiger conflicts in Chitwan National Park. Systematic random sampling with 5% intensity was done to collect the perception of the villagers regarding human-tiger conflicts. The study sites were selected based on frequencies of incidences of human attacks and livestock depredation viz. Rajahar and Ayodhyapuri VDCs respectively. The trend of human casualties by tiger has increased in last five year whereas the trend of livestock has decreased. Reportedly, between 2008 and 2012, tigers killed 22 people, injured 10 and killed at least 213 livestock. Conflict was less common in the park and more intense in the sub-optimal habitats of Buffer Zone. Goat was the most vulnerable livestock followed by cattle. The livestock grazing and human intrusion into tiger habitat were the causes of conflicts. Developing local stewardship and support for tiger conservation, livestock insurance, and compensation policy simplification may help reduce human-tiger conflicts.

Keywords: livestock depredation, sub optimal habitat, human-tiger, local stewardship

Procedia PDF Downloads 438
7362 Integrating Music on Construction Sites: Key Benefits and Cautions: A Literature Perspective

Authors: Oluwatayomi Daniel Fadumo, Chinyere Celestina Esimone

Abstract:

The construction industry, as a massive human capital-related sector, requires an always motivated workforce. The inability to maintain this state has been found to hamper productivity which ultimately leads to poor project delivery, infrastructural development decline, and low morale among citizens. The need to develop an approach to keep this set of people inspired before, during, and after work becomes a necessity; this paper aims to evaluate the key benefits and cautions in integrating music on construction sites in Nigeria to improve effective project delivery. In attaining this, the study identified the advantages of music on construction sites, evaluated the key considerations in introducing music on construction sites, and recommended measures for the effective integration of music on construction sites in Nigeria. The study is a descriptive research through the use of secondary data gleaned from relevant literature, journals, and research sites. The study concluded that different forms of music genres can be implemented ranging from Pop music, rock, metal, and classical music. Introducing music has the advantage of industrial branding, improving workers` morale, setting the pace for working, helping in information retention, and improving mental health and happiness. The key consideration, however, is to provide the right volume and music that doesn’t pose health and safety challenges. The study finally recommended that for effective integration of music on construction sites in Nigeria, policies should be drafted regulating its use, specific radio customized for the site be introduced and that research-based music, proven to have previously helped, should be given to a group of workers.

Keywords: music, construction sites, workers, construction industry, construction management practice

Procedia PDF Downloads 15
7361 Reuse of Huge Industrial Areas

Authors: Martina Perinkova, Lenka Kolarcikova, Marketa Twrda

Abstract:

Brownfields are one of the most important problems that must be solved by today's cities. The topic of this article is description of developing a comprehensive transformation of post-industrial area of the former iron factory national cultural heritage Lower Vítkovice. City of Ostrava used to be industrial superpower of the Czechoslovak Republic, especially in the area of coal mining and iron production, after declining industrial production and mining in the 80s left many unused areas of former factories generally brownfields and backfields. Since the late 90s we are observing how the city officials or private entities seeking to remedy this situation. Regeneration of brownfields is a very expensive and long-term process. The area is now rebuilt for tourists and residents of the city in the entertainment, cultural, and social center. It was necessary do the reconstruction of the industrial monuments. Equally important was the construction of new buildings, which helped reusing of the entire complex. This is a unique example of transformation of technical monuments and completion of necessary new objects, so that the area could start working again and reintegrate back into the urban system.

Keywords: brown fields, conversion, historical and industrial buildings, reconstruction

Procedia PDF Downloads 292
7360 Does the Perceived Value of a National Park Increases Visitor Satisfaction and Loyalty?

Authors: Yoo-Shik Yoon, Hae-Kyung Sohn, Young-Hae Yoon, Hai-Long Cui

Abstract:

This study focused on tourist subjects who have experience visiting national parks in Korea. The reason for selecting national parks as the subject of this study was that many Koreans visit national parks on weekends, and their visits continue even as changes are made to the parks. The purpose of this study was to evaluate what type of value perceived by tourists who visit national parks positively influences their satisfaction. Concurrently, the relationship between satisfaction and future behavioral intention was also examined. The understanding and analysis of this relationship is very important for the success of destination tourism development. This analysis can contribute to the creation of a marketing strategy that will induce tourists to stay longer, revisit, and recommend a national park to others. If national park administrators fully utilize the study results, they will be able to increase the number of visitors to their national parks. Furthermore, the results of this study will contribute to the development of Korean national parks as a tourist destination.

Keywords: national park, visitor satisfaction, loyalty, tourism management

Procedia PDF Downloads 428
7359 Study on Monitoring Techniques Developed for a City Railway Construction

Authors: Myoung-Jin Lee, Sung-Jin Lee, Young-Kon Park, Jin-Wook Kim, Bo-Kyoung Kim, Song-Hun Chong, Sun-Il Kim

Abstract:

Currently, sinkholes may occur due to natural or unknown causes. When the sinkhole is an instantaneous phenomenon, most accidents occur because of significant damage. Thus, methods of monitoring are being actively researched, such that the impact of the accident can be mitigated. A sinkhole can severely affect and wreak havoc in community-based facilities such as a city railway construction. Therefore, the development of a laser / scanning system and an image-based tunnel is one method of pre-monitoring that it stops the accidents. The laser scanning is being used but this has shortcomings as it involves the development of expensive equipment. A laser / videobased scanning tunnel is being developed at Korea Railroad Research Institute. This is designed to automatically operate the railway. The purpose of the scanning is to obtain an image of the city such as of railway structures (stations, tunnel). At the railway structures, it has developed 3D laser scanning that can find a micro-crack can not be distinguished by the eye. An additional aim is to develop technology to monitor the status of the railway structure without the need for expensive post-processing of 3D laser scanning equipment, by developing corresponding software.

Keywords: 3D laser scanning, sinkhole, tunnel, city railway construction

Procedia PDF Downloads 407
7358 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 62
7357 Preliminary Study of Medicinal Plants in Phu Langka National Park, Nakhon Phanom Province, Thailand

Authors: W. Chatan, W. Promprom

Abstract:

Phu Langka National Park is located in Nakhon Phanom Province, the Northeast of Thailand. It contains about 50 km2 of one mountain and three types of forest including deciduous dipterocarp, mixed deciduous and dry evergreen forests. It was interesting area because of that there were some local ethnic groups living around the national park and most people use plants in this area for their life. The objective of this research is to preliminary survey of the use of medicinal plants from this area by local ethnic groups living around the national park. Colour photographs of each species were prepared. In addition, ecology, distribution in the study area, utilization and vernacular names were provided. The result showed that sixteen species of medicinal plant species were found and most plants were used for digestive system and wound. The voucher specimens were deposited in the Forest Herbarium, Department of National Parks, Wildlife and Plant Conservation (BKF), Thailand.

Keywords: diversity, ethnobotany, ethnophamacology, taxonomy, utilization

Procedia PDF Downloads 166