Search results for: public construction sector
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 11037

Search results for: public construction sector

10827 Evidence on the Nature and Extent of Fall in Oil Prices on the Financial Performance of Listed Companies: A Ratio Analysis Case Study of the Insurance Sector in the UAE

Authors: Pallavi Kishore, Mariam Aslam

Abstract:

The sharp decline in oil prices that started in 2014 affected most economies in the world either positively or negatively. In some economies, particularly the oil exporting countries, the effects were felt immediately. The Gulf Cooperation Council’s (GCC henceforth) countries are oil and gas-dependent with the largest oil reserves in the world. UAE (United Arab Emirates) has been striving to diversify away from oil and expects higher non-oil growth in 2018. These two factors, falling oil prices and the economy strategizing away from oil dependence, make a compelling case to study the financial performance of various sectors in the economy. Among other sectors, the insurance sector is widely recognized as an important indicator of the health of the economy. An expanding population, surge in construction and infrastructure, increased life expectancy, greater expenditure on automobiles and other luxury goods translate to a booming insurance sector. A slow-down of the insurance sector, on the other hand, may indicate a general slow-down in the economy. Therefore, a study on the insurance sector will help understand the general nature of the current economy. This study involves calculations and comparisons of ratios pre and post the fall in oil prices in the insurance sector in the UAE. A sample of 33 companies listed on the official stock exchanges of UAE-Dubai Financial Market and Abu Dhabi Stock Exchange were collected and empirical analysis employed to study the financial performance pre and post fall in oil prices. Ratios were calculated in 5 categories: Profitability, Liquidity, Leverage, Efficiency, and Investment. The means pre- and post-fall are compared to conclude that the profitability ratios including ROSF (Return on Shareholder Funds), ROCE (Return on Capital Employed) and NPM (Net Profit Margin) have all taken a hit. Parametric tests, including paired t-test, concludes that while the fall in profitability ratios is statistically significant, the other ratios have been quite stable in the period. The efficiency, liquidity, gearing and investment ratios have not been severely affected by the fall in oil prices. This may be due to the implementation of stronger regulatory policies and is a testimony to the diversification into the non-oil economy. The regulatory authorities can use the findings of this study to ensure transparency in revealing financial information to the public and employ policies that will help further the health of the economy. The study will also help understand which areas within the sector could benefit from more regulations.

Keywords: UAE, insurance sector, ratio analysis, oil price, profitability, liquidity, gearing, investment, efficiency

Procedia PDF Downloads 220
10826 Efficient Management of Construction Logistics: A Challenge to Both Conventional and Technological Systems in the Developing Nations

Authors: Nuruddeen Usman, Ahmad Muhammad Ibrahim

Abstract:

Management of construction logistics at construction sites becomes increasingly complex with rising construction volume, which made it relatively inefficient in the developing nations even with the technological advancement. The objective of this research is to conceptually synthesise the approaches and challenges befall in the course of construction logistic management, with the aim to proffer possible solution to it. Therefore, this study appraised the glitches associated with both conventional and technological methods of construction logistic management that result in its inefficiency. Thus, this investigation found that, both conventional and the technological issues were due to certain obstacles that affect the construction logistic management which resulted into delays, accidents, fraudulent activities, time and cost overrun. Therefore, this study has developed a framework that might bring a lasting solution to the challenges of construction logistic management.

Keywords: construction, conventional, logistic, technological

Procedia PDF Downloads 516
10825 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
10824 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management, transfer stage

Procedia PDF Downloads 216
10823 Road Map to Health: Palestinian Workers in Israel's Construction Sector

Authors: Maya de Vries Kedem, Abir Jubran, Diana Baron

Abstract:

Employment in Israel offers Palestinian workers an income double what they can earn in the West Bank. The need to support their families leads many educated Palestinians to forgo finding work in their profession in the Palestinian Authority and instead look for employment in those sectors open to them in Israel, particularly the construction, agriculture, and industry sectors. The International Labor Organization estimated that about 1,200 workers in Israel die every year because of occupational diseases (diseases caused by working conditions). Construction workers in Israel are constantly exposed to dust, noise, chemical materials, and work in awkward postures, which require prolonged bending, repetitive motion, and other risk factors that can lead to illnesses and death. Occupational health is vastly neglected in Israel and construction workers are particularly at risk . As of June 2022, the Israeli quota in the construction sector for Palestinian workers stood at 80,000. Kav LaOved released a new study on the state of occupational health among Palestinian workers employed in construction in Israel. The study Roadmap to Health: Palestinian Workers in Israel's Construction Sector reviews the extent to which the health of Palestinian workers is protected at work in Israel. The report includes analysis of a survey administered to 256 workers as well as interviews with 10 workers and with 5 Israeli occupational health experts. Report highlights: • Among survey respondents, 63.9% stated that safety procedures to protect their health are rarely followed in their workplace (e.g., taking breaks, using protective gear, following restrictions on lifting heavy items, and having inspectors regularly on site to monitor safety). • All 256 Palestinian workers who participated to the survey said that their health has been directly or indirectly harmed by working in Israel and reported suffering from the following problems: orthopedic problems such as joint, hand, leg or knee problems (100%); headaches (75%); back problems (36.3%); eye problems (23.8%); breathing problems (17.6%); chronic pain (14.8%); heart problems (7.8%); and skin problems (3.5%). • Workers who are injured or do not feel well often continue working for fear of losing their payment for that day. About half of the 256 survey respondents reported that they pay brokerage fees to find an employer with a work permit, often paying between 2,000 and 3,000 NIS per month. “I have an obligation—I pay about NIS 120 a day for my permit, [and] I have to pay for it whether I work or not" a worker said. • Most Palestinian construction workers suffer from stress and mental health problems. Workers pointed to several issues that greatly affect their mood and mental state: daily crossings at crowded checkpoints where workers stand for hours; lack of sleep due to leaving home daily at 3:00-3:30 am; commuting two to four hours to work in each direction; and abusive work environments. A worker told KLO that the sight of thousands of workers standing together at the checkpoint causes “high blood pressure and the feeling that you are going to be squeezed.” Another said, “I felt that my bones would break.” In the survey workers reported suffering from insomnia (70.1%), breathing difficulties (35.8%), chest pressure (27.6%), or rapid pulse rate (12.2%).

Keywords: construction sector, palestinian workers, occupational health, Israel, occupation

Procedia PDF Downloads 58
10822 Evaluation and Analysis of the Regulations of Health and Safety in the Construction Industry: A Case of Study in Skikda, Algeria

Authors: Khorief Ouissem, Sassi Boudmagh Souad, Mahimoud Aissa

Abstract:

The health and safety problem in the construction companies has been a major subject of research in Algeria for many years. The latest statistics of the Algerian National Social Security Fund (CNAS) shows that a third of accidents recorded at the national level are originated from construction activities. It is becoming increasingly essential and urgent to investigate and address its causes in order to find measures to overcome the deficiencies in this area. Thus, this paper takes in investigating this problem through a study conducted in the city of Skikda, Algeria. The study was carried out through questionnaire where twenty construction companies were taking into consideration. First, the study identifies the regulations and the laws related to the health and safety in the construction sector in Algeria. Then it goes on to assess and evaluate the implementation of the identified regulations in the companies selected. The result of the assessment indicates that the majority of the construction companies considered do not meet the health and safety standards and regulations. To extract the main causes of the failure of the system to control this industry, the observations and the evaluation were analyzed using the 5M or Ichikawa diagram method. This method is based on identifying the causes of the problem in terms of purpose, the list of potential causes for families. These families often correspond to 5M (Labor, Material, Methods, Middle, and Management). Finally, having identified the primary motives, the present authors propose a list of actions to move towards a more controlled and effective health and safety system for the construction industry.

Keywords: health and safety, construction industry, performance measurement, Algeria

Procedia PDF Downloads 300
10821 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 245
10820 Comparing Quality of Care in Family Planning Services in Primary Public and Private Health Care Facilities in Ethiopia

Authors: Gizachew Assefa Tessema, Mohammad Afzal Mahmood, Judith Streak Gomersall, Caroline O. Laurence

Abstract:

Introduction: Improving access to quality family planning services is the key to improving health of women and children. However, there is currently little evidence on the quality and scope of family planning services provided by private facilities, and this compares to the services provided in public facilities in Ethiopia. This is important, particularly in determining whether the government should further expand the roles of the private sector in the delivery of family planning facility. Methods: This study used the 2014 Ethiopian Services Provision Assessment Plus (ESPA+) survey dataset for comparing the structural aspects of quality of care in family planning services. The present analysis used a weighted sample of 1093 primary health care facilities (955 public and 138 private). This study employed logistic regression analysis to compare key structural variables between public and private facilities. While taking the structural variables as an outcome for comparison, the facility type (public vs private) were used as the key exposure of interest. Results: When comparing availability of basic amenities (infrastructure), public facilities were less likely to have functional cell phones (AOR=0.12; 95% CI: 0.07-0.21), and water supply (AOR=0.29; 95% CI: 0.15-0.58) than private facilities. However, public facilities were more likely to have staff available 24 hours in the facility (AOR=0.12; 95% CI: 0.07-0.21), providers having family planning related training in the past 24 months (AOR=4.4; 95% CI: 2.51, 7.64) and possessing guidelines/protocols (AOR= 3.1 95% CI: 1.87, 5.24) than private facilities. Moreover, comparing the availability of equipment, public facilities had higher odds of having pelvic model for IUD demonstration (AOR=2.60; 95% CI: 1.35, 5.01) and penile model for condom demonstration (AOR=2.51; 95% CI: 1.32, 4.78) than private facilities. Conclusion: The present study suggests that Ethiopian government needs to provide emphasis towards the private sector in terms of providing family planning guidelines and training on family planning services for their staff. It is also worthwhile for the public health facilities to allocate funding for improving the availability of basic amenities. Implications for policy and/ or practice: This study calls policy makers to design appropriate strategies in providing opportunities for training a health care providers working in private health facility.

Keywords: quality of care, family planning, public-private, Ethiopia

Procedia PDF Downloads 310
10819 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 251
10818 Financial Problems Met in the Tourism Sector in Turkey: A Survey on the Tourism Businesses

Authors: Raif Parlakkaya, Huseyin Cetin, Halil Akmese, Mesut Murat Adabali

Abstract:

As the economies of other countries in the Mediterranean Basin, the tourism sector in our country has a high denominator in economics. Tourism businesses, which are building blocks of tourism, sector faces with a variety of problems during their activities. These problems faced make business efficiency and competition conditions of the businesses difficult. Most of the problems faced by the tourism businesses and the information of consumers about consumers’ rights were used in this study, which is conducted to determine the problems of tourism businesses in the Central Anatolia Region. It is aimed to contribute the awareness of staff and executives working at tourism sector and to attract attention of businesses active concurrently with tourism sector and legislators.

Keywords: financial problems, the problems of tourism businesses, tourism businesses, tourism sector in Turkey

Procedia PDF Downloads 457
10817 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 12
10816 Impact of Revenue Reform on Vulnerable Communities

Authors: Pauliasi Tony Fakahau

Abstract:

This paper provides an overview of the impact of the revenue reform programme on vulnerable communities in the Kingdom of Tonga. Economic turmoil and mismanagement during the late 1990s forced the government to seek technical and financial assistance from the Asian Development Bank to undertake a comprehensive Economic and Public Sector Reform (EPSR) programme. The EPSR is a Western model recommended by donor agencies as the solution to Tonga’s economic challenges. The EPSR programme included public sector reform, private sector growth, and revenue generation. Tax reform was the main tool for revenue generation, which set out to strengthen tax compliance and administration as well as implement a value-added consumption tax. The EPSR is based on Western values and ideology but failed to recognise that Tongan cultural values are important to the local community. Two participant groups were interviewed. Participant group one consisted of 51 people representing vulnerable communities. Participant group two consisted of six people from the government and business sector who were from the elite of Tongan society. The Kakala Research Methodology provided the framework for the research, and the Talanoa Research Method was used to conduct semi-structured interviews in the homes of the first group and in the workplaces of the second group. The research found a heavy burden of the consumption tax on the purchasing power of participant group one (vulnerable participants), having an impact on nearly every financial transaction they made. Participant group ones’ main financial priorities were kavenga fakalotu (obligations to the church), kavenga fakafāmili (obligations to the family) and kavenga fakafonua (obligations to cultural events for the village, nobility, and royalty). The findings identified inequalities of the revenue reform, especially from consumption tax, for vulnerable people and communities compared to the elite of society. The research concluded that government and donor agencies need ameliorating policies to reduce the burden of tax on vulnerable groups more susceptible to the impact of revenue reform.

Keywords: tax reform, tonga vulnerable community revenue, revenue reform, public sector reform

Procedia PDF Downloads 91
10815 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 193
10814 Measuring Strategic Management Maturity: An Empirical Study in Turkish Public and Private Sector Organizations

Authors: F. Demir

Abstract:

Strategic Management is highly critical for all types of organizations. This paper examines maturity level of strategic management practices of public and private sector organizations in Turkey, and presents a conceptual model for assessing the maturity of strategic management in any organization. This research focuses on R&D intensive organizations (RDO) because it is claimed that such organizations are more innovative and innovation is a critical part of the model. The Strategic management maturity model (S-3M) is basically composed of six maturity levels with five different dimensions. Based on 63 organizations, the findings reveal that the average maturity of all organizations in the sample group is three out of five. It corresponds to the stage of ‘performed’. Results simply show that the majority of organizations from various industries and sectors implement strategic management activities; however, they experience multiple challenges to optimize strategic management processes and integrate organizational components with business strategies. Briefly, they struggle to become an innovative organization.

Keywords: strategic management maturity, innovation, developing countries, research and development

Procedia PDF Downloads 248
10813 Identification of Successful Criteria for Measuring Large Infrastructure Projects Performance in Malaysia

Authors: M. A. N. Masrom, M. H. I. A. Rahim, G. K. Chen, S. Mohamed

Abstract:

Large infrastructure project is one of significant category in the development of Malaysian construction industry. This type of project has been recognized as a high complexity project with numerous construction risks, large cost involvement, highly technical requirements and divers of resources. Besides, the development of large infrastructure such as highway, railway, Mass Rapid Transit (MRT) and airport are also needed a large investment of public and private sector. To accomplish the development successfully, several challenges has to be determined prior the project commencement. To date, a comprehensive assessment of key success criteria particularly for large infrastructure in developing country such as Malaysia, is still not systematically defined and therefore, it needs further investigation. This paper aims to explore the potential success criteria that would be useful in gauging overall performance of large infrastructure implementation particularly in developing country. Previous successful criteria studies were used to develop a conceptual framework that possibly suitable for measuring large infrastructure performance. The findings show that successful criteria of infrastructure projects implementation could be grouped according to several key elements as it seems significant to the participants in prioritizing project challenges more systematically.

Keywords: successful criteria, performance, large infrastructure, Malaysia

Procedia PDF Downloads 377
10812 Construction and Demolition Waste Management in Indian Cities

Authors: Vaibhav Rathi, Soumen Maity, Achu R. Sekhar, Abhijit Banerjee

Abstract:

Construction sector in India is extremely resource and carbon intensive. It contributes to significantly to national greenhouse emissions. At the resource end the industry consumes significant portions of the output from mining. Resources such as sand and soil are most exploited and their rampant extraction is becoming constant source of impact on environment and society. Cement is another resource that is used in abundance in building and construction and has a direct impact on limestone resources. Though India is rich in cement grade limestone resource, efforts have to be made for sustainable consumption of this resource to ensure future availability. Use of these resources in high volumes in India is a result of rapid urbanization. More cities have grown to a population of million plus in the last decade and million plus cities are growing further. To cater to needs of growing urban population of construction activities are inevitable in the coming future thereby increasing material consumption. Increased construction will also lead to substantial increase in end of life waste generation from Construction and Demolition (C&D). Therefore proper management of C&D waste has the potential to reduce environmental pollution as well as contribute to the resource efficiency in the construction sector. The present study deals with estimation, characterisation and documenting current management practices of C&D waste in 10 Indian cities of different geographies and classes. Based on primary data the study draws conclusions on the potential of C&D waste to be used as an alternative to primary raw materials. The estimation results show that India generates 716 million tons of C&D waste annually, placing the country as second largest C&D waste generator in the world after China. The study also aimed at utilization of C&D waste in to building materials. The waste samples collected from various cities have been used to replace 100% stone aggregates in paver blocks without any decrease in strength. However, management practices of C&D waste in cities still remains poor instead of notification of rules and regulations notified for C&D waste management. Only a few cities have managed to install processing plant and set up management systems for C&D waste. Therefore there is immense opportunity for management and reuse of C&D waste in Indian cities.

Keywords: building materials, construction and demolition waste, cities, environmental pollution, resource efficiency

Procedia PDF Downloads 276
10811 Overview of E-government Adoption and Implementation in Ghana

Authors: Isaac Kofi Mensah

Abstract:

E-government has been adopted and used by many governments/countries around the world including Ghana to provide citizens and businesses with more accurate, real-time, and high quality services and information. The objective of this paper is to present an overview of the Government of Ghana’s (GoG) adoption and implement of e-government and its usage by the Ministries, Departments and its agencies (MDAs) as well as other public sector institutions to deliver efficient public service to the general public i.e. citizens, business etc. Government implementation of e-government focused on facilitating effective delivery of government service to the public and ultimately to provide efficient government-wide electronic means of sharing information and knowledge through a network infrastructure developed to connect all major towns and cities, Ministries, Departments and Agencies and other public sector organizations in Ghana. One aim for the Government of Ghana use of ICT in public administration is to improve productivity in government administration and service by facilitating the exchange of information to enable better interaction and coordination of work among MDAs, citizens and private businesses. The study was prepared using secondary sources of data from government policy documents, national and international published reports, journal articles, and web sources. This study indicates that through the e-government initiative, currently citizens and businesses can access and pay for services such as renewal of driving license, business registration, payment of taxes, acquisition of marriage and birth certificates as well as application for passport through the GoG electronic service (eservice) and electronic payment (epay) portal. Further, this study shows that there is an enormous commitment from GoG to adopt and implement e-government as a tool not only to transform the business of government but also to bring efficiency in public services delivered by the MDAs. To ascertain this, a further study need to be carried out to determine if the use of e-government has brought about the anticipated improvements and efficiency in service delivery of MDAs and other state institutions in Ghana.

Keywords: electronic government, electronic services, electronic pay, MDAs

Procedia PDF Downloads 471
10810 Rethinking the Public Sphere: Group Polarization on Social Media

Authors: Tianji Jiang

Abstract:

Habermas' definition of public sphere is a classical and well-regarded theory of the formation of public opinions, laying the foundation for many researches on public opinions and public media. In recent decades, public media have been changing rapidly as social media are gaining increasing importance. However, the occurrence of group polarization on social media, which is a hot issue today, is challenging Habermas' theory of the public sphere. This article reviews the public sphere theory and studies group polarization and social media. It proposes ideas on how to understand group polarization within the public sphere and comes up with some suggestions and ideas to reduce polarization on social media.

Keywords: public sphere, social media, group polarization, echo chamber, public opinion

Procedia PDF Downloads 72
10809 Reasons for the Slow Uptake of Embodied Carbon Estimation in the Sri Lankan Building Sector

Authors: Amalka Nawarathna, Nirodha Fernando, Zaid Alwan

Abstract:

Global carbon reduction is not merely a responsibility of environmentally advanced developed countries, but also a responsibility of developing countries regardless of their less impact on global carbon emissions. In recognition of that, Sri Lanka as a developing country has initiated promoting green building construction as one reduction strategy. However, notwithstanding the increasing attention on Embodied Carbon (EC) reduction in the global building sector, they still mostly focus on Operational Carbon (OC) reduction (through improving operational energy). An adequate attention has not yet been given on EC estimation and reduction. Therefore, this study aims to identify the reasons for the slow uptake of EC estimation in the Sri Lankan building sector. To achieve this aim, 16 numbers of global barriers to estimate EC were identified through existing literature. They were then subjected to a pilot survey to identify the significant reasons for the slow uptake of EC estimation in the Sri Lankan building sector. A questionnaire with a three-point Likert scale was used to this end. The collected data were analysed using descriptive statistics. The findings revealed that 11 out of 16 challenges/ barriers are highly relevant as reasons for the slow uptake in estimating EC in buildings in Sri Lanka while the other five challenges/ barriers remain as moderately relevant reasons. Further, the findings revealed that there are no low relevant reasons. Eventually, the paper concluded that all the known reasons are significant to the Sri Lankan building sector and it is necessary to address them in order to upturn the attention on EC reduction.

Keywords: embodied carbon emissions, embodied carbon estimation, global carbon reduction, Sri Lankan building sector

Procedia PDF Downloads 175
10808 Cost Reduction Techniques for Provision of Shelter to Homeless

Authors: Mukul Anand

Abstract:

Quality oriented affordable shelter for all has always been the key issue in the housing sector of our country. Homelessness is the acute form of housing need. It is a paradox that in spite of innumerable government initiated programmes for affordable housing, certain section of society is still devoid of shelter. About nineteen million (18.78 million) households grapple with housing shortage in Urban India in 2012. In Indian scenario there is major mismatch between the people for whom the houses are being built and those who need them. The prime force faced by public authorities in facilitation of quality housing for all is high cost of construction. The present paper will comprehend executable techniques for dilution of cost factor in housing the homeless. The key actors responsible for delivery of cheap housing stock such as capacity building, resource optimization, innovative low cost building material and indigenous skeleton housing system will also be incorporated in developing these techniques. Time performance, which is an important angle of above actors, will also be explored so as to increase the effectiveness of low cost housing. Along with this best practices will be taken up as case studies where both conventional techniques of housing and innovative low cost housing techniques would be cited. Transportation consists of approximately 30% of total construction budget. Thus use of alternative local solutions depending upon the region would be covered so as to highlight major components of low cost housing. Government is laid back regarding base line information on use of innovative low cost method and technique of resource optimization. Therefore, the paper would be an attempt to bring to light simpler solutions for achieving low cost housing.

Keywords: construction, cost, housing, optimization, shelter

Procedia PDF Downloads 413
10807 Construction 4.0: The Future of the Construction Industry in South Africa

Authors: Temidayo. O. Osunsanmi, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The construction industry is a renowned latecomer to the efficiency offered by the adoption of information technology. Whereas, the banking, manufacturing, retailing industries have keyed into the future by using digitization and information technology as a new approach for ensuring competitive gain and efficiency. The construction industry has yet to fully realize similar benefits because the adoption of ICT is still at the infancy stage with a major concentration on the use of software. Thus, this study evaluates the awareness and readiness of construction professionals towards embracing a full digitalization of the construction industry using construction 4.0. The term ‘construction 4.0’ was coined from the industry 4.0 concept which is regarded as the fourth industrial revolution that originated from Germany. A questionnaire was utilized for sourcing data distributed to practicing construction professionals through a convenience sampling method. Using SPSS v24, the hypotheses posed were tested with the Mann Whitney test. The result revealed that there are no differences between the consulting and contracting organizations on the readiness for adopting construction 4.0 concepts in the construction industry. Using factor analysis, the study discovers that adopting construction 4.0 will improve the performance of the construction industry regarding cost and time savings and also create sustainable buildings. In conclusion, the study determined that construction professionals have a low awareness towards construction 4.0 concepts. The study recommends an increase in awareness of construction 4.0 concepts through seminars, workshops and training, while construction professionals should take hold of the benefits of adopting construction 4.0 concepts. The study contributes to the roadmap for the implementation of construction industry 4.0 concepts in the South African construction industry.

Keywords: building information technology, Construction 4.0, Industry 4.0, smart site

Procedia PDF Downloads 360
10806 An Analysis of the Role of Watchdog Civil Society Organisations in the Public Governance in Southern Africa: A study of South Africa and Zimbabwe

Authors: Julieth Gudo

Abstract:

The prevalence of corruption in African countries and persisting unsatisfactory distribution by governments of state resources among the citizens are clear indicators of a festering problem. Civil society organisations (CSOs) in Southern African countries, as citizen representatives, have been involved in challenging the ongoing corruption and poor governance in the public sector that have caused tensions between citizens and their governments. In doing so, civil society organisations demand accountability, transparency, and citizen participation in public governance. The problem is that CSOs’ role in challenging governments is not clearly defined in both law and literature. This uncertainty has resulted in an unsatisfying operating and legal environment for CSOs and a strained relationship between themselves and the governments. This paper examines civil society organisations' role in advancing good public governance in South Africa and Zimbabwe. The study will be conducted by means of a literature review and case studies. The state of public governance in Southern Africa will be discussed. The historical role of CSOs in the region of Southern Africa will be explored, followed by their role in public governance in contemporary South Africa and Zimbabwe. The relationship between state and civil society organisations will be examined. Furthermore, the legal frameworks that regulate and authoriseCSOs in their part in challenging poor governance in the public sector will be identified and discussed. Loopholes in such provisions will be identified, and measures that CSOs use to hold those responsible for poor governance accountable for their actions will be discussed, consequently closing the existing gap on the undefined role of CSOs in public governance in Southern Africa. The research demonstrates the need for an enabling operating environment through better cooperation, communication, and the relationship between governments and CSOs, the speedy and effective amendment of existing laws, and the introduction of legal provisions that give express authority to CSOs to challenge poor governance on the part of Southern African governments. Also critical is the enforcement of laws so that those responsible for poor governance and corruption in government are held accountable.

Keywords: civil society organisations, public governance, southern Africa, South Africa, zimbabwe

Procedia PDF Downloads 84
10805 A Preliminary Study of the Reconstruction of Urban Residential Public Space in the Context of the “Top-down” Construction Model in China: Based on Research of TianZiFang District in Shanghai and Residential Space in Hangzhou

Authors: Wang Qiaowei, Gao Yujiang

Abstract:

With the economic growth and rapid urbanization after the reform and openness, some of China's fast-growing cities have demolished former dwellings and built modern residential quarters. The blind, incomplete reference to western modern cities and the one-off construction lacking feedback mechanism have intensified such phenomenon, causing the citizen gradually expanded their living scale with the popularization of car traffic, and the peer-to-peer lifestyle gradually settled. The construction of large-scale commercial centers has caused obstacles to small business around the residential areas, leading to space for residents' interaction has been compressed. At the same time, the advocated Central Business District (CBD) model even leads to the unsatisfactory reconstruction of many historical blocks such as the Hangzhou Southern Song Dynasty Imperial Street. However, the popularity of historical spaces such as Wuzhen and Hongcun also indicates the collective memory and needs of the street space for Chinese residents. The evolution of Shanghai TianZiFang also proves the importance of the motivation of space participants in space construction in the context of the “top-down” construction model in China. In fact, there are frequent occurrences of “reconstruction”, which may redefine the space, in various residential areas. If these activities can be selectively controlled and encouraged, it will be beneficial to activate the public space as well as the residents’ intercourse, so that the traditional Chinese street space can be reconstructed in the context of modern cities.

Keywords: rapid urbanization, traditional street space, space re-construction, bottom-up design

Procedia PDF Downloads 76
10804 A Critical Evaluation of Building Information Modelling in New Zealand: Deepening Our Understanding of the Benefits and Drawbacks

Authors: Garry Miller, Thomas Alexander, Cameron Lee

Abstract:

There is belief that Building Information Modelling (BIM) will improve performance of the New Zealand (NZ) Architecture, Engineering and Construction (AEC) sector, however, widespread use of BIM is yet to be seen. Previous research indicates there are many issues affecting the uptake of BIM in NZ; nevertheless the underlying benefits, drawbacks, and barriers preventing more widespread uptake are not fully understood. This investigation aimed to understand these factors more clearly and make suggestions on how to improve the uptake of BIM in NZ. Semi-structured interviews were conducted with a range of industry professionals to gather a qualitative understanding. Findings indicated the ability to incorporate better information into a BIM model could drive many benefits. However scepticism and lack of positive incentives in NZ are affecting its widespread use. This concluded that there is a need for the government to produce a number of BIM case studies and develop a set of BIM standards to resolve payment issues surrounding BIM use. This study provides useful information for those interested in BIM and members of government interested in improving the performance of the construction industry. This study may also be of interest to small, developed countries such as NZ where the level of BIM maturity is relatively low.

Keywords: BIM, New Zealand, AEC sector, building information modelling

Procedia PDF Downloads 485
10803 Assessment of the Level of Awareness and Adoption of International Public Sector Accounting Standards (IPSAS) in the Curriculum of Accounting Education in Selected Tertiary Institutions in Ondo and Ekiti States Nigeria

Authors: Olurankinse Felix, Fatukasi Bayo

Abstract:

Over the years, the medium through which government financial statements are prepared has been on cash basis of accounting. This basis was characterised with some shortcomings ranging from non- disclosure of quality and detail information relating to government financial transactions, ill informed assessment of government resource allocation, weak internal control system that inhibits accountability and transparency and non- standardisation of reporting ethics for the purpose of comparability. The emergence of international public sector accounting standards (IPSAS) is therefore seen as leverage as it aims at improving the quality of general purpose financial reporting by public sector entities thereby increasing transparency and accountability. IPSAS is a new concept that all institutions must fully adopts. The crux of this paper is to find out to what extent is the awareness and adoption of IPSAS to both students and lecturers interms of teaching, learning and inclusion in the curriculum of accounting education. The methodology involved the use of well designed questionnaires to obtain information from some selected institutions and the analysis was done with the use of maximum likelihood ordered probit regression. The result of the analysis shows that despite a high level of sensitisation/awareness of IPSAS, the degree of adoption is still low due to low level of desirability by students and lecturers. The paper recommend the need for the government to enact an enabling law to back up the adoption and more importantly to institute appropriate sanctions to ensure full compliance.

Keywords: assessment, awareness, adoption, IPSAS, cash basis

Procedia PDF Downloads 447
10802 The Public Law Studies: Relationship Between Accountability, Environmental Education and Smart Cities

Authors: Aline Alves Bandeira, Luís Pedro Lima, Maria Cecília de Paula Silva, Paulo Henrique de Viveiros Tavares

Abstract:

Nowadays, the study of public policies regarding management efficiency is essential. Public policies are about what governments do or do not do, being an area that has grown worldwide, contributing through the knowledge of technologies and methodologies that monitor and evaluate the performance of public administrators. The information published on official government websites needs to provide for transparency and responsiveness of managers. Thus, transparency is a primordial factor for the execution of Accountability, providing, in this way, services to the citizen with the expansion of transparent, efficient, democratic information and that value administrative eco-efficiency. The ecologically balanced management of a Smart City must optimize environmental education, building a fairer society, which brings about equality in the use of quality environmental resources. Smart Cities add value in the construction of public management, enabling interaction between people, enhancing environmental education and the practical applicability of administrative eco-efficiency, fostering economic development and improving the quality of life.

Keywords: accountability, environmental education, new public administration, smart cities

Procedia PDF Downloads 93
10801 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 313
10800 Region Coastal Land Management and Tracking Changes in Ownership Status

Authors: Tayfun Cay, Fazil Nacar

Abstract:

Energy investments have increased in North Mediterranean Ceyhan and Yumurtalık districts of Turkey in the last years because of the treaties which are signed between Turkey and other countries for petroleum and natural gas transmission. Authority of land use has passed to district and metropolitan municipalities from town municipalities because of changes in coast legislation and local management legislation. Also Ministry of Environment and Urban Planning and Ministry of Industry and Commerce have had a right to comment on planning unofficially. Public investments increase in area and related planning and expropriation services continue. On the other hand, a lot of private sectors invest in organised industrial sites and industrial areas and it causes a rapid change in ownership status. Also Ceyhan-yumurtalık region is the tourism centre of North Mediterranean. Tourism investments continue in this district. Especially construction sector gain speed and a lot of country sites and apartments are built. In these studies, changes in planning activities in management of different administrative organisations and changes in ownership status and changes in private properties will be presented.

Keywords: coast management, land management, land use, property, public interest

Procedia PDF Downloads 482
10799 E-Government, China Internet Plus, and the One Belt One Road Initiative: The Africa Connection

Authors: Isaac Kofi Mensah, Mi Jianing

Abstract:

The lack of Information and Communication Technologies (ICT) infrastructure in African countries is hampering the successful adoption, development and implementation of e-government in Africa. Electronic government is the use of ICTs to modernize government public administration processes and to provide government services to citizens with a purpose to enhance efficiency, accountability, and transparency in government’s interaction with the citizenry. ICT application in public administration has the potential to modernize and create smarter government and improvement in public service delivery. China’s Internet Plus policy and One Belt One Road strategy present a golden opportunity for countries in Africa to attract the huge financial investment through Chinese IT companies to develop and close Africa’s ICT infrastructure gap. This study recommends the establishment of One Belt One Road ICT Infrastructure Fund for Africa (OBOR ICT Fund for Africa) to enable countries in Africa to source solely for the purpose of ICT infrastructure development in the public sector/government machinery which would in turn promote the adoption and development of e-government in the public sectors of respective countries in Africa.

Keywords: e-government, public service delivery, internet plus, one belt one road initiative, China, Africa

Procedia PDF Downloads 639
10798 Construction Sustainability Improvement through Using Recycled Aggregates in Concrete Production

Authors: Zhiqiang Zhu, Khalegh Barati, Xuesong Shen

Abstract:

Due to the energy consumption caused by the construction industry, the public is paying more and more attention to the sustainability of the buildings. With the advancement of research on recycled aggregates, it has become possible to replace natural aggregates with recycled aggregates and to achieve a reduction in energy consumption of materials during construction. The purpose of this paper is to quantitatively compare the emergy consumption of natural aggregate concrete (NAC) and recycled aggregate concrete (RAC). To do so, the emergy analysis method is adopted. Using this technique, it can effectively analyze different forms of energy and substance. The main analysis object is the direct and indirect emergy consumption of the stages in concrete production. Therefore, for indirect energy, consumption of production machinery and transportation vehicle also need to be considered. Finally, the emergy values required to produce the two concrete types are compared to analyze whether the RAC can reduce emergy consumption.

Keywords: sustainable construction, NAC, RAC, emergy, concrete

Procedia PDF Downloads 116