Search results for: project duration
6225 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making
Authors: Sasan Aryaee, Mahdi Ravanshadnia
Abstract:
Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks
Procedia PDF Downloads 1586224 Relationship among Teams' Information Processing Capacity and Performance in Information System Projects: The Effects of Uncertainty and Equivocality
Authors: Ouafa Sakka, Henri Barki, Louise Cote
Abstract:
Uncertainty and equivocality are defined in the information processing literature as two task characteristics that require different information processing responses from managers. As uncertainty often stems from a lack of information, addressing it is thought to require the collection of additional data. On the other hand, as equivocality stems from ambiguity and a lack of understanding of the task at hand, addressing it is thought to require rich communication between those involved. Past research has provided weak to moderate empirical support to these hypotheses. The present study contributes to this literature by defining uncertainty and equivocality at the project level and investigating their moderating effects on the association between several project information processing constructs and project performance. The information processing constructs considered are the amount of information collected by the project team, and the richness and frequency of formal communications among the team members to discuss the project’s follow-up reports. Data on 93 information system development (ISD) project managers was collected in a questionnaire survey and analyzed it via the Fisher Test for correlation differences. The results indicate that the highest project performance levels were observed in projects characterized by high uncertainty and low equivocality in which project managers were provided with detailed and updated information on project costs and schedules. In addition, our findings show that information about user needs and technical aspects of the project is less useful to managing projects where uncertainty and equivocality are high. Further, while the strongest positive effect of interactive use of follow-up reports on performance occurred in projects where both uncertainty and equivocality levels were high, its weakest effect occurred when both of these were low.Keywords: uncertainty, equivocality, information processing model, management control systems, project control, interactive use, diagnostic use, information system development
Procedia PDF Downloads 2946223 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases
Authors: Abdullah Mohammed Alshehri
Abstract:
The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.Keywords: construction, conflict causes, levels, interaction, phases
Procedia PDF Downloads 1806222 Factors Associated with Overweight and Obesity among Recipients of Antiretroviral Therapy at HIV Clinics in Botswana
Authors: Jose G. Tshikuka, Goabaone Rankgoane-Pono, Mgaywa G. M. D. Magafu, Julius C. Mwita, Tiny Masupe, Fortunat M. Kandanda, Shimeles G. Hamda, Roy Tapera, Mooketsi Molefi, John T. Tlhakanelo
Abstract:
Background: Factors associated with overweight and obesity among antiretroviral therapy (ART) recipients have not been sufficiently studied in Botswana. We aimed to study (i) the prevalence and trends in overweight/obesity by duration of exposure to ART among recipients, (ii) changes in body mass index (BMI) categories among recipients before ART initiation (BMI-1) and after ART initiation (BMI-2), (iii) associations between ART and overweight/obesity and (iv) factors associated with BMI changes among ART recipients. Methods: A 12 years retrospective record-based review was conducted. Factors potentially associated with BMI change among patients after at least three years of ART exposure were examined using multiple regression model. Adjusted odds ratios (AOR) and their 95% confidence intervals (CIs) were computed. ART regimens, duration of exposure to ART, and recipients’ demographic and biomedical characteristics including the presence or absence of diabetes mellitus related comorbidities (DRC) were investigated as potential factors associated with overweight/obesity. Results: Twenty-nine percent of recipients were overweight, 16.6% had obesity of whom 2.4% were morbidly-obese at the last clinic visit. Overweight/obesity recipients were more likely to be female, to have DRC and less likely to have nadir CD4 count or CD4 count between 201 – 249 cells/mm³. Neither the first-line nor the second-, third-line ART regimens predicted overweight/obesity more than the other and neither did the duration of exposure to ART. No significant linear trends were observed in the prevalence of overweight/obesity by the duration of exposure to ART. Conclusions: These results indicate that overweight/obesity seen among ART recipients is not directly induced by ART. ART used CD4 and/or DRC pathway to induce overweight/obesity seen among recipients; suggesting that, weight gain documented herein is likely a reflection of improved health status that mirrors trends in the general population or a DRC related effect. Weight management programs may be important components of HIV care.Keywords: overweight/obesity, recipients of antiretroviral therapy, HIV/AIDS, Botswana
Procedia PDF Downloads 1616221 Effects of Extract from Lactuca sativa on Sleep in Pentobarbital-Induced Sleep and Caffeine-Induced Sleep Disturbance in Mice
Authors: Hae Dun Kim, Joo Hyun Jang, Geu Rim Seo, Kyung Soo Ra, Hyung Joo Suh
Abstract:
Lactuca sativa (lettuce) has been known for its medical property to relieve anxiety and nervous. This study was implemented to investigate sleep-promoting effects of the lettuce alcohol extract (LAE). Caffeine is widely used psychoactive substance known to induced wakefulness and insomnia to its consumers. In the present study, the sedative-hypnotic activity of the LAE was studied using the method of pentobarbital-induced sleep in the mouse model. The LAE was administrated to mice 30 min before the pentobarbital injection. The LAE prolonged the pentobarbital-induced sleep duration and decreased sleep latency. The effects of LAE were comparable to those of induced by diazepam. Another study was performed to examine whether LAE ameliorates caffeine-induced sleep disturbance in mice. Additionally, caffeine (10 mg/kg, p.o) delayed sleep onset and reduced sleep duration of mice. Conversely, LAE treatment (80 or 160 mg/kg, p.o), especially at 160 mg/kg, normalized the sleep disturbance induced by caffeine. LAE supplementation can counter the sleep disturbance induced by caffeine. These results suggest that LAE possess significant sedative-hypnotic activity, which supports the popular use of lettuce for treatment of insomnia and provide the basis for new drug discovery. Furthermore, these results demonstrate that the lettuce extract may be preferable for the treatment of insomnia.Keywords: caffeine, Lactuca sativa, sleep duration, sleep latency
Procedia PDF Downloads 3086220 A Project Screening System for Energy Enterprise Based on Dempster-Shafer Theory
Authors: Woosik Jang, Seung Heon Han, Seung Won Baek
Abstract:
Natural gas (NG) is an energy resource in a few countries, and most NG producers do business in politically unstable countries. In addition, as 90% of the LNG market is controlled by a small number of international oil companies (IOCs) and national oil companies (NOCs), entry of latecomers into the market is extremely limited. To meet these challenges, project viability needs to be assessed based on limited information from a project screening perspective. However, the early stages of the project have the following difficulties: (1) What are the factors to consider? (2) How many professionals do you need to decide? (3) How to make the best decision with limited information? To address this problem, this study proposes a model for evaluating LNG project viability based on the Dempster-Shafer theory (DST). A total of 11 indicators for analyzing the gas field, reflecting the characteristics of the LNG industry, and 23 indicators for analyzing the market environment, were identified. The proposed model also evaluates the LNG project based on the survey and provides uncertainty of the results based on DST as well as quantified results. Thus, the proposed model is expected to be able to support the decision-making process of the gas field project using quantitative results as a systematic framework, and it was developed as a stand-alone system to improve its usefulness in practice. Consequently, the amount of information and the mathematical approach are expected to improve the quality and opportunity of decision making for LNG projects for enterprises.Keywords: project screen, energy enterprise, decision support system, Dempster-Shafer theory
Procedia PDF Downloads 3446219 Regional Flood-Duration-Frequency Models for Norway
Authors: Danielle M. Barna, Kolbjørn Engeland, Thordis Thorarinsdottir, Chong-Yu Xu
Abstract:
Design flood values give estimates of flood magnitude within a given return period and are essential to making adaptive decisions around land use planning, infrastructure design, and disaster mitigation. Often design flood values are needed at locations with insufficient data. Additionally, in hydrologic applications where flood retention is important (e.g., floodplain management and reservoir design), design flood values are required at different flood durations. A statistical approach to this problem is a development of a regression model for extremes where some of the parameters are dependent on flood duration in addition to being covariate-dependent. In hydrology, this is called a regional flood-duration-frequency (regional-QDF) model. Typically, the underlying statistical distribution is chosen to be the Generalized Extreme Value (GEV) distribution. However, as the support of the GEV distribution depends on both its parameters and the range of the data, special care must be taken with the development of the regional model. In particular, we find that the GEV is problematic when developing a GAMLSS-type analysis due to the difficulty of proposing a link function that is independent of the unknown parameters and the observed data. We discuss these challenges in the context of developing a regional QDF model for Norway.Keywords: design flood values, bayesian statistics, regression modeling of extremes, extreme value analysis, GEV
Procedia PDF Downloads 726218 Comparative Study on Inhibiting Factors of Cost and Time Control in Nigerian Construction Practice
Authors: S. Abdulkadir, I. Y. Moh’d, S. U. Kunya, U. Nuruddeen
Abstract:
The basis of any contract formation between the client and contractor is the budgeted cost and the estimated duration of projects. These variables are paramount important to project's sponsor in a construction projects and in assessing the success or viability of construction projects. Despite the availability of various techniques of cost and time control, many projects failed to achieve their initial estimated cost and time. The paper evaluate the inhibiting factors of cost and time control in Nigerian construction practice and comparing the result with the United Kingdom practice as identified by one researcher. The populations of the study are construction professionals within Bauchi and Gombe state, Nigeria, a judgmental sampling employed in determining the size of respondents. Descriptive statistics used in analyzing the data in SPSS. Design change, project fraud and corruption, financing and payment of completed work found to be common among the top five inhibiting factors of cost and time control in the study area. Furthermore, the result had shown some comprising with slight contrast as in the case of United Kingdom practice. Study recommend the adaptation of mitigation measures developed in the UK prior to assessing its effectiveness and so also developing a mitigating measure for other top factors that are not within the one developed in United Kingdom practice. Also, it recommends a wider assessing comparison on the modify inhibiting factors of cost and time control as revealed by the study to cover almost all part of Nigeria.Keywords: comparison, cost, inhibiting factor, United Kingdom, time
Procedia PDF Downloads 4426217 Implementation of an Economic – Probabilistic Model to Risk Analysis of ERP Project in Technological Innovation Firms – A Case Study of ICT Industry in Iran
Authors: Reza Heidari, Maryam Amiri
Abstract:
In a technological world, many countries have a tendency to fortifying their companies and technological infrastructures. Also, one of the most important requirements for developing technology is innovation, and then, all companies are struggling to consider innovation as a basic principle. Since, the expansion of a product need to combine different technologies, therefore, different innovative projects would be run in the firms as a base of technology development. In such an environment, enterprise resource planning (ERP) has special significance in order to develop and strengthen of innovations. In this article, an economic-probabilistic analysis was provided to perform an implementation project of ERP in the technological innovation (TI) based firms. The used model in this article assesses simultaneously both risk and economic analysis in view of the probability of each event that is jointly between economical approach and risk investigation approach. To provide an economic-probabilistic analysis of risk of the project, activities and milestones in the cash flow were extracted. Also, probability of occurrence of each of them was assessed. Since, Resources planning in an innovative firm is the object of this project. Therefore, we extracted various risks that are in relation with innovative project and then they were evaluated in the form of cash flow. This model, by considering risks affecting the project and the probability of each of them and assign them to the project's cash flow categories, presents an adjusted cash flow based on Net Present Value (NPV) and with probabilistic simulation approach. Indeed, this model presented economic analysis of the project based on risks-adjusted. Then, it measures NPV of the project, by concerning that these risks which have the most effect on technological innovation projects, and in the following measures probability associated with the NPV for each category. As a result of application of presented model in the information and communication technology (ICT) industry, provided an appropriate analysis of feasibility of the project from the point of view of cash flow based on risk impact on the project. Obtained results can be given to decision makers until they can practically have a systematically analysis of the possibility of the project with an economic approach and as moderated.Keywords: cash flow categorization, economic evaluation, probabilistic, risk assessment, technological innovation
Procedia PDF Downloads 4056216 Environmental Impact Assessment Methodology of the Tirana–Elbasan Road Project
Authors: Aurora Cerri, Niko Pollojani
Abstract:
The Tirana – Elbasan Road project is the most important highway project in Albania, constructed in the period May 2011 - ongoing. This project included construction of 38 km highway category road including 2.6 km of tunnel. It serves as a corridor connecting the Tirana, Capital of Albania and South-East area, and in the near future it is expected to continue in the direction of Macedonian border. Environmental Impact Assesment procedure for this project is provided by the Albanian Environmental Law No. 10431. This law establishes the regulation of procedures for identifying, assessment and reporting on the effects of certain projects on the environment, and the associated administrative procedures, during the decision-making process by the Ministry of Environment and Tourism for issuing environmental permit, and ensures that all relevant information concerning the environment are provided and considered. Due to the nature and size of the project, during the environmental impact assessment process, the European Union legislation, namely the EIA Directive 85/337 / EEC is considered. Moreover, in some cases, due to the lack of national standards and practical guidelines, when necessary those of EU member countries are considered. This paper presents an analysis of the EIA procedure followed on ‘Tirana – Elbasan’ Road project, with a focus on the application of the main stages of the procedure such as: screening, scoping, review, the EIA report; and consideration of alternatives, measures for impact prevention and reduction, and the public hearing T/discussion.Keywords: highway, environmental impact assesment, Tirana, prevention
Procedia PDF Downloads 3256215 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication
Authors: Vita Kalnberzina, Lauren Miller Anderson
Abstract:
The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration
Procedia PDF Downloads 1016214 Employing a Flipped Classroom Approach to Support Project-Based Learning
Authors: Kian Jon Chua, Islam Md Raisul
Abstract:
Findings on a research study conducted for a group of year-2 engineering students participating in a flipped classroom (FC) experience that is judiciously incorporated into project-based learning (PBL) module are presented. The chief purpose of the research is to identify whether if the incorporation of flipped classroom approach to project-based learning indeed yields a positive learning experience for engineering students. Results are presented and compared from the two classes of students – one is subjected to a traditional PBL learning mode while the other undergoes a hybrid PBL-FC learning format. Some themes related to active learning, problem-solving ability, teacher as facilitator, and degree of self-efficacy are also discussed. This paper hopes to provide new knowledge and insights relating to the introduction of flipped classroom learning to a project-based engineering module. Some potential study limitations and future directions to address them are also presented.Keywords: hybrid project-based learning, flipped classroom, problem-solving, active learning
Procedia PDF Downloads 1366213 Effect of Oral Clonidine Premedication on Subarachnoid Block Characteristics of 0.5 % Hyperbaric Bupivacaine for Laparoscopic Gynecological Procedures – A Randomized Control Study
Authors: Buchh Aqsa, Inayat Umar
Abstract:
Background- Clonidine, α 2 agonist, possesses several properties to make it valuable adjuvant for spinal anesthesia. The study was aimed to evaluate the clinical effects of oral clonidine premedication for laparoscopic gynecological procedures under subarachnoid block. Patients and method- Sixtyfour adult female patients of ASA physical status I and II, aged 25 to 45 years and scheduled for laparoscopic gynecological procedures under the subarachnoid block, were randomized into two comparable equal groups of 32 patients each to received either oral clonidine, 100 µg (Group I) or placebo (Group II), 90 minutes before the procedure. Subarachnoid block was established with of 3.5 ml of 0.5% hyperbaric bupivacaine in all patients. Onset and duration of sensory and motor block, maximum cephalad level, and the regression time to reach S1 sensory level were assessed as primary end points. Sedation, hemodynamic variability, and respiratory depression or any other side effects were evaluated as secondary outcomes. Results- The demographic profile was comparable. The intraoperative hemodynamic parameters showed significant differences between groups. Oral clonidine was accelerated the onset time of sensory and motor blockade and extended the duration of sensory block (216.4 ± 23.3 min versus 165 ± 37.2 min, P <0.05). The duration of motor block showed no significant difference. The sedation score was more than 2 in the clonidine group as compared to the control group. Conclusion- Oral clonidine premedication has extended the duration of sensory analgesia with arousable sedation. It also prevented the post spinal shivering of the subarachnoid block.Keywords: oral clonidine, subarachnoid block, sensory analgesia, laparoscopic gynaecological
Procedia PDF Downloads 836212 Major Causes of Delay in Construction Projects
Authors: Y. Gholipour, E. Rezazadeh
Abstract:
Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.Keywords: delay, dam construction, project management, Iran
Procedia PDF Downloads 4476211 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects
Authors: Ali Fazeli Moslehabadi
Abstract:
One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques
Procedia PDF Downloads 1576210 An Approach to Specify Software Requirements in Semantic Form
Authors: Deepa Vijay, Chellammal Surianarayanan, Gopinath Ganapathy
Abstract:
Requirements of a software project serve as a guideline for the entire project team which enable the team towards producing the right outcome. As requirements are the key in deciding the success of the project, it should be specified in an unambiguous manner. Also, the requirements should be complete and consistent. It should be interpreted in the same way by the entire software project team as the customer interprets. Specifying requirements in textual manner is common in software development. This leads to poor understanding of the requirements which results in more errors and degraded quality. There are some literatures which focus on semantic way of specifying functional requirement which ensure the consistency and completeness of requirements. Alternately in the work, a method is proposed to map the syntactic requirements with corresponding semantics in the form of ontologies. This improves the understanding of requirements, prevents errors and improves quality.Keywords: functional requirement, ontology, requirements management, semantics
Procedia PDF Downloads 3646209 Text2Time: Transformer-Based Article Time Period Prediction
Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang
Abstract:
Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.Keywords: NLP, BERT, LLM, deep learning, classification
Procedia PDF Downloads 1056208 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness
Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami
Abstract:
A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.Keywords: construction, critical success factors, performance, stakeholders, team effectiveness
Procedia PDF Downloads 1306207 Relevance of the Tokyo Trial: A Comparative Perspective
Authors: Nalanda Roy
Abstract:
The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.Keywords: Tokyo trial, third world, judgment, international law
Procedia PDF Downloads 926206 Extraction of Grapefruit Essential Oil from Grapefruit Peels
Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi
Abstract:
This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.Keywords: essential oil, carrier oil, medicinal uses, cost of production
Procedia PDF Downloads 4366205 The Addition of Opioids to Bupivacaine in Bilateral Infraorbital Nerve Block for Postoperative Pain Relief in Paediatric Patients for Cleft Lip Repair-Comparative Effects of Pethidine and Fentanyl: A Prospective Randomized Double Blind Study
Authors: Mrudula Kudtarkar, Rajesh Mane
Abstract:
Introduction: Cleft lip repair is one of the common surgeries performed in India and the usual method used for post-operative analgesia is perioperative opioids and NSAIDs. There has been an increase in use of regional techniques and Opioids are the common adjuvants but their efficacy and safety have not been studied extensively in children. Aim: A prospective, randomized, double-blind study was done to compare the efficacy, duration and safety of intraoral infraorbital nerve block on post-operative pain relief using bupivacaine alone or in combination with fentanyl or pethidine in paediatric cleft lip repair. Methodology: 45 children between the age group 5 – 60 months undergoing cleft lip surgery randomly allocated into 3 groups of 15 each received bilateral intraoral infraorbital nerve block with 0.75ml of solution. Group B received 0.25% bupivacaine; group P received 0.25% bupivacaine with 0.25mg/kg pethidine, group F received 0.25% bupivacaine with 0.25microgm/kg fentanyl. Sedation after recovery, post-operative pain intensity and duration of post-operative analgesia were assessed using Modified Hannallah Pain Score. Results: The mean duration of analgesia was 17.8 hrs in Group B, 23.53 hrs in Group F and 35.13 hrs in Group P. There was statistically significant difference between the means of the three groups- ANOVA (p < 0.05). Conclusion: Thus we conclude that addition of fentanyl or pethidine to bupivacaine for Bilateral Intraoral Infraorbital Nerve Block prolong the duration of analgesia with no complications and can be used safely in paediatric patients.Keywords: cleft lip, infraorbital block, NSAIDS, Opiods
Procedia PDF Downloads 2386204 Efficacy of Remote Sensing Application in Monitoring the Effectiveness of Afforestation Project in Northern Nigeria
Authors: T. Garba, Y. Y. Babanyara, K. G. Ilellah, M. A. Modibbo, T. O. Quddus, M. J. Sani
Abstract:
After the United Nation Convention on Desertification (UNCD) in 1977 which was preceded by extensive, regional, and local studies, and consultations with numerous scientists, decision-makers, and relevant institutions. Global Plan of Action to Combat Desertification (PACD) was formulated, endorsed by member Countries. The role of implementing PACD was vested with Governments of countries affected by desertification. The Federal Government of Nigeria as a signatory and World Bank funded and implement afforestation project aimed at combating desertification between 1988 and 1999. This research, therefore, applied remote sensing techniques to assess the effectiveness of the project. To achieve that a small portion of about 143,609 hectares was curved out from the project area. Normalized Difference of the Vegetative Index (NDVI) and Land Use Land Cover were derived from Landsat TM 1986, Landsat ETM 1999 and Nigeria Sat 1, 2007 of the project area. The findings show that there was an increase in cultivated area due to the project from 1986 through 1999 and 2007. This is further buttressed by the three NDVI imageries due to their high positive pixel value from 0.04 in 1986 to 0.22 in 1999 and to 0.32 in 2007 These signifies the gradual physical development of Afforestation project in the area. In addition, it was also verified by histograms of changes in vegetation which indicated an increased vegetative cover from 60,192 in 1986, to 102,476 in 1999 and then to 88,343 in 2007. The study concluded that Remote Sensing approach has actually confirmed that the project was indeed successful and effective.Keywords: afforestation, desertification, landsat, vegetative index, remote sensing
Procedia PDF Downloads 3176203 Advancing Sustainable Development in the Construction Industry: A Theoretical Framework for Integrating Sustainable Project Management
Authors: Francis Kwesi Bondinuba, Seidu Abdullah, Nelly Bondinuba
Abstract:
Purpose: The study proposes a theoretical framework for integrating sustainable project management in the construction sector, addressing the need for sustainable development practices. Methodology: The study adopts a theoretical approach by reviewing existing literature on sustainable development and project management in the construction industry. It analyses various concepts, theories, and frameworks to develop a comprehensive theoretical framework for integrating sustainable project management. Findings: The study emphasizes the importance of incorporating sustainable development practices into construction project management, focusing on collaboration, stakeholder engagement, and continuous improvement to achieve environmental conservation, social responsibility, and economic viability. Conclusion: Sustainable Project Management (SPM) in Ghana's construction industry is challenging due to lack of awareness, regulatory frameworks, financial constraints, and skill shortages, despite its benefits in promoting social inclusivity, job creation, and environmental resilience. Recommendation: The construction industry in Ghana should adopt a comprehensive approach involving local communities, government bodies, and environmental organizations. It should utilize green materials and technologies and effectively manage waste. Originality: This study presents a theoretical framework for sustainable project management in construction. It emphasizes collaboration and stakeholder engagement for long-term sustainable outcomes and considers environmental, social, and economic aspects.Keywords: construction industry, theoretical framework, integration, project management, sustainable development
Procedia PDF Downloads 346202 Thermal Ageing Effect on Mechanical Behavior of Polycarbonate
Authors: H. Babou, S. Ridjla, B. Amerate, R. Ferhoum, M. Aberkane
Abstract:
This work is devoted to the experimental study of thermal ageing effect on the mechanical and micro structural behavior of polycarbonate (PC). A simple compression tests, micro hardness and an IRTF analysis were completed in order to characterize the response of material on specimens after ageing at a temperature of order 100 C° and for serval maintain duration 72, 144 and 216 hours. These investigations showed a decrease of the intrinsic properties of polycarbonate (Young modulus, yield stress, etc.); the superposition of spectra IRTF shows that the intensity of chemical connections C=C, C-O, CH3 and C-H are influenced by the duration of thermal ageing; in addition, an increase of 30 % of micro hardness was detected after 216 hour of ageing.Keywords: amorphous polymer, polycarbonate, mechanical behavior, compression test, thermal ageing
Procedia PDF Downloads 4106201 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals
Authors: Abdulaziz Alnajem, Amit Sharma
Abstract:
Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays
Procedia PDF Downloads 2196200 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development
Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa
Abstract:
The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.Keywords: mentorship, apprenticeship, professional, development
Procedia PDF Downloads 4196199 Effects of Plyometric Exercises on Agility, Power and Speed Improvement of U-17 Female Sprinters in Case of Burayu Athletics Project, Oromia, Ethiopia
Authors: Abdeta Bayissa Mekessa
Abstract:
The purpose of this study was to examine the effects of plyometric exercises on agility, power, and speed and improvement of U-17 female sprinters in the case of the Burayu Athletics project. The true experimental research design was employed for conducting this study. The total populations of the study were 14 U-17 female sprinters from Burayu athletics project. The populations were small in numbers; therefore, the researcher took all as a sample by using comprehensive sampling techniques. These subjects were classified into the Experimental group (N=7) and the Control group (N=7) by using simple random sampling techniques. The Experimental group participated in plyometric training for 8 weeks, 3 days per week and 60 minutes duration per day in addition to their regular training. But, the control groups were following their only regular training program. The variables selected for the purpose of this study were agility, power and speed. The tests were the Illinois agility test, standing long jump test, and 30m sprint test, respectively. Both groups were tested before (pre-test) and after (post-test) 8 weeks of plyometric training. For data analysis, the researcher used SPSS version 26.0 software. The collected data was analyzed using a paired sample t-test to observe the difference between the pre-test and post-test results of the plyometric exercises of the study. The significant level of p<0.05 was considered. The result of the study shows that after 8 weeks of plyometric training, significant improvements were found in Agility (MD=0.45, p<0.05), power (MD=-1.157, P<0.05) and speed (MD=0.37, P<0.05) for experimental group subjects. On the other hand, there was no significant change (P>0.05) in those variables in the control groups. Finally, the findings of the study showed that eight (8) weeks of plyometric exercises had a positive effect on agility, power and speed improvement of female sprinters. Therefore, Athletics coaches and athletes are highly recommended to include plyometric exercise in their training program.Keywords: ploymetric exercise, speed power, aglity, female sprinter
Procedia PDF Downloads 406198 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages
Authors: Kawalpreet Kaur, Panagiotis Mitropoulos
Abstract:
The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.Keywords: work structuring, bid packages, work breakdown, project participants
Procedia PDF Downloads 796197 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project
Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar
Abstract:
Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.Keywords: offshore, construction, project management, sustainability
Procedia PDF Downloads 606196 Big Data in Construction Project Management: The Colombian Northeast Case
Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez
Abstract:
In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.Keywords: big data, building information modeling, tecnology, project manamegent
Procedia PDF Downloads 129