5124 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria

Authors: A. A. Omonori, K. T. Alade, A. F. Lawal

Abstract:

This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.

Keywords: abandonment, case-study, Nigeria, project

Procedia PDF Downloads 368
5123 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 545
5122 Study of Causes and Effects of Road Projects Abandonment in Nigeria

Authors: Monsuru Oyenola Popoola, Oladapo Samson Abiola, Wusamotu Alao Adeniji

Abstract:

The prevalent and incessant abandonment of road construction projects are alarming that it creates several negative effects to social, economic and environmental values of the project. The purpose of this paper is to investigate and determined the various causes and effects of abandoning road construction projects in Nigeria. Likert Scale questionnaire design was used to administered and analysed the data obtained for the stydy. 135 (Nr) questionnaires were completed and retrieved from the respondents, out of 200 (Nr) questionnaires sent out, representing a response rate of 67.5%. The analysis utilized the Relative Importance Index (R.I.I.) method and the results are presented in tabular form. The findings confirms that at least 20 factors were the causes of road projects abandonment in Nigeria with most including Leadership Instability, Improper Project Planning, Inconsistence in government policies and Design, Contractor Incompetence, Economy Instability and Inflation, Delay in remittance of money, Improper financial analysis, Poor risk management, Climatic Conditions, Improper Project Estimates etc. The findings also show that at least eight (8) effect were identified on the system, and these include; Waste of Financial Resources, Loss of economic value, Environmental degradation, Loss of economic value, Reduction in standard of living, Litigation and Arbitration, etc. The reflection is that allocating reasonable finance, developing appropriate and effective implementation plans and monitoring, evaluation and reporting on development project activities by key actors should enhance in resolving the problem of road projects abandonment.

Keywords: road construction, abandonment of road projects, climatic condition, project planning, contractor

Procedia PDF Downloads 303
5121 Implications and Risk Factors of Halting Publicly Funded Construction Projects in Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goal is to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned project has a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: project abandonment, risk, risk factors, cessation, public project

Procedia PDF Downloads 0
5120 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 63
5119 Exclusive Breastfeeding Abandonment among Adolescent Mothers: A Cohort Study

Authors: Maria I. Nuñez-Hernández, Maria L. Riesco

Abstract:

Background: Exclusive breastfeeding (EBF) up to 6 months old infant have been considered one of the most important factors in the overall development of children. Nevertheless, as resources are scarce, it is essential to identify the most vulnerable groups that have major risk of EBF abandonment, in order to deliver the best strategies. Children of adolescent mothers are within these groups. Aims: To determine the EBF abandonment rate among adolescent mothers and to analyze the associated factors. Methods: Prospective cohort study of adolescent mothers in the southern area of Santiago, Chile, conducted in primary care services of public health system. The cohort was established from 2014 to 2015, with a sample of 105 adolescent mothers and their children at 2 months of life. The inclusion criteria were: adolescent mother from 14 to 19 years old; not twin babies; mother and baby leaving the hospital together after birthchild; correct attachment of the baby to the breast; no difficulty understanding the Spanish language or communicating. Follow-up was performed at 4 and 6 months old infant. Data were collected by interviews, considering EBF as breastfeeding only, without adding other milk, tea, juice, water or other product that not breast milk, except drugs. Data were analyzed by descriptive and inferential statistics, by Kaplan-Meier estimator and Log-Rank test, admitting the probability of occurrence of type I error of 5% (p-value = 0.05). Results: The cumulative EBF abandonment rate at 2, 4 and 6 months was 33.3%, 52.2% and 63.8%, respectively. Factors associated with EBF abandonment were maternal perception of the quality of milk as poor (p < 0.001), maternal perception that the child was not satisfied after breastfeeding (p < 0.001), use of pacifier (p < 0.001), maternal consumption of illicit drugs after delivery (p < 0.001), mother return to school (p = 0.040) and presence of nipple trauma (p = 0.045). Conclusion: EBF abandonment rate was higher in the first 4 months of life and is superior to the population of women who breastfeed. Among the EBF abandonment factors, one of them is related to the adolescent condition, and two are related to the maternal subjective perception.

Keywords: adolescent, breastfeeding, midwifery, nursing

Procedia PDF Downloads 329
5118 Sport Facilities and Social Change: European Funds as an Opportunity for Urban Regeneration

Authors: Lorenzo Maiorino, Fabio Fortuna, Giovanni Panebianco, Marco Sanzari, Gabriella Arcese, Valerio Maria Paolozzi

Abstract:

It is well known that sport is a factor of social cohesion and the breaking down of barriers between people. From this point of view, the aim is to demonstrate how, through the (re)generation of sustainable structures, it is possible to give life to a new social, cultural, and economic pathway, where possible, in peripheral areas with problems of abandonment and degradation. The aim of this paper is, therefore, to study realities such as European programs and funds and to highlight the ways in which planning can be used to respond to critical issues such as urban decay, abandonment, and the mitigation of social differences. For this reason, the analysis will be carried out through the Multiannual Financial Framework (MFF) package, the Next Generation EU, the Recovery and Resilience Facility (RRF), the Cohesion Fund, the European Social Fund, and other managed funds. The procedure will rely on sources and data of unquestionable origin, and the relation to the object of study in question will be highlighted. The project lends itself to be ambitious and exploring a further aspect of the sports theme, which, as we know, is one of the foundations for a healthy society.

Keywords: sport, social inclusion, urban regeneration, sports facilities, European funds

Procedia PDF Downloads 228
5117 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 148
5116 The Trauma Suffered by Left behind Children and Its Impact on Their Emotional Development: A Pilot Study with Brazilian Immigrants in the United States

Authors: Liliane Clark

Abstract:

Immigrating to a different country may imply having to handle many difficult exertions. There is a particular issue that has to be endured by some immigrants: the children they had to leave behind. It is a phenomenon that occurs with certain frequency. Surprisingly, despite the fact that immigration in the United States is such a large proceeding, there is not much research about the topic in America exploring the trauma of the abandonment caused by this separation and its consequences on the mental health of those children. The term “left behind children” is usually applied to children who were left behind by their parents in their original nation under the care of a noteworthy relative, frequently the grandparents, when they moved to another country. This preliminary research, which is a partial study projected for a doctoral thesis, investigated whether the trauma of abandonment experienced by ten left behind children had affected their emotional development. The Strengths and Difficulties Questionnaire (SDQ) and a brief interview were utilized to assess the information. The SDQ explored scales such as emotional symptoms, conduct problems, hyperactivity, peer problems and prosocial behavior. In this pilot study, the results indicated that all these issues had some sort of significant correlation between them. During the interviews, the participants or their parents identified a range of symptoms: anxiety disorder, eating disorders, panic attacks, psychotic-like experiences, drug use and depression. Hence, it seems that there is a connection between the trauma of abandonment suffered due to the separation and the children’s consequent symptomatic behavior. Further studies are indeed necessary to validate the initial results of this investigation.

Keywords: abandonment, parent migration, psychological problems, trauma

Procedia PDF Downloads 194
5115 Impact of Project Leader's Style on the Success of the Projects

Authors: Saadia Khalid

Abstract:

This paper discusses the various leadership styles of project manager which lead to the success of a project since it is important for a project manager to understand and adopt the skills required to cope up with the modern challenges of any project. A project manager must be able to handle a project effectively and efficiently and be ready to assess the factors effecting success or failure of the project. A project manager must be capable of handling a project by managing, directing and leading the projects with requisite knowledge and skills. In this paper a project manager’s characteristics linkage to project success have been developed and analyzed for three different projects/industries. A web-based survey has also been carried out which revealed that specific leadership styles/traits can lead to better performance and success of organizations. Some basic factors like project complexity, the age, gender and nationality of the project manager and type of project also play a vital role in success of a project.

Keywords: leadership style, project success, project management, project manager

Procedia PDF Downloads 433
5114 "Project" Approach in Urban: A Response to Uncertainty

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In this paper, we will try to demonstrate the importance of the project approach in the urban to deal with uncertainty, the importance of the involvement of all stakeholders in the urban project process and that the absence of an actor can lead to project failure but also the importance of the urban project management. These points are handled through the following questions: Does the urban adhere to the theory of complexity? Does the project approach bring hope and solution to make urban planning "sustainable"? How converging visions of actors for the same project? Is the management of urban project the solution to support the urban project approach?

Keywords: strategic planning, project, urban project stakeholders, management

Procedia PDF Downloads 520
5113 The Role of Japan's Land-Use Planning in Farmland Conservation: A Statistical Study of Tokyo Metropolitan District

Authors: Ruiyi Zhang, Wanglin Yan

Abstract:

Strict land-use plan is issued based on city planning act for controlling urbanization and conserving semi-natural landscape. And the agrarian land resource in the suburbs has indispensable socio-economic value and contributes to the sustainability of the regional environment. However, the agrarian hinterland of metropolitan is witnessing severe farmland conversion and abandonment, while the contribution of land-use planning to farmland conservation remains unclear in those areas. Hypothetically, current land-use plan contributes to farmland loss. So, this research investigated the relationship between farmland loss and land-use planning at municipality level to provide base data for zoning in the metropolitan suburbs, and help to develop a sustainable land-use plan that will conserve the agrarian hinterland. As data and methods, 1) Farmland data of Census of Agriculture and Forestry for 2005 to 2015 and population data of 2015 and 2018 were used to investigate spatial distribution feathers of farmland loss in Tokyo Metropolitan District (TMD) for two periods: 2005-2010;2010-2015. 2) And the samples were divided by four urbanization facts. 3) DID data and zoning data for 2006 to 2018 were used to specify urbanization level of zones for describing land-use plan. 4) Then we conducted multiple regression between farmland loss, both abandonment and conversion amounts, and the described land-use plan in each of the urbanization scenario and in each period. As the results, the study reveals land-use plan has unignorable relation with farmland loss in the metropolitan suburbs at ward-city-town-village level. 1) The urban promotion areas planned larger than necessity and unregulated urbanization promote both farmland conversion and abandonment, and the effect weakens from inner suburbs to outer suburbs. 2) And the effect of land-use plan on farmland abandonment is more obvious than that on farmland conversion. The study advocates that, optimizing land-use plan will hopefully help the farmland conservation in metropolitan suburbs, which contributes to sustainable regional policy making.

Keywords: Agrarian land resource, land-use planning, urbanization level, multiple regression

Procedia PDF Downloads 153
5112 A ‘Just and Loving Gaze’ on Sexuality and Attachment: Why I Think (Not) All Homosexual Relationships are Borne Out of an Abandonment and Attachment Crisis

Authors: Victor Counted

Abstract:

John Bowlby's Attachment theory is often a framework used by many researchers to understand human relationship experiences with close 'others'. In this short brief on sexuality, I tried to discuss homosexual relationships from three attachment positions, or if you like, conditions, in relation to the compensation and correspondence hypothesis used to understand an individual's attachment orientation with an attachment figure who is seen as a secure base, safe haven, and some kind of target for proximity seeking. Drawing from the springs of virtue and hope in light of Murdock’s ‘just and love gaze’ model, I allowed myself to see the homosexual cases cited in positive terms, as I related to the situations and experiences of our homosexual ‘others’ from the guiding herald of Moltmann's theology of hope. This approach allowed me to conclusively convince readers to engage sexuality from a tolerating tendency of hope in our thinking and thoughts towards the actions and conditions of our dynamic world which is always plunging toward the future.

Keywords: attachment, wellbeing, sexuality, homosexuality, abandonment, tolerance of hope, wise fool

Procedia PDF Downloads 417
5111 Project Objective Structure Model: An Integrated, Systematic and Balanced Approach in Order to Achieve Project Objectives

Authors: Mohammad Reza Oftadeh

Abstract:

The purpose of the article is to describe project objective structure (POS) concept that was developed on research activities and experiences about project management, Balanced Scorecard (BSC) and European Foundation Quality Management Excellence Model (EFQM Excellence Model). Furthermore, this paper tries to define a balanced, systematic, and integrated measurement approach to meet project objectives and project strategic goals based on a process-oriented model. In this paper, POS is suggested in order to measure project performance in the project life cycle. After using the POS model, the project manager can ensure in order to achieve the project objectives on the project charter. This concept can help project managers to implement integrated and balanced monitoring and control project work.

Keywords: project objectives, project performance management, PMBOK, key performance indicators, integration management

Procedia PDF Downloads 386
5110 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.

Keywords: urban project, strategic management, operational management, the modernization project of constantine

Procedia PDF Downloads 528
5109 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 274
5108 Relationship Demise After Having Children: An Analysis of Abandonment and Nuclear Family Structure vs. Supportive Community Cultures

Authors: John W. Travis

Abstract:

There is an epidemic of couples separating after a child is born into a family, generally with the father leaving emotionally or physically in the first few years after birth. This separation creates high levels of stress for both parents, especially the primary parent, leaving her (or him) less available to the infant for healthy attachment and nurturing. The deterioration of the couple’s bond leaves parents increasingly under-resourced, and the dependent child in a compromised environment, with an increased likelihood of developing an attachment disorder. Objectives: To understand the dynamics of a couple, once the additional and extensive demands of a newborn are added to a nuclear family structure, and to identify effective ways to support all members of the family to thrive. Qualitative studies interviewed men, women, and couples after pregnancy and the early years as a family, regarding key destructive factors, as well as effective tools for the couple to retain a strong bond. In-depth analysis of a few cases, including the author’s own experience, reveal deeper insights about subtle factors, replicated in wider studies. Using a self-assessment survey, many fathers report feeling abandoned, due to the close bond of the mother-baby unit, and in turn, withdrawing themselves, leaving the mother without support and closeness to resource her for the baby. Fathers report various types of abandonment, from his partner to his mother, with whom he did not experience adequate connection as a child. The study identified a key destructive factor to be unrecognized wounding from childhood that was carried into the relationship. The study culminated in the naming of Male Postpartum Abandonment Syndrome (MPAS), describing the epidemic in industrialized cultures with the nuclear family as the primary configuration. A growing family system often collapses without a minimum number of adult caregivers per infant, approximately four per infant (3.87), which allows for proper healing and caretaking. In cases with no additional family or community beyond one or two parents, the layers of abandonment and trauma result in the deterioration of a couple’s relationship and ultimately the family structure. The solution includes engaging community in support of new families. The study identified (and recommends) specific resources to assist couples in recognizing and healing trauma and disconnection at multiple levels. Recommendations include wider awareness and availability of resources for healing childhood wounds and greater community-building efforts to support couples for the whole family to thrive.

Keywords: abandonment, attachment, community building, family and marital functioning, healing childhood wounds, infant wellness, intimacy, marital satisfaction, relationship quality, relationship satisfaction

Procedia PDF Downloads 230
5107 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 203
5106 Evaluating the effects of Gas Injection on Enhanced Gas-Condensate Recovery and Reservoir Pressure Maintenance

Authors: F. S. Alavi, D. Mowla, F. Esmaeilzadeh

Abstract:

In this paper, the Eclipse 300 simulator was used to perform compositional modeling of gas injection process for enhanced condensate recovery of a real gas condensate well in south of Iran here referred to as SA4. Some experimental data were used to tune the Peng-Robinson equation of state for this case. Different scenarios of gas injection at current reservoir pressure and at abandonment reservoir pressure had been considered with different gas compositions. Methane, carbon dioxide, nitrogen and two other gases with specified compositions were considered as potential gases for injection. According to the obtained results, nitrogen leads to highest pressure maintenance in the reservoir but methane results in highest condensate recovery among the selected injection gases. At low injection rates, condensate recovery percent is strongly affected by gas injection rate but this dependency shifts to zero at high injection rates. Condensate recovery is higher in all cases of injection at current reservoir pressure than injection at abandonment pressure. Using a constant injection rate, increasing the production well bottom hole pressure results in increasing the condensate recovery percent and time of gas breakthrough.

Keywords: gas-condensate reservoir, case-study, compositional modelling, enhanced condensate recovery, gas injection

Procedia PDF Downloads 203
5105 Effect of Land Use and Abandonment on Soil Carbon and Nitrogen Depletion by Runoff in Shallow Soils under Semi-Arid Mediterranean Climate

Authors: Mohamed Emran, Giovanni Pardini, Maria Gispert, Mohamed Rashad

Abstract:

Land use and abandonment in semi-arid degraded ecosystems may cause regressive dynamics in vegetation cover affecting organic matter contents, soil nutrients and structural stability, thus reducing soil resistance to erosion. Mediterranean areas are generally subjected to climatic fluctuations, which modify soil conditions and hydrological processes, such as runoff and water infiltration within the upper soil horizons. Low erosion rates occur in very fragile and shallow soils with minor clay content progressively decrease organic carbon C and nitrogen N pools in the upper soil horizons. Seven soils were selected representing variant context of land use and abandonment at the Cap de Creus Peninsula, Catalonia, NE Spain, from recent cultivated vines and olive groves, mid abandoned forests standing under cork and pine trees, pasture to late abandoned Cistus and Erica scrubs. The aim of this work was to study the effect of changes in land use and abandonment on the depletion of soil organic carbon and nitrogen transported by runoff water in shallow soils after natural rainfall events during two years with different rainfall patterns (1st year with low rainfall and 2nd year with high rainfall) by i) monitoring the most significant soil erosion parameters at recorded rainfall events, ii) studying the most relevant soil physical and chemical characteristics on seasonal basis and iii) analysing the seasonal trends of depleted carbon and nitrogen and their interaction with soil surface compaction parameters. Significant seasonal variability was observed in the relevant soil physical and chemical parameters and soil erosion parameters in all soils to establish their evolution under land use and abandonment during two years of different rainfall patterns (214 and 487 mm per year), giving important indications on soil response to rainfall impacts. Erosion rates decreased significantly with the increasing of soil C and N under low and high rainfall. In cultivated soils, C and N depletion increased by 144% and 115%, respectively by 13% increase in erosion rates during the 1st year with respect to the 2nd year. Depleted C and N were proportionally higher in soils under vines and olive with vulnerable soil structure and low soil resilience leading to degradation, altering nutrients cycles and causing adverse impact on environmental quality. Statistical analysis underlined that, during the 1st year, soil surface was less effective in preserving stocks of organic resources leading to higher susceptibility to erosion with consequent C and N depletion. During the 2nd year, higher organic reserve and water storage occurred despite the increasing of C and N loss with an effective contribution from soil surface compaction parameters. The overall estimation during the two years indicated clear differences among soils under vines, olive, cork and pines, suggesting on the one hand, that current cultivation practices are inappropriate and that reforestation with pines may delay the achievement of better soil conditions. On the other hand, the natural succession of vegetation under Cistus, pasture and Erica suggests the recovery of good soil conditions.

Keywords: land abandonment, land use, nutrient's depletion, soil erosion

Procedia PDF Downloads 350
5104 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 354
5103 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 143
5102 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 247
5101 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 147
5100 Dilemmas of HRM in a Project-Oriented Organisation

Authors: Katarzyna Piwowar-Sulej

Abstract:

The functioning of a project-oriented organisation creates new and different, from the traditional ones, conditions for human resources management. In the analysed case HRM is primarily characterized by a double-track nature – on the one hand within the framework of permanent structures (departments) and, on the other, within the area of particular projects. The purpose of the article is to present the dilemmas associated with the development of selected HRM areas in project-oriented organisations. Theoretical discussion was supplemented by the results of empirical research.

Keywords: human resources management, tracks of HRM, project, project-oriented organisation

Procedia PDF Downloads 280
5099 Hindrances to Effective Delivery of Infrastructural Development Projects in Nigeria’s Built Environment

Authors: Salisu Gidado Dalibi, Sadiq Gumi Abubakar, JingChun Feng

Abstract:

Nigeria’s population is about 190 million and is on the increase annually making it the seventh most populated nation in the world and first in Africa. This population growth comes with its prospects, needs, and challenges especially on the existing and future infrastructure. Infrastructure refers to structures, systems, and facilities serving the economy of a country, city, town, businesses, industries, etc. These include roads, railways lines, bridges, tunnels, ports, stadiums, dams and water projects, power generation plants and distribution grids, information, and communication technology (ICT), etc. The Nigerian government embarked on several infrastructural development projects (IDPs) to address the deficit as the present infrastructure cannot cater to the needs nor sustain the country. However, delivering such IDPs have not been smooth; comes with challenges from within and outside the project; frequent delays and abandonment. Thus, affecting all the stakeholders involved. Hence, the aim of this paper is to identify and assess the factors that are hindering the effective delivery of IDPs in Nigeria’s built environment with the view to offer more insight into such factors, and ways to address them. The methodology adopted in this study involves the use of secondary sources of data from several materials (official publications, journals, newspapers, internet, etc.) were reviewed within the IDPs field by laying more emphasis on Nigeria’s cases. The hindrance factors in this regard were identified which forms the backbone of the questionnaire. A pilot survey was used to test its suitability; after which it was randomly administered to various project professionals in Nigeria’s construction industry using a 5-point Likert scale format to ascertain the impact of these hindrances. Cronbach’s Alpha reliability test, mean item score computations, relative importance indices, T-test, Chi-Square statistics were used for data analyses. The results outline the impact of various internal, external and project related factors that are hindering IDPs within Nigeria’s built environment.

Keywords: built environment, development, factors, hindrances, infrastructure, Nigeria, project

Procedia PDF Downloads 181
5098 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 345
5097 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 428
5096 A Study on How to Improve PMBOK (Project Management Body of Knowledge) Guidelines Performance by Simulation

Authors: Fatemeh Jaferi, Moslem Parsa, Seyed Mehdi Sajadi

Abstract:

The project-oriented organizations are more appropriate for sustainable environments. Any effective project-oriented organization should institutionalize its project management processes in such a manner to yield the greatest possible profits. The aim of this paper is to study the relationship between the project management PMBOK guideline (Project Management Body of Knowledge) and simulation technology in project-oriented organizations. The methodology involves using five steps for applying these two tools aimed at enhancing project management processes in the Lorestan Gas Corporation, as one of the project-oriented organization. Results show the implementation of such management approach leads to a 5% performance improvement and using PMBOK can be instrumental in effective delay management. The implementation of the aforementioned improvement package was effective in improving the efficiency of organizational processes; in terms of optimizing the resource utilization that has manifested itself in resource losses and cost reductions.

Keywords: project-orientation, processes, PMBOK, optimization, organization, management

Procedia PDF Downloads 409
5095 Role of Leadership in Project Management

Authors: Miriam Filipová, Peter Balco

Abstract:

At present, in Slovak and Czech Republic, the education within the field of Project Management is carried out either within the higher education or via commercial entities, whilst the most used contents are the commonly used methodologies of project management. Obtaining a diploma after completing a university degree or a training certificate does not automatically mean the success of the project or the success of the project manager. The importance of leadership and soft skills in project management is either not included at all within the training of project managers, or it is only partially reflected. From the methodology perspective, the most important things during the preparation and management of the projects are preparation of the project plan, resource planning, and project realization in accordance with the chosen methodology. However, the key element on which the success of the project depends on are the people – whether they are team members on the supplier's side, the stakeholders, or the end users. This research focuses on the real needs of working project managers, on the development of their strengths, expertise, skills, and knowledge regarding leadership and soft skills. At the same time, it looks into identifying the elements that they consider to be key to the success of the projects they have managed and successfully delivered. The result of this research is the input for creating recommendations for a comprehensive education of project managers in the field of leadership and soft skills.

Keywords: project management, leadership, soft skills, education, academic degree, certificates, skills, talents, knowledge

Procedia PDF Downloads 165