Search results for: informal construction practices
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8471

Search results for: informal construction practices

8321 Zoonotic Risk Practices in Rural Households in the Penka-Michel Health District (West Cameroon)

Authors: Namekong Fokeng Armand

Abstract:

Background: Zoonoses are nowadays a serious public health problem in both developing and developed countries. They contribute to increase the economic burden. In case of emergence, rural populations are the most affected, hence the need to investigate risk practices in rural households of Penka-Michel (West Cameroon). Methods: This cross-sectional study was conducted from October to November 2021 among 200 heads of households living in the Penka-Michel health district (West Cameroon). It was done using a pre-tested and validated questionnaire, allowing to obtain socio-demographic, economic data, and data on zoonotic risk practices. Results: The participants [women (56%), men (44%)] worked mainly in the informal private sector (53%) and practiced agriculture secondarily (90%). Their highest level of education, for the most part, was a secondary school (50%); the average household size was 06 persons with a monthly income > 36270 FCFA (72%). 74% of household heads thought that animals can transmit diseases, and 17% had heard about zoonotic diseases through the media (65%). Rats caught in households (60%) were consumed there (74%), as was bush meat (61%) or dog meat (18%). For family food (90%), animals were slaughtered within the household (97%), rarely preceded by a veterinary inspection (6%). 87% of households practiced traditional rites with animal blood, 65% shared the same habitat as their animals, 41% did not systematically wash their hands after handling animals. More than 50% of households owned one or more dogs, usually strays (41%) and 48% of which were vaccinated (rabies). Many households had at least one: poultry (98%); pig (50%); dog (57%), cat (52%). 25% of households slaughtered sick animals for consumption, and 27% ate dead animals. Conclusion: This study identified numerous zoonotic risk practices in households in the Penka-Michel health district (West Cameroon). Concerted, multisectoral communication / awareness-raising actions are needed to break with these practices.

Keywords: zoonoses, risky practices, rural households, penka-michel, cameroon

Procedia PDF Downloads 170
8320 Low Enrollment in Antiretroviral Treatment among Pregnant Women Screened HIV Infected in Informal Health Centers in Cameroon

Authors: Lydie Audrey Amboua Schouame, Sylvie Kwedi Nolna, Antoine Socpa, Alexandre Benjamin Nkoum

Abstract:

Background: Despite the struggle of the Cameroonian Ministry of Public Health against informal health centers (IHCs) because of their illegality, IHCs are booming in Cameroon and a large part of the population uses them. In 2017, more than 3.000 IHCs were counted across the country. Most of these IHCs have antenatal clinics and they screen pregnant women for HIV. However, there is no data on the Prevention of Mother-To-Child Transmission of HIV (PMTCT) in this informal health sector in Cameroon. This study aimed to investigate the initiation of Antiretroviral treatment (ART) in pregnant women screened HIV positive in IHCs and associated factors. Methods: From January 01, 2018, to June 30, 2020, we carried out a cohort study of pregnant women attending their first antenatal visit and screened HIV positive in informal health centers in the cities of Douala and Ebolowa in Cameroon. Consenting participants were interviewed at two points: at least one week after delivery of the HIV result and three months later. The collected data were entered into Kobo collected and analyzed in SPSS V23.0 software. Results: A total of 182 HIV-infected pregnant women were enrolled in the study. The median age at enrollment was 30 years (IQR, 24-34) and the median gestational age at first ANC was 25 weeks (IQR, 19-31). Overall 61% (111/182) had a secondary level of education, 65% (118/182) were married/in a common-law relationship and 69% (126/182) had no income activity. At their first ANC, 91% (166/182) were naïve to ARV treatment. Among them, only 45% (74/166) initiated ART. The median delay in initiating ARV treatment was 5 days (IQR, 0-25). Of those who have started ART, only 64% (48/74) remained on treatment 3 months later. Conclusion: In order to eliminate mother-to-child transmission of HIV, attention should be paid to IHCs.

Keywords: informal health centers, human immunodeficiency, antiretroviral treatment, pregnant women

Procedia PDF Downloads 155
8319 Research on Container Housing: A New Form of Informal Housing on Urban Temporary Land

Authors: Lufei Mao, Hongwei Chen, Zijiao Chai

Abstract:

Informal housing is a widespread phenomenon in developing countries. In many newly-emerging cities in China, rapid urbanization leads to an influx of population as well as a shortage of housing. Under this background, container housing, a new form of informal housing, gradually appears on a small scale on urban temporary land in recent years. Container housing, just as its name implies, transforms containers into small houses that allow migrant workers group to live in it. Scholars in other countries have established sound theoretical frameworks for informal housing study, but the research fruits seem rather limited on this small scale housing form. Unlike the cases in developed countries, these houses, which are outside urban planning, bring about various environmental, economic, social and governance issues. Aiming to figure out this new-born housing form, a survey mainly on two container housing settlements in Hangzhou, China was carried out to gather the information of them. Based on this thorough survey, the paper concludes the features and problems of infrastructure, environment and social communication of container housing settlements. The result shows that these containers were lacking of basic facilities and were restricted in a small mess temporary land. Moreover, because of the deficiency in management, the rental rights of these containers might not be guaranteed. Then the paper analyzes the factors affecting the formation and evolution of container housing settlements. It turns out that institutional and policy factors, market factors and social factors were the main three factors that affect the formation. At last, the paper proposes some suggestions for the governance of container housing and the utility pattern of urban temporary land.

Keywords: container housing, informal housing, urban temporary land, urban governance

Procedia PDF Downloads 257
8318 Analyzing Sociocultural Factors Shaping Architects’ Construction Material Choices: The Case of Jordan

Authors: Maiss Razem

Abstract:

The construction sector is considered a major consumer of materials that undergoes processes of extraction, processing, transportation, and maintaining when used in buildings. Several metrics have been devised to capture the environmental impact of the materials consumed during construction using lifecycle thinking. Rarely has the materiality of this sector been explored qualitatively and systemically. This paper aims to explore socio-cultural forces that drive the use of certain materials in the Jordanian construction industry, using practice theory as a heuristic method of analysis, more specifically Shove et al. three-element model. By conducting semi-structured interviews with architects, the results unravel contextually embedded routines when determining qualities of three materialities highlighted herein; stone, glass and spatial openness. The study highlights the inadequacy of only using efficiency as a quantitative metric of sustainable materials and argues for the need to link material consumption with socio-economic, cultural, and aesthetic driving forces. The operationalization of practice theory by tracing materials’ lifetimes as they integrate with competencies and meanings captures dynamic engagements through the analyzed routines of actors in the construction practice. This study can offer policymakers better-nuanced representation to green this sector beyond efficiency rhetoric and quantitative metrics.

Keywords: architects' practices, construction materials, Jordan, practice theory

Procedia PDF Downloads 169
8317 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.

Keywords: final account closing, construction project, construction delay, supply chain management

Procedia PDF Downloads 366
8316 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 104
8315 The Experience of Applying Multi-Sensory Stimulation ICU for Arousing a Patient with Traumatic Brain Injury in Intensive Care

Authors: Hsiao-Wen Tsai

Abstract:

Motor vehicle accident is the first cause of head injury in the world; severe head injury cases may cause conscious disturbance and death. This is a report about a case of a young adult patient suffering from motor vehicle accident leading to severe head injury who passed through three time surgical procedures, and his mother (who is the informal caregiver). This case was followed from 28th January to 15th February 2011 by using Gordon’s 11 functional health patterns. Patient’s cognitive-perceptual and self-perception-self-concept patterns were altered. Anxiety was also noted on his informal caregiver due to patients’ condition. During the intensive care period, maintaining patient’s vital signs and cerebral perfusion pressure were essential to avoid secondary neuronal injury. Multi-sensory stimulation, caring accompanying, supporting, listening and encouraging patient’s family involved in patient care were very important to reduce informal caregiver anxiety. Finally, the patient consciousness improved from GCS 4 to GCS 11 before discharging from ICU. Patient’s primary informal caregiver, his mother, also showed anxiety improvement. This is was successful case with traumatic brain injury recovered from coma.

Keywords: anxiety, multi-sensory stimulation, reduce intracranial adaptive capacity, traumatic brain injury

Procedia PDF Downloads 267
8314 Construction and Demolition Waste Management in Indian Cities

Authors: Vaibhav Rathi, Soumen Maity, Achu R. Sekhar, Abhijit Banerjee

Abstract:

Construction sector in India is extremely resource and carbon intensive. It contributes to significantly to national greenhouse emissions. At the resource end the industry consumes significant portions of the output from mining. Resources such as sand and soil are most exploited and their rampant extraction is becoming constant source of impact on environment and society. Cement is another resource that is used in abundance in building and construction and has a direct impact on limestone resources. Though India is rich in cement grade limestone resource, efforts have to be made for sustainable consumption of this resource to ensure future availability. Use of these resources in high volumes in India is a result of rapid urbanization. More cities have grown to a population of million plus in the last decade and million plus cities are growing further. To cater to needs of growing urban population of construction activities are inevitable in the coming future thereby increasing material consumption. Increased construction will also lead to substantial increase in end of life waste generation from Construction and Demolition (C&D). Therefore proper management of C&D waste has the potential to reduce environmental pollution as well as contribute to the resource efficiency in the construction sector. The present study deals with estimation, characterisation and documenting current management practices of C&D waste in 10 Indian cities of different geographies and classes. Based on primary data the study draws conclusions on the potential of C&D waste to be used as an alternative to primary raw materials. The estimation results show that India generates 716 million tons of C&D waste annually, placing the country as second largest C&D waste generator in the world after China. The study also aimed at utilization of C&D waste in to building materials. The waste samples collected from various cities have been used to replace 100% stone aggregates in paver blocks without any decrease in strength. However, management practices of C&D waste in cities still remains poor instead of notification of rules and regulations notified for C&D waste management. Only a few cities have managed to install processing plant and set up management systems for C&D waste. Therefore there is immense opportunity for management and reuse of C&D waste in Indian cities.

Keywords: building materials, construction and demolition waste, cities, environmental pollution, resource efficiency

Procedia PDF Downloads 304
8313 Social Entrepreneurship through an Institutional Perspective: A Case Study of Women Social Entrepreneurs from Peshawar, Pakistan

Authors: Madiha Gohar, Ayesha Abrar

Abstract:

Social entrepreneurship has gained currency in the field of entrepreneurship, however, the theoretical underpinning and the contextual influences on the creation and operations of social enterprises are still in infancy. Contextual influences on entrepreneurial endeavors of women have been researched, and it is assumed that like commercial entrepreneurship, some socio-cultural factors are most suitable for the creation of women social enterprises. This research is an effort to explore the contextual influences on women social enterprises using institutional theory as the main conceptual framework. A case study analysis was used to assess the formal and informal institutional influences on women social entrepreneurs and their enterprises. The personal accounts of women social entrepreneurs reveal the importance of formal and informal institutions; however, they advocate greater consideration of informal institutions for their entrepreneurial endeavors.

Keywords: case study, institutional theory, women social entrepreneurship, Pakistan

Procedia PDF Downloads 191
8312 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 59
8311 Eco-Politics of Infrastructure Development in and Around Protected Areas in Kenya: The Case of Nairobi National Park

Authors: Teresa Wanjiru Mbatia

Abstract:

On 7th June 2011, the government Minister of Roads in Kenya announced the proposed construction of a major highway known as a southern bypass to run on the northern border of the Nairobi National Park. The following day on 8th June 2011, the chairperson of the Friends of Nairobi National Park (FONNAP) posted a protest statement on their website, with the heading, ‘Nairobi Park is Not a cake’ alerting its members and conservation groups, with the aim of getting support to the campaign against the government’s intention to hive off a section of the park for road construction. This was the first and earliest statement that led to a series of other events that culminated in conservationists and some other members of the public campaign against the government’s plan to hive off sections of the park to build road and railway infrastructure in or around the park. Together with other non-state actors, mostly non-governmental organisations in conservation/environment and tourism businesses, FoNNAP issued a series of other statements on social, print and electronic media to battle against road and railway construction. This paper examined the strategies, outcomes and interests of actors involved in opposing/proposing the development of transport infrastructure in and around the Nairobi National Park. Specifically, the objectives were to analyse the: (1) Arguments put forward by the eco-warriors to protest infrastructure development; (2) Background and interests of the eco-warriors; (3) Needs/interests and opinions of ordinary common citizens on transport infrastructural development, particularly in and around the urban nature reserve and (4) Final outcomes of the eco-politics surrounding infrastructure development in and around Nairobi National Park. The methodological approach used was environmental history and the social construction of nature. The study collected combined qualitative data using four main approaches, the grounded theory approach, narratives, case studies and a phenomenological approach. The information collected was analysed using critical discourse analysis. The major findings of the study were that under the guise of “public participation,” influential non-state actors have the capacity to perpetuate social-spatial inequalities in the form of curtailing the majority from accessing common public goods. A case in point in this study is how the efforts of powerful conservationists, environmentalists, and tourism businesspersons managed to stall the construction of much-needed road and railway infrastructure severally through litigations in lengthy environmental court processes involving injunctions and stop orders to the government bodies in charge. Moreover, powerful non-state actors were found to have formed informal and sometimes formal coalitions with politicians with selfish interests, which serves to deepen the exclusionary practices and the common good. The study concludes that mostly composed of certain types of elites (NGOs, business communities, politicians and privileged social-cultural groups), non-state actors have used participatory policies to advance their own interests at the expense of the majority whom they claim to represent. These practices are traced to the historically unjust social, political, and economic forces involved in the production of space in Nairobi.

Keywords: eco-politics, exclusion, infrastructure, Nairobi national park, non-state actors, protests

Procedia PDF Downloads 179
8310 Human Resources Management Practices in Hospitality Companies

Authors: Dora Martins, Susana Silva, Cândida Silva

Abstract:

Human Resources Management (HRM) has been recognized by academics and practitioners as an important element in organizations. Therefore, this paper explores the best practices of HRM and seeks to understand the level of participation in the development of these practices by human resources managers in the hospitality industry and compare it with other industries. Thus, the study compared the HRM practices of companies in the hospitality sector with HRM practices of companies in other sectors, and identifies the main differences between their HRM practices. The results show that the most frequent HRM practices in all companies, independently of its sector of activity, are hiring and training. When comparing hospitality sector with other sectors of activity, some differences were noticed, namely in the adoption of the practices of communication and information sharing, and of recruitment and selection. According to these results, the paper discusses the major theoretical and practical implications. Suggestions for future research are also presented.

Keywords: exploratory study, human resources management practices, human resources manager, hospitality companies, Portuguese companies

Procedia PDF Downloads 482
8309 Towards Establishing a Universal Theory of Project Management

Authors: Divine Kwaku Ahadzie

Abstract:

Project management (PM) as a concept has evolved from the early 20th Century into a recognized academic and professional discipline, and indications are that it has come to stay in the 21st Century as a world-wide paradigm shift for managing successful construction projects. However, notwithstanding the strong inroads that PM has made in legitimizing its academic and professional status in construction management practice, the underlining philosophies are still based on cases and conventional practices. An important theoretical issue yet to be addressed is the lack of a universal theory that offers philosophical legitimacy for the PM concept as a uniquely specialized management concept. Here, it is hypothesized that the law of entropy, the theory of uncertainties and the theory of risk management offer plausible explanations for addressing the lacuna of what constitute PM theory. The theoretical bases of these plausible underlying theories are argued and attempts made to establish the functional relationships that exist between these theories and the PM concept. The paper then draws on data related to the success and/or failure of a number of construction projects to validate the theory.

Keywords: concepts, construction, project management, universal theory

Procedia PDF Downloads 328
8308 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 92
8307 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 86
8306 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 255
8305 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 134
8304 Establishing a Sustainable Construction Industry: Review of Barriers That Inhibit Adoption of Lean Construction in Lesotho

Authors: Tsepiso Mofolo, Luna Bergh

Abstract:

The Lesotho construction industry fails to embrace environmental practices, which has then lead to excessive consumption of resources, land degradation, air and water pollution, loss of habitats, and high energy usage. The industry is highly inefficient, and this undermines its capability to yield the optimum contribution to social, economic and environmental developments. Sustainable construction is, therefore, imperative to ensure the cultivation of benefits from all these intrinsic themes of sustainable development. The development of a sustainable construction industry requires a holistic approach that takes into consideration the interaction between Lean Construction principles, socio-economic and environmental policies, technological advancement and the principles of construction or project management. Sustainable construction is a cutting-edge phenomenon, forming a component of a subjectively defined concept called sustainable development. Sustainable development can be defined in terms of attitudes and judgments to assist in ensuring long-term environmental, social and economic growth in society. The key concept of sustainable construction is Lean Construction. Lean Construction emanates from the principles of the Toyota Production System (TPS), namely the application and adaptation of the fundamental concepts and principles that focus on waste reduction, the increase in value to the customer, and continuous improvement. The focus is on the reduction of socio-economic waste, and protestation of environmental degradation by reducing carbon dioxide emission footprint. Lean principles require a fundamental change in the behaviour and attitudes of the parties involved in order to overcome barriers to cooperation. Prevalent barriers to adoption of Lean Construction in Lesotho are mainly structural - such as unavailability of financing, corruption, operational inefficiency or wastage, lack of skills and training and inefficient construction legislation and political interferences. The consequential effects of these problems trigger down to quality, cost and time of the project - which then result in an escalation of operational costs due to the cost of rework or material wastage. Factor and correlation analysis of these barriers indicate that they are highly correlated, which then poses a detrimental potential to the country’s welfare, environment and construction safety. It is, therefore, critical for Lesotho’s construction industry to develop a robust governance through bureaucracy reforms and stringent law enforcement.

Keywords: construction industry, sustainable development, sustainable construction industry, lean construction, barriers to sustainable construction

Procedia PDF Downloads 294
8303 Analyzing the Importance of Technical Writing in Professional Industry of Pakistan

Authors: Sadaf Khalid, Jahanzaib Sarwar, Rabia Touseef

Abstract:

No matter how much perfect we become in our practical skills regarding the implementation of learned ideas, the need of technical writing capability cannot be neglected to be a professional. Technical writing is a way of communicating the ideas in written which, otherwise, need to be presented orally. Technical writing skills have always been the need of the time, as they are required for internal, as well as external official communication in both formal and informal manner. Moreover, they are the best way to capture the attention of your customers by presenting information in an effective manner. This paper aims to analyze the importance of technical writing skills in professional industries of Pakistan by conducting a survey. Survey results presented in this paper clearly depicts the importance of formal and informal written communication media used in different professional industries in Pakistan. Analysis and discussion of the extent to which the alternative ways of communication besides technical writing have got importance in Pakistan is also an important aspect of this survey.

Keywords: technical writing, survey, oral communication, globalization, communication trends, formal communication media, informal communication, audience

Procedia PDF Downloads 416
8302 Sustainability in Retaining Wall Construction with Geosynthetics

Authors: Sateesh Kumar Pisini, Swetha Priya Darshini, Sanjay Kumar Shukla

Abstract:

This paper seeks to present a research study on sustainability in construction of retaining wall using geosynthetics. Sustainable construction is a way for the building and infrastructure industry to move towards achieving sustainable development, taking into account environmental, socioeconomic and cultural issues. Geotechnical engineering, being very resource intensive, warrants an environmental sustainability study, but a quantitative framework for assessing the sustainability of geotechnical practices, particularly at the planning and design stages, does not exist. In geotechnical projects, major economic issues to be addressed are in the design and construction of stable slopes and retaining structures within space constraints. In this paper, quantitative indicators for assessing the environmental sustainability of retaining wall with geosynthetics are compared with conventional concrete retaining wall through life cycle assessment (LCA). Geosynthetics can make a real difference in sustainable construction techniques and contribute to development in developing countries in particular. Their imaginative application can result in considerable cost savings over the use of conventional designs and materials. The acceptance of geosynthetics in reinforced retaining wall construction has been triggered by a number of factors, including aesthetics, reliability, simple construction techniques, good seismic performance, and the ability to tolerate large deformations without structural distress. Reinforced retaining wall with geosynthetics is the best cost-effective and eco-friendly solution as compared with traditional concrete retaining wall construction. This paper presents an analysis of the theme of sustainability applied to the design and construction of traditional concrete retaining wall and presenting a cost-effective and environmental solution using geosynthetics.

Keywords: sustainability, retaining wall, geosynthetics, life cycle assessment

Procedia PDF Downloads 2060
8301 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 123
8300 The Invisible Labour of Informal Care: Parentified Caregiving in David Chariandy's Soucouyant

Authors: Walter Rafael Ramos Villanueva

Abstract:

The overwhelming majority of scholarship on David Chariandy’s novel Soucouyant focuses on how Adele’s dementia represents the preservation of “cultural memory” and the perniciousness of “historical trauma.” However, by metaphorizing Adele’s mental condition, these critics risk treating her dementia as mostly figurative, and they thus elide a more detailed discussion of the literal ramifications of her dementia diagnosis. To move beyond these readings, then, my paper will approach Adele’s disorder as a literal medical condition and explore how her caregiving needs affect not only her but also those around her. Soucouyant subverts traditional caregiving narratives by depicting the difficult and typically invisible labour of informal caregiving that is undertaken by the families and friends of those who are ill or otherwise disabled. Because Adele’s family is unable to access proper public healthcare resources within the community, the burden of care falls upon the protagonist and his brother, who become “parentified children.” Parentified children, according to Nancy D. Chase, are “parents to their parents, and fulfill this role at the expense of their own developmentally appropriate needs and pursuits.” The novel provides a depiction of informal caregiving that is multi-faceted and asks us to question why is it exactly that we place the burden of care on those who are not equipped to handle such pressures instead of putting the onus on the government and the public healthcare system to take care of its most vulnerable members. Ageing Studies scholar Larry Polvika notes that although policymakers often offer “pious expressions of appreciation” and acknowledge that informal caregiving is “the backbone of our long-term care system,” governmental support for these caregivers remains inadequate. It is my belief that, by showcasing the struggles of informal caregivers, Chariandy’s text combats this dangerous and empty political rhetoric.

Keywords: caregiving, dementia, literature, parentified children

Procedia PDF Downloads 174
8299 Effective Affordable Housing Finance in Developing Economies: An Integration of Demand and Supply Solutions

Authors: Timothy Akinwande, Eddie Hui, Karien Dekker

Abstract:

Housing the urban poor remains a persistent challenge, despite evident research attention over many years. It is, therefore, pertinent to investigate affordable housing provision challenges with novel approaches. For innovative solutions to affordable housing constraints, it is apposite to thoroughly examine housing solutions vis a vis the key elements of the housing supply value chain (HSVC), which are housing finance, housing construction and land acquisition. A pragmatic analysis will examine affordable housing solutions from demand and supply perspectives to arrive at consolidated solutions from bilateral viewpoints. This study thoroughly examined informal housing finance strategies of the urban poor and diligently investigated expert opinion on affordable housing finance solutions. The research questions were: (1) What mutual grounds exist between informal housing finance solutions of the urban poor and housing expert solutions to affordable housing finance constraints in developing economies? (2) What are effective approaches to affordable housing finance in developing economies from an integrated demand - supply perspective? Semi-structured interviews were conducted in the 5 largest slums of Lagos, Nigeria, with 40 informal settlers for demand-oriented solutions, while focus group discussion and in-depth interviews were conducted with 12 housing experts in Nigeria for supply-oriented solutions. Following a rigorous thematic, content and descriptive analyses of data using NVivo and Excel, findings ascertained mutual solutions from both demand and supply standpoints that can be consolidated into more effective affordable housing finance solutions in Nigeria. Deliberate finance models that recognise and include the finance realities of the urban poor was found to be the most significant supply-side housing finance solution, representing 25.4% of total expert responses. Findings also show that 100% of sampled urban poor engage in vocations where they earn little irregular income or zero income, limiting their housing finance capacities and creditworthiness. Survey revealed that the urban poor are involved in community savings and employ microfinance institutions within the informal settlements to tackle their housing finance predicaments. These are informal finance models of the urban poor, revealing common grounds between demand and supply solutions for affordable housing financing. Effective, affordable housing approach will be to modify, institutionalise and incorporate the informal finance strategies of the urban poor into deliberate government policies. This consolidation of solutions from demand and supply perspectives can eliminate the persistent misalliance between affordable housing demand and affordable housing supply. This study provides insights into mutual housing solutions from demand and supply perspectives, and findings are informative for effective, affordable housing provision approaches in developing countries. This study is novel in consolidating affordable housing solutions from demand and supply viewpoints, especially in relation to housing finance as a key component of HSVC. The framework for effective, affordable housing finance in developing economies from a consolidated viewpoint generated in this study is significant for the achievement of sustainable development goals, especially goal 11 for sustainable, resilient and inclusive cities. Findings are vital for future housing studies.

Keywords: affordable housing, affordable housing finance, developing economies, effective affordable housing, housing policy, urban poor, sustainable development goal, sustainable affordable housing

Procedia PDF Downloads 70
8298 The Examination And Assurance Of The Microbiological Safety Pertaining To Raw Milk And its Derived Processed Products

Authors: Raana Babadi Fathipour

Abstract:

The production of dairy holds significant importance in the sustenance of billions of individuals worldwide, as they rely on milk and its derived products for daily consumption. In addition to being a source of essential nutrients crucial for human well-being, such as proteins, fats, vitamins, and minerals; dairy items are witnessing an increasing demand worldwide. Amongst all the factors contributing to the quality and safety assurance of dairy products, the strong focus lies on maintaining high standards in raw milk procurement. Raw milk serves as an externally nutritious medium for various microorganisms due to its inherent properties. This poses a considerable challenge for the dairy industry in ensuring that microbial contamination is minimized throughout every stage of the value chain. Despite implementing diverse process technologies—both conventional and innovative—the occurrence of microbial spoilage still results in substantial losses within this industry context. Moreover, milk and dairy products have been associated with numerous cases of foodborne illnesses across the globe. Various pathogens such as Salmonella serovars, Campylobacter spp., Shiga toxin-producing Escherichia coli, Listeria monocytogenes, and enterotoxin producing Staphylococcus aureus are commonly identified as the culprits behind these outbreaks in the dairy industry. The effective management of food safety within this sector necessitates a proactive and risk-based approach to reform. However, this strategy presents difficulties for developing nations where informal value chains dominate the dairy sector. Whether operating on a small or large scale or falling within formal or informal realms, it is imperative that the dairy industry adheres to principles of good hygiene practices and good manufacturing practices. Additionally, identifying and managing potential sources of contamination is crucial in mitigating challenges pertaining to quality and safety precautions.

Keywords: dairy value chain, microbial contamination, food safety, hygiene

Procedia PDF Downloads 70
8297 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 255
8296 From De Soto’s Solution to Urban Disaster: The Effects of Land Titling Policies on the Development of Cities of the Global South in the Case of Lima Peru

Authors: Jitka Molnarova

Abstract:

Based on De Soto’s idea that a formal land title can provide a secure home and access to credit to poor urban families, a large number of developing countries accepted the formalization of informal settlements as the ultimate solution for their housing crises and struggles with poverty. After two decades of implementation, very little is known about the effects this policy has on the quality of the neighborhoods it produces and on the development of cities in general. Using the capital of Peru -where the solution originated- as a case study, this paper illustrates the negative outcomes this policy has on urban development arguing that land titling encourages 1) expansion of the city often to areas of high physical risk, 2) production of precarious housing on unserviced land, and 3) practices of illegal land trafficking. The evidence is based on interviews with community leaders and officials working at the Cooperation for Formalization of Informal Property (COFOPRI), comparison of satellite images documenting the expansion of Lima in the past twenty years, and a technical evaluation of dozens of houses that have been or are in the process of being granted a land title.

Keywords: COFOPRI, De Soto, housing policies, land titling, land trafficking, Lima, Peru, precarious housing, urban expansion

Procedia PDF Downloads 187
8295 The Reflexive Interaction in Group Formal Practices: The Question of Criteria and Instruments for the Character-Skills Evaluation

Authors: Sara Nosari

Abstract:

In the research field on adult education, the learning development project followed different itineraries: recently it has promoted adult transformation by practices focused on the reflexive oriented interaction. This perspective, that connects life stories and life-based methods, characterizes a transformative space between formal and informal education. Within this framework, in the Nursing Degree Courses of Turin University, it has been discussed and realized a formal reflexive path on the care work professional identity through group practices. This path compared the future care professionals with possible experiences staged by texts used with the function of a pre-tests: these texts, setting up real or believable professional situations, had the task to start a reflection on the different 'elements' of care work professional life (relationship, educational character of relationship, relationship between different care roles; or even human identity, aims and ultimate aim of care, …). The learning transformative aspect of this kind of experience-test is that it is impossible to anticipate the process or the conclusion of reflexion because they depend on two main conditions: the personal sensitivity and the specific situation. The narrated experience is not a device, it does not include any tricks to understand the answering advance; the text is not aimed at deepening the knowledge, but at being an active and creative force which takes the group to compare with problematic figures. In fact, the experience-text does not have the purpose to explain but to problematize: it creates a space of suspension to live for questioning, for discussing, for researching, for deciding. It creates a space 'open' and 'in connection' where each one, in comparing with others, has the possibility to build his/her position. In this space, everyone has to possibility to expose his/her own argumentations and to be aware of the others emerged points of view, aiming to research and find the own personal position. However, to define his/her position, it is necessary to learn to exercise character skills (conscientiousness, motivation, creativity, critical thinking, …): if these not-cognitive skills have an undisputed evidence, less evident is how to value them. The paper will reflect on the epistemological limits and possibility to 'measure' character skills, suggesting some evaluation criteria.

Keywords: transformative learning, educational role, formal/informal education, character-skills

Procedia PDF Downloads 193
8294 Floorboards, Whitewalls and Butterflies: Ethnography of a Community Mental Health Cafe

Authors: J. N. Bardi, N. Wright, S. Timmons, P. Crawford

Abstract:

Introduction: In the United Kingdom (UK), the transfer of care from the asylums to the community has meant that some people with mental health problems (MHP) may not have access to suitable or adequate statutory community mental health services (CMHS). However, in addition to statutory CMHS, there are informal CMHS that provide spaces where people with MHP can attend such as faith communities, clubhouses, user-led organisations, day centres including drop-in-centres and community hubs and community mental health cafés (CMHCs). Aim: To qualitatively understand what happens in a community mental health café in relation to the place, people and processes, from the participant's perspective. Methodology: Ethnography Methods: Data collection will be field notes from observations written as thick description and interviews with participants. Data analysis will be thematic and narrative analysis. Relevance: The study seeks to observe what happens in a user-led community mental health café and explore if it provides the services that it claims to offer. Therefore, a literature review was conducted to examine the research evidence related to informal CMHS, focusing on similarities and differences. Results indicated that informal CMHS differ with regards to why, how, who set them up and who funds them, but they are similar because people with MHP who attend them report related psychological, vocational, and social interaction benefits. In addition to the differences listed above, CMHCs differ in their adoption of the commercial café model of social space and some CMHCs claim to address needs of social isolation and loneliness which they assert are not properly addressed by statutory CMHS and some informal CMHS. Therefore, CMHCs explicitly differentiate themselves from statutory CMHS and some informal CMHS such as day centres, hospitals and social services. However, CMHCs were found to be like drop-in-centres and community hubs which are also free for MHP to attend without the need for assessments, membership or appointments. To situate community mental health café within other informal CMHS and provide a rationale for the proposed study a scoping review was conducted to determine the scope of available research evidence on CMHCs. Findings from the scoping review reflected the literature review findings with regards to the benefits of attending informal CMHCs for people with MHP. Of the ten studies included in the scoping review, seven were on CMHCs for people living with dementia and two were on CMHCs for people with a broader range of MHP. The researcher hopes that findings from the proposed PhD study will build on the existing understanding of informal CMHS, extend the research evidence on CMHCs and address any gap in the literature.

Keywords: cafe, community, ethnography, mental health

Procedia PDF Downloads 198
8293 Digital Leadership and HR practices

Authors: Joanna Konstantinou

Abstract:

Due to the pandemic, we have recently witnessed an explosion of HR Tech offering a variety of solutions for digital transformation, as well as a large number of HR practices implemented by professionals both in data science and occupational psychology. The aim of this study is to explore the impact of these practices and their effectiveness and to develop an understanding of digital leadership. The study will be based on semi-structured interviews using qualitative research methods and tools.

Keywords: HR practices, digital trasformation, pandemic, digital leadership

Procedia PDF Downloads 205
8292 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 390