5691 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 283
5690 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 485
5689 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 287
5688 Cross-Cultural Competence Development through 'Learning by Reflection': A Case Study of Chinese International Students Learning through Taking Part-Time Jobs in the UK

Authors: Xin Zhao

Abstract:

The project aims to expand the notion of narrative learning and address the importance of learning by reflection in our learning and teaching context at a British university. Drawing on the key concepts such as development ZPD, transition and reflection-in and –on-action, this project analyses the learning experiences of a small sample of Chinese postgraduate students in a British University, who use part-time job experience to develop cross-cultural communication skills. The project adopts a mixed methods approach. Questionnaires and focus group interviews are used to examine the way in which students adapt (or not adapt) to the culture of learning in a British university and develop a renewed sense of self in transitions from one culture to the other. The project also looks at how the students appropriate opportunities for learning not just from classrooms but outside classrooms from everyday encounters. The project aims to address the implication of learning by reflection as development in transition. Time in and for learning, or duration, is taken for granted in theorising narrative learning. The project shall explore this very issue of time in relation to learning by reflection in considering time in/of/for learning as duration.

Keywords: cross-cultural competence, learning by refection, international student transition, part-time work experience

Procedia PDF Downloads 165
5687 Performing the Landscape: Temporary and Performative Practices in Landscape Production

Authors: Miguel Costa

Abstract:

Despite the "time" element being an intrinsic characteristic of the work with the landscape, its execution and completion are also often dependent on external factors, i.e., the slow bureaucratic procedures required for the implementation of a project. In the urban areas of the city, these conditions are even more present — some landscape projects are articulated with the architectural/urban design, transporting itself long, expensive and inflexible processes related with the constant transformations of contemporary urban culture, where the needs and expectations could change before the project is finished. However, despite the renewed interest and growing concern for issues related to the landscapes (particularly since the European Landscape Convention, its scope and fields of action, extended to all the landscapes and not just the selected ones), still lacks the need for a greater inclusion of citizens in its protection and construction processes as well as a greater transparency and clarity of the consequences and results of their active participation. This article aims to reflect on the production processes of urban landscapes, on its completion runtime and its relationship with the citizens by introducing temporary projects as a fieldwork methodology, as well as using the contribution of different professional practices and knowledge for its monitoring, execution, and implementation. These strategies address a more interdisciplinary, transdisciplinary and performative approach, not only from the ephemeral experience of objects and actions but also from the processes and the dynamic events that are organized from these objects and actions over the landscape. The goal is to discuss the results of these approaches on its different dimensions: critical dimension; experimental and strategic dimension; pedagogical dimension; political dimension; cultural.

Keywords: landscape fieldwork, interdisciplinarity, public inclusion, public participation, temporary projects, transdisciplinarity

Procedia PDF Downloads 301
5686 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 274
5685 The Influence of Beta Shape Parameters in Project Planning

Authors: Αlexios Kotsakis, Stefanos Katsavounis, Dimitra Alexiou

Abstract:

Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.

Keywords: beta distribution, PERT, Monte Carlo simulation, skewness, project completion time distribution

Procedia PDF Downloads 121
5684 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 107
5683 Process of Revitalization of the City Centres in Poland: The Problem of Cooperation between Sectors

Authors: Ewa M. Boryczka

Abstract:

Contemporary city is a subject to rapid economic and social changes. Therefore it requires an active policy designed to meet the diverse needs of their residents, build competitive position and capacity to compete with other cities. Competitiveness of cities depends largely on their resources, but also to a large extent, on the policies and performance of local authorities. Cooperation with private and social sectors also plays an important role, as it affects the use of resources and builds an advantage over other cities. The subject of this article is city's contemporary problems of development with particular emphasis on central areas. This issue is a starting point for reflection on the process of urban regeneration in medium size cities in Poland, as well as cooperation between various actors and their roles in the revitalization processes of Polish cities' centres.

Keywords: city, cooperation between sectors, crisis of city centres, revitalization

Procedia PDF Downloads 418
5682 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 293
5681 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 218
5680 Islam and Globalization: Accommodation or Containment of One by the Other

Authors: Mohammed Isah Shehu

Abstract:

This paper examined the context of globalization and Islam and accommodation or containment of one by the other. The paper is born out of the misconception and misunderstanding among many people that globalization is purely Western, anti-Islam and that Islam, globalization and Islam are diametrically opposed as such have no places for accommodating each other. The study used secondary sources to gather data. The study found that from its origin, Islam is in the whole context, a globalized religion and the contemporary globalization is already contained by Islam; that while contemporary globalization is centered on Western world, values and preferences (Western civilization, information and communication technology, free markets, trade and investments); some of the major foundation works that are aiding globalization were originally handiworks of past great Muslims (Islamic civilizations, Order of Algebra, tools of Navigation, Calligraphy, Medicine, Astronomy et cetera) whose major values are not Islamic; with globalization the Muslims have greater opportunities of spreading of Islam and practicing it in a most conducive atmosphere, easy and fast linkage with their fellow Muslim brothers wherever they may be; easier and freer world of trade and have the best opportunities to most things. The study however observed that Western contemporary globalization poses threats to religions such as those of globalization of immorality, injustice, trade with anti-Islamic terms and conditions, internationalized crime et cetera. Muslims would have to avoid or be cautious of many things for Islam is a complete religion that has what is forbidden and allowed (halaal and haramm) based on principles of (Shariah, justice to all, humanity and compassion, obedience to and seeking Allah’s pleasure); to Muslims, Contemporary globalization has to be in conformity with original provisions of Islam. The study recommended that Muslims must rise up in seeking knowledge on Islam and all other fields, further intellectual explorations of works by Muslim scholars/thinkers so that any advancement in globalization would be properly domesticated within Islam for the Muslims to make optimum use of any advancement to the benefit of Islam.

Keywords: accommodation, containment, Islam, globalization

Procedia PDF Downloads 260
5679 From Mathematics Project-Based Learning to Commercial Product Using Geometer’s Sketchpad (GSP)

Authors: Krongthong Khairiree

Abstract:

The purpose of this research study is to explore mathematics project-based learning approach and the use of technology in the context of school mathematics in Thailand. Data of the study were collected from 6 sample secondary schools and the students were 6-14 years old. Research findings show that through mathematics project-based learning approach and the use of GSP, students were able to make mathematics learning fun and challenging. Based on the students’ interviews they revealed that, with GSP, they were able to visualize and create graphical representations, which will enable them to develop their mathematical thinking skills, concepts and understanding. The students had fun in creating variety of graphs of functions which they can not do by drawing on graph paper. In addition, there are evidences to show the students’ abilities in connecting mathematics to real life outside the classroom and commercial products, such as weaving, patterning of broomstick, and ceramics design.

Keywords: mathematics, project-based learning, Geometer’s Sketchpad (GSP), commercial products

Procedia PDF Downloads 315
5678 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 328
5677 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia

Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim

Abstract:

Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.

Keywords: green building, sustainability, project stakeholders, Malaysia

Procedia PDF Downloads 534
5676 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 342
5675 Improving Cost and Time Control of Construction Projects Management Practices in Nigeria

Authors: Mustapha Yakubu, Ahmed Usman, Hashim Ambursa

Abstract:

This paper presents the findings of a research which sought to investigate techniques used to improve cost and time control of construction projects management practice in Nigeria. However, there is limited research on issues surrounding the practical usage of these techniques. Data were collected through a questionnaire distributed to construction experts through a survey conducted on the 100 construction organisations and 50 construction consultancy firms in the Nigeria aimed at identifying common project cost and time control practices and factors inhibiting effective project control in practice. The study reveals that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Keywords: construction project, cost control, Nigeria, time control

Procedia PDF Downloads 281
5674 Global Learning Supports Global Readiness with Projects with Purpose

Authors: Brian Bilich

Abstract:

A typical global learning program is a two-week project based, culturally immersive and academically relevant experience built around a project with purpose and catered to student and business groups. Global Learning in Continuing Education at Austin Community College promotes global readiness through projects with purpose with special attention given to balancing learning, hospitality and travel. A recent project involved CommunityFirst! Village; a 51-acre planned community which provides affordable, permanent housing for men and women coming out of chronic homelessness. Global Learning students collaborated with residents and staff at the Community First! Village on a project to produce two-dimensional remodeling plans of residents’ tiny homes with a focus on but not limited to design improvements on elements related to accessibility, increased usability of living and storage space and esthetic upgrades to boost psychological and emotional appeal. The goal of project-based learning in the context of global learning in Continuing Educaiton at Austin Community Collegen general is two fold. One, in rapid fashion we develop a project which gives the learner a hands-on opportunity to exercise soft and technical skills, like creativity and communication and analytical thinking. Two, by basing projects on global social conflict issues, the project of purpose promotes the development of empathy for other people and fosters a sense of corporate social responsibility in future generations of business leadership. In the example provide above the project informed the student group on the topic of chronic homelessness and promoted awareness and empathy for this underserved segment of the community. Project-based global learning based on projects with purpose has the potential to cultivate global readiness by developing empathy and strengthening emotional intelligence for future generations.

Keywords: project-based learning, global learning, global readiness, globalization, international exchange, collaboration

Procedia PDF Downloads 32
5673 Contemporary Materialities

Authors: Fabian Saptouw

Abstract:

In the past decade there was a resurgence of interest in the value of ‘process’ and ‘craft’ within the social and artistic community. Theorist like Barbara Bolt and Paul Carter have eloquently argued for the importance of ‘theorizing out of practice’ and ‘material thinking’ in response to this trend. Time and labour intensive artistic production processes are however not generally included in this bracket and often labelled as either obsessive or absurd. Neither of these terms adequately conveys the conceptual importance of labour in relation to ‘process’ as manifested through this production method. This issue will be addressed by critically assessing the work of eight South African artists through the lens of contemporary process-based production. This will result in a more integrated view of the art-object, its art-historical trajectory, its materialisation as well as its production process. This paper will conclude by tying the characteristics of these artworks to international trends and provide a platform for the overall reconsideration of unalienated artistic labour.

Keywords: materiality, process art, practice-led research, unalienated labour

Procedia PDF Downloads 315
5672 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 85
5671 Conceptual Modeling of the Relationship between Project Management Practices and Knowledge Absorptive Capacity Using Interpretive Structural Modeling Method

Authors: Seyed Abdolreza Mosavi, Alireza Babakhan, Elham Sadat Hoseinifard

Abstract:

Knowledge-based firms need to design mechanisms for continuous absorptive and creation of knowledge in order to ensure their survival in the competitive arena and to follow the path of development. Considering the project-oriented nature of product development activities in knowledge-based firms on the one hand and the importance of analyzing the factors affecting knowledge absorptive capacity in these firms on the other, the purpose of this study is to identify and classify the factors affecting project management practices on absorptive knowledge capacity. For this purpose, we have studied and reviewed the theoretical literature in the field of project management and absorptive knowledge capacity so as to clarify its dimensions and indexes. Then, using the ISM method, the relationship between them has been studied. To collect data, 21 questionnaires were distributed in project-oriented knowledge-based companies. The results of the ISM method analysis provide a model for the relationship between project management activities and knowledge absorptive capacity, which includes knowledge acquisition capacity, scope management, time management, cost management, quality management, human resource management, communications management, procurement management, risk management, stakeholders management and integration management. Having conducted the MICMAC analysis, we divided the variables into three groups of independent, relational and dependent variables and came up with no variables to be included in the group of autonomous variables.

Keywords: knowledge absorptive capacity, project management practices, knowledge-based firms, interpretive structural modeling

Procedia PDF Downloads 173
5670 The New Far-Right: The Social Construction of Hatred against the Contemporary Islamic Community in Multicultural Australia

Authors: Angel Adams

Abstract:

In Australia, the contemporary social construction of hatred against the Islamic community was facilitated through the mainstream media. Australian public figures who have depicted Muslims and Islam not only as potential terrorists but also as incompatible with the country’s values and identities have helped to increase the level of fear against the Islamic community, leading sympathetic far-right movements to shift discussions towards anti-Islamic and anti-Muslim rhetoric. Political opportunities combined with a socially constructed narrative of fear of the ‘other’, introduced during the White Australia Policy of 1901, has allowed extreme and radical far-right movements to justify hate against the contemporary Australian Islamic community. This study aims to answer the following question: How does Australia’s founding provide a fertile environment to the spread of hatred against the contemporary Islamic community? The paper demonstrates that a forged social construct of grievances concerning the Islamic community in Australia has led to a surge in supply of far-right activism to combat what has become a perceived ‘national threat’. In essence, Australia’s history of a fear of the ‘other’ brings challenges to a multicultural society, and can potentially lead to a more unstable socio-political environment where abuse and violence are normalized and more likely to develop. Furthermore, the paper aims to bring a more nuanced understanding of what is considered ‘new far-right’ discourses with shared anti-Islam and anti-Muslim agendas in Australia. The political opportunity structures theory was the mechanism used to determine how new forms of far-right groups have become more mainstream in Australia. Previous studies on far-right groups in Australia have relied on qualitative data, but further empirical research in this area is sorely needed. Above all, this paper clarifies how hatred against minorities can have a negative impact on wider communities and allow a global narrative of ‘us’ versus ‘them’ to erupt from the fringes of society in Australia.

Keywords: Australia, Islamophobia, far-right, nationalism, political opportunity structures, political violence, social construction

Procedia PDF Downloads 103
5669 Out of the Shadows: Constructing a Female Gaze in Neo-Noir: Exegesis and Screenplay, The Lonely Drive

Authors: Jade Bitomsky

Abstract:

We all consume films on a daily basis. Yet, we frequently fail to recognize that these narratives shape our social, political, cultural, and economic values and attitudes. Narratives influence our perception; specifically, for this research, our perception of women within the genre of film noir. This creative research project examines to what extent film noir has perpetuated the male gaze and how noir’s representation of women has scripted female gender identity through perpetuated performative acts of femininity. Evolving from this research will be a deconstruction and (re)presentation of the femininity in noir. It will go beyond reiterated examinations, which developed awareness of Hollywood’s oppressive cinematic structures, to subvert the usual phallic diegesis and construct a female gaze in neo-noir screenplay, The Lonely Drive.

Keywords: femme fatale, film noir (classic), male gaze, neo-noir (contemporary), scopophilia

Procedia PDF Downloads 208
5668 Cai Guo-Qiang: A Chinese Artist at the Cutting-Edge of Global Art

Authors: Marta Blavia

Abstract:

Magiciens de la terre, organized in 1989 by the Centre Pompidou, became 'the first worldwide exhibition of contemporary art' by presenting artists from Western and non-Western countries, including three Chinese artists. For the first time, West turned its eyes to other countries not as exotic sources of inspiration, but as places where contemporary art was also being created. One year later, Chine: demain pour hier was inaugurated as the first Chinese avant-garde group-exhibition in Occident. Among the artists included was Cai Guo-Qiang who, like many other Chinese artists, had left his home country in the eighties in pursuit of greater creative freedom. By exploring artistic non-Western perspectives, both landmark exhibitions questioned the predominance of the Eurocentric vision in the construction of history art. But more than anything else, these exhibitions laid the groundwork for the rise of the so-called phenomenon 'global contemporary art'. All the same time, 1989 also was a turning point in Chinese art history. Because of the Tiananmen student protests, The Chinese government undertook a series of measures to cut down any kind of avant-garde artistic activity after a decade of a relative openness. During the eighties, and especially after the Tiananmen crackdown, some important artists began to leave China to move overseas such as Xu Bing and Ai Weiwei (USA); Chen Zhen and Huang Yong Ping (France); or Cai Guo-Qiang (Japan). After emigrating abroad, Chinese overseas artists began to develop projects in accordance with their new environments and audiences as well as to appear in numerous international exhibitions. With their creations, that moved freely between a variety of Eastern and Western art sources, these artists were crucial agents in the emergence of global contemporary art. As other Chinese artists overseas, Cai Guo-Qiang’s career took off during the 1990s and early 2000s right at the same moment in which Western art world started to look beyond itself. Little by little, he developed a very personal artistic language that redefines Chinese ideas, symbols, and traditional materials in a new world order marked by globalization. Cai Guo-Qiang participated in many of the exhibitions that contributed to shape global contemporary art: Encountering the Others (1992); the 45th Venice Biennale (1993); Inside Out: New Chinese Art (1997), or the 48th Venice Biennale (1999), where he recreated the Chinese monumental social realist work Rent Collection Courtyard that earned him the Golden Lion Award. By examining the different stages of Cai Guo-Qiang’s artistic path as well as the transnational dimensions of his creations, this paper aims at offering a comprehensive survey on the construction of the discourse of global contemporary art.

Keywords: Cai Guo-Qiang, Chinese artists overseas, emergence global art, transnational art

Procedia PDF Downloads 266
5667 Connecting Students and Faculty Research Efforts through the Research and Projects Portal

Authors: Havish Nalapareddy, Mark V. Albert, Ranak Bansal, Avi Udash, Lin Lin

Abstract:

Students engage in many course projects during their degree programs. However, impactful projects often need a time frame longer than a single semester. Ideally, projects are documented and structured to be readily accessible to future students who may choose to continue the project, with features that emphasize the local community, university, or course structure. The Research and Project Portal (RAPP) is a place where students can post both their completed and ongoing projects with all the resources and tools used. This portal allows students to see what other students have done in the past, in the same university environment, related to their domain of interest. Computer science instructors or students selecting projects can use this portal to assign or choose an incomplete project. Additionally, this portal allows non-computer science faculty and industry collaborators to document their project ideas for students in courses to prototype directly, rather than directly soliciting the help of instructors in engaging students. RAPP serves as a platform linking students across classes and faculty both in and out of computer science courses on joint projects to encourage long-term project efforts across semesters or years.

Keywords: education, technology, research, academic portal

Procedia PDF Downloads 118
5666 An Analysis of Gender Competencies of Project Managers in National Capital Region, Philippines using the Mann-Whitney U Test

Authors: Ryan Vincent Teodoro, Adrian Paul Virador, Jan Christopher Cardenas

Abstract:

In the field of construction, managerial positions are completely dominated by males. The researchers conducted this study to see if there is a significant difference between the competencies of male and female project managers in the construction field. To see if there is a significant difference, they subdivided the competency of project managers into three components; decision making, organizing skills, and resiliency. The researchers conducted a five-point Likert scale survey of 28 project managers in the construction field, 18 of them are males and 10 are females. The researchers used Cronbach’s alpha to translate the raw scores of the respondents into competency scores. Then, the competency scores are analyzed using the Mann-Whitney U Test to see if there is a significant difference between the male’s and female’s competency scores. A p-value of 0.808 was calculated, which is greater than 0.05, which means that the null hypothesis is accepted. Therefore, the researchers concluded that there is no significant difference between the competencies of male and female project managers in terms of decision making, organizing skills, and resiliency in the construction field in the National Capital Region, Philippines.

Keywords: competency, resiliency, project managers, Mann-Whitney U test

Procedia PDF Downloads 97
5665 Examining Awareness, Foresight and Expectations about Fatih Project Increasing the Occasions and Normalizing the Technology Movement

Authors: Agah Tugrul Korucu, Mustafa Mucahit Gundogdu, Tarık Gencturk, Ahmet Yucel

Abstract:

Countries are developing big projects and supplying financial resource for developing technological substructure and integrating technology into the education. In Turkey, the Ministry of Education, with the aim of integrating ICT into learning and teaching processes, created a project named increasing occasions and normalizing the technology movement. FATIH Project with this project, the aim is to create teaching environments which are enriched with technology. In orientating people with the technology and integrating technology into the education, teacher and teacher candidates have a big responsibility. While teachers are using technology in lesson, the devices in class and the methods developed are important factors. The aim of this research is to examine awareness, and foresight about FATIH Project in different aspects. This study was conducted during the practice period of the second semester in the 2014-2015 academic years. The working group of the research was created from 209 teacher candidates which are from different teaching departments in the Ahmet Kelesoglu Education Faculty of Necmettin Erbakan University. Scanning model was used in this research. In research, as a getting data tool evaluation of “opinion about FATIH Project: awareness, foresight and expectation scale” which was developed by Karal et. al.; personal information form which was developed by researchers were used. Cronbach coefficient which is the reliability of the scale is 0.91. In analyzing the data, statistical package program average, standard deviation, percentage, correlation, t-test and variance analysis test were used.

Keywords: Fatih Project, information and communication technologies, information technology integration, views on the Fatih Project, technology integration in education

Procedia PDF Downloads 443
5664 Dying and Sexuality − Controversial Motive in Contemporary Cinema

Authors: Małgorzata Jakubowska, Monika Michałowska

Abstract:

Since the beginning of the cinematographic industry, there has been a visible interest in two leading themes: death and sexuality. One of the reasons of the unfading popularity of these motives was the fact that death or sex employed as leitmotivs attracted great attention of the viewers, and this guaranteed a financial success. What seems interesting is the fact that the themes of death and sexuality/eroticism seem to be mutually exclusive in the mainstream movies to such extent that they almost never appear together on the screen. As leitmotivs they describe opposite experiences of human life, one refers to affirmation of life, the other points to atrophy and decay. This film paradigm is rarely challenged. Thus, a relatively less attention has been devoted so far to entwining dying and sexuality/eroticism in one movie. In our paper, we wish to have a closer look at the visualizations of dying with focus on the aspect of sexuality/eroticism. Our analysis will concentrate on the contemporary European and American cinema, and especially the recent productions that contribute to the cultural phenomenon of entwining the two realms of human life. We will investigate the main clichés, plot and visual schemes, motives and narrative techniques on the examples of Sweet November (2001), A Little Bit of Heaven (2011) and Now is good (2012). We will also shed some light on the recent film productions that seem to provide a shift in portraying the realms of dying and sexuality concentrating on The Garden of Earthly Delights (2003) as the most paradigmatic example.

Keywords: contemporary cinema, dying and sexuality, narrative techniques, plot and visual schemes

Procedia PDF Downloads 373
5663 Monitoring Public Attitudes Towards Tourism Valorisation of the Dinara Nature Park’s Dry Grasslands

Authors: Sven Ratković

Abstract:

The survey of public attitudes and knowledge was conducted as part of the Dinara back to LIFE project during June and July 2020. The aim of the research was to collect public opinions and knowledge on the topics of the biodiversity of Dinara, perception of tourist potential, sustainable development, and acceptance of the project. The research was conducted using the survey method in the cities of Sinj, Knin, Vrlika, and Trilj, and the municipalities of Hrvace, Otok, Kijevo, and Civljane, where a total of 404 people were surveyed. The respondents perceive the cultural and recreational potential of Dinara and recognize it as a potential for agriculture and tourism. According to respondents, the biological diversity of Dinara is most affected by fires and human activity. When it comes to nature protection, the majority of respondents don’t trust local self-government units and relevant ministries. The obtained results indicate the need for informing and educating the community, and they serve to adjust the project activities and better guide the touristic development of the project area. The examination will be repeated in the last project year (2023).

Keywords: protected area tourism, Dinara Nature Park, dry grasslands, touristic infrastructure

Procedia PDF Downloads 69
5662 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 177