Search results for: AI project success factors
16513 Interactions within the School Setting and Their Potential Impact on the Wellbeing or Educational Success of High Ability Students: A Literature Review
Authors: Susan Burkett-McKee, Bruce Knight, Michelle Vanderburg
Abstract:
The wellbeing and educational success of high ability students are interrelated concepts with each potentially hindering or enhancing the other. A student’s well-being and educational success are also influenced by intrapersonal and interpersonal factors. This presentation begins with an exploration of the literature pertinent to the wellbeing and educational success of this cohort before an ecological perspective is taken to discuss research into the impact of interactions within the school context. While the literature consistently states that interactions exchanged between high ability students and school community members impact the students’ wellbeing or educational success, no consensus has been reached about whether the impact is positive or negative. Findings from the review shared in this presentation inform an interpretative phenomenological study involving senior secondary students enrolled in inclusive Australian schools to highlight, from the students’ perspective, the ways school-based interactions impact their wellbeing or educational success.Keywords: educational success, interactions, literature review, wellbeing
Procedia PDF Downloads 30216512 Facilitating Factors for the Success of Mobile Service Providers in Bangkok Metropolitan
Authors: Yananda Siraphatthada
Abstract:
The objectives of this research were to study the level of influencing factors, leadership, supply chain management, innovation, competitive advantages, business success, and affecting factors to the business success of the mobile phone system service providers in Bangkok Metropolitan. This research was done by the quantitative approach and the qualitative approach. The quantitative approach was used for questionnaires to collect data from the 331 mobile service shop managers franchised by AIS, Dtac and TrueMove. The mobile phone system service providers/shop managers were randomly stratified and proportionally allocated into subgroups exclusive to the number of the providers in each network. In terms of qualitative method, there were in-depth interviews of 6 mobile service providers/managers of Telewiz and Dtac and TrueMove shop to find the agreement or disagreement with the content analysis method. Descriptive Statistics, including Frequency, Percentage, Means and Standard Deviation were employed; also, the Structural Equation Model (SEM) was used as a tool for data analysis. The content analysis method was applied to identify key patterns emerging from the interview responses. The two data sets were brought together for comparing and contrasting to make the findings, providing triangulation to enrich result interpretation. It revealed that the level of the influencing factors – leadership, innovation management, supply chain management, and business competitiveness had an impact at a great level, but that the level of factors, innovation and the business, financial success and nonbusiness financial success of the mobile phone system service providers in Bangkok Metropolitan, is at the highest level. Moreover, the business influencing factors, competitive advantages in the business of mobile system service providers which were leadership, supply chain management, innovation management, business advantages, and business success, had statistical significance at .01 which corresponded to the data from the interviews.Keywords: mobile service providers, facilitating factors, Bangkok Metropolitan, business success
Procedia PDF Downloads 35016511 Project Abandonment and Its Effect on Host Community: Case Study of Ajaokuta Steel Project, Nigeria
Authors: A. A. Omonori, K. T. Alade, A. F. Lawal
Abstract:
This research was conducted to identify the causes of project abandonment in Nigeria and the effect it has on the host community. The aim of the research was to identify the causes and effects of project failure and abandonment. Project abandonment is a major course of concern in the country as different projects fail and are abandoned at various levels. These projects do not fulfill the purpose for which they were initiated. This is the absolute definition of failure and hence the selection of the Ajaokuta Steel Project as an interesting case study and a typical example of project failure and abandonment. This has been done by conducting field study through the administration of questionnaires. This study was carried out on the Ajaokuta Steel Project to investigate the causes of the abandonment of the project and the effects it has had on the people of Ajaokuta community. Qualitative method of data analysis was used to analyze the findings through frequency tables and ranking. This study brought to light the major factors that led to the abandonment of the Ajaokuta Steel Project. The effects the abandonment of the project has had on the immediate community were identified and recommendations made to prevent the menace of Project abandonment.Keywords: abandonment, case-study, Nigeria, project
Procedia PDF Downloads 36416510 Simulating the Interaction of Strategy Development and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.Keywords: strategy, simulation, project management, game theory
Procedia PDF Downloads 13816509 The Career Success for Female Managers: A Case Study of The Primary Education Department, Thailand
Authors: Nipon Sasithornsaowapa
Abstract:
The purposes of this research was to study the female management career success of the primary education department of Thailand. The independent variable was human capital which included three factors: family status, personality, and knowledge-skill-experience, while the important dependent variable was the career success. The population of this study included 2,179 female management officials in the department of primary education. A total of 400 female managers were interviewed and utilized as a sample group. A questionnaire was developed and used as a main tool for collecting data. Content analysis was performed to get the quantitative data. Descriptive statistics in this research was done by SPSS program. The findings revealed that family and personality factors had a high influence on the human capital and, in turn, influenced the career success of female managers. On the other hand, knowledge-skill-experience had an insignificant influence to the human capital and the female career success. In addition, the findings from the in-depth interview revealed that the majority of respondents defined career success as the satisfaction in job duties, not money and position.Keywords: career, female managers, primary education
Procedia PDF Downloads 30116508 A Relational Case-Based Reasoning Framework for Project Delivery System Selection
Authors: Yang Cui, Yong Qiang Chen
Abstract:
An appropriate project delivery system (PDS) is crucial to the success of a construction project. Case-based reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the relational case-based reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then, feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.Keywords: relational cased-based reasoning, case-based reasoning, project delivery system, PDS selection
Procedia PDF Downloads 43216507 Analyzing Competition in Public Construction Projects
Authors: Khaled Hesham Hyari, Amjad Almani
Abstract:
Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.Keywords: construction projects, competitive bidding, public construction, competition
Procedia PDF Downloads 33816506 Application of Causal Inference and Discovery in Curriculum Evaluation and Continuous Improvement
Authors: Lunliang Zhong, Bin Duan
Abstract:
The undergraduate graduation project is a vital part of the higher education curriculum, crucial for engineering accreditation. Current evaluations often summarize data without identifying underlying issues. This study applies the Peter-Clark algorithm to analyze causal relationships within the graduation project data of an Electronics and Information Engineering program, creating a causal model. Structural equation modeling confirmed the model's validity. The analysis reveals key teaching stages affecting project success, uncovering problems in the process. Introducing causal discovery and inference into project evaluation helps identify issues and propose targeted improvement measures. The effectiveness of these measures is validated by comparing the learning outcomes of two student cohorts, stratified by confounding factors, leading to improved teaching quality.Keywords: causal discovery, causal inference, continuous improvement, Peter-Clark algorithm, structural equation modeling
Procedia PDF Downloads 2016505 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia
Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim
Abstract:
Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.Keywords: green building, sustainability, project stakeholders, Malaysia
Procedia PDF Downloads 56616504 Learning Made Right: Building World Class Engineers in Tunisia
Authors: Zayen Chagra
Abstract:
Several educational institutions are experimenting new approaches in learning in order to guarantee the success of its students. In Tunisia, and since 2011, the experience of making a new software engineering branch called mobile software engineering began at ESPRIT: Higher School of Engineering and Technology. The project was surprisingly a success since its creation, and even before the graduation of the first generation, partnerships were held with the biggest mobile technology manufacturers and several international awards were won by teams of students. This session presents this experience with details of the approaches made from idea stage to the actual stage where the project counts 32 graduated engineers, 90 graduate students and 120 new participants.Keywords: innovation, education, engineering education, mobile
Procedia PDF Downloads 42616503 Comparative Study on Inhibiting Factors of Cost and Time Control in Nigerian Construction Practice
Authors: S. Abdulkadir, I. Y. Moh’d, S. U. Kunya, U. Nuruddeen
Abstract:
The basis of any contract formation between the client and contractor is the budgeted cost and the estimated duration of projects. These variables are paramount important to project's sponsor in a construction projects and in assessing the success or viability of construction projects. Despite the availability of various techniques of cost and time control, many projects failed to achieve their initial estimated cost and time. The paper evaluate the inhibiting factors of cost and time control in Nigerian construction practice and comparing the result with the United Kingdom practice as identified by one researcher. The populations of the study are construction professionals within Bauchi and Gombe state, Nigeria, a judgmental sampling employed in determining the size of respondents. Descriptive statistics used in analyzing the data in SPSS. Design change, project fraud and corruption, financing and payment of completed work found to be common among the top five inhibiting factors of cost and time control in the study area. Furthermore, the result had shown some comprising with slight contrast as in the case of United Kingdom practice. Study recommend the adaptation of mitigation measures developed in the UK prior to assessing its effectiveness and so also developing a mitigating measure for other top factors that are not within the one developed in United Kingdom practice. Also, it recommends a wider assessing comparison on the modify inhibiting factors of cost and time control as revealed by the study to cover almost all part of Nigeria.Keywords: comparison, cost, inhibiting factor, United Kingdom, time
Procedia PDF Downloads 44216502 Factors Related to the Success of Exclusive Breastfeeding: A Cross Sectional Study among Mothers in Cirebon City, Indonesia
Authors: Witri Pratiwi, Shopa Nur Fauzah, Dini Norviatin
Abstract:
WHO recommends breastfeeding exclusively for infants aged 0 to 6 months because breast milk is the best nutrition. There are several factors associated with the success of exclusive breastfeeding. This study aims to determine the factors associated with the success of exclusive breastfeeding. A cross-sectional study was conducted at 6 community health centers in Cirebon City, Indonesia. Primary data were obtained from a validated questionnaire given to mothers who have children aged 6 to 24 months. A total of 326 mothers participated in this study. Two hundred and eighteen (66.9%) mothers gave exclusive breastfeeding to their babies, and 108 (33.1%) did not give exclusive breastfeeding. The baby gender (p=0.240), birth weight (p=0.436), and place of birth (0.137) were not related to exclusive breastfeeding. Mode of delivery (p=0.029) and early initiation of breastfeeding (p=0.001) were significantly associated with exclusive breastfeeding. Infants with early initiation of breastfeeding are three times more likely to get exclusive breastfeeding compared to those who do not get breastfeeding early (p=0.001; OR=3.696 [95% CI 1.764 – 7.746]). Early initiation of breastfeeding is the most important factor in determining the success of exclusive breastfeeding. Promotion and education on the importance of early breastfeeding initiation to prospective mothers, families, and health workers are expected to be improved.Keywords: early initiation of breastfeeding, exclusive breastfeeding, mode of delivery, Indonesia
Procedia PDF Downloads 14116501 Factors of Influence in Software Process Improvement: An ISO/IEC 29110 for Very-Small Entities
Authors: N. Wongsai, R. Wetprasit, V. Siddoo
Abstract:
The recently introduced ISO/IEC 29110 standard Lifecycle profile for Very Small Entities (VSE) has been adopted and practiced in many small and medium software companies, including in Thailand’s software industry. Many Thai companies complete their software process improvement (SPI) initiative program and have been certified. There are, however, a number of participants fail to success. This study was concerned with the factors that influence the accomplishment of the standard implementation in various VSE characteristics. In order to achieve this goal, exploring and extracting critical factors from prior studies were carried out and then the obtained factors were validated by the standard experts. Data analysis of comments and recommendations was performed using a qualitative content analysis method. This paper presents the initial set of influence factors in both positive and negative impact the ISO/IEC 29110 implementation with an aim at helping such SPI practitioners with some considerations to manage appropriate adoption approach in order to achieve its implementation.Keywords: barriers, critical success factors, ISO/IEC 29110, Software Process Improvement, SPI, Very-Small Entity, VSE
Procedia PDF Downloads 31616500 MegaProjects and the Governing Processes That Lead to Success and Failure: A Literature Review
Authors: Fangwei Zhu, Wei Tian, Linzhuo Wang, Miao Yu
Abstract:
Megaproject has long been a critical issue in project governance, for its low success rate and large impact on society. Although the extant literature on megaproject governance is vast, to our best knowledge, the lacking of a thorough literature review makes it hard for us to gain a holistic view on current scenario of megaproject governance. The study conducts a systematic literature review process to analyze the existing literatures on megaproject governance. The finding indicates that mega project governance needs to be handled at network level and forming a network level governance provides a holistic framework for governing megaproject towards sustainable development of the projects. Theoretical and practical implications, as well as future studies and limitations, were discussed.Keywords: megaproject, governance, literature review, network
Procedia PDF Downloads 20116499 The Role of Time Management Skills in Academic Performance of the University Lecturers
Authors: Thuduwage Lasanthika Sajeevanie
Abstract:
Success is very important, and there are many factors affecting the success of any situation or a person. In Sri Lankan Context, it is hardly possible to find an empirical study relating to time management and academic success. Globally many organizations, individuals practice time management to be effective. Hence it is very important to examine the nature of time management practice. Thus this study will fill the existing gap relating to achieving academic success through proper time management practices. The research problem of this study is what is the relationship exist among time management skills and academic success of university lecturers in state universities. The objective of this paper is to identify the impact of time management skills for academic success of university lecturers. This is a conceptual study, and it was done through a literature survey by following purposive sampling technique for the selection of literature. Most of the studies have found that time management is highly related to academic performance. However, most of them have done on the academic performance of the students, and there were very few studies relating to academic performance of the university lecturers. Hence it can be further suggested to conduct a study relating to identifying the relationship between academic performance and time management skills of university lecturers.Keywords: academic success, performance, time management skills, university lecturers
Procedia PDF Downloads 35716498 Factors Affecting the Success of Private Higher Education Businesses in Malaysia
Authors: Nasir Khalid
Abstract:
In Malaysia, higher education is big business. There are many companies that are willing if not already to invest heavily in higher education for students that aspire to pursue their degree in diploma, undergraduate as well as graduate studies. These companies sometimes even have a joint venture twinning program with other already established universities in and across Europe, Australia, the United States, and Canada. Some of these investments have been successful whereas others find themselves limited by the obstacle of receiving new students. Recently, the Malaysian Ministry of Higher Education has stopped issuing licenses to set up private institutions of higher education. This paper will thus examine the factors affecting the success of private higher education businesses in Malaysia. The samples will consist of thirty private institutions [N=30]. Among the factors that will be mentioned in the literature are academic programs, student quality and achievement, student employability, alumni satisfaction, student enrolment, institutional environment, lecturer-quality and effectiveness of supporting staff. A questionnaire was developed and analyzed using statistical analysis. The result of this study found that the top three factors affecting the success of private higher education businesses in Malaysia are student enrolment, institutional environment and the academic programs offered.Keywords: higher education business, successful business factors, private institutions, business in Malaysia
Procedia PDF Downloads 31716497 ERP Implementation in Iran: A Successful Experience in DGC
Authors: Mohammad Reza Ostad Ali Naghi Kashani
Abstract:
Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing. Although ERP projects are expensive, time consuming, and complex, there are some successful experiences. These days, developing countries are striving to implement ERP projects successfully; however, there are many obstacles. Therefore, these projects would be failed or partially failed. This paper concerns the implementation of a successful ERP implementation, IFS, in Iran at Dana Geophysics Company (DGC). After a short review of ERP and ERP market in Iran, we propose a three phases deployment methodology (phase 1: Preparation and Business Process Management (BPM) phase 2: implementation and phase 3: testing, golive-1 (pilot) and golive-2 (final)). Then, we present five guidelines (Project Management, Change Management, Business Process Management (BPM), Training& Knowledge Management, and Technical Management), which were chose as work streams. In this case study we present lessons learned in Project management and Business process Management.Keywords: business process management, critical success factors, ERP, project management
Procedia PDF Downloads 49316496 Key Success Factors for Malaysian SMES Companies’ Entrepreneurial Leader
Authors: Zainal Abu Zarim, Hafizah Omar Zaki
Abstract:
The objective of this study is to analyse the success factors of entrepreneurs in the Malaysian SMEs in the urge to discover their entrepreneurial leadership characteristics. Data has been collected from top 50 SME award winning companies. The study has used the qualitative approach to data collection, where interviews are dispersed on these selected companies. From these 50 SMEs, only 25 accepted the interview request where one entrepreneur from each SME answered the questions. To successfully run this study, we administered some questions based on Hornaday 42 characteristics of an entrepreneurs, as well some structured questions to determine a successful of a company. The result shows that, entrepreneurs are confident, determine, diligent, flexible, responsive to challenges, responsible, foresight, courageous, aggressive, and committed. Consistent to this, several elements that makes the company successful includes (1) strong financial control, (2) continuous improvement, (3) product quality and product safety as top priority, (4) hard work and team work, and (5) eagerness in taking challenges. These results has deemed that entrepreneurs in many aspects are also leaders that are risk averse and determine, and are eager to work on continuous improvement in a financially strong company.Keywords: characteristics of entrepreneurs, success of a company, key success factors, Malaysian SMEs
Procedia PDF Downloads 59316495 An Investigation of Customer Relationship Management of Tourism
Authors: Wanida Suwunniponth
Abstract:
This research paper aimed to developing a causal relationship model of success factors of customer relationship management of tourism in Thailand and to investigating relationships among the potential factors that facilitate the success of customer relationship management (CRM). The research was conducted in both quantitative and qualitative methods, by utilizing both questionnaire and in-depth interview. The questionnaire was used in collecting the data from 250 management staff in the hotels located within Bangkok area. Sampling techniques used in this research included cluster sampling according to the service quality and simple random sampling. The data input was analyzed by use of descriptive analysis and System Equation Model (SEM). The research findings demonstrated important factors accentuated by most respondents towards the success of CRM, which were organization, people, information technology and the process of CRM. Moreover, the customer relationship management of tourism business in Thailand was found to be successful at a very significant level. The hypothesis testing showed that the hypothesis was accepted, as the factors concerning with organization, people and information technology played an influence on the process and the success of customer relationship management, whereas the process of customer relationship management factor manipulated its success. The findings suggested that tourism business in Thailand with the implementation of customer relationship management should opt in improvement approach in terms of managerial structure, corporate culture building with customer- centralized approach accentuated, and investment of information technology and customer analysis, in order to capacitate higher efficiency of customer relationship management process that would result in customer satisfaction and retention of service.Keywords: customer relationship management, casual relationship model, tourism, Thailand
Procedia PDF Downloads 33116494 Effect of Institutional Structure on Project Managers Performance in Construction Projects: A Case Study in Nigeria
Authors: Ebuka Valentine Iroha, Tsunemi Watanabe, Satoshi Tsuchiya
Abstract:
Project management practices play an important role in construction project performance and are one of project managers' essential key performance indicators. Previous studies have explored the poor performance of the construction industry, with project delays and cost overruns identified to contribute largely to numerous abandoned projects. These challenges are attributed to insufficient project management practices and a lack of utilization of project managers. The actual causes of inadequate project management practices and underutilization of project managers have been rarely discussed. This study tends to bridge the gap by identifying and assessing the actual causes of insufficient project management practices and underutilization of project managers. This study differs from past studies investigating the causes of poor performance by using institutional analysis methods to identify and analyze the factors influencing project management practices and proper utilization of project managers. Based on a comprehensive literature review, this study identified some factors embedded in the construction industry that influence the institutional environment and weaken the laws and regulations. These factors were used as the basis for semi-structured interview questions to investigate their impacts on project management practices and project managers. The data collected were coded into a four-level framework for institutional analysis. This method was used to analyze the interrelationships between the identified embedded factors, institutional laws and regulations, and construction organizations to understand how these influences result in the underutilization of project managers. The study found that the underutilization of project managers consists of two subsystems, including underutilization and lowering commitment. The first subsystem, corruption, political influence, religious and tribal discrimination, and organizational culture, were found to affect the institutional structure. These embedded factors weaken the industry’s governance mechanism, forcing project managers to prioritize corrupt practices over project demands. The ineffectiveness of the existing laws and regulations worsens the situation, supporting unfair working conditions and contributing to the underperformance of project managers. This situation leads to the development of the second subsystem, which is characterized by a lack of opportunities for career development and minimal incentives within construction organizations. The findings provide significant potential for addressing systemic challenges in the construction industry, particularly the underutilization of project managers and enhancing organizational support measures to improve project management practices and mitigate the adverse effects of corruption.Keywords: construction industry, project management, poor performance, embedded factors, project managers underutilization
Procedia PDF Downloads 4116493 Statistical Analysis with Prediction Models of User Satisfaction in Software Project Factors
Authors: Katawut Kaewbanjong
Abstract:
We analyzed a volume of data and found significant user satisfaction in software project factors. A statistical significance analysis (logistic regression) and collinearity analysis determined the significance factors from a group of 71 pre-defined factors from 191 software projects in ISBSG Release 12. The eight prediction models used for testing the prediction potential of these factors were Neural network, k-NN, Naïve Bayes, Random forest, Decision tree, Gradient boosted tree, linear regression and logistic regression prediction model. Fifteen pre-defined factors were truly significant in predicting user satisfaction, and they provided 82.71% prediction accuracy when used with a neural network prediction model. These factors were client-server, personnel changes, total defects delivered, project inactive time, industry sector, application type, development type, how methodology was acquired, development techniques, decision making process, intended market, size estimate approach, size estimate method, cost recording method, and effort estimate method. These findings may benefit software development managers considerably.Keywords: prediction model, statistical analysis, software project, user satisfaction factor
Procedia PDF Downloads 12416492 A Case Study on the Guidelines for Application of Project Management Methods in Infrastructure Projects
Authors: Fernanda Varella Borges, Silvio Burrattino Melhado
Abstract:
Motivated by the importance of public infrastructure projects in the civil construction chain, this research shows the study of project management methods and the infrastructure projects’ characteristics. The research aims at the objective of improving management efficiency by proposing guidelines for the application of project management methods in infrastructure projects. Through literature review and case studies, the research analyses two major infrastructure projects underway in Brazil, identifying the critical points for achieving its success. As a result, the proposed guidelines indicate that special attention should be given to the management of stakeholders, focusing on their knowledge and experience, their different interests, the efficient management of their communication, and their behavior in the day-by-day project management process.Keywords: construction, infrastructure, project management, public projects
Procedia PDF Downloads 49616491 Environmental Factors and Executive Functions of Children in 5-Year-Old Kindergarten
Authors: Stephanie Duval
Abstract:
The concept of educational success, combined with the overall development of the child in kindergarten, is at the center of current interests, both in research and in the environments responsible for the education of young children. In order to promote it, researchers emphasize the importance of studying the executive functions [EF] of children in preschool education. More precisely, the EFs, which refers to working memory [WM], inhibition, mental flexibility and planning, would be the pivotal element of the child’s educational success. In order to support the EFs of the child, and even his educational success, the quality of the environments is beginning to be explored more and more. The question that arises now is how to promote EFs for young children in the educational environment, in order to support their educational success? The objective of this study is to investigate the link between the quality of interactions in 5-year-old kindergarten and child’s EFs. The sample consists of 118 children (70 girls, 48 boys) in 12 classes. The quality of the interactions is observed from the Classroom Assessment Scoring System [CLASS], and the EFs (i.e., working memory, inhibition, cognitive flexibility, and planning) are measured with administered tests. The hypothesis of this study was that the quality of teacher-child interactions in preschool education, as measured by the CLASS, was associated with the child’s EFs. The results revealed that the quality of emotional support offered by adults in kindergarten, included in the CLASS tool, was positively and significantly related to WM and inhibition skills. The results also suggest that WM is a key skill in the development of EFs, which may be associated with the educational success of the child. However, this hypothesis remains to be clarified, as is the link with educational success. In addition, results showed that factors associated to the family (ex. parents’ income) moderate the relationship between the domain ‘instructional support’ of the CLASS (ex. concept development) and child’s WM skills. These data suggest a moderating effect related to family characteristics in the link between ‘quality of classroom interactions’ and ‘EFs’. This project proposes, as a future avenue, to check the distinctive effect of different environments (familial and educational) on the child’s EFs. More specifically, future study could examine the influence of the educational environment on EF skills, as well as whether or not there is a moderating effect of the family environment (ex. parents' income) on the link between the quality of the interactions in the classroom and the EFs of the children, as anticipated by this research.Keywords: executive functions [EFs], environmental factors, quality of interactions, preschool education
Procedia PDF Downloads 36516490 Critical Success Factors of OCOP Business Model in Pattani Province Thailand: A Qualitative Approach
Authors: Poonsook Thatchaopas, Nik Kamariah Nikmat, Nattakarn Eakuru
Abstract:
Since 2003, the Thai Government has implemented several initiatives to encourage and incubate entrepreneurial skills and motivation among her citizens. One of the initiatives is the “One College One Product” business model or well known as ‘OCOP’, launched by the Vocational Education Commission to encourage partnership between college students to choose at least one product for business venture. In line with this mission, several business enterprises were established such as food products, restaurants, spa, Thai massage, minimart, computer maintenance, karaoke centre, internet café, mini theater etc. Currently, these business incubator projects can be observed at 404 vocational colleges and 21 incubation centres to encourage entrepreneurial small and medium enterprise (SME) development. However, the number of successful OCOP projects is still minimal. Out of the 404 individual OCOP projects at Vocational Colleges around Thailand, very few became successful. The objective of this paper is to identify the critical success factors needed to be a successful OCOP business entrepreneur. This study uses qualitative method by interviewing business partners of an OCOP business called Crispy Roti Krua Acheeva Brand (CRKAB). It is a snack food company that is developed at Pattani Vocational College in South Thailand. This project was initiated by three female entrepreneurs who were alumni student cum owners of the CRKAB. The finding shows that the main critical success factors are self-confidence, creativity or innovativeness, knowledge, skills and perseverance. Additionally, they reiterated that the keys to business success are product quality, perceived price, promotion, branding, new packaging to increase sales and continuous developments. The results implies for a student business SME to be successful, the company should have credible partners and effective marketing plan.Keywords: student entrepreneurship, business incubator, food industry, qualitative, Thailand
Procedia PDF Downloads 39516489 Decision Making during the Project Management Life Cycle of Infrastructure Projects
Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik
Abstract:
The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.Keywords: leadership style, construction, decision-making, built environment
Procedia PDF Downloads 36016488 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study
Authors: Kwasi Dartey-Baah, Mias De Klerk
Abstract:
Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana
Procedia PDF Downloads 16116487 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 7516486 Analysis of Critical Success Factors for Implementing Industry 4.0 and Circular Economy to Enhance Food Traceability
Authors: Mahsa Pishdar
Abstract:
Food traceability through the supply chain is facing increased demand. IoT and blockchain are among the tools under consideration in the Industry 4.0 era that could be integrated to help implementation of the Circular Economy (CE) principles while enhancing food traceability solutions. However, such tools need intellectual system, and infrastructureto be settled as guidance through the way, helping overcoming obstacles. That is why the critical success factors for implementing Industry 4.0 and circular economy principles in food traceability concept are analyzed in this paper by combination of interval type 2 fuzzy Worst Best Method and Measurement Alternatives and Ranking according to Compromise Solution (Interval Type 2 fuzzy WBM-MARCOS). Results indicate that “Knowledge of Industry 4.0 obligations and CE principle” is the most important factor that is the basis of success following by “Management commitment and support”. This will assist decision makers to seize success in gaining a competitive advantage while reducing costs through the supply chain.Keywords: food traceability, industry 4.0, internet of things, block chain, best worst method, marcos
Procedia PDF Downloads 20716485 An Assessment of Factors Affecting the Cost and Time Performance of Subcontractors
Authors: Adedayo Jeremiah Adeyekun, Samuel Oluwagbemiga Ishola,
Abstract:
This paper is an assessment of factors influencing the cost and time performance of subcontractors and the need for effective performance of subcontractors at the project sites. The factors influencing the performance of subcontractors are grouped, similar to those identified with the project or an organization and on another hand, there are significant factors influencing the performance of the subcontractors. These factors incorporate management level leadership, time required to complete the project, profit, staff capability/expertise, reputation, installment method, organization history, and project procurement method strategy, security, bidding technique, insurance, bond and relationship with the major contractors. The factors influencing the management of subcontractors in building development projects includes performance of significant past projects, standard of workmanship, consistence with guidelines, regular payment to labourers, adherence to program, regularity and viability of communication with main contractor, adherence to subcontract necessities. Other factors comprise adherence to statutory environmental regulations, number of experienced sites administrative staff, inspection and maintenance of good workplace, number of artisans and workers, quality of as-built and shop drawings and ability to carry out the quantity of work and so on. This study also aimed to suggest a way forward to improve the performance of subcontractors which is the reason for exceeding budget at the project sites. To carry out this study, a questionnaire was drafted to derive information on the causes of low performance of subcontractors and the implication to cost.Keywords: performance, contractor, subcontractors, construction
Procedia PDF Downloads 7716484 Appraisal of Transaction Cost in South African Construction Projects
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.Keywords: construction projects, project cost, South Africa, transaction cost
Procedia PDF Downloads 99