4985 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 102
4984 Price to Earnings Growth (PEG) Predicting Future Returns Better than the Price to Earnings (PE) Ratio

Authors: Lindrianasari Stefanie, Aminah Khairudin

Abstract:

This study aims to provide empirical evidence regarding the ability of Price to Earnings Ratio and PEG Ratio in predicting future stock returns issuers. The samples used in this study are stocks that go into LQ45. The main contribution is to assign empirical evidence if the PEG Ratio can provide optimum return compared to Price to Earnings Ratio. This study used a sample of the entire company into the group LQ45 with the period of observation. The data used is limited to the financial statements of a company incorporated in LQ45 period July 2013-July 2014, using the financial statements and the position of the company's closing stock price at the end of 2010 as a reference benchmark for the growth of the company's stock price compared to the closing price of 2013. This study found that the method of PEG Ratio can outperform the method of PE ratio in predicting future returns on the stock portfolio of LQ45.

Keywords: price to earnings growth, price to earnings ratio, future returns, stock price

Procedia PDF Downloads 387
4983 Accounting Performance of the Leading Companies in the Construction Sector in Brazil during the Period 2009-2012

Authors: Fabrício José Piacente, Vanessa de Cillos Silva, Thiago Luiz Mello Melato

Abstract:

The construction industry has been demonstrating increased growth and importance in Brazil’s national economic development. This study aims to evaluate the financial performance of the leading companies in the construction sector in Brazil in the period from 2009 to 2012. An analysis is made of the capital structure, liquidity, and profitability of the six largest companies in the construction sector in Brazil: Brookfield, Cyrela, Gafisa, MRV, PDG and Rossi. The results are then compared with standard industry ratios. It was found that among the companies analyzed, MRV and Cyrela showed the best relative performance in the period under consideration.

Keywords: accounting ratios, construction, financial performance, Brazil

Procedia PDF Downloads 412
4982 Designing an App to Solve Surveying Challenges

Authors: Ali Mohammadi

Abstract:

Forming and equipping the surveyors team for construction projects such as dams, roads, and tunnels is always one of the first challenges and hiring surveyors who are proficient in reading maps and controlling structures, purchasing appropriate surveying equipment that the employer can find Also, using methods that can save time, in the bigger the project, the more these challenges show themselves. Finding a surveyor engineer who can lead the teams and train surveyors of the collection and buy TOTAL STATION according to the company's budget and the surveyors' ability to use them and the time available to each team In the following, we will introduce a surveying app and examine how to use it, which shows how useful it can be for surveyors in projects.

Keywords: DTM CUTFILL, datatransfer, section, tunnel, traverse

Procedia PDF Downloads 53
4981 Sustainable Practices through Organizational Internal Factors among South African Construction Firms

Authors: Oluremi I. Bamgbade, Oluwayomi Babatunde

Abstract:

Governments and nonprofits have been in the support of sustainability as the goal of businesses especially in the construction industry because of its considerable impacts on the environment, economy, and society. However, to measure the degree to which an organisation is being sustainable or pursuing sustainable growth can be difficult as a result of the clear sustainability strategy required to assume their commitment to the goal and competitive advantage. This research investigated the influence of organisational culture and organisational structure in achieving sustainable construction among South African construction firms. A total of 132 consultants from the nine provinces in South Africa participated in the survey. The data collected were initially screened using SPSS (version 21) while Partial Least Squares Structural Equation Modeling (PLS-SEM) algorithm and bootstrap techniques were employed to test the hypothesised paths. The empirical evidence also supported the hypothesised direct effects of organisational culture and organisational structure on sustainable construction. Similarly, the result regarding the relationship between organisational culture and organisational structure was supported. Therefore, construction industry can record a considerable level of construction sustainability and establish suitable cultures and structures within the construction organisations. Drawing upon organisational control theory, these findings supported the view that these organisational internal factors have a strong contingent effect on sustainability adoption in construction project execution. The paper makes theoretical, practical and methodological contributions within the domain of sustainable construction especially in the context of South Africa. Some limitations of the study are indicated, suggesting opportunities for future research.

Keywords: organisational culture, organisational structure, South African construction firms, sustainable construction

Procedia PDF Downloads 258
4980 The City Ecological Corridor Construction Based on the Concept Of "Sponge City"(Case Study: Lishui)

Authors: Xu Mengyuan, Xu Lei

Abstract:

Behind the rapid development of Chinese city, the contradiction of frequent urban waterlogging and the shortage of water resources is deepening. In order to solve this problem, introduce the low impact development "sponge city" construction mode in the process of the construction of new urbanization in China, make our city " resilience to adapt" environmental change and natural disaster. Firstly this paper analyses the basic reason of urban waterlogging, then introduces the basic connotation and realization approach of “sponge city”. Finally, study on the project in Lishui Guazhou, focuses on the analysis of the "urban ecological corridor" construction strategy and the positive impact on city in the construction of “sponge city”. Meanwhile, we put forward the ”local conditions” and ”sustainable” as the construction ideas, make use of ecological construction leading city development, explore the ecological balance through the city to enhance the regional value, and providing reference and reflection for the development and future of the “sponge city” in China.

Keywords: urban water logging, sponge city, urban ecological corridor, sustainable development, China

Procedia PDF Downloads 613
4979 Safety Factors for Improvement of Labor's Health and Safety in Construction Industry of Pakistan

Authors: Ahsan Ali Khan

Abstract:

During past few years, researchers are emphasizing more on the need of safety in construction industry. This need of safety is an important issue in developing countries. As due to development they are facing huge construction growth. This research is done to evaluate labor safety condition in construction industry of Pakistan. The research carried out through questionnaire survey at different construction sites. Useful data are gathered from these sites which then factor analyzed resulting in five factors. These factors reflect that most of the workers are aware of the safety need, but they divert this responsibility towards management and claim that the work is more essential for management instead of safety. Moreover, those work force which is unaware of safety state that there is lack of any training and guidance from upper management which lead to many unfavorable events on construction sites. There is need of implementation safety activities by management like training, formulation of rules and policies. This research will be helpful to divert management attention towards safety need so they will make efforts for safety of their manpower—the workers.

Keywords: labor's safety, management role, Pakistan, safety factors

Procedia PDF Downloads 161
4978 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 195
4977 Waste Generation in Iranian Building Industry: Addressing a Theory

Authors: Golnaz Moghimi, Alireza Afsharghotli, Alireza Rezaei

Abstract:

Construction waste has been gradually increased as a result of upsizing construction projects which are occurred within the lifecycle of buildings. Since waste management is a major priority and has profound impacts on the volume of waste generated in construction stage, the majority of efforts have been attempted to reuse, recycle and reduce waste. However, there is still room to study on lack of sufficient knowledge about waste management in construction industry. This paper intends to provide an insight into the effect of project management knowledge areas on waste management solely on construction stage. To this end, a survey among Iranian building construction industry contractors was conducted to identify the effectiveness of project management knowledge areas on three jobsite key factors including ‘Site activity’, ‘Training’, and ‘Awareness’. As a result, four management disciplines were identified as most influential ones on amount of construction waste. These disciplines were Project Cost Management, Quality Management, Human Resource Management, and Integration Management. Based on the research findings, a new model was presented to develop effective construction waste strategies.

Keywords: awareness, PMBOK, site activity, training, waste management

Procedia PDF Downloads 312
4976 Finite Dynamic Programming to Decision Making in the Use of Industrial Residual Water Treatment Plants

Authors: Oscar Vega Camacho, Andrea Vargas, Ellery Ariza

Abstract:

This paper presents the application of finite dynamic programming, specifically the "Markov Chain" model, as part of the decision making process of a company in the cosmetics sector located in the vicinity of Bogota DC. The objective of this process was to decide whether the company should completely reconstruct its waste water treatment plant or instead optimize the plant through the addition of equipment. The goal of both of these options was to make the required improvements in order to comply with parameters established by national legislation regarding the treatment of waste before it is released into the environment. This technique will allow the company to select the best option and implement a solution for the processing of waste to minimize environmental damage and the acquisition and implementation costs.

Keywords: decision making, markov chain, optimization, waste water

Procedia PDF Downloads 383
4975 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 311
4974 UNIX Source Code Leak: Evaluation and Feasible Solutions

Authors: Gu Dongxing, Li Yuxuan, Nong Tengxiao, Burra Venkata Durga Kumar

Abstract:

Since computers are widely used in business models, more and more companies choose to store important information in computers to improve productivity. However, this information can be compromised in many cases, such as when it is stored locally on the company's computers or when it is transferred between servers and clients. Of these important information leaks, source code leaks are probably the most costly. Because the source code often represents the core technology of the company, especially for the Internet companies, source code leakage may even lead to the company's core products lose market competitiveness, and then lead to the bankruptcy of the company. In recent years, such as Microsoft, AMD and other large companies have occurred source code leakage events, suffered a huge loss. This reveals to us the importance and necessity of preventing source code leakage. This paper aims to find ways to prevent source code leakage based on the direction of operating system, and based on the fact that most companies use Linux or Linux-like system to realize the interconnection between server and client, to discuss how to reduce the possibility of source code leakage during data transmission.

Keywords: data transmission, Linux, source code, operating system

Procedia PDF Downloads 221
4973 Developing an Information Model of Manufacturing Process for Sustainability

Authors: Jae Hyun Lee

Abstract:

Manufacturing companies use life-cycle inventory databases to analyze sustainability of their manufacturing processes. Life cycle inventory data provides reference data which may not be accurate for a specific company. Collecting accurate data of manufacturing processes for a specific company requires enormous time and efforts. An information model of typical manufacturing processes can reduce time and efforts to get appropriate reference data for a specific company. This paper shows an attempt to build an abstract information model which can be used to develop information models for specific manufacturing processes.

Keywords: process information model, sustainability, OWL, manufacturing

Procedia PDF Downloads 400
4972 Abusing Business Rescue Proceedings by a Director and Its Impact on the Ethics of Good Corporate Governance

Authors: Simphiwe Phungula

Abstract:

In the past few years, the impact of Covid 19 in South Africa has given rise to the need for business rescue proceedings where businesses are financially distressed. Even more, the looting unrest and floods in certain parts of South Africa have also played an impact on businesses’ financial stress. To help financially distressed companies in South Africa, the Companies Act (“the Act”) has introduced a business rescue procedure aimed at helping those ailing companies. This mechanism is aimed at rehabilitating financially distressed companies so that they become solvent again and if it is not possible, results in a better return for the company’s creditors or shareholders than would result from the immediate liquidation of the company. Unfortunately, since the introduction of business rescue, evidence has shown that sometimes companies resort to business rescue proceedings to seek refuge from creditors even if the facts do not justify that the company should commence business rescue. In most cases, the abuse of business rescue is done by directors who pass a resolution that the company should embark on business rescue even if evidence shows that the company should not commence the proceedings. This is done notwithstanding the principles of King Code IV which requires ethics and good governance on the part of directors. This paper demonstrates how the abuse of business rescue can impact the principles of good governance and ethics of King Code IV. It argues that directors should rethink their corporate practices, and ethical standards when passing a resolution to commence business rescue proceedings.

Keywords: business rescue, king code, corporate governance, ethics

Procedia PDF Downloads 72
4971 An Investigation on the Relationship between Taxi Company Safety Climate and Safety Performance of Taxi Drivers in Iloilo City

Authors: Jasper C. Dioco

Abstract:

The study was done to investigate the relationship of taxi company safety climate and drivers’ safety motivation and knowledge on taxi drivers’ safety performance. Data were collected from three Taxi Companies with taxi drivers as participants (N = 84). The Hiligaynon translated version of Transportation Companies’ Climate Scale (TCCS), Safety Motivation and Knowledge Scale, Occupational Safety Motivation Questionnaire and Global Safety Climate Scale were used to study the relationships among four parameters: (a) Taxi company safety climate; (b) Safety motivation; (c) Safety knowledge; and (d) Safety performance. Correlational analyses found that there is no relation between safety climate and safety performance. A Hierarchical regression demonstrated that safety motivation predicts the most variance in safety performance. The results will greatly impact how taxi company can increase safe performance through the confirmation of the proximity of variables to organizational outcome. A strong positive safety climate, in which employees perceive safety to be a priority and that managers are committed to their safety, is likely to increase motivation to be safety. Hence, to improve outcomes, providing knowledge based training and health promotion programs within the organization must be implemented. Policy change might include overtime rules and fatigue driving awareness programs.

Keywords: safety climate, safety knowledge, safety motivation, safety performance, taxi drivers

Procedia PDF Downloads 156
4970 Identifying the Level of Awareness on Value Management Practice amongst Construction Practitioners in Nigeria

Authors: Alhassan Dahiru

Abstract:

Value management is widely accepted technique of eliminating unnecessary cost at different stages of project development that maximizes the functional value of a project by managing its evolution and development from concept to completion. Many construction industry practitioners are not aware of Value Management practice, and its use is less widespread in Nigeria. The aim of this research is to identify the level of awareness on value management practice amongst construction practitioners with a view to contribute to the improvement of the implementation of value management practice in the Nigerian construction industry. In this study, construction practitioners have been chosen as respondents from the 6 geopolitical zones of the federation including FCT Abuja. Through the survey, a total number of 360 semi-structured questionnaires were administered and 284 were returned and remained good for the analysis. The results indicate that most of the respondents were aware of the value management concept and issues surrounding construction industry in Nigeria, while about 32% of the respondents were not aware of its potential benefits. Therefore, organisations should review their techniques and processes from time to time for improvement on effective service delivery. Additionally, a change management strategy should also be part of every organization to ease the introduction of new techniques such as value management. There is also the need for more value management training workshops and seminars in order to enlighten the participants of the construction industry on the principles, concept, and techniques involved in the value management process.

Keywords: sustainability, value management, construction practitioners, Nigeria

Procedia PDF Downloads 202
4969 Building Learning Organization: Case Study of Transforming a Banking Company with 21st Century Creative Services Company

Authors: Zeynep Aykul Yavuz

Abstract:

Misconception about design is about making a product pretty. However, the holistic approaches such as design thinking or human-centered design could take the design from making things nice to things inspired by real people and work with real-world limitations. Design thinking helps companies to understand not only problem area but also opportunities. It can be used by any people from any background which provide a space for companies where employees from different departments work together to solve the same problem. While demanding skills changing year to year into the market, previous technical skills are commons anymore. The frontier companies in the sectors look for interactive methods to solve problems. Moreover, the recruiter aims to understand the candidate’s design thinking skills (. The study includes a case study where a 21st century creative services company “ATÖLYE” offers innovation transformation with design thinking to a banking company. Both companies are located in İstanbul in Turkey. The banking company contacted with the ATÖLYE in January 2018 because they heard design thinking in different markets and how it transformed the way of working. The transformation process had 3 phases which were basic training of teams while getting coaching from ATÖLYE’s employees, coaching training with graduates of basic training, facilitator training. Employees built new skills while solving the banking company’s strategic problems. ATÖLYE offered experiential learning which helped employees’ making sense of new skills and knowledge. One day workshops were organized to create awareness about the practice of design thinking. In addition to these, a community of practice was built to create an environment to make reflections and discuss good practice. Not only graduates from the training program but also other employees from the company participated in the community gatherings. ATÖLYE did not train some employees in the company. Rather than that, its aim was to build a contemporary organization for the company. This provided a sustainable system in terms of human resources and motivation. At the beginning of 2020, employees from the first cohort in the basic training who took coaching training and facilitator training have started to design training for different groups in the company. They have considered what could be better in their training experience and designed new ones according to that, so they have been using design thinking to design the design training. This is one of the outcomes which shows the impact of all process clearly.

Keywords: design thinking, learning community, professional development, training, organizational transformation

Procedia PDF Downloads 94
4968 Corporate Cultures Management towards the Retention of Employees: Case Study Company in Thailand

Authors: Duangsamorn Rungsawanpho

Abstract:

The objectives of this paper are to explore the corporate cultures management as determinants of employee retention company in Thailand. This study using mixed method methodology. Data collection using questionnaires and in-depth interviews. The statistics used for data analysis were percentage, mean, standard deviation and inferential statistics will include. The results show that the corporate management culture is perfect for any organization but it depends on the business and the industry because the situations or circumstances that corporate executives are met is different. Because the finding explained that the employees of the company determine the achievement of value-oriented by the corporate culture and international relations is perceived most value for their organizations. In additional we found the employees perceiving with participation can be interpreted as a positive example, many employees feel that they are part of management because they care about their opinions or ideas related with their work.

Keywords: corporate culture, employee retention, retention of employees, management approaches

Procedia PDF Downloads 277
4967 Research on Contract's Explicit Incentive and Reputation's Implicit Incentive Mechanism towards Construction Contractors

Authors: Li Ma, Meishuang Ma, Mengying Huang

Abstract:

The quality of construction projects reflects the credit and responsibilities of construction contractors for the owners and the whole society. Because the construction contractors master more relevant information about the entrusted engineering project under construction while the owners are in unfavorable position of gaining information, asymmetric information may lead the contractors act against the owners in order to pursue their own interests. Building a powerful motivation mechanism is the key to guarantee investor economic interests and the life and property of users in construction projects. Based on principal-agent theory and game theory, the authors develop relevant mathematical models to analyze and compare the contractor’s utility functions under different combinations of contracts’ explicit incentive mechanism and reputation’s implicit incentive mechanism aiming at finding out the conditions for incentive validity. The research concludes that the most rational motivation way is to combine the explicit and implicit incentive effects of both contracts and reputation mechanism, and puts forth some measures for problems on account of China’s current situation.

Keywords: construction contractors, contract, reputation, incentive mechanism

Procedia PDF Downloads 481
4966 Innovative Housing Construction Technologies in Slum Upgrading

Authors: Edmund M. Muthigani

Abstract:

Innovation in the construction industry has been characterized by new products and processes especially in slum upgrading. The need for low cost housing has motivated stakeholders to think outside the box in coming up with solutions. This paper explored innovative construction technologies that have been used in slum upgrading. The main objectives of the paper was to examine innovations in the construction housing sector and to show how incremental derived demand for decent housing has led to adoption of innovative technologies and materials. Systematic literature review was used to review studies on innovative construction technologies in slum upgrading. The review revealed slow process of innovations in the construction industry due to risk aversion by firms and the hesitance to adopt by firms and individuals. Low profit margins in low cost housing and lack of sufficient political support remain the major hurdles to innovative techniques adoption that can actualize right to decent housing. Conventional construction materials have remained unaffordable to many people and this has negated them decent housing. This has necessitated exploration of innovative materials to realize low cost housing. Stabilized soil blocks and sisal-cement roofing blocks are some of the innovative construction materials that have been utilized in slum upgrading. These innovative materials have not only lowered the cost of production of building elements but also eased costs of transport as the raw materials to produce them are readily available in or within the slum sites. Despite their shortcomings in durability and compressive strength, they have proved worthwhile in slum upgrading. Production of innovative construction materials and use of innovative techniques in slum upgrading also provided employment to the locals.

Keywords: construction, housing, innovation, slum, technology

Procedia PDF Downloads 176
4965 Application of Finite Dynamic Programming to Decision Making in the Use of Industrial Residual Water Treatment Plants

Authors: Oscar Vega Camacho, Andrea Vargas Guevara, Ellery Rowina Ariza

Abstract:

This paper presents the application of finite dynamic programming, specifically the "Markov Chain" model, as part of the decision making process of a company in the cosmetics sector located in the vicinity of Bogota DC. The objective of this process was to decide whether the company should completely reconstruct its wastewater treatment plant or instead optimize the plant through the addition of equipment. The goal of both of these options was to make the required improvements in order to comply with parameters established by national legislation regarding the treatment of waste before it is released into the environment. This technique will allow the company to select the best option and implement a solution for the processing of waste to minimize environmental damage and the acquisition and implementation costs.

Keywords: decision making, Markov chain, optimization, wastewater

Procedia PDF Downloads 460
4964 Environmental Decision Making Model for Assessing On-Site Performances of Building Subcontractors

Authors: Buket Metin

Abstract:

Buildings cause a variety of loads on the environment due to activities performed at each stage of the building life cycle. Construction is the first stage that affects both the natural and built environments at different steps of the process, which can be defined as transportation of materials within the construction site, formation and preparation of materials on-site and the application of materials to realize the building subsystems. All of these steps require the use of technology, which varies based on the facilities that contractors and subcontractors have. Hence, environmental consequences of the construction process should be tackled by focusing on construction technology options used in every step of the process. This paper presents an environmental decision-making model for assessing on-site performances of subcontractors based on the construction technology options which they can supply. First, construction technologies, which constitute information, tools and methods, are classified. Then, environmental performance criteria are set forth related to resource consumption, ecosystem quality, and human health issues. Finally, the model is developed based on the relationships between the construction technology components and the environmental performance criteria. The Fuzzy Analytical Hierarchy Process (FAHP) method is used for weighting the environmental performance criteria according to environmental priorities of decision-maker(s), while the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method is used for ranking on-site environmental performances of subcontractors using quantitative data related to the construction technology components. Thus, the model aims to provide an insight to decision-maker(s) about the environmental consequences of the construction process and to provide an opportunity to improve the overall environmental performance of construction sites.

Keywords: construction process, construction technology, decision making, environmental performance, subcontractor

Procedia PDF Downloads 217
4963 Characterization of Copper Slag and Jarofix Waste Materials for Road Construction

Authors: V. K. Arora, V. G. Havanagi, A. K. Sinha

Abstract:

Copper slag and Jarofix are waste materials, generated during the manufacture of copper and zinc respectively, which have potential for utility in embankment and road construction. Accordingly, a research project was carried out to study the characteristics of copper slag and Jarofix to utilize in the construction of road. In this study, copper slag and Jarofix were collected from Tuticorin, State of Tamil Nadu and Hindustan Zinc Ltd., Chittorgarh, Rajasthan state, India respectively. These materials were investigated for their physical, chemical, and geotechnical characteristics. The materials were collected from the disposal area and laboratory investigations were carried out to study its feasibility for use in the construction of embankment and sub grade layers of road pavement. This paper presents the results of physical, chemical and geotechnical characteristics of copper slag and Jarofix. It was concluded that copper slag and Jarofix may be utilized in the construction of road.

Keywords: copper slag, Jarofix waste, material, road construction

Procedia PDF Downloads 418
4962 Lean Implementation: Manufacturing vs. Construction a Roadmap for Success

Authors: Patrick Ahern, David Collery

Abstract:

The implementation of lean thinking in the manufacturing industry revolutionized the traditional approach to large-scale production through the process of identifying the waste in each task and putting in place mitigation measures to eliminate the waste in all its forms. The Irish construction industry, however, has been much slower to adopt the principles of lean, opting instead to stick with the traditional approach to construction project delivery which is inherently wasteful. Lean thinking holds the potential to revolutionize the construction industry in a similar manner to the adoption of lean manufacturing. Lean principles present opportunities for reduced project duration, reduced project cost, improved quality, and elimination of re-works and non-value-added activities. The following research has been designed to accumulate research data through available literature, electronic surveys, and interviews. The results show an industry reluctant to accept change and an undefined path to successful lean construction implementation.

Keywords: barriers, lean construction, lean implementation, lean manufacturing, lean philosophy

Procedia PDF Downloads 50
4961 General Principles of Accident Prevention in Built Environment Rehabilitation

Authors: Alfredo Soeiro

Abstract:

Rehabilitation in construction or built environment is a particular type of operations when concerning prevention of accidents. In fact, it is also a different type of task in construction itself. Therefore, due to the complex characteristics of construction rehabilitation tasks and due to the intrinsic difficulty of preventing accidents in construction, a major challenge faces the responsibility for implementing adequate safety levels in this type of safety management. This paper addresses a set of proposed generic measures to face the unknown characteristics of built environment in terms of stability, materials and actual performance of buildings or other constructions. It is also addressed the necessary adaptation of preventive guidelines to this type of delicate refurbishing and renovating of existing facilities. Training, observation and reflective approaches are necessary to perform this safety management in the rehabilitation of built environment.

Keywords: built environment, rehabilitation, construction safety, accident prevention, safety plan

Procedia PDF Downloads 178
4960 The Relationship between Organizational Political Behavior and Moral Values with Work Engagement in Sport Employees of National Iranian Gas Company

Authors: Seyed Salahedin Naghshbandi, Mahnaz Ahmadikhatir, Siavash Hamidzadeh

Abstract:

The purpose of this study was to investigate the relationship between organizational political behavior and ethical values with the job enthusiasm of the sport personnel of the National Iranian Gas Company. The population of this research included all personnel of the National Iranian Gas Company's sports personnel (150 people). For collecting information, library resources and three questionnaires, organizational political behavior by Kaspar and Carlsen (1997), Lewall's moral values questionnaire (1986) and job enthusiasm questionnaire Schaufeli & Bekker (2003) have been used. Validity of the questionnaires was confirmed by university professors. Using Cronbach alpha correlation coefficient, the reliability of the organizational political behavior questionnaire was 0.92, the moral values questionnaire was 0.86 and the Schaufeli & Baker job enthusiasm questionnaire was 0.91-0.96. The results of this research show a significant, direct and positive relationship between the components of job aspiration with political behavior and ethical values. Therefore, managers of organizations should, as far as possible, remove political behaviors from the organization and be able to institutionalize ethical values in their organization so that they can increase employee eagerness.

Keywords: political behavior, ethical values, job enthusiasm, staff, national Iranian gas company

Procedia PDF Downloads 88
4959 Concrete Recycling in Egypt for Construction Applications: A Technical and Financial Feasibility Model

Authors: Omar Farahat Hassanein, A. Samer Ezeldin

Abstract:

The construction industry is a very dynamic field. Every day new technologies and methods are developing to fasten the process and increase its efficiency. Hence, if a project uses fewer resources, it will be more efficient. This paper examines the recycling of concrete construction and demolition (C&D) waste to reuse it as aggregates in on-site applications for construction projects in Egypt and possibly in the Middle East. The study focuses on a stationary plant setting. The machinery set-up used in the plant is analyzed technically and financially. The findings are gathered and grouped to obtain a comprehensive cost-benefit financial model to demonstrate the feasibility of establishing and operating a concrete recycling plant. Furthermore, a detailed business plan including the time and hierarchy is proposed.

Keywords: construction wastes, recycling, sustainability, financial model, concrete recycling, concrete life cycle

Procedia PDF Downloads 386
4958 A Conceptual Framework of Impact of Lean on the Performance of Construction Industry

Authors: Jaber Shurrab, Matloub Hussain

Abstract:

The rapid pace of changes in the construction industry, technological advancements, and rising costs present tremendous challenges for project managers. Project managers are under severe pressure to minimize the waste, improve the efficiency of the entire operations and the philosophy of ‘lean thinking’ so that ‘more could be achieved with less’ is becoming very popular. Though, lean management has strong roots in manufacturing industry and over the last decade lean philosophy has started gaining attention in the service industry as well. However, little has been known in the context of waste minimization and lean implementation in the construction industry and this paper deals with this important issue. The primary objective of this paper is to propose a conceptual framework for the exploration of appropriate lean techniques applicable to medium and large construction companies and measure their impact on the competitiveness and economic performance of construction companies of United Arab Emirates (UAE). To this end, a comprehensive literature review and interviews with eight project managers of medium and large construction companies of UAE have been conducted. It has been found that competitive, reduce waste and costs are critical to the construction industry. This is an ongoing research in lean management, giving project managers a practical framework for improving the efficiency of their project through various lean techniques. Originality/value: Research significance emphasizes increasing the effectiveness of the construction industry, influences the development of lean construction framework which improves lean construction practices using the lean techniques. This contributes to the effort of applying lean techniques in the construction industry. Limited publications were done in the construction industry mainly in United Arab Emirates (UAE) compared to the lean manufacturing. This research will recommend a systematic approach for the implementing of the anticipated framework within a cyclical look-ahead period and emphasizes the practical implications of the proposed approach.

Keywords: construction, lean, lean manufacturing, waste

Procedia PDF Downloads 257
4957 Assessment of Human Factors Analysis and Classification System in Construction Accident Prevention

Authors: Zakari Mustapha, Clinton Aigbavboa, Wellington Didi Thwala

Abstract:

Majority of the incidents and accidents in complex high-risk systems that exist in the construction industry and other sectors have been attributed to unsafe acts of workers. The purpose of this paper was to asses Human Factors Analysis and Classification System (HFACS) in construction accident prevention. The study was conducted through the use of secondary data from journals, books and internet to achieve the objective of the study. The review of literature looked into details of different views from different scholars about HFACS framework in accidents investigations. It further highlighted on various sections or disciplines of accident occurrences in human performance within the construction. The findings from literature review showed that unsafe acts of a worker and unsafe working conditions are the two major causes of accident in the construction industry.Most significant factor in the cause of site accident in the construction industry is unsafe acts of a worker. The findings also show how the application of HFACS framework in the investigation of accident will lead to the identification of common trends. Further findings show that provision for the prevention of accident will be made based on past accident records to identify and prioritize where intervention is needed within the construction industry.

Keywords: accident, construction, HFACS, unsafe acts

Procedia PDF Downloads 297
4956 Application of Griddization Management to Construction Hazard Management

Authors: Lingzhi Li, Jiankun Zhang, Tiantian Gu

Abstract:

Hazard management that can prevent fatal accidents and property losses is a fundamental process during the buildings’ construction stage. However, due to lack of safety supervision resources and operational pressures, the conduction of hazard management is poor and ineffective in China. In order to improve the quality of construction safety management, it is critical to explore the use of information technologies to ensure that the process of hazard management is efficient and effective. After exploring the existing problems of construction hazard management in China, this paper develops the griddization management model for construction hazard management. First, following the knowledge grid infrastructure, the griddization computing infrastructure for construction hazards management is designed which includes five layers: resource entity layer, information management layer, task management layer, knowledge transformation layer and application layer. This infrastructure will be as the technical support for realizing grid management. Second, this study divides the construction hazards into grids through city level, district level and construction site level according to grid principles. Last, a griddization management process including hazard identification, assessment and control is developed. Meanwhile, all stakeholders of construction safety management, such as owners, contractors, supervision organizations and government departments, should take the corresponding responsibilities in this process. Finally, a case study based on actual construction hazard identification, assessment and control is used to validate the effectiveness and efficiency of the proposed griddization management model. The advantage of this designed model is to realize information sharing and cooperative management between various safety management departments.

Keywords: construction hazard, griddization computing, grid management, process

Procedia PDF Downloads 243