3402 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 247
3401 Preferences of Electric Buses in Public Transport; Conclusions from Real Life Testing in Eight Swedish Municipalities

Authors: Sven Borén, Lisiana Nurhadi, Henrik Ny

Abstract:

From a theoretical perspective, electric buses can be more sustainable and can be cheaper than fossil fuelled buses in city traffic. The authors have not found other studies based on actual urban public transport in Swedish winter climate. Further on, noise measurements from buses for the European market were found old. The aims of this follow-up study was therefore to test and possibly verify in a real-life environment how energy efficient and silent electric buses are, and then conclude on if electric buses are preferable to use in public transport. The Ebusco 2.0 electric bus, fitted with a 311 kWh battery pack, was used and the tests were carried out during November 2014-April 2015 in eight municipalities in the south of Sweden. Six tests took place in urban traffic and two took place in more of a rural traffic setting. The energy use for propulsion was measured via logging of the internal system in the bus and via an external charging meter. The average energy use turned out to be 8% less (0,96 kWh/km) than assumed in the earlier theoretical study. This rate allows for a 320 km range in public urban traffic. The interior of the bus was kept warm by a diesel heater (biodiesel will probably be used in a future operational traffic situation), which used 0,67 kWh/km in January. This verified that electric buses can be up to 25% cheaper when used in public transport in cities for about eight years. The noise was found to be lower, primarily during acceleration, than for buses with combustion engines in urban bus traffic. According to our surveys, most passengers and drivers appreciated the silent and comfortable ride and preferred electric buses rather than combustion engine buses. Bus operators and passenger transport executives were also positive to start using electric buses for public transport. The operators did however point out that procurement processes need to account for eventual risks regarding this new technology, along with personnel education. The study revealed that it is possible to establish a charging infrastructure for almost all studied bus lines. However, design of a charging infrastructure for each municipality requires further investigations, including electric grid capacity analysis, smart location of charging points, and tailored schedules to allow fast charging. In conclusion, electric buses proved to be a preferable alternative for all stakeholders involved in public bus transport in the studied municipalities. However, in order to electric buses to be a prominent support for sustainable development, they need to be charged either by stand-alone units or via an expansion of the electric grid, and the electricity should be made from new renewable sources.

Keywords: sustainability, electric, bus, noise, greencharge

Procedia PDF Downloads 338
3400 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 174
3399 Sediment Transport Monitoring in the Port of Veracruz Expansion Project

Authors: Francisco Liaño-Carrera, José Isaac Ramírez-Macías, David Salas-Monreal, Mayra Lorena Riveron-Enzastiga, Marcos Rangel-Avalos, Adriana Andrea Roldán-Ubando

Abstract:

The construction of most coastal infrastructure developments around the world are usually made considering wave height, current velocities and river discharges; however, little effort has been paid to surveying sediment transport during dredging or the modification to currents outside the ports or marinas during and after the construction. This study shows a complete survey during the construction of one of the largest ports of the Gulf of Mexico. An anchored Acoustic Doppler Current Velocity profiler (ADCP), a towed ADCP and a combination of model outputs were used at the Veracruz port construction in order to describe the hourly sediment transport and current modifications in and out of the new port. Owing to the stability of the system the new port was construction inside Vergara Bay, a low wave energy system with a tidal range of up to 0.40 m. The results show a two-current system pattern within the bay. The north side of the bay has an anticyclonic gyre, while the southern part of the bay shows a cyclonic gyre. Sediment transport trajectories were made every hour using the anchored ADCP, a numerical model and the weekly data obtained from the towed ADCP within the entire bay. The sediment transport trajectories were carefully tracked since the bay is surrounded by coral reef structures which are sensitive to sedimentation rate and water turbidity. The survey shows that during dredging and rock input used to build the wave breaker sediments were locally added (< 2500 m2) and local currents disperse it in less than 4 h. While the river input located in the middle of the bay and the sewer system plant may add more than 10 times this amount during a rainy day or during the tourist season. Finally, the coastal line obtained seasonally with a drone suggests that the southern part of the bay has not been modified by the construction of the new port located in the northern part of the bay, owing to the two subsystem division of the bay.

Keywords: Acoustic Doppler Current Profiler, construction around coral reefs, dredging, port construction, sediment transport monitoring,

Procedia PDF Downloads 221
3398 Risk Assessment on Construction Management with “Fuzzy Logy“

Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi

Abstract:

Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.

Keywords: fuzzy logy, risk, prioritization, assessment

Procedia PDF Downloads 586
3397 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 122
3396 Axisymmetric Rotating Flow over a Permeable Surface with Heat and Mass Transfer Effects

Authors: Muhammad Faraz, Talat Rafique, Jang Min Park

Abstract:

In this article, rotational flow above a permeable surface with a variable free stream angular velocity is considered. Main interest is to solve the associated heat/mass transport equations under different situations. Firstly, heat transport phenomena occurring in generalized vortex flow are analyzed under two altered heating processes, namely, the (i) prescribed surface temperature and (ii) prescribed heat flux. The vortex motion imposed at infinity is assumed to follow a power-law form 〖(r/r_0)〗^((2n-1)) where r denotes the radial coordinate, r_0 the disk radius, and n is a power-law parameter. Assuming a similar solution, the governing Navier-Stokes equations transform into a set of coupled ODEs which are treated numerically for the aforementioned thermal conditions. Secondly, mass transport phenomena accompanied by activation energy are incorporated into the generalized vortex flow situation. After finding self-similar equations, a numerical solution is furnished by using MATLAB's built-in function bvp4c.

Keywords: bödewadt flow, vortex flow, rotating flows, prescribed heat flux, permeable surface, activation energy

Procedia PDF Downloads 107
3395 Assessing the Impacts of Long-Range Forest Fire Emission Transport on Air Quality in Toronto, Ontario, Using MODIS Fire Data and HYSPLIT Trajectories

Authors: Bartosz Osiecki, Jane Liu

Abstract:

Pollutants emitted from forest fires such as PM₂.₅ and carbon monoxide (CO) have been found to impact the air quality of distant regions through long-range transport. PM₂.₅ is of particular concern due to its transport capacity and implications for human respiratory and cardiovascular health. As such, significant increases in PM₂.₅ concentrations have been exhibited in urban areas downwind of fire sources. This study seeks to expand on this literature by evaluating the impacts of long-range forest fire emission transport on air quality in Toronto, Ontario, as a means of evaluating the vulnerability of this major urban center to distant fire events. In order to draw correlations between the fire event and air pollution episode in Toronto, MODIS fire count data and HYPLSIT trajectories are used to assess the date, location, and severity of the fire and track the trajectory of emissions (respectively). Forward and back-trajectories are run, terminating at the West Toronto air monitoring station. PM₂.₅ and CO concentrations in Toronto during September 2017 are found to be significantly elevated, which is likely attributable to the fire activity. Other sites in Ontario including Toronto (East, North, Downtown), Mississauga, Brampton, and Hamilton (Downtown) exhibit similar peaks in PM₂.₅ concentrations. This work sheds light on the non-local, natural factors influencing air quality in urban areas. This is especially important in the context of climate change which is expected to exacerbate intense forest fire events in the future.

Keywords: air quality, forest fires, PM₂.₅, Toronto

Procedia PDF Downloads 124
3394 Disaggregate Travel Behavior and Transit Shift Analysis for a Transit Deficient Metropolitan City

Authors: Sultan Ahmad Azizi, Gaurang J. Joshi

Abstract:

Urban transportation has come to lime light in recent times due to deteriorating travel quality. The economic growth of India has boosted significant rise in private vehicle ownership in cities, whereas public transport systems have largely been ignored in metropolitan cities. Even though there is latent demand for public transport systems like organized bus services, most of the metropolitan cities have unsustainably low share of public transport. Unfortunately, Indian metropolitan cities have failed to maintain balance in mode share of various travel modes in absence of timely introduction of mass transit system of required capacity and quality. As a result, personalized travel modes like two wheelers have become principal modes of travel, which cause significant environmental, safety and health hazard to the citizens. Of late, the policy makers have realized the need to improve public transport system in metro cities for sustaining the development. However, the challenge to the transit planning authorities is to design a transit system for cities that may attract people to switch over from their existing and rather convenient mode of travel to the transit system under the influence of household socio-economic characteristics and the given travel pattern. In this context, the fast-growing industrial city of Surat is taken up as a case for the study of likely shift to bus transit. Deterioration of public transport system of bus after 1998, has led to tremendous growth in two-wheeler traffic on city roads. The inadequate and poor service quality of present bus transit has failed to attract the riders and correct the mode use balance in the city. The disaggregate travel behavior for trip generations and the travel mode choice has been studied for the West Adajan residential sector of city. Mode specific utility functions are calibrated under multi-nominal logit environment for two-wheeler, cars and auto rickshaws with respect to bus transit using SPSS. Estimation of shift to bus transit is carried indicate an average 30% of auto rickshaw users and nearly 5% of 2W users are likely to shift to bus transit if service quality is improved. However, car users are not expected to shift to bus transit system.

Keywords: bus transit, disaggregate travel nehavior, mode choice Behavior, public transport

Procedia PDF Downloads 255
3393 A Global Fuel Combustion Data Product and Its Application

Authors: Shu Tao, Rong Wang, Huizhong Shen, Ye Huang

Abstract:

High-resolution mapping of fuel combustion is essential for reducing uncertainties in assessments of greenhouse gases and air pollutant emissions. Such inventories provide valuable information for inferring carbon sinks, modeling pollutant transport, and developing control strategies. Previous inventories included only a few fuel types and were derived using national population proxies which may distort the geographical variation within countries. In this study, a global 0.1 degree by 0.1 degree geo-referenced inventory of fuel combustion (PKU-FUEL-2007) was developed for 64 fuel sub-types along with uncertainty analysis for the year 2007. Sub-national fuel consumption of large countries and major power-station locations were used. The disaggregation error can be reduced significantly by using the sub-nationally energy data, because the uneven distribution of per-capita fuel consumption within countries is taken into consideration. The PKU-FUEL was used to generate global emission inventories of CO2 (PKU-CO2-2007), polycyclic aromatic hydrocarbons (PKU-PAHs-2007), and black carbons (PKU-BC-2007). Atmospheric transport modeling and expsoure assessment were conducted for BC and PAHs based on the inventory.

Keywords: fuel, emission, BC, PAHs, atmospheric transport, exposure

Procedia PDF Downloads 323
3392 Enhanced Performance of Perovskite Solar Cells by Modifying Interfacial Properties Using MoS2 Nanoflakes

Authors: Kusum Kumari, Ramesh Banoth, V. S. Reddy Channu

Abstract:

Organic-inorganic perovskite solar cells (PrSCs) have emerged as a promising solar photovoltaic technology in terms of realizing high power conversion efficiency (PCE). However, their limited lifetime and poor device stability limits their commercialization in future. In this regard, interface engineering of the electron transport layer (ETL) using 2D materials have been currently used owing to their high carrier mobility, high thermal stability and tunable work function, which in turn enormously impact the charge carrier dynamics. In this work, we report an easy and effective way of simultaneously enhancing the efficiency of PrSCs along with the long-term stability through interface engineering via the incorporation of 2D-Molybdenum disulfide (2D-MoS₂, few layered nanoflakes) in mesoporous-Titanium dioxide (mp-TiO₂)scaffold electron transport buffer layer, and using poly 3-hexytheophene (P3HT) as hole transport layers. The PSCs were fabricated in ambient air conditions in device configuration, FTO/c-TiO₂/mp-TiO₂:2D-MoS₂/CH3NH3PbI3/P3HT/Au, with an active area of 0.16 cm². The best device using c-TiO₂/mp-TiO₂:2D-MoS₂ (0.5wt.%) ETL exhibited a substantial increase in PCE ~13.04% as compared to PCE ~8.75% realized in reference device fabricated without incorporating MoS₂ in mp-TiO₂ buffer layer. The incorporation of MoS₂ nanoflakes in mp-TiO₂ ETL not only enhances the PCE to ~49% but also leads to better device stability in ambient air conditions without encapsulation (retaining PCE ~86% of its initial value up to 500 hrs), as compared to ETLs without MoS₂.

Keywords: perovskite solar cells, MoS₂, nanoflakes, electron transport layer

Procedia PDF Downloads 68
3391 Education for Sustainability Using PBL on an Engineering Course at the National University of Colombia

Authors: Hernán G. Cortés-Mora, José I. Péna-Reyes, Alfonso Herrera-Jiménez

Abstract:

This article describes the implementation experience of Project-Based Learning (PBL) in an engineering course of the Universidad Nacional de Colombia, with the aim of strengthening student skills necessary for the exercise of their profession under a sustainability framework. Firstly, we present a literature review on the education for sustainability field, emphasizing the skills and knowledge areas required for its development, as well as the commitment of the Faculty of Engineering of the Universidad Nacional de Colombia, and other engineering faculties of the country, regarding education for sustainability. This article covers the general aspects of the course, describes how students team were formed, and how their experience was during the first semester of 2017. During this period two groups of students decided to develop their course project aiming to solve a problem regarding a Non-Governmental Organization (NGO) that works with head-of-household mothers in a low-income neighborhood in Bogota (Colombia). Subsequently, we show how sustainability is involved in the course, how tools are provided to students, and how activities are developed as to strengthen their abilities, which allows them to incorporate sustainability in their projects while also working on the methodology used to develop said projects. Finally, we introduce the results obtained by the students who sent the prototypes of their projects to the community they were working on and the conclusions reached by them regarding the course experience.

Keywords: sustainability, project-based learning, engineering education, higher education for sustainability

Procedia PDF Downloads 347
3390 A 3D Numerical Environmental Modeling Approach For Assessing Transport of Spilled Oil in Porous Beach Conditions under a Meso-Scale Tank Design

Authors: J. X. Dong, C. J. An, Z. Chen, E. H. Owens, M. C. Boufadel, E. Taylor, K. Lee

Abstract:

Shorelines are vulnerable to significant environmental impacts from oil spills. Stranded oil can cause potential short- to long-term detrimental effects along beaches that include injuries to the ecosystem, socio-economic and cultural resources. In this study, a three-dimensional (3D) numerical modeling approach is developed to evaluate the fate and transport of spilled oil for hypothetical oiled shoreline cases under various combinations of beach geomorphology and environmental conditions. The developed model estimates the spatial and temporal distribution of spilled oil for the various test conditions, using the finite volume method and considering the physical transport (dispersion and advection), sinks, and sorption processes. The model includes a user-friendly interface for data input on variables such as beach properties, environmental conditions, and physical-chemical properties of spilled oil. An experimental mesoscale tank design was used to test the developed model for dissolved petroleum hydrocarbon within shorelines. The simulated results for effects of different sediment substrates, oil types, and shoreline features for the transport of spilled oil are comparable to those obtained with a commercially available model. Results show that the properties of substrates and the oil removal by shoreline effects have significant impacts on oil transport in the beach area. Sensitivity analysis, through the application of the one-step-at-a-time method (OAT), for the 3D model identified hydraulic conductivity as the most sensitive parameter. The 3D numerical model allows users to examine the behavior of oil on and within beaches, assess potential environmental impacts, and provide technical support for decisions related to shoreline clean-up operations.

Keywords: dissolved petroleum hydrocarbons, environmental multimedia model, finite volume method, sensitivity analysis, total petroleum hydrocarbons

Procedia PDF Downloads 209
3389 Progress and Challenges of Smart Cities in India: An Exploratory Study

Authors: Sushil K. Sharma, Jeff Zhang, Saeed Tabar

Abstract:

Worldwide, several governments are utilizing the Internet of Things (IoT) and other information and communication technologies (ICTs) to create smart city infrastructures to improve both the quality of government services and citizen welfare. Over 700 cities from around the world have already started implementing their smart city projects. Smart City utilizes the network of connected things, or the Internet of Things (IoT), that interconnects devices and various components across city infrastructure, making them work together seamlessly to enhance the quality, performance, and interactivity of urban services, optimize resources, and reduce costs. Without developing smart cities, the accelerating growth of cities, and their disproportionate consumption of physical and social resources are unsustainable. In 2016, the Indian Government released a list of 100 cities with the intention of kick-starting the process of developing them into 'smart cities’ as part of the Smart Cities Mission. This study reports the progress and challenges of Smart City projects in India. The data were collected through the city/state government websites, media reports, and focus group discussions/interviews. The preliminary results indicate that smart city projects are not only behind in their implementation and scope but also lacks the sincerity for its implementation.

Keywords: smart city, smart government, Internet of Things, digital government

Procedia PDF Downloads 170
3388 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 450
3387 Modeling Sediment Transports under Extreme Storm Situation along Persian Gulf North Coast

Authors: Majid Samiee Zenoozian

Abstract:

The Persian Gulf is a bordering sea with an normal depth of 35 m and a supreme depth of 100 m near its narrow appearance. Its lengthen bathymetric axis divorces two main geological shires — the steady Arabian Foreland and the unbalanced Iranian Fold Belt — which are imitated in the conflicting shore and bathymetric morphologies of Arabia and Iran. The sediments were experimented with from 72 offshore positions through an oceanographic cruise in the winter of 2018. Throughout the observation era, several storms and river discharge actions happened, as well as the major flood on record since 1982. Suspended-sediment focus at all three sites varied in reaction to both wave resuspension and advection of river-derived sediments. We used hydrological models to evaluation and associate the wave height and inundation distance required to carriage the rocks inland. Our results establish that no known or possible storm happening on the Makran coast is accomplished of detaching and transporting the boulders. The fluid mud consequently is conveyed seaward due to gravitational forcing. The measured sediment focus and velocity profiles on the shelf provide a strong indication to provision this assumption. The sediment model is joined with a 3D hydrodynamic module in the Environmental Fluid Dynamics Code (EFDC) model that offers data on estuarine rotation and salinity transport under normal temperature conditions. 3-D sediment transport from model simulations specify dynamic sediment resuspension and transport near zones of highly industrious oyster beds.

Keywords: sediment transport, storm, coast, fluid dynamics

Procedia PDF Downloads 111
3386 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 354
3385 Unconventional Composite Inorganic Membrane Fabrication for Carbon Emissions Mitigation

Authors: Ngozi Nwogu, Godson Osueke, Mamdud Hossain, Edward Gobina

Abstract:

An unconventional composite inorganic ceramic membrane capable in carbon dioxide emission decline was fabricated and tested at laboratory scale to develop in conformism to various environmental guidelines to mitigate the effect of global warming. A review of the existing membrane technologies for carbon capture including the relevant gas transport mechanisms are presented and discussed. Single gas separation experiments using silica modified ceramic membrane with internal diameter 20mm, outside diameter 25mm and length of 368mm deposited on a macro porous supported reactor.was carried out to investigate individual gas permeation behaviours at different pressures and membrane efficiency after a dip coating method. Nitrogen, Carbon dioxide, Argon, Oxygen and Methane pure gases were used to investigate their individual permeation rates at various pressures. Results show that the gas flow rate increases with pressure drop. However at above a pressure of 3bar, CO2 permeability ratio to than the other gases indicated control of a more selective surface adsorptive transport mechanism.

Keywords: carbon dioxide, composite membranes, permeability, transport mechanisms

Procedia PDF Downloads 496
3384 Execution of Joinery in Large Scale Projects: Middle East Region as a Case Study

Authors: Arsany Philip Fawzy

Abstract:

This study is going to address the hurdles of project management in the joinery field. It is widely divided into two sections; the first one will shed light on how to execute large-scale projects with a specific focus on the middle east region. It will also raise major obstacles that may face the joinery team from the site clearance and the coordination between the joinery team and the construction team. The second section is going to technically analyze the commercial side of the joinery and how to control the main cost of the project to avoid financial problems. It will also suggest empirical solutions to monitor the cost impact (e.g., Variation of contract quantity and claims).

Keywords: clearance, quality, cost, variation, claim

Procedia PDF Downloads 92
3383 Traffic Study and Proposal for a Bike Lane for the University of the Basque Country

Authors: Elisabete Alberdi, Irantzu Álvarez, Laura Girón

Abstract:

The objective of this work is to propose a cycle path or network of paths to the UPV/EHU Campus in Leioa. The proposal will be presented from the point of view of sustainability. In order to achieve this, the roads that are already built will be used, and the road or network will be proposed to be built with the least amount of money possible. To select the most suitable route for the bike lane, various sources of information have been used. Through this data, we analyse the transport infrastructure and the mobility around the UPV/EHU Campus in Leioa. This work aims to satisfy the mobility needs of users on the University Campus to contribute to the sustainability of the campus.

Keywords: cycle lane, sustainability, accessibility, transport, agenda 2030

Procedia PDF Downloads 221
3382 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 557
3381 Learners as Consultants: Knowledge Acquisition and Client Organisations-A Student as Producer Case Study

Authors: Barry Ardley, Abi Hunt, Nick Taylor

Abstract:

As a theoretical and practical framework, this study uses the student-as-producer approach to learning in higher education, as adopted by the Lincoln International Business School, University of Lincoln, UK. Students as producer positions learners as skilled and capable agents, able to participate as partners with tutors in live research projects. To illuminate the nature of this approach to learning and to highlight its critical issues, the authors report on two guided student consultancy projects. These were set up with the assistance of two local organisations in the city of Lincoln, UK. Using the student as a producer model to deliver the projects enabled learners to acquire and develop a range of key skills and knowledge not easily accessible in more traditional educational settings. This paper presents a systematic case study analysis of the eight organising principles of the student-as-producer model, as adopted by university tutors. The experience of tutors implementing students as producers suggests that the model can be widely applied to benefit not only the learning and teaching experiences of higher education students and staff but additionally a university’s research programme and its community partners.

Keywords: consultancy, learning, student as producer, research

Procedia PDF Downloads 76
3380 Traffic Congestion: Causes, Consequences, and Planning Solutions

Authors: Raj Kumar Kama, Rajshree Kamat

Abstract:

Traffic congestion is a serious problem that is to be considered, and it is increasing day-by-day in urban areas that is seriously affecting the urban society. From the study, it is understood that increased urbanization and growth of population are the principal causes of congestion. It has adverse effects on society, economy, environment, and health. This study mainly focussed on studying and understanding the causes of congestion, consequences faced by urban society, and planning solutions to mitigate congestion. Techniques like transit oriented development (TOD) and integrated transport systems are more effective in mitigating traffic congestion.

Keywords: traffic congestion, transit oriented development, integrated transport system, urbanization

Procedia PDF Downloads 300
3379 Willingness to Pay for the Preservation of Geothermal Areas in Iceland: The Contingent Valuation Studies of Eldvörp and Hverahlíð

Authors: David Cook, Brynhildur Davidsdottir, Dadi. M. Kristofersson

Abstract:

The approval of development projects with significant environmental impacts implies that the economic costs of the affected environmental resources must be less than the financial benefits, but such irreversible decisions are frequently made without ever attempting to estimate the monetary value of the losses. Due to this knowledge gap in the processes informing decision-making, development projects are commonly approved despite the potential for social welfare to be undermined. Heeding a repeated call by the OECD to commence economic accounting of environmental impacts as part of the cost-benefit analysis process for Icelandic energy projects, this paper sets out the results pertaining to the nation’s first two contingent valuation studies of geothermal areas likely to be developed in the near future. Interval regression using log-transformation was applied to estimate willingness to pay (WTP) for the preservation of the high-temperature Eldvörp and Hverahlíð fields. The estimated mean WTP was 8,333 and 7,122 ISK for Eldvörp and Hverahlíð respectively. Scaled up to the Icelandic population of national taxpayers, this equates to estimated total economic value of 2.10 and 1.77 billion ISK respectively. These results reinforce arguments in favour of accounting for the environmental impacts of Iceland’s future geothermal power projects as a mandatory component of the exploratory and production license application process. Further research is necessary to understand the economic impacts to specific ecosystem services associated with geothermal environments, particularly connected to changes in recreational amenity. In so doing, it would be possible to gain greater comprehension of the various components of total economic value, evolving understanding of why one geothermal area – in this case, Eldvörp – has a higher preservation value than another.

Keywords: decision-making, contingent valuation, geothermal energy, preservation

Procedia PDF Downloads 206
3378 Development of a Forecast-Supported Approach for the Continuous Pre-Planning of Mandatory Transportation Capacity for the Design of Sustainable Transport Chains: A Literature Review

Authors: Georg Brunnthaller, Sandra Stein, Wilfried Sihn

Abstract:

Transportation service providers are facing increasing volatility concerning future transport demand. Short-term planning horizons and planning uncertainties lead to reduced capacity utilization and increasing empty mileage. To overcome these challenges, a model is proposed to continuously pre-plan future transportation capacity in order to redesign and adjust the intermodal fleet accordingly. It is expected that the model will enable logistics service providers to organize more economically and ecologically sustainable transport chains in a more flexible way. To further describe these planning aspects, this paper gives an overview on transportation planning problems in a structured way. The focus is on strategic and tactical planning levels, comprising relevant fleet-sizing, service-network-design and choice-of-carriers-problems. Models and their developed solution techniques are presented, and the literature review is concluded with an outlook to our future research directions.

Keywords: freight transportation planning, multimodal, fleet-sizing, service network design, choice of transportation mode, review

Procedia PDF Downloads 311
3377 Exploring the Role of Building Information Modeling for Delivering Successful Construction Projects

Authors: Muhammad Abu Bakar Tariq

Abstract:

Construction industry plays a crucial role in the progress of societies and economies. Furthermore, construction projects have social as well as economic implications, thus, their success/failure have wider impacts. However, the industry is lagging behind in terms of efficiency and productivity. Building Information Modeling (BIM) is recognized as a revolutionary development in Architecture, Engineering and Construction (AEC) industry. There are numerous interest groups around the world providing definitions of BIM, proponents describing its advantages and opponents identifying challenges/barriers regarding adoption of BIM. This research is aimed at to determine what actually BIM is, along with its potential role in delivering successful construction projects. The methodology is critical analysis of secondary data sources i.e. information present in public domain, which include peer reviewed journal articles, industry and government reports, conference papers, books, case studies etc. It is discovered that clash detection and visualization are two major advantages of BIM. Clash detection option identifies clashes among structural, architectural and MEP designs before construction actually commences, which subsequently saves time as well as cost and ensures quality during execution phase of a project. Visualization is a powerful tool that facilitates in rapid decision-making in addition to communication and coordination among stakeholders throughout project’s life cycle. By eliminating inconsistencies that consume time besides cost during actual construction, improving collaboration among stakeholders throughout project’s life cycle, BIM can play a positive role to achieve efficiency and productivity that consequently deliver successful construction projects.

Keywords: building information modeling, clash detection, construction project success, visualization

Procedia PDF Downloads 257
3376 Estimation of Aquifer Properties Using Pumping Tests: Case Study of Pydibhimavaram Industrial Area, Srikakulam, India

Authors: G. Venkata Rao, P. Kalpana, R. Srinivasa Rao

Abstract:

Adequate and reliable estimates of aquifer parameters are of utmost importance for proper management of vital groundwater resources. At present scenario the ground water is polluted because of industrial waste disposed over the land and the contaminants are transported in the aquifer from one area to another area which is depending on the characteristics of the aquifer and contaminants. To know the contaminant transport, the accurate estimation of aquifer properties is highly needed. Conventionally, these properties are estimated through pumping tests carried out on water wells. The occurrence and movement of ground water in the aquifer are characteristically defined by the aquifer parameters. The pumping (aquifer) test is the standard technique for estimating various hydraulic properties of aquifer systems, viz, transmissivity (T), hydraulic conductivity (K), storage coefficient (S) etc., for which the graphical method is widely used. The study area for conducting pumping test is Pydibheemavaram Industrial area near the coastal belt of Srikulam, AP, India. The main objective of the present work is to estimate the aquifer properties for developing contaminant transport model for the study area.

Keywords: aquifer, contaminant transport, hydraulic conductivity, industrial waste, pumping test

Procedia PDF Downloads 439
3375 An Economic Study for Fish Production in Egypt

Authors: Manal Elsayed Elkheshin, Rasha Saleh Mansour, Mohamed Fawzy Mohamed Eldnasury, Mamdouh Elbadry Mohamed

Abstract:

This research Aims to identify the main factors affecting the production and the fish consumption in Egypt, through the econometric estimation for various forms functions of fish production and fish consumption during the period (1991-2014), as the aim of this research to forecast the production and the fish consumption in Egypt until 2020, through determine the best standard methods using (ARIMA).This research also aims to the economic feasibility of the production of fish in aquaculture farms study; investment cost and represents the value of land, buildings, equipment and irrigation. Aquaculture requires three types of fish (Tilapia, carp fish, and mullet fish), and the total area of the farm, about an acre. The annual Fish production from this project about 3.5 tons. The annual investment costs of about 50500 pounds, Find conclude that the project can repay the cost of their investments after about 4 years and 5 months, and therefore recommend the implementation of the project, and internal rate of return reached (IRR) of about 22.1%, where it is clear that the rate of large internal rate of return, and achieves pound invested in this project annual return is estimated at 22.1 pounds, more than the opportunity cost, so we recommend the need to implement the project.Recommendations:1. Increasing the fish agriculture to decrease the gap of animal protein. 2.Increasing the number of mechanism fishing boats, and the provision of transport equipped to maintain the quality of fish production. 3.Encourage and attract the local and foreign investments, providing advice to the investor on the aquaculture field. 4. Action newsletters awareness of the importance of these projects where these projects resulted in a net profit after recovery in less than five years, IRR amounted to about 23%, which is much more than the opportunity cost of a bank interest rate is about 7%, helping to create work and graduates opportunities, and contribute to the reduction of imports of the fish, and improve the performance of the food trade balance.

Keywords: equation model, individual share, red meat, consumption, production, endogenous variable, exogenous variable, financial performance evaluates fish culture, feasibility study, fish production, aquaculture

Procedia PDF Downloads 358
3374 Effectiveness of ATMS (Advanced Transport Management Systems) in Asuncion, Paraguay

Authors: Sung Ho Oh

Abstract:

The advanced traffic lights, the system of traffic information collection and provision, the CCTVs for traffic control, and the traffic information center were installed in Asuncion, capital of Paraguay. After pre-post comparison of the installation, significant changes were found. Even though the traffic volumes were increased, travel speed was higher, so that travel time from origin to destination was decreased. the saving values for travel time, gas cost, and environmental cost are about 47 million US dollars per year. Satisfaction survey results for the installation were presented with statistical significance analysis.

Keywords: advanced transport management systems, effectiveness, Paraguay, traffic lights

Procedia PDF Downloads 346
3373 Integrating Experiential Real-World Learning in Undergraduate Degrees: Maximizing Benefits and Overcoming Challenges

Authors: Anne E. Goodenough

Abstract:

One of the most important roles of higher education professionals is to ensure that graduates have excellent employment prospects. This means providing students with the skills necessary to be immediately effective in the workplace. Increasingly, universities are seeking to achieve this by moving from lecture-based and campus-delivered curricula to more varied delivery, which takes students out of their academic comfort zone and allows them to engage with, and be challenged by, real world issues. One popular approach is integration of problem-based learning (PBL) projects into curricula. However, although the potential benefits of PBL are considerable, it can be difficult to devise projects that are meaningful, such that they can be regarded as mere ‘hoop jumping’ exercises. This study examines three-way partnerships between academics, students, and external link organizations. It studied the experiences of all partners involved in different collaborative projects to identify how benefits can be maximized and challenges overcome. Focal collaborations included: (1) development of real-world modules with novel assessment whereby the organization became the ‘client’ for student consultancy work; (2) frameworks where students collected/analyzed data for link organizations in research methods modules; (3) placement-based internships and dissertations; (4) immersive fieldwork projects in novel locations; and (5) students working as partners on staff-led research with link organizations. Focus groups, questionnaires and semi-structured interviews were used to identify opportunities and barriers, while quantitative analysis of students’ grades was used to determine academic effectiveness. Common challenges identified by academics were finding suitable link organizations and devising projects that simultaneously provided education opportunities and tangible benefits. There was no ‘one size fits all’ formula for success, but careful planning and ensuring clarity of roles/responsibilities were vital. Students were very positive about collaboration projects. They identified benefits to confidence, time-keeping and communication, as well as conveying their enthusiasm when their work was of benefit to the wider community. They frequently highlighted employability opportunities that collaborative projects opened up and analysis of grades demonstrated the potential for such projects to increase attainment. Organizations generally recognized the value of project outputs, but often required considerable assistance to put the right scaffolding in place to ensure projects worked. Benefits were maximized by ensuring projects were well-designed, innovative, and challenging. Co-publication of projects in peer-reviewed journals sometimes gave additional benefits for all involved, being especially beneficial for student curriculum vitae. PBL and student projects are by no means new pedagogic approaches: the novelty here came from creating meaningful three-way partnerships between academics, students, and link organizations at all undergraduate levels. Such collaborations can allow students to make a genuine contribution to knowledge, answer real questions, solve actual problems, all while providing tangible benefits to organizations. Because projects are actually needed, students tend to engage with learning at a deep level. This enhances student experience, increases attainment, encourages development of subject-specific and transferable skills, and promotes networking opportunities. Such projects frequently rely upon students and staff working collaboratively, thereby also acting to break down the traditional teacher/learner division that is typically unhelpful in developing students as advanced learners.

Keywords: higher education, employability, link organizations, innovative teaching and learning methods, interactions between enterprise and education, student experience

Procedia PDF Downloads 179