5064 Renegotiating International Contract Clauses: The Case of Investment Environment Changes in Egypt

Authors: Marwa Zein

Abstract:

The long-term of the contract is one of the major features that distinguish international trade and investment contracts from other internal contracts. This is due to the nature of the contract and the huge works required to be performed from one hand or the desire of the parties to achieve stability in their transactions. However, long-term contracts might expose them to certain events and circumstances that impact the capability of the parties to execute their obligations pursuant to these contracts. During the year 2016, the Egyptian government has taken series of economic decisions which greatly impacted the economic and investment environment. Consequently, many contracts have encountered many problems in their execution due to such changes that greatly influence the performance of their obligation, a matter that necessitated the renegotiation of the conditions of these contracts on the basis of the unpredicted changes that could be listed under the Force Majeure Clause. The principle of fair and equitable treatment in investment placed on an obligation on the Egyptian government to consider the renegotiation of contract clauses based on the new conditions. This paper will discuss the idea of renegotiating international trade and investment contracts in Egypt with reference to the changes the economic environment has witnessed lately.

Keywords: change of circumstances, international contracts, investment contracts, renegotiation

Procedia PDF Downloads 170
5063 Islamic Financial Instrument, Standard Parallel Salam as an Alternative to Conventional Derivatives

Authors: Alireza Naserpoor

Abstract:

Derivatives are the most important innovation which has happened in the past decades. When it comes to financial markets, it has changed the whole way of operations of stock, commodities and currency market. Beside a lot of advantages, Conventional derivatives contracts have some disadvantages too. Some problems have been caused by derivatives contain raising Volatility, increasing Bankruptcies and causing financial crises. Standard Parallel Salam contract as an Islamic financial product meanwhile is a financing instrument can be used for risk management by investors. Standard Parallel Salam is a Shari’ah-Compliant contract. Furthermore, it is an alternative to conventional derivatives. Despite the fact that the unstructured types of that, has been used in several Islamic countries, This contract as a structured and standard financial instrument introduced in Iran Mercantile Exchange in 2014. In this paper after introducing parallel Salam, we intend to examine a collection of international experience and local measure regarding launching standard parallel Salam contract and proceed to describe standard scenarios for trading this instrument and practical experience in Iran Mercantile Exchange about this instrument. Afterwards, we make a comparison between SPS and Futures contracts as a conventional derivative. Standard parallel salam contract as an Islamic financial product, can be used for risk management by investors. SPS is a Shariah-Compliant contract. Furthermore it is an alternative to conventional derivatives. This contract as a structured and standard financial instrument introduced in Iran Mercantile Exchange in 2014. despite the fact that the unstructured types of that, has been used in several Islamic countries. In this article after introducing parallel salam, we intend to examine a collection of international experience and local measure regarding launching standard parallel salam contract and proceed to describe standard scenarios for trading this instrument containing two main approaches in SPS using, And practical experience in IME about this instrument Afterwards, a comparison between SPS and Futures contracts as a conventional derivatives.

Keywords: futures contracts, hedging, shari’ah compliant instruments, standard parallel salam

Procedia PDF Downloads 351
5062 The Effects of Perceived Organizational Support and Abusive Supervision on Employee’s Turnover Intention: The Mediating Roles of Psychological Contract and Emotional Exhaustion

Authors: Seung Yeon Son

Abstract:

Workers (especially, competent personnel) have been recognized as a core contributor to overall organizational effectiveness. Hence, verifying the determinants of turnover intention is one of the most important research issues. This study tested the influence of perceived organizational support and abusive supervision on employee’s turnover intention. In addition, mediating roles of psychological contract and emotional exhaustion were examined. Data from 255 Korean employees supported all hypotheses Implications for research and directions for future research are discussed.

Keywords: abusive supervision, emotional exhaustion, perceived organizational support, psychological contract, turnover intention

Procedia PDF Downloads 467
5061 A Systematic Review on Development of a Cost Estimation Framework: A Case Study of Nigeria

Authors: Babatunde Dosumu, Obuks Ejohwomu, Akilu Yunusa-Kaltungo

Abstract:

Cost estimation in construction is often difficult, particularly when dealing with risks and uncertainties, which are inevitable and peculiar to developing countries like Nigeria. Direct consequences of these are major deviations in cost, duration, and quality. The fundamental aim of this study is to develop a framework for assessing the impacts of risk on cost estimation, which in turn causes variabilities between contract sum and final account. This is very important, as initial estimates given to clients should reflect the certain magnitude of consistency and accuracy, which the client builds other planning-related activities upon, and also enhance the capabilities of construction industry professionals by enabling better prediction of the final account from the contract sum. In achieving this, a systematic literature review was conducted with cost variability and construction projects as search string within three databases: Scopus, Web of science, and Ebsco (Business source premium), which are further analyzed and gap(s) in knowledge or research discovered. From the extensive review, it was found that factors causing deviation between final accounts and contract sum ranged between 1 and 45. Besides, it was discovered that a cost estimation framework similar to Building Cost Information Services (BCIS) is unavailable in Nigeria, which is a major reason why initial estimates are very often inconsistent, leading to project delay, abandonment, or determination at the expense of the huge sum of money invested. It was concluded that the development of a cost estimation framework that is adjudged an important tool in risk shedding rather than risk-sharing in project risk management would be a panacea to cost estimation problems, leading to cost variability in the Nigerian construction industry by the time this ongoing Ph.D. research is completed. It was recommended that practitioners in the construction industry should always take into account risk in order to facilitate the rapid development of the construction industry in Nigeria, which should give stakeholders a more in-depth understanding of the estimation effectiveness and efficiency to be adopted by stakeholders in both the private and public sectors.

Keywords: cost variability, construction projects, future studies, Nigeria

Procedia PDF Downloads 166
5060 Law, Resistance, and Development in Georgia: A Case of Namakhvani HPP

Authors: Konstantine Eristavi

Abstract:

The paper will contribute to the discussion on the pitfalls, limits, and possibilities of legal and rights discourse in opposing large infrastructural projects in the context of neoliberal globalisation. To this end, the paper will analyse the struggle against the Namakhvani HPP project in Georgia. The latter has been hailed by the government as one of the largest energy projects in the history of the country, with an enormous potential impact on energy security, energy independence, economic growth, and development. This takes place against the backdrop of decades of market-led -or neoliberal- model of development in Georgia, characterised by structural adjustments, deregulation, privatisation, and Laissez-Fair approach to foreign investment. In this context, the Georgian state vies with other low and middle-income countries for foreign capital by offering to potential investors, on the one hand, exemptions from social and environmental regulations and, on the other hand, huge legal concessions and safeguards, thereby participating in what is often called a “race to the bottom.” The Namakhvani project is a good example of this. At every stage, the project has been marred with violations of laws and regulations concerning transparency, participation, social and environmental regulations, and so on. Moreover, the leaked contract between the state and the developer reveals the contractual safeguards which effectively insulate the investment throughout the duration of the contract from the changes in the national law that might adversely affect investors’ rights and returns. These clauses, aimed at preserving investors' economic position, place the contract above national law in many respects and even conflict with fundamental constitutional rights. In response to the perceived deficiencies of the project, one of the largest and most diverse social movements in the history of post-soviet Georgia has been assembled, consisting of the local population, conservative and leftist groups, human rights and environmental NGOs, etc. Crucially, the resistance movement is actively using legal tools. In order to analyse both the limitations and possibilities of legal discourse, the paper will distinguish between internal and immanent critiques. Law as internal critique, in the context of the struggles around the Namakhvani project, while potentially fruitful in hindering the project, risks neglecting and reproducing those factors -e.g., the particular model of development- that made such contractual concessions and safeguards and concomitant rights violations possible in the first place. On the other hand, the use of rights and law as part of immanent critique articulates a certain incapacity on the part of the addressee government to uphold existing laws and rights due to structural factors, hence, pointing to a need for a fundamental change. This 'ruptural' form of legal discourse that the movement employs makes it possible to go beyond the discussion around the breaches of law and enables a critical deliberation on the development model within which these violations and extraordinary contractual safeguards become necessary. It will be argued that it is this form of immanent critique that expresses the emancipatory potential of legal discourse.

Keywords: law, resistance, development, rights

Procedia PDF Downloads 56
5059 Contractual Complexity and Contract Parties' Opportunistic Behavior in Construction Projects: In a Contractual Function View

Authors: Mengxia Jin, Yongqiang Chen, Wenqian Wang, Yu Wang

Abstract:

The complexity and specificity of construction projects have made common opportunism phenomenon, and contractual governance for opportunism has been a topic of considerable ongoing research. Based on TCE, the research distinguishes control and coordination as different functions of the contract to investigate their complexity separately. And in a nuanced way, the dimensionality of contractual control is examined. Through the analysis of motivation and capability of strong or weak form opportunism, the framework focuses on the relationship between the complexity of above contractual dimensions and different types of opportunistic behavior and attempts to verify the possible explanatory mechanism. The explanatory power of the research model is evaluated in the light of empirical evidence from questionnaires. We collect data from Chinese companies in the construction industry, and the data collection is still in progress. The findings will speak to the debate surrounding the effects of contract complexity on opportunistic behavior. This nuanced research will derive implications for research on the role of contractual mechanisms in dealing with inter-organizational opportunism and offer suggestions for curbing contract parties’ opportunistic behavior in construction projects.

Keywords: contractual complexity, contractual control, contractual coordinatio, opportunistic behavior

Procedia PDF Downloads 357
5058 The Role of BPSK (Consumer Dispute Settlement Body) in the Monitoring of Standard Clause Inclusion within Indonesian Customer Protection Law

Authors: Deviana Yuanitasari

Abstract:

The rapid development of world commerce and trade nowadays has created fast-paced demand in every business activities and transactions. That also includes the need for ready to use and practical form of standard contract. For the company or business owner, the use of standard contract is an alternative way to achieve economic goals faster, effectively and efficiently. In the other hand, for the consumer the practice of using standard contract usually unfavorable, because the contract clauses usually have been defined by the company and cannot be individually negotiated. That means consumer cannot influence the substances of the contract clauses. The purpose of this study is to get deeper understanding and analyze the role of Consumer Dispute Settlement Body in the monitoring of standard clause inclusion by businesses and industries within the context of practicing consumer protection law. Furthermore, this study will focus on the procedure of sanction and the effectiveness of the sanction for the business practitioners which disregard the inclusion of the prohibited standard clause. Therefore, this study will depict the law issues and other phenomenon that related with the role of Consumer Dispute Settlement Body in monitoring the inclusion of standard clause and procedure of sanction for the business practitioners that still use exemption clause within Consumer Protection Law System. This study results that BPSK has been assigned to monitor the inclusion of standard clause and settle consumer dispute. At this stage, BPSK role is passive, which means BPSK only takes an action if there are consumer complaints. The procedure of sanction is not part of BPSK tasks, since should there be a violation of standard clause; BPSK can only ask the business practitioners to remove the prohibited clause and not give a sanction. As a result, the procedure of sanction rule for the Standard Clause violation in this context can be considered as ineffective.

Keywords: standard contract, standard clause, consumer protection law, consumer dispute settlement body

Procedia PDF Downloads 300
5057 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 173
5056 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 90
5055 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study

Authors: Arsany Philip Fawzy

Abstract:

This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).

Keywords: clearance, quality, cost, variation, claim

Procedia PDF Downloads 68
5054 Supply Chain Coordination under Carbon Trading Mechanism in Case of Conflict

Authors: Fuqiang Wang, Jun Liu, Liyan Cai

Abstract:

This paper investigates the coordination of the conflicting two-stage low carbon supply chain consisting of upstream and downstream manufacturers. The conflict means that the upstream manufacturer takes action for carbon emissions reduction under carbon trading mechanism while the downstream manufacturer’s production cost rises. It assumes for the Stackelberg game that the upstream manufacturer plays as a leader and the downstream manufacturer does as a follower. Four kinds of the situation of decentralized decision making, centralized decision-making, the production cost sharing contract and the carbon emissions reduction revenue sharing contract under decentralized decision making are considered. The backward induction approach is adopted to solve the game. The results show that the more intense the conflict is, the lower the efficiency of carbon emissions reduction and the higher the retail price is. The optimal investment of the decentralized supply chain under the two contracts is unchanged and still lower than that of the centralized supply chain. Both the production cost sharing contract and the carbon emissions reduction revenue sharing contract cannot coordinate the supply chain, because that the sharing cost or carbon emissions reduction sharing revenue will transfer through the wholesale price mechanism. As a result, it requires more complicated contract forms to coordinate such a supply chain.

Keywords: cap-and-trade mechanism, carbon emissions reduction, conflict, supply chain coordination

Procedia PDF Downloads 304
5053 Commitment Based Revenue Sharing Contract

Authors: Muhammad Shafiq, Huynh Trung Luong

Abstract:

In this paper, we proposed a commitment based revenue sharing contract for a supply chain comprising one manufacturer and one retailer facing highly uncertain demand of a short life span fashionable product. In our model, the retailer reserves a commitment level with the manufacturer prior to the selling season. In response, the manufacturer allocates and produces a specific quantity which is the maximum available quantity for the retailer. The retailer is motivated to commit more by offering higher revenue sharing percentage for reserved capacity than non-reserved capacity. Due to asymmetric information, it is found that the manufacturer can optimize quantity allocation decision while the commitment level decision of the retailer may not be optimal.

Keywords: supply chain coordination, revenue sharing contract, commitment based revenue sharing, quantity allocation

Procedia PDF Downloads 460
5052 Project Objective Structure Model: An Integrated, Systematic and Balanced Approach in Order to Achieve Project Objectives

Authors: Mohammad Reza Oftadeh

Abstract:

The purpose of the article is to describe project objective structure (POS) concept that was developed on research activities and experiences about project management, Balanced Scorecard (BSC) and European Foundation Quality Management Excellence Model (EFQM Excellence Model). Furthermore, this paper tries to define a balanced, systematic, and integrated measurement approach to meet project objectives and project strategic goals based on a process-oriented model. In this paper, POS is suggested in order to measure project performance in the project life cycle. After using the POS model, the project manager can ensure in order to achieve the project objectives on the project charter. This concept can help project managers to implement integrated and balanced monitoring and control project work.

Keywords: project objectives, project performance management, PMBOK, key performance indicators, integration management

Procedia PDF Downloads 335
5051 A Systematic Snapshot of Software Outsourcing Challenges

Authors: Issam Jebreen, Eman Al-Qbelat

Abstract:

Outsourcing software development projects can be challenging, and there are several common challenges that organizations face. A study was conducted with a sample of 46 papers on outsourcing challenges, and the results show that there are several common challenges faced by organizations when outsourcing software development projects. Poor outsourcing relationship was identified as the most significant challenge, with 35% of the papers referencing it. Lack of quality was the second most significant challenge, with 33% of the papers referencing it. Language and cultural differences were the third most significant challenge, with 24% of the papers referencing it. Non-competitive price was another challenge faced by organizations, with 21% of the papers referencing it. Poor coordination and communication were also identified as a challenge, with 21% of the papers referencing it. Opportunistic behavior, lack of contract negotiation, inadequate user involvement, and constraints due to time zone were also challenges faced by organizations. Other challenges faced by organizations included poor project management, lack of technical capabilities, vendor employee high turnover, poor requirement specification, IPR issues, poor management of budget, schedule, and delay, geopolitical and country instability, the difference in development methodologies, failure to manage end-user expectations, and poor monitoring and control. In conclusion, outsourcing software development projects can be challenging, but organizations can mitigate these challenges by selecting the right outsourcing partner, having a well-defined contract and clear communication, having a clear understanding of the requirements, and implementing effective project management practices.

Keywords: software outsourcing, vendor, outsourcing challenges, quality model, continent, country, global outsourcing, IT workforce outsourcing.

Procedia PDF Downloads 58
5050 Research on Contract's Explicit Incentive and Reputation's Implicit Incentive Mechanism towards Construction Contractors

Authors: Li Ma, Meishuang Ma, Mengying Huang

Abstract:

The quality of construction projects reflects the credit and responsibilities of construction contractors for the owners and the whole society. Because the construction contractors master more relevant information about the entrusted engineering project under construction while the owners are in unfavorable position of gaining information, asymmetric information may lead the contractors act against the owners in order to pursue their own interests. Building a powerful motivation mechanism is the key to guarantee investor economic interests and the life and property of users in construction projects. Based on principal-agent theory and game theory, the authors develop relevant mathematical models to analyze and compare the contractor’s utility functions under different combinations of contracts’ explicit incentive mechanism and reputation’s implicit incentive mechanism aiming at finding out the conditions for incentive validity. The research concludes that the most rational motivation way is to combine the explicit and implicit incentive effects of both contracts and reputation mechanism, and puts forth some measures for problems on account of China’s current situation.

Keywords: construction contractors, contract, reputation, incentive mechanism

Procedia PDF Downloads 481
5049 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.

Keywords: urban project, strategic management, operational management, the modernization project of constantine

Procedia PDF Downloads 486
5048 Building Information Modeling-Based Approach for Automatic Quantity Take-off and Cost Estimation

Authors: Lo Kar Yin, Law Ka Mei

Abstract:

Architectural, engineering, construction and operations (AECO) industry practitioners have been well adapting to the dynamic construction market from the fundamental training of its discipline. As further triggered by the pandemic since 2019, great steps are taken in virtual environment and the best collaboration is strived with project teams without boundaries. With adoption of Building Information Modeling-based approach and qualitative analysis, this paper is to review quantity take-off and cost estimation process through modeling techniques in liaison with suppliers, fabricators, subcontractors, contractors, designers, consultants and services providers in the construction industry value chain for automatic project cost budgeting, project cost control and cost evaluation on design options of in-situ reinforced-concrete construction and Modular Integrated Construction (MiC) at design stage, variation of works and cash flow/spending analysis at construction stage as far as practicable, with a view to sharing the findings for enhancing mutual trust and co-operation among AECO industry practitioners. It is to foster development through a common prototype of design and build project delivery method in NEC Engineering and Construction Contract (ECC) Options A and C.

Keywords: building information modeling, cost estimation, quantity take-off, modeling techniques

Procedia PDF Downloads 147
5047 Disruption Coordination of Supply Chain with Loss-Averse Retailer Under Buy-Back Contract

Authors: Yuan Tian, Benhe Gao

Abstract:

This paper aims to investigate a two stage supply chain of one leading supplier and one following retailer that experiences two factors perturbation out of supplier's production cost, retailer's marginal cost and retail price in stochastic demand environment. Granted that risk neutral condition has long been discussed, little attention has been given to disruptions under the premise of risk neutral supplier and risk aversion retailer. We establish the optimal order quantity and revealed the profit distribution coefficient in risk-neutral static model, make adjustment under disruption scenario, and then select utility function method for risk aversion model. Using buy-back contract policy, the improvement of parameters can achieve channel coordination where Pareto optimal is realized.

Keywords: supply chain coordination, disruption management, buy-back contract, lose aversion

Procedia PDF Downloads 300
5046 Circular Economy and Remedial Frameworks in Contract Law

Authors: Reza Beheshti

Abstract:

This paper examines remedies for defective manufactured goods in commercial circular economic transactions. The linear ‘take-make-dispose’ model fits well with the conventional remedial framework in which damages are considered the primary remedy. Damages under English Sales Law encourages buyers to look for a substitute seller with broadly similar goods to the ones agreed on in the original contract, enter into contract with this new seller and hence terminate the original contract. By doing so, the buyer ends the contractual relationship. This seems contrary to the core principles of the circular economy: keeping products, components, and materials in longer use, which can partly be achieved by product refurbishment. This process involves returning a product to good working condition by replacing or repairing major components that are faulty or close to failure and making ‘cosmetic’ changes to update the appearance of a product. This remedy has not been widely accepted or applied in commercial cases, which in turn flags up the secondary nature of performance-related remedies. This paper critically analyses the laws concerning the seller’s duty to cure in English law and the extent to which they correspond with core principles of the circular economy. In addition, this paper takes into account the potential of circular economic transactions being characterised as something other than sales. In such situations, the likely outcome will be a license to use products, which may limit the choice of remedy further. Consequently, this paper suggests an outline remedial framework specifically for commercial circular economic transactions in manufactured goods.

Keywords: circular economy, contract law, remedies, English Sales Law

Procedia PDF Downloads 115
5045 Comparison of Buyback Contracts and Concession Regimes in the Regime of the Common Law System and the Islamic Legal Regime

Authors: Javid Zarei

Abstract:

International buyback contracts are a type of contract service. These kinds of contracts are the most important instrument for attracting foreign investors in accordance with Iran's laws. These contracts have been the basis of commercial and economic relations between Iran and foreign companies for about 30 years. The legal structure of this type of contract has gradually evolved, so today, an advanced generation of it under the title of Iran Petroleum Contract is being used in the industry of Iran. This article has analytically examined the issue of Iran's commercial contracts in the oil industry and contracting services and allocated sections to examine the strengths and weaknesses of these oil contracts. Also, this research is an attempt to examine and compare the Concession regime with the Buyback contracts, each of which is derived from the common law legal system and the Islamic legal system, respectively.

Keywords: buyback contracts, concession regime, ownership, common law legal system, Islamic legal system of Iran

Procedia PDF Downloads 52
5044 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 126
5043 Occupational Safety in Construction Projects

Authors: Heba Elbibas, Esra Gnijeewa, Zedan Hatush

Abstract:

This paper presents research on occupational safety in construction projects, where the importance of safety management in projects was studied, including the preparation of a safety plan and program for each project and the identification of the responsibilities of each party to the contract. The research consists of two parts: 1-Field visits: which were field visits to three construction projects, including building projects, road projects, and tower installation. The safety level of these projects was evaluated through a checklist that includes the most important safety elements in terms of the application of these items in the projects. 2-Preparation of a questionnaire: which included supervisors and engineers and aimed to determine the level of awareness and commitment of different project categories to safety standards. The results showed the following: i) There is a moderate occupational safety policy. ii) The preparation and storage of maintenance reports are not fully complied with. iii) There is a moderate level of training on occupational safety for project workers. iv) The company does not impose penalties on safety violators permanently. v) There is a moderate policy for equipment and machinery safety. vi) Self-injuries occur due to (fatigue, lack of attention, deliberate error, and emotional factors), with a rate of 82.4%.

Keywords: management, safety, occupational safety, classification

Procedia PDF Downloads 68
5042 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 270
5041 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities

Procedia PDF Downloads 264
5040 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 253
5039 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria

Authors: A. A. Omonori, K. T. Alade, A. F. Lawal

Abstract:

This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.

Keywords: abandonment, case-study, Nigeria, project

Procedia PDF Downloads 320
5038 The Existence of Field Corn Networks on the Thailand-Burma Border under the Patron-Client Contract Farming System

Authors: Kettawa Boonprakarn, Jedsarid Sangkaphan, Bejapornd Deekhuntod, Nuntharat Suriyo

Abstract:

This study aimed to investigate the existence of field corn networks on the Thailand-Burma border under the patron-client contract farming system. The data of this qualitative study were collected through in-depth interviews with nine key informants. The results of the study revealed that the existence of the field corn networks was associated with the relationship where farmers had to share their crops with protectors in the areas under the influence of the KNU (Karen National Union) and the DKBA (Democratic Karen Buddhist Army) or Burmese soldiers. A Mae Liang, the person who starts a network has a connection with a Thaokae, Luk Rai Hua Chai or the head of a group of farmers, and farmers. They are under the patron-client system with trust and loyalty that enable the head of the group and the farmers in the Burma border side to remain under the same Mae Liang even though the business has been passed down to later generations.

Keywords: existence, field-corn networks, patron-client system, contract farming

Procedia PDF Downloads 243
5037 Contractual Risk Transfer in Islamic Home Financing: Analysis in Bank Malaysia

Authors: Ahmad Dahlan Salleh, Nik Abdul Rahim Nik Abdul Ghani, Muhamad Firdaus M. Hatta

Abstract:

Risk management has implications on pricing, governance arrangements, business practices and strategy. Nowadays, home financing contract offers more in the risk transfer form to increase bank profit. This is parallel with Islamic jurisprudence method al-Kharaj bi al-thaman (gain accompanies liability for loss) and al-ghurm bil ghunm (gain is justified with risk) that determine the matching between risk transfer and returns. Malaysian financing trend is to buy house. Besides, exists transparency lacking risk transfer issues to the clients because of not been informed clearly. Terms and conditions of each financing also do not reflect clearly that the risk has been transferred to the client, justifying a determination price been made. The assumption on risk occurrence is also inaccurate as each risk is different with the type of financing contract. This makes the Islamic Financial Services Act 2013 in providing standards that transparent and consistent can be used by Islamic financial institution less effective. This study examines how far the level of the risk and obligation incurred by bank and client under various Islamic home financing contract. This research is qualitative by using two methods, document analysis, and semi-structured interviews. Document analysis from literature review to identify profile, themes and risk transfer element in home financing from Islamic jurisprudence perspective. This study finds that need to create a risk transfer parameter by banks which are consistent with risk transfer theory according to Islamic jurisprudence. This study has potential to assist the authority in Islamic finance such as The Central Bank of Malaysia (Bank Negara Malaysia) in regulating Islamic banking industry so that the risk transfer valuation in home financing contract based on home financing good practice and determined risk limits.

Keywords: risk transfer, home financing contract, Sharia compliant, Malaysia

Procedia PDF Downloads 388
5036 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 166
5035 Hear My Voice: The Educational Experiences of Disabled Students

Authors: Karl Baker-Green, Ian Woolsey

Abstract:

Historically, a variety of methods have been used to access the student voice within higher education, including module evaluations and informal classroom feedback. However, currently, the views articulated in student-staff-committee meetings bear the most weight and can therefore have the most significant impact on departmental policy. Arguably, these forums are exclusionary as several students, including those who experience severe anxiety, might feel unable to participate in this face-to-face (large) group activities. Similarly, students who declare a disability, but are not in possession of a learning contract, are more likely to withdraw from their studies than those whose additional needs have been formally recognised. It is also worth noting that whilst the number of disabled students in Higher Education has increased in recent years, the percentage of those who have been issued a learning contract has decreased. These issues foreground the need to explore the educational experiences of students with or without a learning contract in order to identify their respective aspirations and needs and therefore help shape education policy. This is in keeping with the ‘Nothing about us without us’, agenda, which recognises that disabled individuals are best placed to understand their own requirements and the most effective strategies to meet these.

Keywords: education, student voice, student experience, student retention

Procedia PDF Downloads 75