Search results for: Off–highway trucks
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 103

Search results for: Off–highway trucks

103 Impact of Vehicle Travel Characteristics on Level of Service: A Comparative Analysis of Rural and Urban Freeways

Authors: Anwaar Ahmed, Muhammad Bilal Khurshid, Samuel Labi

Abstract:

The effect of trucks on the level of service is determined by considering passenger car equivalents (PCE) of trucks. The current version of Highway Capacity Manual (HCM) uses a single PCE value for all tucks combined. However, the composition of truck traffic varies from location to location; therefore, a single PCE value for all trucks may not correctly represent the impact of truck traffic at specific locations. Consequently, present study developed separate PCE values for single-unit and combination trucks to replace the single value provided in the HCM on different freeways. Site specific PCE values, were developed using concept of spatial lagging headways (that is the distance between rear bumpers of two vehicles in a traffic stream) measured from field traffic data. The study used data from four locations on a single urban freeway and three different rural freeways in Indiana. Three-stage-leastsquares (3SLS) regression techniques were used to generate models that predicted lagging headways for passenger cars, single unit trucks (SUT), and combination trucks (CT). The estimated PCE values for single-unit and combination truck for basic urban freeways (level terrain) were: 1.35 and 1.60, respectively. For rural freeways the estimated PCE values for single-unit and combination truck were: 1.30 and 1.45, respectively. As expected, traffic variables such as vehicle flow rates and speed have significant impacts on vehicle headways. Study results revealed that the use of separate PCE values for different truck classes can have significant influence on the LOS estimation.

Keywords: Level of Service, Capacity Analysis, Lagging Headway.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2096
102 A Conceptual Framework of Scheduled Waste Management in Highway Industry

Authors: Nurul Nadhirah Anuar, Muhammad Fauzi Abdul Ghani

Abstract:

Scheduled waste management is very important in environmental and health aspects. In delivering services, highway industry has been indirectly involved in producing scheduled wastes. This paper aims to define the scheduled waste, to provide a conceptual framework of the scheduled waste management in highway industry, to highlight the effect of improper management of scheduled waste and to encourage future researchers to identify and share the present practice of scheduled waste management in their country. The understanding on effective management of scheduled waste will help the operators of highway industry, the academicians, future researchers, and encourage a friendly environment around the world. The study on scheduled waste management in highway industry is very crucial as highway transverse and run along kilometers crossing the various type of environment, residential and schools. Using Environmental Quality (Scheduled Waste) Regulations 2005 as a guide, this conceptual paper highlight several scheduled wastes produced by highway industry in Malaysia and provide a conceptual framework of scheduled waste management that focused on the highway industry. Understanding on scheduled waste management is vital in order to preserve the environment. Besides that, the waste substances are hazardous to human being. Many diseases have been associated with the improper management of schedule waste such as cancer, throat irritation and respiration problem.

Keywords: Asia Region, Environment, Highway Industry, Scheduled Waste.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2464
101 A Quadratic Programming for Truck-to-Door Assignment Problem

Authors: Y. Fathi, B. Karimi, S. M. J. Mirzapour Al-e-Hashem

Abstract:

Cross-docking includes receiving products supplied by a set of suppliers, unloading them from inbound trucks (ITs) at strip doors, consolidating and handling these products to stack doors based on their destinations, loading them into outbound trucks (OTs); then, delivering these products to customers. An effective assignment of the trucks to the doors would enhance the advantages of the cross-docking (e.g. reduction of the handling costs). This paper addresses the truck-to-door assignment problem in a cross-dock in which assignment of the ITs to the strip doors as well as assignment of the OTs to the stacks doors is determined so that total material handling cost in the cross-dock is minimized. Capacity constraints are applied for the ITs, OTs, strip doors, and stack doors. We develop a Quadratic Programming (QP) to formulate the problem. To solve it, the model is coded in LINGO software to specify the best assignment of the trucks to the doors.

Keywords: Cross-docking, truck-to-door assignment, supply chain, quadratic programming.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1735
100 Operational Risks for Highway Projects in Malaysia

Authors: Farid Ezanee Mohamed Ghazali

Abstract:

The Malaysia Highway Authority (MHA) was established by the Government in 1980 for the purpose of designing, constructing and maintaining toll highways in Malaysia that include the North-South Expressway and the Penang Bridge, which were procured using the publicly-funded traditional procurement. However following a recession in the mid 80-s, the operations of these tolledhighways had been privatized to ensure that their operational services continue through private financing as a result of long-term concession agreement concurred between the Malaysian Government and private operators. The change in the contract strategy for highway projects in Malaysia would have a great tendency to dictate a significant risk exposure towards the key parties involved, particularly the Malaysian Government as project principal, unless operational risks are clearly identified and managed via appropriate mitigation measures prior to a contract signing. This research identifies potential operational risks that have a possibility to occur in highway projects in Malaysia from the perspective of public sector clients. Since this research focuses on the operational risks for highway projects in Malaysia, the initial results acquired from literature review on the operational risks of highway projects in some Asian countries are then justified by a number of key individuals from the MHA through interviews. As a result, among key operational risks that have possibility to occur in the highway projects in Malaysia include initial toll-tariff decided by the Government, traffic congestion, change of road network and overloaded freight transportation, which could cause damage to the road surface and hence affecting the operation of a particular highway.

Keywords: Malaysia, operating highway project, operational risk.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3545
99 Study on Geometric Design of Nay Pyi Taw-Mandalay Expressway and Possible Improvements; Sagarinn-Myinsain Portion

Authors: War War Myint

Abstract:

Geometric design is an important part of planning process design for physical highway to fill up basic function of roads, to give good traffic service. It is found that most of the road safety problems occur at the horizontal curves and complex-compound curves. In this paper, review on Sagarinn-Myinsain Portion of Nay Pyi Taw - Mandalay highway has been conducted in aspect of geometric design induced road safety condition. Horizontal alignment of geometric features and curve details are reviewed based on (AASHTO) standard and revised by Autodesk Land Desktop Software. Moreover, 85th Percentile Operation Speeds (V85) with driver confidence on horizontal curves is evaluated in order to obtain the range of highway safety factor (FS). The length of the selected highway portion is 13.65 miles and 8 lanes. The results of this study can be used to investigate the possible hazardous locations in advance and to revise how design radius and super elevation should be for better road safety performance for the selected portion. Moreover, the relationship between highway safety and highway geometry characteristics can also be known.

Keywords: Geometric design; horizontal alignment; superelevation; 85th percentile operation speed (V85), safety factor (FS).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1538
98 Developing Efficient Testing and Unloading Procedures for a Local Sewage Holding Pit

Authors: Esra E. Aleisa

Abstract:

A local municipality has decided to build a sewage pit to receive residential sewage waste arriving by tank trucks. Daily accumulated waste are to be pumped to a nearby waste water treatment facility to be re-consumed for agricultural and construction projects. A discrete-event simulation model using Arena Software was constructed to assist in defining the capacity of the system in cubic meters, number of tank trucks to use the system, number of unload docks required, number of standby areas needed and manpower required for data collection at entrance checkpoint and truck tank load toxicity testing. The results of the model are statistically validated. Simulation turned out to be an excellent tool in the facility planning effort for the pit project, as it insured smooth flow lines of tank trucks load discharge and best utilization of facilities on site.

Keywords: Discrete-event simulation, Facilities Planning, Layout, Pit, Sewage management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1681
97 Tehran-Tabriz Intelligent Highway

Authors: P. Parvizi, F. Norouzifard, S.Mohammadi

Abstract:

The need to implement intelligent highways is much more emphasized with the growth of vehicle production line as well as vehicle intelligence. The control of intelligent vehicles in order to reduce human error and boost ease congestion is not accomplished solely by the aid of human resources. The present article is an attempt to introduce an intelligent control system based on a single central computer. In this project, central computer, without utilizing Global Positioning System (GPS), is capable of tracking all vehicles, crisis management and control, traffic guidance and recording traffic crimes along the highway. By the help of RFID technology, vehicles are connected to computerized systems, intelligent light poles and other available hardware along the way. By the aid of Wimax communicative technology, all components of the system are virtually connected together through local and global networks devised in them and the energy of the network is provided by the solar cells installed on the intelligent light poles.

Keywords: intelligent highway, intelligent light pole, highway automation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1754
96 Assessment of Landslide Volume for Alishan Highway Based On Database of Rainfall-Induced Slope Failure

Authors: Yun-Yao Chi, Ya-Fen Lee

Abstract:

In this paper, a study of slope failures along the Alishan Highway is carried out. An innovative empirical model is developed based on 15-year records of rainfall-induced slope failures. The statistical models are intended for assessing the volume of landslide for slope failure along the Alishan Highway in the future. The rainfall data considered in the proposed models include the effective cumulative rainfall and the critical rainfall intensity. The effective cumulative rainfall is defined at the point when the curve of cumulative rainfall goes from steep to flat. Then, the rainfall thresholds of landslide are established for assessing the volume of landslide and issuing warning and/or closure for the Alishan Highway during a future extreme rainfall. Slope failures during Typhoon Saola in 2012 demonstrate that the new empirical model is effective and applicable to other cases with similar rainfall conditions.

Keywords: Slope failure, landslide, volume, model, rainfall thresholds.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1771
95 Nonlinear Seismic Dynamic Response of Continuous Curved Highway Viaducts with Different Bearing Supports

Authors: Rinna Tanaka, Carlos Mendez Galindo, Toshiro Hayashikawa

Abstract:

The results show that the bridge equipped with seismic isolation bearing system shows a high amount of energy dissipation. The purpose of the present study is to analyze the overall performance of continuous curved highway viaducts with different bearing supports, with an emphasis on the effectiveness of seismic isolation based on lead rubber bearing and hedge reaction force bearing system consisted of friction sliding bearing and rubber bearing. The bridge seismic performance has been evaluated on six different cases with six bearing models. The effects of the different arrangement of bearing on the deck superstructure displacements, the seismic damage at the bottom of the piers, movement track at the pier-s top and the total and strain energies absorbed by the structure are evaluated. In conclusion, the results provide sufficient evidence of the effectiveness on the use of seismic isolation on steel curved highway bridges.

Keywords: Curved highway viaducts, non-linear dynamic response, seismic damage.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1634
94 Geotechnical Characteristics of Miocenemarl in the Region of Medea North-South Highway, Algeria

Authors: Y. Yongli, M. H. Aissa

Abstract:

The purpose of this paper aims for a geotechnical analysis based on experimental physical and mechanical characteristics of Miocene marl situated at Medea region in Algeria. More than 150 soil samples were taken in the investigation part of the North-South Highway which extends over than 53 km from Chiffa in the North to Berrouaghia in the South of Algeria. The analysis of data in terms of Atterberg limits, plasticity index, and clay content reflects an acceptable correlation justified by a high coefficient of regression which was compared with the previous works in the region. Finally, approximated equations that serve as a guideline for geotechnical design locally have been suggested.

Keywords: Correlation, geotechnical properties, Miocene marl, north-south highway.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1454
93 Truck Routing Problem Considering Platooning and Drivers’ Breaks

Authors: Xiaoyuan Yan, Min Xu

Abstract:

Truck platooning refers to a convoy of digitally connected automated trucks traveling safely with a small inter-vehicle gap. It has been identified as one of the most promising and applicable technologies towards automated and sustainable freight transportation. Although truck platooning delivers significant energy-saving benefits, it cannot be realized without good coordination of drivers’ shifts to lead the platoons subject to their mandatory breaks. Therefore, this study aims to route a fleet of trucks to their destinations using the least amount of fuel by maximizing platoon opportunities under the regulations of drivers’ mandatory breaks. We formulate this platoon coordination problem as a mixed-integer linear programming problem and solve it by CPLEX. Numerical experiments are conducted to demonstrate the effectiveness and efficiency of our proposed model. In addition, we also explore the impacts of drivers’ compulsory breaks on the fuel-savings performance. The results show a slight increase in the total fuel costs in the presence of drivers’ compulsory breaks, thanks to driving-while-resting benefit provided for the trailing trucks. This study may serve as a guide for the operators of automated freight transportation.

Keywords: Truck platooning, route optimization, compulsory breaks, energy saving.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 617
92 Traffic Congestion on Highways in Nigeria Causes, Effects and Remedies

Authors: Popoola M. O., Abiola S. O., Adeniji W. A.

Abstract:

This study investigates the causes, effects and remedies of traffic congestion which has become a common sight in most highways in Nigeria; Mowe/Ibafo section of the Lagos-Ibadan expressway was used as the case-study. 300 Structured questionnaires were distributed among the road users comprising drivers (Private and Commercial), passengers, pedestrians, traffic officers, church congregations, community leaders, Mowe/Ibafo residents, and other users of the road.

300 questionnaires were given out; the average of 276 well completed returned questionnaires formed the basis of the study and was analyzed by the Relative Importance Index (R.I.I.). The result from the study showed the causes of traffic congestion as inadequate road capacity, poor road pavement, poor traffic management, poor drainage system poor driving habit, poor parking habit, poor design junctions/round-about, presence of heavy trucks, lack of pedestrian facilities, lack of road furniture, lack of parking facilities and others. Effects of road congestion from the study are waste of time, delay movement, stress, accident, inability to forecast travel of time, fuel consumption, road rage, relocation, night driving, and environmental pollution. To drastically reduce these negative effects; there must be provision for adequate parking space, construction of proper drainage, enlarging the width of the road, rehabilitate all roads needing attention, public enlightenment, traffic education, hack down all illegal buildings/shops built on the right of way (ROW), create a separate/alternative root for trucks and heavy vehicles, provision of pedestrian facilities, In-depth training of transport/traffic personnel, ban all form of road trading/hawking, and reduce the number of bus-stop where necessary. It is hoped that this study will become the foundation of further research in the area of improve road traffic management on our major highway.

Keywords: Highways, Congestion, Traffic, Traffic congestion, traffic management, Nigeria.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12425
91 Public-Private Partnership Transportation Projects: An Exploratory Study

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results show that PPP highway projects on average have saved time and cost; however, the main benefit is a faster delivery rather than an under-budget completion. This study can provide better insights to understand PPP highways’ performance and assist practitioners in applying PPP for transportation projects with the opportunity to save time and cost.

Keywords: Cost, delivery method, highway, public-private partnership, schedule, transportation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 470
90 Development of a Value Evaluation Model of Highway Box-Girder Bridge

Authors: Hao Hsi Tseng

Abstract:

Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.

Keywords: Box girder bridge, deterioration, infrastructure, maintenance, value evaluation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1236
89 Design of Walking Beam Pendle Axle Suspension System

Authors: K. Arunachalam, P. Mannar Jawahar

Abstract:

This paper deals with design of walking beam pendel axle suspension system. This axles and suspension systems are mainly required for transportation of heavy duty and Over Dimension Consignment (ODC) cargo, which is exceeding legal limit in terms of length, width and height. Presently, in Indian transportation industry, ODC movement growth rate has increased in transportation of bridge sections (pre-cast beams), transformers, heavy machineries, boilers, gas turbines, windmill blades etc. However, current Indian standard road transport vehicles are facing lot of service and maintenance issues due to non availability of suitable axle and suspension to carry the ODC cargoes. This in turn will lead to increased number of road accidents, bridge collapse and delayed deliveries, which finally result in higher operating cost. Understanding these requirements, this work was carried out. These axles and suspensions are designed for optimum self – weight with maximum payload carrying capacity with better road stability.

Keywords: Heavy duty trailer, Off–highway trucks, Over dimension cargo, Walking beam pendel axle suspension.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5622
88 Traffic Violation Detection System based on RFID

Authors: S. Hajeb, M. Javadi, S. M. Hashemi, P. Parvizi

Abstract:

Road Traffic Accidents are a major cause of disability and death throughout the world. The control of intelligent vehicles in order to reduce human error and boost ease congestion is not accomplished solely by the aid of human resources. The present article is an attempt to introduce an intelligent control system based on RFID technology. By the help of RFID technology, vehicles are connected to computerized systems, intelligent light poles and other available hardware along the way. In this project, intelligent control system is capable of tracking all vehicles, crisis management and control, traffic guidance and recording Driving offences along the highway.

Keywords: RFID, Intelligent highway, Traffic violation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13979
87 Extent of Highway Capacity Loss Due to Rainfall

Authors: Hashim Mohammed Alhassan, Johnnie Ben-Edigbe

Abstract:

Traffic flow in adverse weather conditions have been investigated in this study for general traffic, week day and week end traffic. The empirical evidence is strong in support of the view that rainfall affects macroscopic traffic flow parameters. Data generated from a basic highway section along J5 in Johor Bahru, Malaysia was synchronized with 161 rain events over a period of three months. This revealed a 4.90%, 6.60% and 11.32% reduction in speed for light rain, moderate rain and heavy rain conditions respectively. The corresponding capacity reductions in the three rainfall regimes are 1.08% for light rain, 6.27% for moderate rain and 29.25% for heavy rain. In the week day traffic, speed drops of 8.1% and 16.05% were observed for light and heavy conditions. The moderate rain condition speed increased by 12.6%. The capacity drops for week day traffic are 4.40% for light rain, 9.77% for moderate rain and 45.90% for heavy rain. The weekend traffic indicated speed difference between the dry condition and the three rainy conditions as 6.70% for light rain, 8.90% for moderate rain and 13.10% for heavy rain. The capacity changes computed for the weekend traffic were 0.20% in light rain, 13.90% in moderate rain and 16.70% in heavy rain. No traffic instabilities were observed throughout the observation period and the capacities reported for each rain condition were below the norain condition capacity. Rainfall has tremendous impact on traffic flow and this may have implications for shock wave propagation.

Keywords: Highway Capacity, Dry condition, Rainfall Intensity, Rainy condition, Traffic Flow Rate.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2076
86 Towards an Enhanced Stochastic Simulation Model for Risk Analysis in Highway Construction

Authors: Anshu Manik, William G. Buttlar, Kasthurirangan Gopalakrishnan

Abstract:

Over the years, there is a growing trend towards quality-based specifications in highway construction. In many Quality Control/Quality Assurance (QC/QA) specifications, the contractor is primarily responsible for quality control of the process, whereas the highway agency is responsible for testing the acceptance of the product. A cooperative investigation was conducted in Illinois over several years to develop a prototype End-Result Specification (ERS) for asphalt pavement construction. The final characteristics of the product are stipulated in the ERS and the contractor is given considerable freedom in achieving those characteristics. The risk for the contractor or agency depends on how the acceptance limits and processes are specified. Stochastic simulation models are very useful in estimating and analyzing payment risk in ERS systems and these form an integral part of the Illinois-s prototype ERS system. This paper describes the development of an innovative methodology to estimate the variability components in in-situ density, air voids and asphalt content data from ERS projects. The information gained from this would be crucial in simulating these ERS projects for estimation and analysis of payment risks associated with asphalt pavement construction. However, these methods require at least two parties to conduct tests on all the split samples obtained according to the sampling scheme prescribed in present ERS implemented in Illinois.

Keywords: Asphalt Pavement, Risk Analysis, StochasticSimulation, QC/QA.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1513
85 Simulation Modeling for Analysis and Evaluation of the Internal Handling Fleet System at Shahid Rajaee Container Port

Authors: Parham Azimi, Mohammad Reza Ghanbari

Abstract:

The dramatic increasing of sea-freight container transportations and the developing trends for using containers in the multimodal handling systems through the sea, rail, road and land in nowadays market cause general managers of container terminals to face challenges such as increasing demand, competitive situation, new investments and expansion of new activities and need to use new methods to fulfil effective operations both along quayside and within the yard. Among these issues, minimizing the turnaround time of vessels is considered to be the first aim of every container port system. Regarding the complex structure of container ports, this paper presents a simulation model that calculates the number of trucks needed in the Iranian Shahid Rajaee Container Port for handling containers between the berth and the yard. In this research, some important criteria such as vessel turnaround time, gantry crane utilization and truck utilization have been considered. By analyzing the results of the model, it has been shown that increasing the number of trucks to 66 units has a significant effect on the performance indices of the port and can increase the capacity of loading and unloading up to 10.8%.

Keywords: Container Terminal, Gantry Crane Utilization, Simulation, Vessel Turnaround Time

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1879
84 Managing Truck Drivers’ Fatigue: A Critical Review of the Literature and Recommended Remedies

Authors: Mozhgan Aliakbari, Sara Moridpour

Abstract:

In recent years, much attention has been given to truck drivers’ fatigue management. Long working hours negatively influence truck drivers’ physiology, health, and safety. However, there is little empirical research in the heavy vehicle transport sector in Australia to identify the influence of working hours’ management on drivers’ fatigue and consequently, on the risk of crashes and injuries. There is no national legislation regulating the number of hours or kilometres travelled by truck drivers. Consequently, it is almost impossible to define a standard number of hours or kilometres for truck drivers in a safety management system. This paper reviews the existing studies concerning safe system interventions such as tachographs in relation to fatigue caused by long working hours. This paper also reviews the literature to identify the influence of frequency of rest breaks on the reduction of work-related road transport accidents involving trucks. A framework is presented to manage truck drivers’ fatigue, which may result in the reduction of injuries and fatalities involving heavy vehicles.

Keywords: Fatigue, time management, trucks, traffic safety.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1450
83 Advantages of Large Strands in Precast/Prestressed Concrete Highway Application

Authors: Amin Akhnoukh

Abstract:

The objective of this research is to investigate the advantages of using large-diameter 0.7 inch prestressing strands in pretention applications. The advantages of large-diameter strands are mainly beneficial in the heavy construction applications. Bridges and tunnels are subjected to a higher daily traffic with an exponential increase in trucks ultimate weight, which raise the demand for higher structural capacity of bridges and tunnels. In this research, precast prestressed I-girders were considered as a case study. Flexure capacities of girders fabricated using 0.7 inch strands and different concrete strengths were calculated and compared to capacities of 0.6 inch strands girders fabricated using equivalent concrete strength. The effect of bridge deck concrete strength on composite deck-girder section capacity was investigated due to its possible effect on final section capacity. Finally, a comparison was made to compare the bridge cross-section of girders designed using regular 0.6 inch strands and the large-diameter 0.7 inch. The research findings showed that structural advantages of 0.7 inch strands allow for using fewer bridge girders, reduced material quantity, and light-weight members. The structural advantages of 0.7 inch strands are maximized when high strength concrete (HSC) are used in girder fabrication, and concrete of minimum 5ksi compressive strength is used in pouring bridge decks. The use of 0.7 inch strands in bridge industry can partially contribute to the improvement of bridge conditions, minimize construction cost, and reduce the construction duration of the project.

Keywords: 0.7 Inch Strands, I-Girders, Pretension, Flexure Capacity

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2741
82 A Technical Perspective on Roadway Safety in Eastern Province: Data Evaluation and Spatial Analysis

Authors: Muhammad Farhan, Sayed Faruque, Amr Mohammed, Sami Osman, Omar Al-Jabari, Abdul Almojil

Abstract:

Saudi Arabia in recent years has seen drastic increase in traffic related crashes. With population of over 29 million, Saudi Arabia is considered as a fast growing and emerging economy. The rapid population increase and economic growth has resulted in rapid expansion of transportation infrastructure, which has led to increase in road crashes. Saudi Ministry of Interior reported more than 7,000 people killed and 68,000 injured in 2011 ranking Saudi Arabia to be one of the worst worldwide in traffic safety. The traffic safety issues in the country also result in distress to road users and cause and economic loss exceeding 3.7 billion Euros annually. Keeping this in view, the researchers in Saudi Arabia are investigating ways to improve traffic safety conditions in the country. This paper presents a multilevel approach to collect traffic safety related data required to do traffic safety studies in the region. Two highway corridors including King Fahd Highway 39 kilometre and Gulf Cooperation Council Highway 42 kilometre long connecting the cities of Dammam and Khobar were selected as a study area. Traffic data collected included traffic counts, crash data, travel time data, and speed data. The collected data was analysed using geographic information system to evaluate any correlation. Further research is needed to investigate the effectiveness of traffic safety related data when collected in a concerted effort.

Keywords: Crash Data, Data Collection, Traffic Safety.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2351
81 An Approaching Index to Evaluate a forward Collision Probability

Authors: Yuan-Lin Chen

Abstract:

This paper presents an approaching forward collision probability index (AFCPI) for alerting and assisting driver in keeping safety distance to avoid the forward collision accident in highway driving. The time to collision (TTC) and time headway (TH) are used to evaluate the TTC forward collision probability index (TFCPI) and the TH forward collision probability index (HFCPI), respectively. The Mamdani fuzzy inference algorithm is presented combining TFCPI and HFCPI to calculate the approaching collision probability index of the vehicle. The AFCPI is easier to understand for the driver who did not even have any professional knowledge in vehicle professional field. At the same time, the driver’s behavior is taken into account for suiting each driver. For the approaching index, the value 0 is indicating the 0% probability of forward collision, and the values 0.5 and 1 are indicating the 50% and 100% probabilities of forward collision, respectively. The AFCPI is useful and easy-to-understand for alerting driver to avoid the forward collision accidents when driving in highway.

Keywords: Approaching index, forward collision probability, time to collision, time headway.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1160
80 Application of AIMSUN Microscopic Simulation Model in Evaluating Side Friction Impacts on Traffic Stream Performance

Authors: H. Naghawi, M. Abu Shattal, W. Idewu

Abstract:

Side friction factors can be defined as all activities taking place at the side of the road and within the traffic stream, which would negatively affect the traffic stream performance. If the effect of these factors is adequately addressed and managed, traffic stream performance and capacity could be improved. The main objective of this paper is to identify and assess the impact of different side friction factors on traffic stream performance of a hypothesized urban arterial road. Hypothetical data were assumed mainly because there is no road operating under ideal conditions, with zero side friction, in the developing countries. This is important for the creation of the base model which is important for comparison purposes. For this purpose, three essential steps were employed. Step one, a hypothetical base model was developed under ideal traffic and geometric conditions. Step two, 18 hypothetical alternative scenarios were developed including side friction factors such as on-road parking, pedestrian movement, and the presence of trucks in the traffic stream. These scenarios were evaluated for one, two, and three lane configurations and under different traffic volumes ranging from low to high. Step three, the impact of side friction, of each scenario, on speed-flow models was evaluated using AIMSUN microscopic traffic simulation software. Generally, it was found that, a noticeable negative shift in the speed flow curves from the base conditions was observed for all scenarios. This indicates negative impact of the side friction factors on free flow speed and traffic stream average speed as well as on capacity.

Keywords: AIMSUN, parked vehicles, pedestrians, side friction, traffic performance, trucks.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 860
79 Approximating Maximum Speed on Road from Curvature Information of Bezier Curve

Authors: M. Y. Misro, A. Ramli, J. M. Ali

Abstract:

Bezier curves have useful properties for path generation problem, for instance, it can generate the reference trajectory for vehicles to satisfy the path constraints. Both algorithms join cubic Bezier curve segment smoothly to generate the path. Some of the useful properties of Bezier are curvature. In mathematics, curvature is the amount by which a geometric object deviates from being flat, or straight in the case of a line. Another extrinsic example of curvature is a circle, where the curvature is equal to the reciprocal of its radius at any point on the circle. The smaller the radius, the higher the curvature thus the vehicle needs to bend sharply. In this study, we use Bezier curve to fit highway-like curve. We use different approach to find the best approximation for the curve so that it will resembles highway-like curve. We compute curvature value by analytical differentiation of the Bezier Curve. We will then compute the maximum speed for driving using the curvature information obtained. Our research works on some assumptions; first, the Bezier curve estimates the real shape of the curve which can be verified visually. Even though, fitting process of Bezier curve does not interpolate exactly on the curve of interest, we believe that the estimation of speed are acceptable. We verified our result with the manual calculation of the curvature from the map.

Keywords: Speed estimation, path constraints, reference trajectory, Bezier curve.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4057
78 Enhancing Transit Trade, Facilitation System and Supply Chain Security for Local, Regional and an International Corridor

Authors: Moh’d A. AL-Shboul

Abstract:

Recently, and due to Arab spring and terrorism around the globe, pushing and driving most governments potentially to harmonize their border measures particularly the regional and an international transit trade within and among Customs Unions. The main purpose of this study is to investigate and provide an insight for monitoring and controlling the trade supply chain within and among different countries by using technological advancement (i.e. an electronic tracking system, etc.); furthermore, facilitate the local and intra-regional trade among countries through reviewing the recent trends and practical implementation of an electronic transit traffic and cargo that related to customs measures by introducing and supporting some case studies of several international and landlocked transit trade countries. The research methodology employed in this study was described as qualitative by conducting few interviews with managers, transit truck drivers, and traders and reviewing the related literature to collect qualitative data from secondary sources such as statistical reports, previous studies, etc. The results in this study show that Jordan and other countries around the globe that used an electronic tracking system for monitoring transit trade has led to a significant reduction in cost, effort and time in physical movement of goods internally and crossing through other countries. Therefore, there is no need to escort transit trucks by customs staff; hence, the rate of escort transit trucks is reduced by more than ninety percent, except the bulky and high duty goods. Electronic transit traffic has been increased; the average transit time journey has been reduced by more than seventy percent and has led to decrease in rates of smuggling up to fifty percent. The researcher recommends considering Jordan as regional and international office for tracking electronically and monitoring the transit trade for many considerations.

Keywords: Electronic tracking system, facilitation system, regional and international corridor, supply chain security, transit trade.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1402
77 An Effective Decision-Making Strategy Based on Multi-Objective Optimization for Commercial Vehicles in Highway Scenarios

Authors: Weiming Hu, Xu Li, Xiaonan Li, Zhong Xu, Li Yuan, Xuan Dong

Abstract:

Maneuver decision-making plays a critical role in high-performance intelligent driving. This paper proposes a risk assessment-based decision-making network (RADMN) to address the problem of driving strategy for the commercial vehicle. RADMN integrates two networks, aiming at identifying the risk degree of collision and rollover and providing decisions to ensure the effectiveness and reliability of driving strategy. In the risk assessment module, risk degrees of the backward collision, forward collision and rollover are quantified for hazard recognition. In the decision module, a deep reinforcement learning based on multi-objective optimization (DRL-MOO) algorithm is designed, which comprehensively considers the risk degree and motion states of each traffic participant. To evaluate the performance of the proposed framework, Prescan/Simulink joint simulation was conducted in highway scenarios. Experimental results validate the effectiveness and reliability of the proposed RADMN. The output driving strategy can guarantee the safety and provide key technical support for the realization of autonomous driving of commercial vehicles.

Keywords: Decision-making strategy, risk assessment, multi-objective optimization, commercial vehicle.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 592
76 Experimental Inspection of Damage and Performance Evaluation after Repair and Strengthening of Jiamusi Highway Prestressed Concrete Bridge in China

Authors: Ali Fadhil Naser, Wang Zonglin

Abstract:

The main objectives of this study are to inspect and identify any damage of jaimusi highway prestressed concrete bridge after repair and strengthening of damaged structural members and to evaluate the performance of the bridge structural members by adopting static load test. Inspection program after repair and strengthening includes identifying and evaluating the structural members of bridge such as T-shape cantilever structure, hanging beams, corbels, external tendons, anchor beams, sticking steel plate, and piers. The results of inspection show that the overall state of the bridge structural member after repair and strengthening is good. The results of rebound test of concrete strength show that the average strength of concrete is 46.31Mpa. Whereas, the average value of concrete strength of anchor beam is 49.82Mpa. According to the results of static load test, the experimental values are less than theoretical values of internal forces, deflection, and strain, indicating that the stiffness of the experimental structure, overall deformation and integrity satisfy the designed standard and the working performance is good, and the undertaking capacity has a certain surplus. There is not visible change in the length and width of cracks and there are not new cracks under experimental load.

Keywords: Jiamusi Bridge, Damage inspection, deflection, strain.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1812
75 Introducing Principles of Land Surveying by Assigning a Practical Project

Authors: Introducing Principles of Land Surveying by Assigning a Practical Project

Abstract:

A practical project is used in an engineering surveying course to expose sophomore and junior civil engineering students to several important issues related to the use of basic principles of land surveying. The project, which is the design of a two-lane rural highway to connect between two arbitrary points, requires students to draw the profile of the proposed highway along with the existing ground level. Areas of all cross-sections are then computed to enable quantity computations between them. Lastly, Mass-Haul Diagram is drawn with all important parts and features shown on it for clarity. At the beginning, students faced challenges getting started on the project. They had to spend time and effort thinking of the best way to proceed and how the work would flow. It was even more challenging when they had to visualize images of cut, fill and mixed cross sections in three dimensions before they can draw them to complete the necessary computations. These difficulties were then somewhat overcome with the help of the instructor and thorough discussions among team members and/or between different teams. The method of assessment used in this study was a well-prepared-end-of-semester questionnaire distributed to students after the completion of the project and the final exam. The survey contained a wide spectrum of questions from students' learning experience when this course development was implemented to students' satisfaction of the class instructions provided to them and the instructor's competency in presenting the material and helping with the project. It also covered the adequacy of the project to show a sample of a real-life civil engineering application and if there is any excitement added by implementing this idea. At the end of the questionnaire, students had the chance to provide their constructive comments and suggestions for future improvements of the land surveying course. Outcomes will be presented graphically and in a tabular format. Graphs provide visual explanation of the results and tables, on the other hand, summarize numerical values for each student along with some descriptive statistics, such as the mean, standard deviation, and coefficient of variation for each student and each question as well. In addition to gaining experience in teamwork, communications, and customer relations, students felt the benefit of assigning such a project. They noticed the beauty of the practical side of civil engineering work and how theories are utilized in real-life engineering applications. It was even recommended by students that such a project be exercised every time this course is offered so future students can have the same learning opportunity they had.

Keywords: Land surveying, highway project, assessment, evaluation, descriptive statistic.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1481
74 Capacity Building for Hazmat Transport Emergency Preparedness: 'Hotspot Impact Zone' Mapping from Flammable and Toxic Releases

Authors: U K Chakrabarti, Jigisha Parikh

Abstract:

Hazardous Material transportation by road is coupled with inherent risk of accidents causing loss of lives, grievous injuries, property losses and environmental damages. The most common type of hazmat road accident happens to be the releases (78%) of hazardous substances, followed by fires (28%), explosions (14%) and vapour/ gas clouds (6 %.). The paper is discussing initially the probable 'Impact Zones' likely to be caused by one flammable (LPG) and one toxic (ethylene oxide) chemicals being transported through a sizable segment of a State Highway connecting three notified Industrial zones in Surat district in Western India housing 26 MAH industrial units. Three 'hotspots' were identified along the highway segment depending on the particular chemical traffic and the population distribution within 500 meters on either sides. The thermal radiation and explosion overpressure have been calculated for LPG / Ethylene Oxide BLEVE scenarios along with toxic release scenario for ethylene oxide. Besides, the dispersion calculations for ethylene oxide toxic release have been made for each 'hotspot' location and the impact zones have been mapped for the LOC concentrations. Subsequently, the maximum Initial Isolation and the protective zones were calculated based on ERPG-3 and ERPG-2 values of ethylene oxide respectively which are estimated taking the worst case scenario under worst weather conditions. The data analysis will be helpful to the local administration in capacity building with respect to rescue / evacuation and medical preparedness and quantitative inputs to augment the District Offsite Emergency Plan document.

Keywords: Hotspot, Ethylene Oxide, LPG, MAH (MajorAccident Hazard).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1805