4866 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 628
4865 Optimizing Bridge Deck Construction: A deep Neural Network Approach for Limiting Exterior Grider Rotation

Authors: Li Hui, Riyadh Hindi

Abstract:

In the United States, bridge construction often employs overhang brackets to support the deck overhang, the weight of fresh concrete, and loads from construction equipment. This approach, however, can lead to significant torsional moments on the exterior girders, potentially causing excessive girder rotation. Such rotations can result in various safety and maintenance issues, including thinning of the deck, reduced concrete cover, and cracking during service. Traditionally, these issues are addressed by installing temporary lateral bracing systems and conducting comprehensive torsional analysis through detailed finite element analysis for the construction of bridge deck overhang. However, this process is often intricate and time-intensive, with the spacing between temporary lateral bracing systems usually relying on the field engineers’ expertise. In this study, a deep neural network model is introduced to limit exterior girder rotation during bridge deck construction. The model predicts the optimal spacing between temporary bracing systems. To train this model, over 10,000 finite element models were generated in SAP2000, incorporating varying parameters such as girder dimensions, span length, and types and spacing of lateral bracing systems. The findings demonstrate that the deep neural network provides an effective and efficient alternative for limiting the exterior girder rotation for bridge deck construction. By reducing dependence on extensive finite element analyses, this approach stands out as a significant advancement in improving safety and maintenance effectiveness in the construction of bridge decks.

Keywords: bridge deck construction, exterior girder rotation, deep learning, finite element analysis

Procedia PDF Downloads 41
4864 A Preliminary Study of the Subcontractor Evaluation System for the International Construction Market

Authors: Hochan Seok, Woosik Jang, Seung-Heon Han

Abstract:

The stagnant global construction market has intensified competition since 2008 among firms that aim to win overseas contracts. Against this backdrop, subcontractor selection is identified as one of the most critical success factors in overseas construction project. However, it is difficult to select qualified subcontractors due to the lack of evaluation standards and reliability. This study aims to identify the problems associated with existing subcontractor evaluations using a correlations analysis and a multiple regression analysis with pre-qualification and performance evaluation of 121 firms in six countries.

Keywords: subcontractor evaluation system, pre-qualification, performance evaluation, correlation analysis, multiple regression analysis

Procedia PDF Downloads 346
4863 Incentivize Contracting Partners of Public Projects

Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee

Abstract:

Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.

Keywords: incentives, public accountability, project effectiveness, public opinions

Procedia PDF Downloads 43
4862 Smart BIM Documents - the Development of the Ontology-Based Tool for Employer Information Requirements (OntEIR), and its Transformation into SmartEIR

Authors: Shadan Dwairi

Abstract:

Defining proper requirements is one of the key factors for a successful construction projects. Although there have been many attempts put forward in assist in identifying requirements, but still this area is under developed. In Buildings Information Modelling (BIM) projects. The Employer Information Requirements (EIR) is the fundamental requirements document and a necessary ingredient in achieving a successful BIM project. The provision on full and clear EIR is essential to achieving BIM Level-2. As Defined by PAS 1192-2, EIR is a “pre-tender document that sets out the information to be delivered and the standards and processes to be adopted by the supplier as part of the project delivery process”. It also notes that “EIR should be incorporated into tender documentation to enable suppliers to produce an initial BIM Execution Plan (BEP)”. The importance of effective definition of EIR lies in its contribution to a better productivity during the construction process in terms of cost and time, in addition to improving the quality of the built asset. Proper and clear information is a key aspect of the EIR, in terms of the information it contains and more importantly the information the client receives at the end of the project that will enable the effective management and operation of the asset, where typically about 60%-80% of the cost is spent. This paper reports on the research done in developing the Ontology-based tool for Employer Information Requirements (OntEIR). OntEIR has proven the ability to produce a full and complete set of EIRs, which ensures that the clients’ information needs for the final model delivered by BIM is clearly defined from the beginning of the process. It also reports on the work being done into transforming OntEIR into a smart tool for Defining Employer Information Requirements (smartEIR). smartEIR transforms the OntEIR tool into enabling it to develop custom EIR- tailored for the: Project Type, Project Requirements, and the Client Capabilities. The initial idea behind smartEIR is moving away from the notion “One EIR fits All”. smartEIR utilizes the links made in OntEIR and creating a 3D matrix that transforms it into a smart tool. The OntEIR tool is based on the OntEIR framework that utilizes both Ontology and the Decomposition of Goals to elicit and extract the complete set of requirements needed for a full and comprehensive EIR. A new ctaegorisation system for requirements is also introduced in the framework and tool, which facilitates the understanding and enhances the clarification of the requirements especially for novice clients. Findings of the evaluation of the tool that was done with experts in the industry, showed that the OntEIR tool contributes towards effective and efficient development of EIRs that provide a better understanding of the information requirements as requested by BIM, and support the production of a complete BIM Execution Plan (BEP) and a Master Information Delivery Plan (MIDP).

Keywords: building information modelling, employer information requirements, ontology, web-based, tool

Procedia PDF Downloads 110
4861 Balanced Scorecard (BSC) Project : A Methodological Proposal for Decision Support in a Corporate Scenario

Authors: David de Oliveira Costa, Miguel Ângelo Lellis Moreira, Carlos Francisco Simões Gomes, Daniel Augusto de Moura Pereira, Marcos dos Santos

Abstract:

Strategic management is a fundamental process for global companies that intend to remain competitive in an increasingly dynamic and complex market. To do so, it is necessary to maintain alignment with their principles and values. The Balanced Scorecard (BSC) proposes to ensure that the overall business performance is based on different perspectives (financial, customer, internal processes, and learning and growth). However, relying solely on the BSC may not be enough to ensure the success of strategic management. It is essential that companies also evaluate and prioritize strategic projects that need to be implemented to ensure they are aligned with the business vision and contribute to achieving established goals and objectives. In this context, the proposition involves the incorporation of the SAPEVO-M multicriteria method to indicate the degree of relevance between different perspectives. Thus, the strategic objectives linked to these perspectives have greater weight in the classification of structural projects. Additionally, it is proposed to apply the concept of the Impact & Probability Matrix (I&PM) to structure and ensure that strategic projects are evaluated according to their relevance and impact on the business. By structuring the business's strategic management in this way, alignment and prioritization of projects and actions related to strategic planning are ensured. This ensures that resources are directed towards the most relevant and impactful initiatives. Therefore, the objective of this article is to present the proposal for integrating the BSC methodology, the SAPEVO-M multicriteria method, and the prioritization matrix to establish a concrete weighting of strategic planning and obtain coherence in defining strategic projects aligned with the business vision. This ensures a robust decision-making support process.

Keywords: MCDA process, prioritization problematic, corporate strategy, multicriteria method

Procedia PDF Downloads 56
4860 The Analysis of the Protection of Historical and Cultural Heritage in the Development of Cities: Taking Quzhou Ancient City as an Example

Authors: Zhen Shu

Abstract:

The historical and cultural heritage demonstrates the wisdom of the entire nation and it has left its own traces in the process of urban construction. It has very important instructional significance for the construction of modern cities and the development of cultural aspects of modern people. The Protection of historical and cultural heritage has become an inevitable choice for the development of modern civilization. This paper discusses the relationship between urban development and historic preservation. And it emphasizes the important value of strengthening the protection of historical and cultural heritage in urban construction, introduces the value of cultural heritage, the process of historic preservation and its problems in Quzhou, Zhejiang Province. In conclusion, we puts forward some Suggestions for strengthening the protection of historical heritage in the process of urban construction.

Keywords: cultural heritage, historic preservation, Quzhou ancient city, urban development

Procedia PDF Downloads 261
4859 Role of Facade in Sustainability Enhancement of Contemporary Iranian Buildings

Authors: H. Nejadriahi

Abstract:

A growing demand for sustainability makes sustainability as one of the significant debates of nowadays. Energy saving is one of the main criteria to be considered in the context of sustainability. Reducing energy use in buildings is one of the most important ways to reduce humans’ overall environmental impact. Taking this into consideration, study of different design strategies, which can assist in reducing energy use and subsequently improving the sustainability level of today's buildings would be an essential task. The sustainability level of a building is highly affected by the sustainability performance of its components. One of the main building components, which can have a great impact on energy saving and sustainability level of the building, is its facade. The aim of this study is to investigate on the role of facade in sustainability enhancement of the contemporary buildings of Iran. In this study, the concept of sustainability in architecture, the building facades, and their relationship to sustainability are explained briefly. Following that, a number of contemporary Iranian buildings are discussed and analyzed in terms of different design strategies used in their facades in accordance to the sustainability concepts. The methods used in this study are descriptive and analytic. The results of this paper would assist in generating a wider vision and a source of inspiration for the current designers to design and create environmental and sustainable buildings for the future.

Keywords: building facade, contemporary buildings, Iran, sustainability

Procedia PDF Downloads 310
4858 Developing a Decision-Making Tool for Prioritizing Green Building Initiatives

Authors: Tayyab Ahmad, Gerard Healey

Abstract:

Sustainability in built environment sector is subject to many development constraints. Building projects are developed under different requirements of deliverables which makes each project unique. For an owner organization, i.e., a higher-education institution, involved in a significant building stock, it is important to prioritize some of the sustainability initiatives over the others in order to align the sustainable building development with organizational goals. The point-based green building rating tools i.e. Green Star, LEED, BREEAM are becoming increasingly popular and are well-acknowledged worldwide for verifying a sustainable development. It is imperative to synthesize a multi-criteria decision-making tool that can capitalize on the point-based methodology of rating systems while customizing the sustainable development of building projects according to the individual requirements and constraints of the client organization. A multi-criteria decision-making tool for the University of Melbourne is developed that builds on the action-learning and experience of implementing Green Buildings at the University of Melbourne. The tool evaluates the different sustainable building initiatives based on the framework of Green Star rating tool of Green Building Council of Australia. For each different sustainability initiative the decision-making tool makes an assessment based on at least five performance criteria including the ease with which a sustainability initiative can be achieved and the potential of a sustainability initiative to enhance project objectives, reduce life-cycle costs, enhance University’s reputation, and increase the confidence in quality construction. The use of a weighted aggregation mathematical model in the proposed tool can have a considerable role in the decision-making process of a Green Building project by indexing the Green Building initiatives in terms of organizational priorities. The index value of each initiative will be based on its alignment with some of the key performance criteria. The usefulness of the decision-making tool is validated by conducting structured interviews with some of the key stakeholders involved in the development of sustainable building projects at the University of Melbourne. The proposed tool is realized to help a client organization in deciding that within limited resources which sustainability initiatives and practices are more important to be pursued than others.

Keywords: higher education institution, multi-criteria decision-making tool, organizational values, prioritizing sustainability initiatives, weighted aggregation model

Procedia PDF Downloads 211
4857 Gilgel Gibe III: Dam-Induced Displacement in Ethiopia and Kenya

Authors: Jonny Beirne

Abstract:

Hydropower developments have come to assume an important role within the Ethiopian government's overall development strategy for the country during the last ten years. The Gilgel Gibe III on the Omo river, due to become operational in September 2014, represents the most ambitious, and controversial, of these projects to date. Further aspects of the government's national development strategy include leasing vast areas of designated 'unused' land for large-scale commercial agricultural projects and 'voluntarily' villagizing scattered, semi-nomadic agro-pastoralist groups to centralized settlements so as to use land and water more efficiently and to better provide essential social services such as education and healthcare. The Lower Omo valley, along the Omo River, is one of the sites of this villagization programme as well as of these large-scale commercial agricultural projects which are made possible owing to the regulation of the river's flow by Gibe III. Though the Ethiopian government cite many positive aspects of these agricultural and hydropower developments there are still expected to be serious regional and transnational effects, including on migration flows, in an area already characterized by increasing climatic vulnerability with attendant population movements and conflicts over scarce resources. The following paper is an attempt to track actual and anticipated migration flows resulting from the construction of Gibe III in the immediate vicinity of the dam, downstream in the Lower Omo Valley and across the border in Kenya around Lake Turkana. In the case of those displaced in the Lower Omo Valley, this will be considered in view of the distinction between voluntary villagization and forced resettlement. The research presented is not primary-source material. Instead, it is drawn from the reports and assessments of the Ethiopian government, rights-based groups, and academic researchers as well as media articles. It is hoped that this will serve to draw greater attention to the issue and encourage further methodological research on the dynamics of dam constructions (and associated large-scale irrigation schemes) on migration flows and on the ultimate experience of displacement and resettlement for environmental migrants in the region.

Keywords: forced displacement, voluntary resettlement, migration, human rights, human security, land grabs, dams, commercial agriculture, pastoralism, ecosystem modification, natural resource conflict, livelihoods, development

Procedia PDF Downloads 356
4856 Fear of Covid-19 a Major Contributing Factor to Insomnia in General Iranian Population

Authors: Amin Nakhostin-Ansari, Samaneh Akbarour, Khosro Sadeghniiat Haghighi, Zahra Banafsheh Alemohammad, Farnaz Etesam, Arezu Najafi, Mahnaz Khalafehnilsaz

Abstract:

Introduction: The outbreak of coronavirus disease has considerably burdened the healthcare system in Iran. This study aimed to evaluate the characteristics of insomnia experienced by the general Iranian population during the COVID-19 pandemic. Method: A scale(FCV-19) was used for Fear of COVID-19, Insomnia Severity Index (ISI), Patient Health Questionnaire-2 (PHQ-2), and Generalized Anxiety Disorder Scale-2 (GAD-2) for detailed characterization of insomnia and its patterns Results: In total, 675 people with insomnia with the mean age of 40.28 years (SD=11.15) participated in this study. Prevalence of difficulty initiating sleep (DIS), difficulty maintaining sleep (DMS), and early morning awakening (EMA) were 91.4%, 86.7%, and 77%, respectively. DIS, DMS, and EMA were more common in people with depression and anxiety. FCV-19 score was higher in those with more severe types of DIS, DMS, and EMA (P<0.001). FCV-19 was a risk factor for all patterns of insomnia (OR=1.19, 1.12, 1.02 for DIS, DMS, and EMA, respectively). Conclusion: fear of COVID-19 is a major factor to insomnia patterns. Investigation of COVID-19 fear in people with insomnia and the addition of attributed relieving or management strategies to conventional management of insomnia are reasonable approaches to improve the sleep condition of people in the pandemic.

Keywords: insomnia, difficulty maintaining sleep, COVID-19, Coronavirus

Procedia PDF Downloads 149
4855 Assessment of Educational Service Quality at Master's Level in an Iranian University Using Based on HEdPERF Model

Authors: Faranak Omidian

Abstract:

The aim of this research was to examine the quality of education service at master's level in the Islamic Azad University of Dezful. In terms of objective, this is an applied research and in regard to methodology, it is a descriptive analytical research. The statistical population included all students of master's degree in the Islamic Azad University of Dezful. The sample size was determined using stratified random sampling method in different fields of study. The research questionnaire is the translated version of standardized Abdullah's HEdPERF 41-item scale which is based on a 5-point Likert scale. In order to determine the validity, the translated questionnaire was given to the professors of educational sciences. The correlation among all questions has been regarded at a value of 0.644. The results showed that the quality of educational service at master's level in this university, based on chi-square goodness of fit test, was equal to 73.36 and its degree of freedom was 2 at a significant level of 0.001, indicating the low desirability of the services. According to Friedman test, academic responsiveness has been reported to be in a higher status than other dimensions with an average rank of 3.94 while accessibility, with an average rank of 2.15, has been in the lowest status from master's students' viewpoint.

Keywords: educational service quality, master's level, Iranian university

Procedia PDF Downloads 262
4854 Comparison Constructions in the Language of the Qur'an

Authors: Safiah Ahmed Yahya Madkhali

Abstract:

The aim of the present paper is to provide a characterization of the expression of comparison in the language of the Qur’an, the language of the Divine Book of the Muslim nation. It focuses on quantitative as well as qualitative comparisons. While works on comparison constructions in Arabic focus on a type(s) of the comparison construction and exclude another and investigate its behaviour in Standard Arabic, the paper aims to be inclusive of the varied instances that are scalar comparison constructions and describe its aspects in the language of the Qur’an. To the best of my knowledge, comparative constructions in the language of the Qur’an has not been tackled before and hence the characterization provided in the paper would be the contribution of the present work. The paper highlights the several rhetorical features of the construction as present in the different verses in the Qur’an which set them distinct from the ordinary use of the construction in the different verities of the Arabic language.

Keywords: comparison constructions, inequality, comparative, superlative, equality

Procedia PDF Downloads 57
4853 Reliability of the Estimate of Earthwork Quantity Based on 3D-BIM

Authors: Jaechoul Shin, Juhwan Hwang

Abstract:

In case of applying the BIM method to the civil engineering in the area of free formed structure, we can expect comparatively high rate of construction productivity as it is in the building engineering area. In this research, we developed quantity calculation error applying it to earthwork and bridge construction (e.g. PSC-I type segmental girder bridge amd integrated bridge of steel I-girders and inverted-Tee bent cap), NATM (New Austrian Tunneling Method) tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D modeling quantity survey. we confirmed high reliability of the BIM-based method in structure work in which errors occurred in range between -6% ~ +5%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14% ~ +13% of earthwork quantity calculation. It is benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed.

Keywords: BIM, 3D modeling, 3D-BIM, quantity of earthwork

Procedia PDF Downloads 423
4852 Artificial Intelligence in Art and Other Sectors: Selected Aspects of Mutual Impact

Authors: Justyna Minkiewicz

Abstract:

Artificial Intelligence (AI) applied in the arts may influence the development of AI knowledge in other sectors and then also impact mutual collaboration with the artistic environment. Hence this collaboration may also impact the development of art projects. The paper will reflect the qualitative research outcomes based on in-depth (IDI) interviews within the marketing sector in Poland and desk research. Art is a reflection of the spirit of our times. Moreover, now we are experiencing a significant acceleration in the development of technologies and their use in various sectors. The leading technologies that contribute to the development of the economy, including the creative sector, embrace technologies such as artificial intelligence, blockchain, extended reality, voice processing, and virtual beings. Artificial intelligence is one of the leading technologies developed for several decades, which is currently reaching a high level of interest and use in various sectors. However, the conducted research has shown that there is still low awareness of artificial intelligence and its wide application in various sectors. The study will show how artists use artificial intelligence in their art projects and how it can be translated into practice within the business. At the same time, the paper will raise awareness of the need for businesses to be inspired by the artistic environment. The research proved that there is still a need to popularize knowledge about this technology which is crucial for many sectors. Art projects are tools to develop knowledge and awareness of society and also various sectors. At the same time, artists may benefit from such collaboration. The paper will include selected aspects of mutual relations, areas of possible inspiration, and possible transfers of technological solutions. Those are AI applications in creative industries such as advertising and film, image recognition in art, and projects from different sectors.

Keywords: artificial intelligence, business, art, creative industry, technology

Procedia PDF Downloads 76
4851 The Micro-Activated Organic Regeneration in Rural Construction: A Case Study of Yangdun Village in Deqing County, Zhejiang Province

Authors: Chengyuan Zhu, Zhu Wang

Abstract:

With the strategy of Rural Rejuvenation proposed in China, the rural has become the focus of all works today. In addition to the support of industry and policy, the rural planning and construction which is the space dependence of Rural Rejuvenation are also very crucial. Based on an analysis of the case of Yangdun Village in Deqing County, this paper summarizes village existing resources and construction status quo. It tries to illuminate the micro-activated organic renewal strategies and methods, based on ecological landscape, history context, industry development and living life requirements. It takes advantage of industrial linkage and then asks for the coordination of both spatial and industrial planning, the revival and remodeling of the rural image can be achieved through shaping the of architectural and landscape nodes as well as the activation of street space.

Keywords: rural construction, rural human settlements, micro-activation, organic renewal

Procedia PDF Downloads 208
4850 Eco-Design of Construction Industrial Park in China with Selection of Candidate Tenants

Authors: Yang Zhou, Kaijian Li, Guiwen Liu

Abstract:

Offsite construction is an innovative alternative to conventional site-based construction, with wide-ranging benefits. It requires building components, elements or modules were prefabricated and pre-assembly before installed into their final locations. To improve efficiency and achieve synergies, in recent years, construction companies were clustered into construction industrial parks (CIPs) in China. A CIP is a community of construction manufacturing and service businesses located together on a common property. Companies involved in industrial clusters can obtain environment and economic benefits by sharing resources and information in a given region. Therefore, the concept of industrial symbiosis (IS) can be applied to the traditional CIP to achieve sustainable industrial development or redevelopment through the implementation of eco-industrial parks (EIP). However, before designing a symbiosis network between companies in a CIP, candidate support tenants need to be selected to complement the existing construction companies. In this study, an access indicator system and a linear programming model are established to select candidate tenants in a CIP while satisfying the degree of connectivity among the enterprises in the CIP, minimizing the environmental impact, and maximizing the annualized profit of the CIP. The access indicator system comprises three primary indicators and fifteen secondary indicators, is proposed from the perspective of park-based level. The fifteen indicators are classified as three primary indicators including industrial symbiosis, environment performance and economic benefit, according to the three dimensions of sustainability (environment, economic and social dimensions) and the three R's of the environment (reduce, reuse and recycle). The linear programming model is a method to assess the satisfactoriness of all the indicators and to make an optimal multi-objective selection among candidate tenants. This method provides a practical tool for planners of a CIP in evaluating which among the candidate tenants would best complement existing anchor construction tenants. The reasonability and validity of the indicator system and the method is worth further study in the future.

Keywords: construction industrial park, China, industrial symbiosis, offsite construction, selection of support tenants

Procedia PDF Downloads 252
4849 Digital Transformation in Developing Countries, A Study into Building Information Modelling Adoption in Thai Design and Engineering Small- and Medium-Sizes Enterprises

Authors: Prompt Udomdech, Eleni Papadonikolaki, Andrew Davies

Abstract:

Building information modelling (BIM) is the major technological trend amongst built environment organisations. Digitalising businesses and operations, BIM brings forth a digital transformation in any built environment industry. The adoption of BIM presents challenges for organisations, especially small- and medium-sizes enterprises (SMEs). The main problem for built-environment SMEs is the lack of project actors with adequate BIM competences. The research highlights learning in projects as the key and explores into the learning of BIM in projects of designers and engineers within Thai design and engineering SMEs. The study uncovers three impeding attributes, which are: a) lack of English proficiency; b) unfamiliarity with digital technologies; and c) absence of public standards. This research expands on the literature on BIM competences and adoption.

Keywords: BIM competences and adoption, digital transformation, learning in projects, SMEs, and developing built environment industry

Procedia PDF Downloads 120
4848 Modelling Conceptual Quantities Using Support Vector Machines

Authors: Ka C. Lam, Oluwafunmibi S. Idowu

Abstract:

Uncertainty in cost is a major factor affecting performance of construction projects. To our knowledge, several conceptual cost models have been developed with varying degrees of accuracy. Incorporating conceptual quantities into conceptual cost models could improve the accuracy of early predesign cost estimates. Hence, the development of quantity models for estimating conceptual quantities of framed reinforced concrete structures using supervised machine learning is the aim of the current research. Using measured quantities of structural elements and design variables such as live loads and soil bearing pressures, response and predictor variables were defined and used for constructing conceptual quantities models. Twenty-four models were developed for comparison using a combination of non-parametric support vector regression, linear regression, and bootstrap resampling techniques. R programming language was used for data analysis and model implementation. Gross soil bearing pressure and gross floor loading were discovered to have a major influence on the quantities of concrete and reinforcement used for foundations. Building footprint and gross floor loading had a similar influence on beams and slabs. Future research could explore the modelling of other conceptual quantities for walls, finishes, and services using machine learning techniques. Estimation of conceptual quantities would assist construction planners in early resource planning and enable detailed performance evaluation of early cost predictions.

Keywords: bootstrapping, conceptual quantities, modelling, reinforced concrete, support vector regression

Procedia PDF Downloads 193
4847 Effect of Residential Block Scale Envelope in Buildings Energy Consumption: A Vernacular Case Study in an Iranian Urban Context

Authors: M. Panahian

Abstract:

A global challenge which is of paramount significance today is the issue of devising innovative solutions to tackle the environmental issues, as well as more intelligent and foresightful consumption of and management of natural resources. Changes in global climate resulting from the burning of fossil fuel and the rise in the level of energy consumption are a few examples of environmental issues detrimental to any form of life on earth, which are aggravated year by year. Overall, energy-efficient designs and construction strategies can be studied at three scales: building, block, and city. Nevertheless, as the available literature suggests, the greatest emphasis has been on building and city scales, and little has been done as to the energy-efficient designs at block scale. Therefore, the aim of the current research is to investigate the influences of residential block scale envelope on the energy consumption in buildings. To this end, a case study of residential block scale has been selected in the city of Isfahan, in Iran, situated in a hot and dry climate with cold winters. Eventually, the most effective variables in energy consumption, concerning the block scale envelope, will be concluded.

Keywords: sustainability, passive energy saving solutions, residential block scale, energy efficiency

Procedia PDF Downloads 225
4846 Integrating Lessons in Sustainable Development and Sustainability in Undergraduate Education: The CLASIC Way

Authors: Intan Azura Mokhtar, Yaacob Ibrahim

Abstract:

In recent years, learning about sustainable development and sustainability has become an increasingly significant component in universities’ degree programmes and curricula. As the world comes together and races to fulfil the 17 United Nations’ sustainable development goals (SDGs) by the year 2030, our educational curricula and landscapes simultaneously evolve to integrate lessons and opportunities for sustainable development and sustainability to redefine our university education and set the trajectory for our young people to take the lead in co-creating solutions for a better world. In this paper, initiatives and projects that revolved around themes of sustainable development and sustainability in a young university in Singapore are discussed. These initiatives and projects were curated by a new centre in the university that focuses on community leadership, social innovation, and service learning and was led by the university’s academic staff. The university’s undergraduate students were also involved in these initiatives and projects and played an active role in reaching out to and engaging members of different segments of the community – to better understand their needs and concerns and to co-create with them relevant and sustainable solutions that generate positive social impact.

Keywords: singapore, sustainable development, sustainability, undergraduate education

Procedia PDF Downloads 79
4845 Iranian English as Foreign Language Teachers' Psychological Well-Being across Gender: During the Pandemic

Authors: Fatemeh Asadi Farsad, Sima Modirkhameneh

Abstract:

The purpose of this study was to explore the pattern of Psychological Well-Being (PWB) of Iranian male and female EFL teachers during the pandemic. It was intended to see if such a drastic change in the context and mode of teaching affects teachers' PWB. Furthermore, the possible difference between the six elements of PWB of Iranian EFL male vs. female teachers during the pandemic was investigated. The other purpose was to find out the EFL teachers’ perceptions of any modifications, and factors leading to such modifications in their PWB during pandemic. For the purpose of this investigation, a total of 81 EFL teachers (59 female, 22 male) with an age range of 25 to 35 were conveniently sampled from different cities in Iran. Ryff’s PWB questionnaire was sent to participant teachers through online platforms to elicit data on their PWB. As for their perceptions on the possible modifications and the factors involved in PWB during pandemic, a set of semi-structured interviews were run among both sample groups. The findings revealed that male EFL teachers had the highest mean on personal growth, followed by purpose of life, and self-acceptance and the lowest mean on environmental mastery. With a slightly similar pattern, female EFL teachers had the highest mean on personal growth, followed by purpose in life, and positive relationship with others with the lowest mean on environmental mastery. However, no significant difference was observed between the male and female groups’ overall means on elements of PWB. Additionally, participants perceived that their anxiety level in online classes altered due to factors like (1) Computer literacy skills, (2) Lack of social communications and interactions with colleagues and students, (3) Online class management, (4) Overwhelming workloads, and (5) Time management. The study ends with further suggestions as regards effective online teaching preparation considering teachers PWB, especially at severe situations such as covid-19 pandemic. The findings offer to determine the reformations of educational policies concerning enhancing EFL teachers’ PWB through computer literacy courses and stress management courses. It is also suggested that to proactively support teachers’ mental health, it is necessary to provide them with advisors and psychologists if possible for free. Limitations: One limitation is the small number of participants (81), suggesting that future replications should include more participants for reliable findings. Another limitation is the gender imbalance, which future studies should address to yield better outcomes. Furthermore, Limited data gathering tools suggest using observations, diaries, and narratives for more insights in future studies. The study focused on one model of PWB, calling for further research on other models in the literature. Considering the wide effect of the COVID-19 pandemic, future studies should consider additional variables (e.g., teaching experience, age, income) to understand Iranian EFL teachers’ vulnerabilities and strengths better.

Keywords: online teaching, psychological well-being, female and male EFL teachers, pandemic

Procedia PDF Downloads 35
4844 Challenges of Strategies for Improving Sustainability in Urban Historical Context in Developing Countries: The Case of Shiraz Bein Al-Haramein

Authors: Amir Hossein Ashari, Sedighe Erfan Manesh

Abstract:

One of the problems in developing countries is renovating the historical context and inducing behaviors appropriate to modern life to such a context. This study was conducted using field and library methods in 2012. Similar cases carried out in Iran and developing countries were compared to unveil the strengths and weaknesses of these projects. At present, in the historical context of Shiraz, the distance between two religious shrines of Shahcheragh (Ahmad ibn Musa) and Astaneh (Sayed Alaa al-Din Hossein), which are significant places in religious, cultural, social, and economic terms, is an area full of historic places called Bein Al-Haramein. Unfortunately, some of these places have been worn out and are not appropriate for common uses. The basic strategy of Bein Al-Haramein was to improve social development of Shiraz, to enhance the vitality and dynamism of the historical context of Bein Al-Haramein and to create tourist attractions in order to boost the city's economic and social stability. To this end, the project includes the huge Bein Al-Haramein Commercial Complex which is under construction now. To construct the complex, officials have decided to demolish places of historical value which can lead to irreparable consequences. Iranian urban design has always been based on three elements of bazaars, mosques and government facilities with bazaars being the organic connector of the other elements. Therefore, the best strategy in the above case is to provide for a commercial connection between the two poles. Although this strategy is included in the project, lack of attention to renovation principles in this area and complete destruction of the context will lead to its irreversible damage and will destroy its cultural and historical identity. In urban planning of this project, some important issues have been neglected including: preserving valuable buildings and special old features of the city, rebuilding worn buildings and context to attract trust and confidence of the people, developing new models according to changes, improving the structural position of old context with minimal degradation, attracting partnerships of residents and protecting their rights and finally using potential facilities of the old context. The best strategy for achieving sustainability in Bein Al-Haramein can be the one used in the distance between Santa Maria Novella and Santa Maria Del Fiore churches in historical context where while protecting the historic context and constructions, old buildings were renovated and given different commercial and service uses making them sustainable and dynamic places. Similarly, in Bein Al-Haramein, renovating old constructions and monuments and giving different commercial and other uses to them can help improve the economic and social sustainability of the area.

Keywords: Bein Al-Haramein, sustainability, historical context, historical context

Procedia PDF Downloads 423
4843 The Material-Process Perspective: Design and Engineering

Authors: Lars Andersen

Abstract:

The development of design and engineering in large construction projects are characterized by an increased degree of flattening out of formal structures, extended use of parallel and integrated processes (‘Integrated Concurrent Engineering’) and an increased number of expert disciplines. The integration process is based on ongoing collaborations, dialogues, intercommunication and comments on each other’s work (iterations). This process based on reciprocal communication between actors and disciplines triggers value creation. However, communication between equals is not in itself sufficient to create effective decision making. The complexity of the process and time pressure contribute to an increased risk of a deficit of decisions and loss of process control. The paper refers to a study that aims at developing a resilient decision-making system that does not come in conflict with communication processes based on equality between the disciplines in the process. The study includes the construction of a hospital, following the phases design, engineering and physical building. The Research method is a combination of formative process research, process tracking and phenomenological analyses. The study tracked challenges and problems in the building process to the projection substrates (drawing and models) and further to the organization of the engineering and design phase. A comparative analysis of traditional and new ways of organizing the projecting made it possible to uncover an implicit material order or structure in the process. This uncovering implied a development of a material process perspective. According to this perspective the complexity of the process is rooted in material-functional differentiation. This differentiation presupposes a structuring material (the skeleton of the building) that coordinates the other types of material. Each expert discipline´s competence is related to one or a set of materials. The architect, consulting engineer construction etc. have their competencies related to structuring material, and inherent in this; coordination competence. When dialogues between the disciplines concerning the coordination between them do not result in agreement, the disciplines with responsibility for the structuring material decide the interface issues. Based on these premises, this paper develops a self-organized expert-driven interdisciplinary decision-making system.

Keywords: collaboration, complexity, design, engineering, materiality

Procedia PDF Downloads 202
4842 Exploring Reading Attitudes among Iranian English Language Teachers

Authors: Narges Nemati, Mohammadreza Fallahpour, Hossein Bozorgian

Abstract:

Reading is one of the receptive skills which has an important role in improving other skills like writing and speaking. Furthermore, language learners can acquire plenty of vocabularies and become more acquainted with written expression through reading. Also, negative attitudes toward reading can cause negligible reading comprehension, which could prompt poor performance in the English language. Considering the fact that reading instruction was discussed as a low priority skill in the field of EFL teacher education, this study attempted to investigate EFL teachers’ attitudes toward reading instruction. Therefore, to serve the purpose of this study, a mixed-method approach was utilized by inviting 100 Iranian EFL teachers who taught at English language institutes of Iran to fill out a validated questionnaire on teachers’ attitude toward reading. Subsequently, 10 participants were randomly selected for further observations and interview sessions to evaluate the differences between their stated attitude and their actual practices. The findings from analyzing questionnaires, observations, and interviews revealed that EFL teachers’ stated attitude toward reading instruction was positive; whereas, due to some reasons like lack of time, scarcity of interesting passages, and lack of interest in reading long passages, teachers did not show positive actual attitude toward teaching reading skill.

Keywords: English as foreign language classroom, English language, reading skill, teachers' attitude

Procedia PDF Downloads 130
4841 Lessons Learned from Interlaboratory Noise Modelling in Scope of Environmental Impact Assessments in Slovenia

Authors: S. Cencek, A. Markun

Abstract:

Noise assessment methods are regularly used in scope of Environmental Impact Assessments for planned projects to assess (predict) the expected noise emissions of these projects. Different noise assessment methods could be used. In recent years, we had an opportunity to collaborate in some noise assessment procedures where noise assessments of different laboratories have been performed simultaneously. We identified some significant differences in noise assessment results between laboratories in Slovenia. We estimate that despite good input Georeferenced Data to set up acoustic model exists in Slovenia; there is no clear consensus on methods for predictive noise methods for planned projects. We analyzed input data, methods and results of predictive noise methods for two planned industrial projects, both were done independently by two laboratories. We also analyzed the data, methods and results of two interlaboratory collaborative noise models for two existing noise sources (railway and motorway). In cases of predictive noise modelling, the validations of acoustic models were performed by noise measurements of surrounding existing noise sources, but in varying durations. The acoustic characteristics of existing buildings were also not described identically. The planned noise sources were described and digitized differently. Differences in noise assessment results between different laboratories have ranged up to 10 dBA, which considerably exceeds the acceptable uncertainty ranged between 3 to 6 dBA. Contrary to predictive noise modelling, in cases of collaborative noise modelling for two existing noise sources the possibility to perform the validation noise measurements of existing noise sources greatly increased the comparability of noise modelling results. In both cases of collaborative noise modelling for existing motorway and railway, the modelling results of different laboratories were comparable. Differences in noise modeling results between different laboratories were below 5 dBA, which was acceptable uncertainty set up by interlaboratory noise modelling organizer. The lessons learned from the study were: 1) Predictive noise calculation using formulae from International standard SIST ISO 9613-2: 1997 is not an appropriate method to predict noise emissions of planned projects since due to complexity of procedure they are not used strictly, 2) The noise measurements are important tools to minimize noise assessment errors of planned projects and should be in cases of predictive noise modelling performed at least for validation of acoustic model, 3) National guidelines should be made on the appropriate data, methods, noise source digitalization, validation of acoustic model etc. in order to unify the predictive noise models and their results in scope of Environmental Impact Assessments for planned projects.

Keywords: environmental noise assessment, predictive noise modelling, spatial planning, noise measurements, national guidelines

Procedia PDF Downloads 219
4840 Study of Human Position in Architecture with Contextual Approach

Authors: E. Zarei, M. Bazaei, A. seifi, A. Keshavarzi

Abstract:

Contextuallism has been always the main component of urban science. It not only has great direct and indirect impact on behaviors, events and interactions, but also is one of the basic factors of an urban values and identity. Nowadays there might be some deficiencies in the cities. In the theories of environment designing, humanistic orientations with the focus on culture and cultural variables would enable us to transfer information. To communicate with the context in which human lives, he needs some common memories, understandable symbols and daily activities in that context. The configuration of a place can impact on human’s behaviors. The goal of this research is to review 7 projects in different parts of the world with various usages and some factors such as ‘sense of place’, ‘sense of belonging’ and ‘social and cultural relations’ will be discussed in these projects. The method used for research in this project is descriptive- analytic. Library information and Internet are the main sources of gathering information and the method of reasoning used in this project is inductive. The consequence of this research will be some data in the form of tables that has been extracted from mentioned projects.

Keywords: contextuallism with humanistic approach, sense of place, sense of belonging, social and cultural relations

Procedia PDF Downloads 374
4839 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 226
4838 Cross Project Software Fault Prediction at Design Phase

Authors: Pradeep Singh, Shrish Verma

Abstract:

Software fault prediction models are created by using the source code, processed metrics from the same or previous version of code and related fault data. Some company do not store and keep track of all artifacts which are required for software fault prediction. To construct fault prediction model for such company, the training data from the other projects can be one potential solution. The earlier we predict the fault the less cost it requires to correct. The training data consists of metrics data and related fault data at function/module level. This paper investigates fault predictions at early stage using the cross-project data focusing on the design metrics. In this study, empirical analysis is carried out to validate design metrics for cross project fault prediction. The machine learning techniques used for evaluation is Naïve Bayes. The design phase metrics of other projects can be used as initial guideline for the projects where no previous fault data is available. We analyze seven data sets from NASA Metrics Data Program which offer design as well as code metrics. Overall, the results of cross project is comparable to the within company data learning.

Keywords: software metrics, fault prediction, cross project, within project.

Procedia PDF Downloads 322
4837 Assessing Suitability of Earthbag Technology for Temporary Housing: Sustainability Challenge

Authors: S. M. Amin Hosseini, Ana Blanco, Albert De La Fuente, Sergio Cavalaro

Abstract:

In emergency situations, it is fundamental to provide with a safe shelter to the population affected. However, the lack of resources and short time often represent a barrier difficult to overcome. A sustainable, rapid and low-cost construction technique is earthbag construction. This technique has spread as an alternative to the construction of emergency shelter, social housing, and even ecovillages. The earthbag construction consists of introducing soil in degradable bags that are stacked to form adobe structures. The present study aims to assess characteristics of the earthbag construction technique based on sustainability requirements and features of other methods used for temporary housing. In this case, after defining the sustainability criteria and emergency situation necessities, this study compares earthbag construction with other types of prefabricated temporary housing. Finally, the most suitable conditions for applying this technique based on the particular local properties and second life scenarios of superadobe temporary housing. The results of the study contribute to promote the earthbag and superadobe techniques as sustainable alternatives for temporary housing. However, the sustainability index of this technology highly depends on affected local conditions and characteristics. Consequently, in order to achieve a high sustainability index, emergency managers need to decide about this technology based on the highlighted results of this study, attention to the importance of specific local conditions and next functions of temporary housing.

Keywords: temporary housing, temporary shelter, earthbag, superadobe, sustainability, emergency

Procedia PDF Downloads 211