Search results for: abandonment of road projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3258

Search results for: abandonment of road projects

3258 Study of Causes and Effects of Road Projects Abandonment in Nigeria

Authors: Monsuru Oyenola Popoola, Oladapo Samson Abiola, Wusamotu Alao Adeniji

Abstract:

The prevalent and incessant abandonment of road construction projects are alarming that it creates several negative effects to social, economic and environmental values of the project. The purpose of this paper is to investigate and determined the various causes and effects of abandoning road construction projects in Nigeria. Likert Scale questionnaire design was used to administered and analysed the data obtained for the stydy. 135 (Nr) questionnaires were completed and retrieved from the respondents, out of 200 (Nr) questionnaires sent out, representing a response rate of 67.5%. The analysis utilized the Relative Importance Index (R.I.I.) method and the results are presented in tabular form. The findings confirms that at least 20 factors were the causes of road projects abandonment in Nigeria with most including Leadership Instability, Improper Project Planning, Inconsistence in government policies and Design, Contractor Incompetence, Economy Instability and Inflation, Delay in remittance of money, Improper financial analysis, Poor risk management, Climatic Conditions, Improper Project Estimates etc. The findings also show that at least eight (8) effect were identified on the system, and these include; Waste of Financial Resources, Loss of economic value, Environmental degradation, Loss of economic value, Reduction in standard of living, Litigation and Arbitration, etc. The reflection is that allocating reasonable finance, developing appropriate and effective implementation plans and monitoring, evaluation and reporting on development project activities by key actors should enhance in resolving the problem of road projects abandonment.

Keywords: road construction, abandonment of road projects, climatic condition, project planning, contractor

Procedia PDF Downloads 264
3257 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria

Authors: A. A. Omonori, K. T. Alade, A. F. Lawal

Abstract:

This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.

Keywords: abandonment, case-study, Nigeria, project

Procedia PDF Downloads 313
3256 Factors Leading to the Renegotiation of Private Finance Initiative Design-Build-Finance-Operate Road Projects in the UK

Authors: Ajibola Fatokun, Akintola Akintoye, Champika Liyanage

Abstract:

The issue of renegotiation has not received public sector applause because of the outcomes recorded over years. Numerous reasons have been adduced by the stakeholders for the renegotiation of PPP road projects. In some instances, the reason can also be the factor leading to the renegotiation of PFI (DBFO) road projects. Thus, a number of factors inform the decision of the primary stakeholders to renegotiate the contract. This paper, therefore, evaluates and assesses the factors leading to the renegotiation of PFI (DBFO) road projects in the UK. Qualitative interviews involving both public and private stakeholders were extensively adopted on five PFI (DBFO) case study road projects in order to address the aim of this study. This serves to complement the findings of the literature with respect to the factors leading to the renegotiation of PPP road projects. The findings of this research reveal the respective factors leading to the renegotiations of PFI (DBFO) road projects in the UK. However, the prominent factors are a change in scope of the works necessitating works removal and an addition of assets, change in standards and obsolete specification occasioned by the long duration of the PFI road project concession among others.

Keywords: renegotiation, factors, Private Finance Initiative (PFI), design-build-finance-operate (DBFO) road projects

Procedia PDF Downloads 307
3255 Risk Variables and Implications in Nigeria of Publicly Funded Construction Works Cessation

Authors: Nnadi Ezekiel Oluwaseun Ejiofor

Abstract:

The foundation of this study is the identification of risk variables and their implications on abandoned construction projects in Nigeria. The study's particular goals are to pinpoint the risk factors that lead to the abandonment of public building projects in Nigeria. This study used a hybrid research design that included case studies and descriptive survey research methods. Professionals who work directly in the built environment and are employed by Ministries and Departmental Agencies (MDAs), the public sector, or the private sector are the study's target demographic. This study used a descriptive survey and case study research design to gather data. Nigeria is experiencing a high rate of project abandonment due to housing deficit issues. Factors contributing to this include The study reveals factors contributing to public project abandonment in Abuja FCT include poor cashflow 4.96, inconsistent government policies 4.89, lack of accountability, high corruption, incompetent contractors, non-availability of building materials, lack of utilities, wrong materials, infrastructural facilities, poor planning, and undefined contracts. The study reveals that abandoned projects have a huge impact on the construction industry, such as wastage of resources with a mean value of 3.35, distrust of economic growth, 3.28, and so on. The study found a significant relationship between risk factors and public building construction in Abuja through a T-test value of 0.037, rejecting the null hypothesis and indicating a positive correlation.

Keywords: cost, tetfund, construction projects, public university

Procedia PDF Downloads 18
3254 Web-GIS Technology: A Tool for Farm-to-Market Road Project Profiling and Proposal Prioritization of the Philippines’ Department of Agriculture

Authors: Elbert S. Moyon, Edsel Matt O. Morales, Jaymer M. Jayoma, Kent C. Espejon, Jayson C. Dollete, Mark Phil B. Pacot

Abstract:

This research paper focuses on the potential of using Web-GIS technology in prioritizing farm-to-market road projects by the Philippines’ Department of Agriculture (DA). The study aimed to explore the benefits of Web-GIS in addressing the limitations faced by the DA in terms of Farm to Market Road profiling and project prioritization, which include a lack of access to updated data, limited spatial analysis capabilities, and difficulties in sharing information between stakeholders. The research methodology involves a comprehensive literature review and a case study of a Web-GIS application developed for the DA, which was used to profile and prioritize farm-to-market road projects in the Philippines. The results showed that the Web-GIS technology provides the DA with an effective tool for analyzing and visualizing data, which can help in profiling and prioritizing road projects based on various criteria such as economic, social, and environmental impacts. The study also showed that Web-GIS technology could help in reducing the time and effort required for road project prioritization and improve communication between stakeholders.

Keywords: GIS, web application, farm-to-market road, FMR prioritization, Django, GeoServer

Procedia PDF Downloads 49
3253 Aspects on the Problems of Road Asset Management and Maintenance in Albania

Authors: Diana Bardhi

Abstract:

Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis.

Keywords: infrastructure, maintenance, depreciation, efficiency

Procedia PDF Downloads 121
3252 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 500
3251 Performance Evaluation and Planning for Road Safety Measures Using Data Envelopment Analysis and Fuzzy Decision Making

Authors: Hamid Reza Behnood, Esmaeel Ayati, Tom Brijs, Mohammadali Pirayesh Neghab

Abstract:

Investment projects in road safety planning can benefit from an effectiveness evaluation regarding their expected safety outcomes. The objective of this study is to develop a decision support system (DSS) to support policymakers in taking the right choice in road safety planning based on the efficiency of previously implemented safety measures in a set of regions in Iran. The measures considered for each region in the study include performance indicators about (1) police operations, (2) treated black spots, (3) freeway and highway facility supplies, (4) speed control cameras, (5) emergency medical services, and (6) road lighting projects. To this end, inefficiency measure is calculated, defined by the proportion of fatality rates in relation to the combined measure of road safety performance indicators (i.e., road safety measures) which should be minimized. The relative inefficiency for each region is modeled by the Data Envelopment Analysis (DEA) technique. In a next step, a fuzzy decision-making system is constructed to convert the information obtained from the DEA analysis into a rule-based system that can be used by policy makers to evaluate the expected outcomes of certain alternative investment strategies in road safety.

Keywords: performance indicators, road safety, decision support system, data envelopment analysis, fuzzy reasoning

Procedia PDF Downloads 309
3250 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 37
3249 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 54
3248 Investigating Causes of Pavement Deterioration in Khartoum State, Sudan

Authors: Magdi Mohamed Eltayeb Zumrawi

Abstract:

It is quite essential to investigate the causes of pavement deterioration in order to select the proper maintenance technique. The objective of this study was to identify factors cause deterioration of recently constructed roads in Khartoum state. A comprehensive literature concerning the factors of road deterioration, common road defects and their causes were reviewed. Three major road projects with different deterioration reasons were selected for this study. The investigation involved field survey and laboratory testing on those projects to examine the existing pavement conditions. The results revealed that the roads investigated experienced severe failures in the forms of cracks, potholes and rutting in the wheel path. The causes of those failures were found mainly linked to poor drainage, traffic overloading, expansive subgrade soils and the use of low quality materials in construction. Based on the results, recommendations were provided to help highway engineers in selecting the most effective repair techniques for specific kinds of distresses.

Keywords: pavement, deterioration, causes, failures

Procedia PDF Downloads 319
3247 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 79
3246 Value Engineering Change Proposal Application in Construction of Road-Building Projects

Authors: Mohammad Mahdi Hajiali

Abstract:

Many of construction projects estimated in Iran have been influenced by the limitations of financial resources. As for Iran, a country that is developing, and to follow this development-oriented approach which many numbers of projects each year run in, if we can reduce the cost of projects by applying a method we will help greatly to minimize the cost of major construction projects and therefore projects will finish faster and more efficiently. One of the components of transportation infrastructure are roads that are considered to have a considerable share of the country budget. In addition, major budget of the related ministry is spending to repair, improve and maintain roads. Value Engineering is a simple and powerful methodology over the past six decades that has been successful in reducing the cost of many projects. Specific solution for using value engineering in the stage of project implementation is called value engineering change proposal (VECP). It was tried in this research to apply VECP in one of the road-building projects in Iran in order to enhance the value of this kind of projects and reduce their cost. In this case study after applying VECP, an idea was raised. It was about use of concrete pavement instead of hot mixed asphalt (HMA) and also using fiber in order to improve concrete pavement performance. VE group team made a decision that for choosing the best alternatives, get expert’s opinions in pavement systems and use Fuzzy TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) for ranking opinions of the experts. Finally, Jointed Plain Concrete Pavement (JPCP) was selected. Group also experimented concrete samples with available fibers in Iran and the results of experiments showed a significant increment in concrete specifications such as flexural strength. In the end, it was shown that by using of fiber-reinforced concrete pavement instead of asphalt pavement, we can achieve a significant saving in cost, time and also increment in quality, durability, and longevity.

Keywords: road-building projects, value engineering change proposal (VECP), Jointed Plain Concrete Pavement (JPCP), Fuzzy TOPSIS, fiber-reinforced concrete

Procedia PDF Downloads 154
3245 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects

Authors: S. Kaira, S. Mohamed, A. Rahman

Abstract:

Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.

Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance

Procedia PDF Downloads 101
3244 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 58
3243 Exclusive Breastfeeding Abandonment among Adolescent Mothers: A Cohort Study

Authors: Maria I. Nuñez-Hernández, Maria L. Riesco

Abstract:

Background: Exclusive breastfeeding (EBF) up to 6 months old infant have been considered one of the most important factors in the overall development of children. Nevertheless, as resources are scarce, it is essential to identify the most vulnerable groups that have major risk of EBF abandonment, in order to deliver the best strategies. Children of adolescent mothers are within these groups. Aims: To determine the EBF abandonment rate among adolescent mothers and to analyze the associated factors. Methods: Prospective cohort study of adolescent mothers in the southern area of Santiago, Chile, conducted in primary care services of public health system. The cohort was established from 2014 to 2015, with a sample of 105 adolescent mothers and their children at 2 months of life. The inclusion criteria were: adolescent mother from 14 to 19 years old; not twin babies; mother and baby leaving the hospital together after birthchild; correct attachment of the baby to the breast; no difficulty understanding the Spanish language or communicating. Follow-up was performed at 4 and 6 months old infant. Data were collected by interviews, considering EBF as breastfeeding only, without adding other milk, tea, juice, water or other product that not breast milk, except drugs. Data were analyzed by descriptive and inferential statistics, by Kaplan-Meier estimator and Log-Rank test, admitting the probability of occurrence of type I error of 5% (p-value = 0.05). Results: The cumulative EBF abandonment rate at 2, 4 and 6 months was 33.3%, 52.2% and 63.8%, respectively. Factors associated with EBF abandonment were maternal perception of the quality of milk as poor (p < 0.001), maternal perception that the child was not satisfied after breastfeeding (p < 0.001), use of pacifier (p < 0.001), maternal consumption of illicit drugs after delivery (p < 0.001), mother return to school (p = 0.040) and presence of nipple trauma (p = 0.045). Conclusion: EBF abandonment rate was higher in the first 4 months of life and is superior to the population of women who breastfeed. Among the EBF abandonment factors, one of them is related to the adolescent condition, and two are related to the maternal subjective perception.

Keywords: adolescent, breastfeeding, midwifery, nursing

Procedia PDF Downloads 290
3242 Exposing the Concealed Impact: Evaluating the Role of Development Projects on Corruption Perception in Afghanistan

Authors: Jawad Taheri

Abstract:

This paper investigates the impact of foreign aid-funded development projects on corruption perception in Afghanistan, utilizing instrumental variable (IV) approaches in regression analysis setting. Seven sub-categories of development projects are examined in order to have a glance over comparative usefulness of each project. The study incorporates natural disaster indicators as exogenous variables to mitigate endogeneity concerns and control variables. The findings reveal significant associations between certain types of projects and corruption perception. Road and bridge construction, irrigation, and agriculture projects are found to decrease corruption perception, fostering optimism and trust within affected communities. Mosque construction and healthcare initiatives aligned with religious beliefs also contribute to reduced corruption perception. However, drinking water projects are associated with increased corruption perception, highlighting potential challenges in their implementation. The study emphasizes the importance of well-implemented projects, cultural contexts, and effective governance in mitigating corruption and fostering trust within communities. These findings contribute to a refined understanding of the relationship between development projects and corruption perception in Afghanistan.

Keywords: foreign aid, development projects, corruption perception, Afghanistan, instrumental variable analysis, survey of Afghan people (SAP), natural disasters, exogenous variation

Procedia PDF Downloads 32
3241 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects

Authors: Akerele Akintunde Hareef

Abstract:

GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.

Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment

Procedia PDF Downloads 510
3240 Safety Analysis and Accident Modeling of Transportation in Srinagar City

Authors: Adinarayana Badveeti, Mohammad Shafi Mir

Abstract:

In Srinagar city, in India, road safety is an important aspect that creates ecological balance and social well being. A road accident creates a situation that leaves behind distress, sorrow, and sufferings. Therefore identification of causes of road accidents becomes highly essential for adopting necessary preventive measures against a critical event. The damage created by road accidents to large extent is unrepairable and therefore needs attention to eradicate this continuously increasing trend of awful 'epidemic'. Road accident in India is among the highest in the world, with at least approximately 142.000 people killed each year on the road. Kashmir region is an ecologically sensitive place but lacks necessary facilities and infrastructure regarding road transportation, ultimately resulting in the critical event-road accidents creating a major problem for common people in the region. The objective of this project is to study the safety aspect of Srinagar City and also model the accidents with different aspect that causes accidents and also to suggest the possible remedies for lessening/eliminating the road accidents.

Keywords: road safety, road accident, road infrastructure, accident modeling

Procedia PDF Downloads 219
3239 Assessment of the Impact of Road Transportation Improvement on Rural Development

Authors: Mohammad Mirwais Arghandiwal, Fujita Motohiro, Wisinee Wisetjindawat

Abstract:

Since 2001, the new government of Afghanistan addressed the improvement of transportation in rural areas as one of the key issues for the country development. This paper thus, aims to show the impotency of transportation in the rural area of Kabul province. A field survey in Kabul Province capital of Afghanistan has been conducted during March, 2015, and 201 questionnaires were collected from four districts named Shakar Dara, Paghman, Char Asyab, and Khak Jabar to investigate the impacts of road transportation on the people’s daily life. The districts had their road projects constructed during the last 3-5 years. The interviewees are chosen randomly from a different category of districts residences. As transportation is one of the most important factors for the development of the communities, during the survey it was very easily to observe a positive effect on the life of people. The improvement on the accessibility has had a positive impact on the land and land price. In this paper, a model is created to show the relationship between different factors and the land price improvement. In the end, a recommendation is presented on the establishment of the community council for a better use and maintenance of road projects. We emphasize on a public and private partnership at a community level in the districts during the construction period too. In addition, the communities should be encouraged on their positive role in the improvement of transportation through their participation and collaboration with the local government.

Keywords: accessibility, Afghanistan, poverty, rural area, transportation development

Procedia PDF Downloads 397
3238 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria

Authors: Md. Aftabuzzaman, Md. Kamruzzaman

Abstract:

Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.

Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority

Procedia PDF Downloads 96
3237 A Statistical Study on Young UAE Driver’s Behavior towards Road Safety

Authors: Sadia Afroza, Rakiba Rouf

Abstract:

Road safety and associated behaviors have received significant attention in recent years, reflecting general public concern. This paper portrays a statistical scenario of the young drivers in UAE with emphasis on various concern points of young driver’s behavior and license issuance. Although there are many factors contributing to road accidents, statistically it is evident that age plays a major role in road accidents. Despite ensuring strict road safety laws enforced by the UAE government, there is a staggering correlation among road accidents and young driver’s at UAE. However, private organizations like BMW and RoadSafetyUAE have extended its support on conducting surveys on driver’s behavior with an aim to ensure road safety. Various strategies such as road safety law enforcement, license issuance, adapting new technologies like safety cameras and raising awareness can be implemented to improve the road safety concerns among young drivers.

Keywords: driving behavior, Graduated Driver Licensing System (GLDS), road safety, UAE drivers, young drivers

Procedia PDF Downloads 217
3236 The Design of Imaginable Urban Road Landscape

Authors: Wang Zhenzhen, Wang Xu, Hong Liangping

Abstract:

With the rapid development of cities, the way that people commute has changed greatly, meanwhile, people turn to require more on physical and psychological aspects in the contemporary world. However, the current urban road landscape ignores these changes, for example, those road landscape elements are boring, confusing, fragmented and lack of integrity and hierarchy. Under such current situation, in order to shape beautiful, identifiable and unique road landscape, this article concentrates on the target of imaginability. This paper analyses the main elements of the urban road landscape, the concept of image and its generation mechanism, and then discusses the necessity and connotation of building imaginable urban road landscape as well as the main problems existing in current urban road landscape in terms of imaginability. Finally, this paper proposes how to design imaginable urban road landscape in details based on a specific case.

Keywords: identifiability, imaginability, road landscape, the image of the city

Procedia PDF Downloads 387
3235 Perception of Risk toward Traffic Violence among Road Users in Makassar, Indonesia

Authors: Sulasmi Sudirman, Rachmadanty Mujah Hartika

Abstract:

Traffic violence is currently a big issue in Indonesia. However, the road users perceived risk that is caused by traffic violence is low. The lack of safety driving awareness is one of the factors that road users committed to traffic violence. There are several lists of common traffic violence in Indonesia such as lack of physical fitness, not wearing helmet, unfasten seatbelt, breaking through the traffic light, not holding a driving license, and some more violence. This research sought to explore the perception of road users toward traffic violence. The participants were road users in Makassar, Indonesia who were using cars and motorbikes. The method of the research was a qualitative approach by using a personal interview to collect data. The research showed that there three main ideas of perceiving traffic violence which are motives, environment that supported traffic violence, and reinforcement. The road users committed traffic violence had particular motive, for example, rushing. The road users committed to traffic violence when other road users and significant other did the same. The road users committed traffic violence when the police were not there to give a ticket. It can be concluded that the perception of road users toward traffic violence determined by internal aspect, the social aspect, and regulation.

Keywords: perception, road users, traffic, violence

Procedia PDF Downloads 183
3234 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 237
3233 Applications of Social Marketing in Road Safety of Georgia

Authors: Charita Jashi

Abstract:

The aim of the paper is to explore the role of social marketing in changing the behavior of consumers on road safety, identify critical aspects and priority needs which impede the implementation of road safety program in Georgia. Given the goals of the study, a quantitative method was used to carry out interviews for primary data collection. This research identified the awareness level of road safety, legislation base, and marketing interventions to change behavior of drivers and pedestrians. During several years the non-governmental sector together with the local authorities and media have been very intensively working on the road safety issue in Georgia, but only seat-belts campaign should be considered rather successful. Despite achievements in this field, efficiency of road safety programs far from fulfillment and needs strong empowering.

Keywords: road safety, social marketing interventions, behavior change, well-being

Procedia PDF Downloads 160
3232 A Study on Establishing Criteria for Installation of Small Road Signs

Authors: Sang-KeunBaik, Kyu-Soo Chong, Joon-Yeop Na

Abstract:

This study attempts to reduce the wind load of road signs, improve roadside landscaping, and enhance the safety of road users by establishing criteria for the installation of small road signs. First, we derive the minimum font size that can be used on road signs according to the road’s design speed by considering the visibility and legibility of such road signs. We classify road junctions into eight types based on junction type (intersection, interchange, and expressway) and on the number of road lanes. Furthermore, we propose small sign alternatives, to which the minimum font size is applied, to be placed by each road junction. To verify the effects of the small signs, we implemented a 3D simulation road environment, to which the small road signs were applied, and performed experiments using the driving simulator targeting 50 drivers. The experiments compared and analyzed the effects, whether the driver proceeds to the desired exit and the average driving time, between the existing large road signs and the improved small road signs under the same road conditions and intersection type. We conducted a survey with the participants of the simulation experiment on the preference between graphical signs (large road signs) and exit-centric signs (small road signs). The results show that the participants prefer the exit-centric signs (60%) to the graphical signs (40%). We propose installation criteria for small road signs for intersections, interchanges, and expressways based on the results of the experiment and the survey.

Keywords: 3D simulation, driving simulator, legibility distance, minimum font size, small road signs

Procedia PDF Downloads 447
3231 The Trauma Suffered by Left behind Children and Its Impact on Their Emotional Development: A Pilot Study with Brazilian Immigrants in the United States

Authors: Liliane Clark

Abstract:

Immigrating to a different country may imply having to handle many difficult exertions. There is a particular issue that has to be endured by some immigrants: the children they had to leave behind. It is a phenomenon that occurs with certain frequency. Surprisingly, despite the fact that immigration in the United States is such a large proceeding, there is not much research about the topic in America exploring the trauma of the abandonment caused by this separation and its consequences on the mental health of those children. The term “left behind children” is usually applied to children who were left behind by their parents in their original nation under the care of a noteworthy relative, frequently the grandparents, when they moved to another country. This preliminary research, which is a partial study projected for a doctoral thesis, investigated whether the trauma of abandonment experienced by ten left behind children had affected their emotional development. The Strengths and Difficulties Questionnaire (SDQ) and a brief interview were utilized to assess the information. The SDQ explored scales such as emotional symptoms, conduct problems, hyperactivity, peer problems and prosocial behavior. In this pilot study, the results indicated that all these issues had some sort of significant correlation between them. During the interviews, the participants or their parents identified a range of symptoms: anxiety disorder, eating disorders, panic attacks, psychotic-like experiences, drug use and depression. Hence, it seems that there is a connection between the trauma of abandonment suffered due to the separation and the children’s consequent symptomatic behavior. Further studies are indeed necessary to validate the initial results of this investigation.

Keywords: abandonment, parent migration, psychological problems, trauma

Procedia PDF Downloads 147
3230 An Accidental Forecasting Modelling for Various Median Roads

Authors: Pruethipong Xinghatiraj, Rajwanlop Kumpoopong

Abstract:

Considering the current situation of road safety, Thailand has the world’s second-highest road fatality rate. Therefore, decreasing the road accidents in Thailand is a prime policy of the Thai government seeking to accomplish. One of the approaches to reduce the accident rate is to improve road environments to fit with the local behavior of the road users. The Department of Highways ensures that choosing the road median types right to the road characteristics, e.g. roadside characteristics, traffic volume, truck traffic percentage, etc., can decrease the possibility of accident occurrence. Presently, raised median, depressed median, painted median and median barriers are typically used in Thailand Highways. In this study, factors affecting road accident for each median type will be discovered through the analysis of the collecting of accident data, death numbers on sample of 600 Kilometers length across the country together with its roadside characteristics, traffic volume, heavy vehicles percentage, and other key factors. The benefits of this study can assist the Highway designers to select type of road medians that can match local environments and then cause less accident prone.

Keywords: highways, road safety, road median, forecasting model

Procedia PDF Downloads 233
3229 Segmentation of Korean Words on Korean Road Signs

Authors: Lae-Jeong Park, Kyusoo Chung, Jungho Moon

Abstract:

This paper introduces an effective method of segmenting Korean text (place names in Korean) from a Korean road sign image. A Korean advanced directional road sign is composed of several types of visual information such as arrows, place names in Korean and English, and route numbers. Automatic classification of the visual information and extraction of Korean place names from the road sign images make it possible to avoid a lot of manual inputs to a database system for management of road signs nationwide. We propose a series of problem-specific heuristics that correctly segments Korean place names, which is the most crucial information, from the other information by leaving out non-text information effectively. The experimental results with a dataset of 368 road sign images show 96% of the detection rate per Korean place name and 84% per road sign image.

Keywords: segmentation, road signs, characters, classification

Procedia PDF Downloads 411