Operational Risks for Highway Projects in Malaysia
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Operational Risks for Highway Projects in Malaysia

Authors: Farid Ezanee Mohamed Ghazali

Abstract:

The Malaysia Highway Authority (MHA) was established by the Government in 1980 for the purpose of designing, constructing and maintaining toll highways in Malaysia that include the North-South Expressway and the Penang Bridge, which were procured using the publicly-funded traditional procurement. However following a recession in the mid 80-s, the operations of these tolledhighways had been privatized to ensure that their operational services continue through private financing as a result of long-term concession agreement concurred between the Malaysian Government and private operators. The change in the contract strategy for highway projects in Malaysia would have a great tendency to dictate a significant risk exposure towards the key parties involved, particularly the Malaysian Government as project principal, unless operational risks are clearly identified and managed via appropriate mitigation measures prior to a contract signing. This research identifies potential operational risks that have a possibility to occur in highway projects in Malaysia from the perspective of public sector clients. Since this research focuses on the operational risks for highway projects in Malaysia, the initial results acquired from literature review on the operational risks of highway projects in some Asian countries are then justified by a number of key individuals from the MHA through interviews. As a result, among key operational risks that have possibility to occur in the highway projects in Malaysia include initial toll-tariff decided by the Government, traffic congestion, change of road network and overloaded freight transportation, which could cause damage to the road surface and hence affecting the operation of a particular highway.

Keywords: Malaysia, operating highway project, operational risk.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1334896

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3552

References:


[1] Partnerships Victoria, Guideline Material: Risk Allocation and Contractual Issues www.partnerships.vic.gov.au/domino/web_notes/PartVic/PVSite.nsf/Fra meset (Access on 25/11/2005).
[2] Li, B., Akintoye, A., Edwards, P.J. and Hardcastle, C. (2005), Critical success factors for PPP/ PFI projects in the UK construction industry, Construction Management & Economics, Volume 23, Issue 5.
[3] Hashim, A. and Ku Hamid, K.H. (2007), Pollutant removal system on Senai-Desaru Expressway, 9th Joint Technical Conference (JTC) 2007 Penang, Malaysia.
[4] Meizhen, G. (2007), Expressway asset management and risk prevention - Institutional arrangement and overloaded transport control in China, 9th Joint Technical Conference (JTC) 2007 Penang, Malaysia.
[5] Cariawan, U. (2007), Risk management system development in PT Jasa Marga (Persero) Indonesia, 9th Joint Technical Conference (JTC) 2007 Penang, Malaysia
[6] Leerakomsan, S. (2007), Road safety on motorways during construction in Thailand, 9th Joint Technical Conference (JTC) 2007 Penang, Malaysia
[7] Wikipedia: Shadow Toll http://en.wikipedia.org/wiki/Shadow_toll (Access on 28/01/2009)