29 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 371
28 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 127
27 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 95
26 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 254
25 A Critical Study on Unprecedented Employment Discrimination and Growth of Contractual Labour Engaged by Rail Industry in India

Authors: Munmunlisa Mohanty, K. D. Raju

Abstract:

Rail industry is one of the model employers in India has separate national legislation (Railways Act 1989) to regulate its vast employment structure, functioning across the country. Indian Railway is not only the premier transport industry of the country; indeed, it is Asia’s most extensive rail network organisation and the world’s second-largest industry functioning under one management. With the growth of globalization of industrial products, the scope of anti-employment discrimination is no more confined to gender aspect only; instead, it extended to the unregularized classification of labour force applicable in the various industrial establishments in India. And the Indian Rail Industry inadvertently enhanced such discriminatory employment trends by engaging contractual labour in an unprecedented manner. The engagement of contractual labour by rail industry vanished the core “Employer-Employee” relationship between rail management and contractual labour who employed through the contractor. This employment trend reduces the cost of production and supervision, discourages the contractual labour from forming unions, and reduces its collective bargaining capacity. So, the primary intention of this paper is to highlight the increasing discriminatory employment scope for contractual labour engaged by Indian Railways. This paper critically analyses the diminishing perspective of anti-employment opportunity practiced by Indian Railways towards contractual labour and demands an urgent outlook on the probable scope of anti-employment discrimination against contractual labour engaged by Indian Railways. The researcher used doctrinal methodology where primary materials (Railways Act, Contract Labour Act and Occupational, health and Safety Code, 2020) and secondary data (CAG Report 2018, Railways Employment Regulation Rules, ILO Report etc.) are used for the paper.

Keywords: anti-employment, CAG Report, contractual labour, discrimination, Indian Railway, principal employer

Procedia PDF Downloads 128
24 Disclosure Extension of Oil and Gas Reserve Quantum

Authors: Ali Alsawayeh, Ibrahim Eldanfour

Abstract:

This paper examines the extent of disclosure of oil and gas reserve quantum in annual reports of international oil and gas exploration and production companies, particularly companies in untested international markets, such as Canada, the UK and the US, and seeks to determine the underlying factors that affect the level of disclosure on oil reserve quantum. The study is concerned with the usefulness of disclosure of oil and gas reserves quantum to investors and other users. Given the primacy of the annual report (10-k) as a source of supplemental reserves data about the company and as the channel through which companies disseminate information about their performance, the annual reports for one year (2009) were the central focus of the study. This comparative study seeks to establish whether differences exist between the sample companies, based on new disclosure requirements by the Securities and Exchange Commission (SEC) in respect of reserves classification and definition. The extent of disclosure of reserve is provided and compared among the selected companies. Statistical analysis is performed to determine whether any differences exist in the extent of disclosure of reserve under the determinant variables. This study shows that some factors would affect the extent of disclosure of reserve quantum in the above-mentioned countries, namely: company’s size, leverage and quality of auditor. Companies that provide reserves quantum in detail appear to display higher size. The findings also show that the level of leverage has affected companies’ reserves quantum disclosure. Indeed, companies that provide detailed reserves quantum disclosure tend to employ a ‘high-quality auditor’. In addition, the study found significant independent variable such as Profit Sharing Contracts (PSC). This factor could explain variations in the level of disclosure of oil reserve quantum between the contractor and host governments. The implementation of SEC oil and gas reporting requirements do not enhance companies’ valuation because the new rules are based only on past and present reserves information (proven reserves); hence, future valuation of oil and gas companies is missing for the market.

Keywords: comparison, company characteristics, disclosure, reserve quantum, regulation

Procedia PDF Downloads 379
23 Conception of Increasing the Efficiency of Excavation Shoring by Prestressing Diaphragm Walls

Authors: Mateusz Frydrych

Abstract:

The construction of diaphragm walls as excavation shoring as well as part of deep foundations is widely used in geotechnical engineering. Today's design challenges lie in the optimal dimensioning of the cross-section, which is demanded by technological considerations. Also in force is the issue of optimization and sustainable use of construction materials, including reduction of carbon footprint, which is currently a relevant challenge for the construction industry. The author presents the concept of an approach to achieving increased efficiency of diaphragm wall excavation shoring by using structural compression technology. The author proposes to implement prestressed tendons in a non-linear manner in the reinforcement cage. As a result bending moment is reduced, which translates into a reduction in the amount of steel needed in the section, a reduction in displacements, and a reduction in the scratching of the casing, including the achievement of better tightness. This task is rarely seen and has not yet been described in a scientific way in the literature. The author has developed a dynamic numerical model that allows the dimensioning of the cross-section of a prestressed shear wall, as well as the study of casing displacements and cross-sectional forces in any defined computational situation. Numerical software from the Sofistik - open source development environment - was used for the study, and models were validated in Plaxis software . This is an interesting idea that allows for optimizing the execution of construction works and reducing the required resources by using fewer materials and saving time. The author presents the possibilities of a prestressed diaphragm wall, among others, using. The example of a diaphragm wall working as a cantilever at the height of two underground floors without additional strutting or stability protection by using ground anchors. This makes the execution of the work more criminal for the contractor and, as a result, cheaper for the investor.

Keywords: prestressed diaphragm wall, Plaxis, Sofistik, innovation, FEM, optimisation

Procedia PDF Downloads 43
22 Democratising Rivers: Local River Conflicts in Rajasthan

Authors: Renu Sisodia

Abstract:

This paper attempted to explore and explain the local level river water conflicts in the larger context of state - society relations. This study also covered causes of local level river water conflicts in the catchment area of Bandi and Arvari river of Rajasthan. The focus of the study was on the emergence of community driven, decentralised management of river water bodies and strategies used by local communities to protect and manage river water conflicts. The research is conducted through the process of designing a framework based on essential theoretical and practical findings supported by primary and secondary data. Two in depth case study is conducted to understand the phenomenon in depth. The first field site is Bandi River of Pali district, which is about the struggle between textile industries, community and the State government in which water pollution is said to be one of the driving force of the conflict. Finding shows that the state is supporting textile industries in Pali district have not been adherent to the environmental ethics. Present legal infrastructure and local institutions fail to resolve the serious problem of water pollution in Bandi River and its adverse impact on the local community as a result local community resistance against the local administration and the state government. The second case illustrates the plight of Arvari River in Alwar district. Tussle for the ownership of fisheries between local community, the private fish contractor and State government has been the main bone of contestation. To resolve this conflict local community formed conflict management mechanism named as Arvari Parliament. Arvari Parliament has its own principle and rules to resolve water conflicts related to ownership of the river and use of the river water. The research findings also highlight the co-existence between conventional and modern practices in resolving conflicts.

Keywords: water, water pollution, water conflicts, water scarcity, conflict resolution, local community

Procedia PDF Downloads 454
21 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities

Procedia PDF Downloads 264
20 Post-Disaster Recovery and Impacts on Construction Resources: Case Studies of Queensland Catastrophic Events

Authors: Scott A. Abbott

Abstract:

This paper examines the increase in the occurrence of natural disasters worldwide and the need to support vulnerable communities in post-disaster recovery. Preparation and implementation of post-disaster recovery projects need to be improved to allow communities to recover infrastructure, housing, economically and socially following a catastrophe. With the continual rise in catastrophic events worldwide due to climate change, impacts on construction resources affect the ability for post-disaster recovery to be undertaken. This research focuses on case studies of catastrophic events in Queensland, Australia, to contribute to the body of knowledge and gain valuable insights on lessons learned from past events and how they have been managed. The aim of this research is to adopt qualitative data using semi-structured interviews from participants predominantly from the insurance sector to understand barriers that have previously and currently exist in post-disaster recovery. Existing literature was reviewed to reveal gaps in knowledge that needed to be tested. Qualitative data was collected and summarised from field research with the results analysed and discussed. Barriers that impacted post-disaster recovery included time, cost, and resource capability and capacity. Causal themes that impacted time and cost were identified as decision making, pre-planning, and preparedness, as well as effective communication across stakeholders. The research study applied a qualitative approach to the existing literature and case studies across Queensland, Australia, to identify existing and new barriers that impact post-disaster recovery. It was recommended to implement effective procurement strategies to assist in cost control; implement pre-planning and preparedness strategies across funder, contractor, and local governments; more effective and timely decision making to reduce time and cost impacts.

Keywords: construction recovery, cost, disaster recovery, resources, time

Procedia PDF Downloads 100
19 The Emergence of Construction Mafia in South Africa: The Implication on the Construction Industry

Authors: Thandokazi Nyangiwe, Christopher Amoah, Charles P. Mukumba

Abstract:

The South African construction sector is threatened by emerging black business forums called construction mafias. The emergence of the construction mafia has culminated in the disruptions and abandonment of construction sites resulting in the loss of jobs for construction workers. The paper examines the origin of construction mafias and their impact on the construction sector, including the potential ways to cope with their operations. A qualitative research approach was adopted for this study using open-ended interview questions to gather information from 30 key construction industry stakeholders, including contractors, subcontractors, consultants, and the construction project communities. Content and thematic analysis were used to analyse the data collected. The findings suggest that most participants do not fully understand the existence and operations of construction mafias in the construction industry. Construction mafias claim to be part of the local business forums. They disrupt construction projects and demand a certain amount, usually 30% of the construction value. Construction mafias frequently resort to intimidation and violence if their demands are unmet. Their operations have resulted in delayed completion of construction projects, abandonment of projects, and loss of income for the contractor and jobs for the construction workers. The interviews were limited to construction stakeholders. Because of the nature of the mafias’ operations, they could not be accessed for interviews for fear of being identified because of the connotation attached to their role as construction mafias. Construction project owners face disruptions of projects resulting in loss of equipment, materials, and income. Therefore, there is a need to sensitise the construction stakeholders in the construction industry regarding the existence and operations of the construction mafia and the implications on construction project performance and delivery. The findings will give insight into the operations of the construction mafias in the South African construction industry, which has caused disruptions in construction project sites. Stakeholders must find solutions to address the construction mafias’ disruptive actions on construction projects. The study presents an initial inquiry that will come up with how to manage and cope with the growing operations of construction mafias in the South African construction industry.

Keywords: black business forums, construction mafia, emergence, implication

Procedia PDF Downloads 85
18 A Review: The Impact of Core Quality the Empirical Review of Critical Factors on the Causes of Delay in Road Constructions Projects in the GCC Countries

Authors: Sulaiman Al-Hinai, Setyawan Widyarto

Abstract:

The aim of this study is to identify the critically dominating factors on the delays of road constructions in the GCC countries and their effects on project delivery in Arab countries. Towards the achieved of the objectives the study used the empirical literature from the all relevant online sources and database as many as possible. The findings of this study have summarized and short listed of the success factors in the two categories such as internal and external factors have caused to be influenced to delay of road constructions in the Arab regions. However, in the category of internal factors, there are 63 factors short listed from seven group of factors which has revealed to effects on the delay of road constructions especially, the consultant related factors, the contractor related factors, designed related factors, client related factors, labor related factors, material related issues, equipment related issues respectively. Moreover, for external related factors are also considered to summarized especially natural disaster (flood, hurricanes and cyclone etc.), conflict, war, global financial crisis, compensation delay to affected property owner, price fluctuated, unexpected ground conditions (soil and high-water level), changing of government regulations and laws, delays in obtaining permission from municipality, loss of time by traffic control and restrictions at job site, problem with inhabitant of community, delays in providing service from utilities (water and electricity’s) and accident during constructions accordingly. The present study also concluded the effects of above factors which has delay road constructions through increasing of cost and overrun it, taken overtime, creating of disputes, going for lawsuits, finally happening of abandon of projects. Thus, the present study has given the following recommendations to overcome of above problems by increasing of detailed site investigations, ensure careful monitoring and regular meetings, effective site management, collaborative working and effective coordination’s, proper and comprehensive planning and scheduling and ensure full and intensive commitment from all parties accordingly.

Keywords: Arab GCC countries, critical success factors, road constructions delay, project management

Procedia PDF Downloads 98
17 Practice on Design Knowledge Management and Transfer across the Life Cycle of a New-Built Nuclear Power Plant in China

Authors: Danying Gu, Xiaoyan Li, Yuanlei He

Abstract:

As a knowledge-intensive industry, nuclear industry highly values the importance of safety and quality. The life cycle of a NPP (Nuclear Power Plant) can last 100 years from the initial research and design to its decommissioning. How to implement the high-quality knowledge management and how to contribute to a more safe, advanced and economic NPP (Nuclear Power Plant) is the most important issue and responsibility for knowledge management. As the lead of nuclear industry, nuclear research and design institute has competitive advantages of its advanced technology, knowledge and information, DKM (Design Knowledge Management) of nuclear research and design institute is the core of the knowledge management in the whole nuclear industry. In this paper, the study and practice on DKM and knowledge transfer across the life cycle of a new-built NPP in China is introduced. For this digital intelligent NPP, the whole design process is based on a digital design platform which includes NPP engineering and design dynamic analyzer, visualization engineering verification platform, digital operation maintenance support platform and digital equipment design, manufacture integrated collaborative platform. In order to make all the design data and information transfer across design, construction, commissioning and operation, the overall architecture of new-built digital NPP should become a modern knowledge management system. So a digital information transfer model across the NPP life cycle is proposed in this paper. The challenges related to design knowledge transfer is also discussed, such as digital information handover, data center and data sorting, unified data coding system. On the other hand, effective delivery of design information during the construction and operation phase will contribute to the comprehensive understanding of design ideas and components and systems for the construction contractor and operation unit, largely increasing the safety, quality and economic benefits during the life cycle. The operation and maintenance records generated from the NPP operation process have great significance for maintaining the operating state of NPP, especially the comprehensiveness, validity and traceability of the records. So the requirements of an online monitoring and smart diagnosis system of NPP is also proposed, to help utility-owners to improve the safety and efficiency.

Keywords: design knowledge management, digital nuclear power plant, knowledge transfer, life cycle

Procedia PDF Downloads 245
16 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 174
15 Zooming into the Leadership Behaviours Desired by the 21st Century Workforce: Introduction of the Research Theory and Methods

Authors: Anita Bela, Marta Juhasz

Abstract:

Adapting to the always-changing environment comes with complex determinants. The authors are zooming into one aspect only when the current workforce comes with obstacles by being less keen to stay engaged, even short or mid-term, resulting in additional challenges impacting the business performance. Seeing these occurring in practice made the researchers eager to gain a better understanding of the reasons behind. The paper aims to provide an overview of the theoretical background and research methods planned for the different stages of the research. The theoretical part takes the leadership behaviors under lens while the focus is on finding ways to attract and retain those who prefer working under more flexible employment conditions (e.g. contractor, contingent worker, etc.). These are considered as the organizational values and along with the power of people management are having their engaging relevance. The organizational culture (visible or invisible level) is clearly the mirror of the set of shared values guiding all members of the companies towards acceptable behavior. The applied research method, inductive reasoning was selected since the focus and questions raised in this research are results of specific observations made on the employees (various employment types) and leaders of start-ups and corporates. By comparing the similarities and differences, the researchers are hoping to prove the readiness and agility of the start-up culture for the desired leadership behaviours of the current and future workforce against the corporate culture. While exploring the preferences and engaging factors of the 21st-century workforce the data gathering would happen through website analysis – using ATLAS.ti qualitative software – followed by interview sessions where demographics will be collected and preferred leadership behaviors - using the Critical Incident Technique. Moreover, a short engagement survey will be administered to understand the linkage between the organizational culture type and engagement level. To conclude, after gaining theoretical understanding, we will zoom back to the employees to reveal the behaviors to be followed to achieve engagement in an environment where nothing is stable and where the companies always must keep their agile eyes and reactions vivid.

Keywords: leadership behaviours, organizational culture, qualitative analysis, workforce engagement

Procedia PDF Downloads 90
14 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 186
13 The Impact of Artificial Intelligence on Medicine Production

Authors: Yasser Ahmed Mahmoud Ali Helal

Abstract:

The use of CAD (Computer Aided Design) technology is ubiquitous in the architecture, engineering and construction (AEC) industry. This has led to its inclusion in the curriculum of architecture schools in Nigeria as an important part of the training module. This article examines the ethical issues involved in implementing CAD (Computer Aided Design) content into the architectural education curriculum. Using existing literature, this study begins with the benefits of integrating CAD into architectural education and the responsibilities of different stakeholders in the implementation process. It also examines issues related to the negative use of information technology and the perceived negative impact of CAD use on design creativity. Using a survey method, data from the architecture department of University was collected to serve as a case study on how the issues raised were being addressed. The article draws conclusions on what ensures successful ethical implementation. Millions of people around the world suffer from hepatitis C, one of the world's deadliest diseases. Interferon (IFN) is treatment options for patients with hepatitis C, but these treatments have their side effects. Our research focused on developing an oral small molecule drug that targets hepatitis C virus (HCV) proteins and has fewer side effects. Our current study aims to develop a drug based on a small molecule antiviral drug specific for the hepatitis C virus (HCV). Drug development using laboratory experiments is not only expensive, but also time-consuming to conduct these experiments. Instead, in this in silicon study, we used computational techniques to propose a specific antiviral drug for the protein domains of found in the hepatitis C virus. This study used homology modeling and abs initio modeling to generate the 3D structure of the proteins, then identifying pockets in the proteins. Acceptable lagans for pocket drugs have been developed using the de novo drug design method. Pocket geometry is taken into account when designing ligands. Among the various lagans generated, a new specific for each of the HCV protein domains has been proposed.

Keywords: drug design, anti-viral drug, in-silicon drug design, hepatitis C virus (HCV) CAD (Computer Aided Design), CAD education, education improvement, small-size contractor automatic pharmacy, PLC, control system, management system, communication

Procedia PDF Downloads 32
12 Management of Permits and Regulatory Compliance Obligations for the East African Crude Oil Pipeline Project

Authors: Ezra Kavana

Abstract:

This article analyses the role those East African countries play in enforcing crude oil pipeline regulations. The paper finds that countries are more likely to have responsibility for enforcing these regulations if they have larger networks of gathering and transmission lines and if their citizens are more liberal and more pro-environment., Pipeline operations, transportation costs, new pipeline construction, and environmental effects are all heavily controlled. All facets of pipeline systems and the facilities connected to them are governed by statutory bodies. In order to support the project manager on such new pipeline projects, companies building and running these pipelines typically include personnel and consultants who specialize in these permitting processes. The primary permissions that can be necessary for pipelines carrying different commodities are mentioned in this paper. National, regional, and local municipalities each have their own permits. Through their right-of-way group, the contractor's project compliance leadership is typically directly responsible for obtaining those permits, which are typically obtained through government agencies. The whole list of local permits needed for a planned pipeline can only be found after a careful field investigation. A country's government regulates pipelines that are entirely within its borders. With a few exceptions, state regulations governing ratemaking and safety have been enacted to be consistent with regulatory requirements. Countries that produce a lot of energy are typically more involved in regulating pipelines than countries that produce little to no energy. To identify the proper regulatory authority, it is important to research the several government agencies that regulate pipeline transportation. Additionally, it's crucial that the scope determination of a planned project engage with a various external professional with experience in linear facilities or the company's pipeline construction and environmental professional to identify and obtain any necessary design clearances, permits, or approvals. These professionals can offer precise estimations of the costs and length of time needed to process necessary permits. Governments with a stronger energy sector, on the other hand, are less likely to take on control. However, the performance of the pipeline or national enforcement activities are unaffected significantly by whether a government has taken on control. Financial fines are the most efficient government enforcement instrument because they greatly reduce occurrences and property damage.

Keywords: crude oil, pipeline, regulatory compliance, and construction permits

Procedia PDF Downloads 57
11 Identifying the Challenges of Subcontractors Management in Building Area Projects and Providing Solutions (Supply Chain Management Approach)

Authors: Hamideh Sadat Zekri, Seyed Mojtaba Hosseinalipour, Mohammadreza Hafezi

Abstract:

Nowadays, an organization cannot usually overcome all tasks singly due to the increasing complexity and vast expanse of projects, increment in uncertainty of activities, fast advances in technology, advent and influence of various factors in decision-making and implication of projects, and competitive atmosphere of different affairs. Thus, firms proceed to outsource the tasks to subcontractors. Nevertheless, large Iranian contracting companies suffer from extra consumed costs and time owing to conflicts between the activities of suppliers and subcontractors. The paucity of coordination in planning and execution, scarcity of coordination among suppliers, subcontractors, and the main contractor during the implementation of construction activities and also the lack of proper management of the aforesaid situation result in the growth of contradictions, number of claims, and legal issues in a project and consequently impose enormous expenses on those companies. Regarding the prosperity of supply chain management in other industries, its importance is increasingly getting appreciated in the field of construction. The ultimate aim of supply chain management is an effective delivery of the best value for customers, which is achievable by encouraging the members to interact and collaborate. In the present research, there was an effort to obtain a set of relevant challenges in the managing of subcontractors by identifying the main contractors and subcontractors and their role in the execution of projects and the supply chain management in the construction industry. Then, some of those challenges were selected in accordance with the views of industry professionals and academic experts. In the next step, a questionnaire was prepared and completed based on the analytic hierarchy process (AHP) and the challenges were prioritized. When it comes to subcontractors, the findings of the research demonstrate that difficulties in timely payments, alterations in approved drawings and the lack of rectification of job after completion by the subcontractor, paucity of a predetermined and legal process for qualifications of subcontractors, neglecting the supply chain processes in material procurement from producers, and delays in delivery of works by a subcontractor are the most significant problems. Finally, some solutions for encountering, eradicating, or reducing of mentioned problems are presented in accordance with previous studies and a survey from specialists.

Keywords: main contractors, subcontractors, supply chain management, construction supply chain, analytic hierarchy process, solution

Procedia PDF Downloads 24
10 Decision-Making Process Based on Game Theory in the Process of Urban Transformation

Authors: Cemil Akcay, Goksun Yerlikaya

Abstract:

Buildings are the living spaces of people with an active role in every aspect of life in today's world. While some structures have survived from the early ages, most of the buildings that completed their lifetime have not transported to the present day. Nowadays, buildings that do not meet the social, economic, and safety requirements of the age return to life with a transformation process. This transformation is called urban transformation. Urban transformation is the renewal of the areas with a risk of disaster and the technological infrastructure required by the structure. The transformation aims to prevent damage to earthquakes and other disasters by rebuilding buildings that have completed their non-earthquake-resistant economic life. It is essential to decide on other issues related to conversion and transformation in places where most of the building stock should transform into the first-degree earthquake belt, such as Istanbul. In urban transformation, property owners, local authority, and contractor must deal at a common point. Considering that hundreds of thousands of property owners are sometimes in the areas of transformation, it is evident how difficult it is to make the deal and decide. For the optimization of these decisions, the use of game theory is foreseeing. The main problem in this study is that the urban transformation is carried out in place, or the building or buildings are transport to a different location. There are many stakeholders in the Istanbul University Cerrahpaşa Medical Faculty Campus, which is planned to be carried out in the process of urban transformation, was tried to solve the game theory applications. An analysis of the decisions given on a real urban transformation project and the logical suitability of decisions taken without the use of game theory were also supervised using game theory. In each step of this study, many decision-makers are classifying according to a specific logical sequence, and in the game trees that emerged as a result of this classification, Nash balances were tried to observe, and optimum decisions were determined. All decisions taken for this project have been subjected to two significant differentiated comparisons using game theory, and as decisions are taken without the use of game theory, and according to the results, solutions for the decision phase of the urban transformation process introduced. The game theory model developed from beginning to the end of the urban transformation process, particularly as a solution to the difficulty of making rational decisions in large-scale projects with many participants in the decision-making process. The use of a decision-making mechanism can provide an optimum answer to the demands of the stakeholders. In today's world for the construction sector, it is also seeing that the game theory is a non-surprising consequence of the fact that it is the most critical issues of planning and making the right decision in future years.

Keywords: urban transformation, the game theory, decision making, multi-actor project

Procedia PDF Downloads 102
9 Strategic Public Procurement: A Lever for Social Entrepreneurship and Innovation

Authors: B. Orser, A. Riding, Y. Li

Abstract:

To inform government about how gender gaps in SME ( small and medium-sized enterprise) contracting might be redressed, the research question was: What are the key obstacles to, and response strategies for, increasing the engagement of women business owners among SME suppliers to the government of Canada? Thirty-five interviews with senior policymakers, supplier diversity organization executives, and expert witnesses to the Canadian House of Commons, Standing Committee on Government Operations and Estimates. Qualitative data were conducted and analysed using N’Vivo 11 software. High order response categories included: (a) SME risk mitigation strategies, (b) SME procurement program design, and (c) performance measures. Primary obstacles cited were government red tape and long and complicated requests for proposals (RFPs). The majority of 'common' complaints occur when SMEs have questions about the federal procurement process. Witness responses included use of outcome-based rather than prescriptive procurement practices, more agile procurement, simplified RFPs, making payment within 30 days a procurement priority. Risk mitigation strategies included provision of procurement officers to assess risks and opportunities for businesses and development of more agile procurement procedures and processes. Recommendations to enhance program design included: improved definitional consistency of qualifiers and selection criteria, better co-ordination across agencies; clarification about how SME suppliers benefit from federal contracting; goal setting; specification of categories that are most suitable for women-owned businesses; and, increasing primary contractor awareness about the importance of subcontract relationships. Recommendations also included third-party certification of eligible firms and the need to enhance SMEs’ financial literacy to reduce financial errors. Finally, there remains the need for clear and consistent pre-program statistics to establish baselines (by sector, issuing department) performance measures, targets based on percentage of contracts granted, value of contract, percentage of target employee (women, indigenous), and community benefits including hiring local employees. The study advances strategies to enhance federal procurement programs to facilitate socio-economic policy objectives.

Keywords: procurement, small business, policy, women

Procedia PDF Downloads 90
8 Necessity for a Standardized Occupational Health and Safety Management System: An Exploratory Study from the Danish Offshore Wind Sector

Authors: Dewan Ahsan

Abstract:

Denmark is well ahead in generating electricity from renewable sources. The offshore wind sector is playing the pivotal role to achieve this target. Though there is a rapid growth of offshore wind sector in Denmark, still there is a dearth of synchronization in OHS (occupational health and safety) regulation and standards. Therefore, this paper attempts to ascertain: i) what are the major challenges of the company specific OHS standards? ii) why does the offshore wind industry need a standardized OHS management system? and iii) who can play the key role in this process? To achieve these objectives, this research applies the interview and survey techniques. This study has identified several key challenges in OHS management system which are; gaps in coordination and communication among the stakeholders, gaps in incident reporting systems, absence of a harmonized OHS standard and blame culture. Furthermore, this research has identified eleven key stakeholders who are actively involve with the offshore wind business in Denmark. As noticed, the relationships among these stakeholders are very complex specially between operators and sub-contractors. The respondent technicians are concerned with the compliance of various third-party OHS standards (e.g. ISO 31000, ISO 29400, Good practice guidelines by G+) which are applying by various offshore companies. On top of these standards, operators also impose their own OHS standards. From the technicians point of angle, many of these standards are not even specific for the offshore wind sector. So, it is a big challenge for the technicians and sub-contractors to comply with different company specific standards which also elevate the price of their services offer to the operators. For instance, when a sub-contractor is competing for a bidding, it must fulfill a number of OHS requirements (which demands many extra documantions) set by the individual operator and/the turbine supplier. According to sub-contractors’ point of view these extra works consume too much time to prepare the bidding documents and they also need to train their employees to pass the specific OHS certification courses to accomplish the demand for individual clients and individual project. The sub-contractors argued that in many cases these extra documentations and OHS certificates are inessential to ensure the quality service. So, a standardized OHS management procedure (which could be applicable for all the clients) can easily solve this problem. In conclusion, this study highlights that i) development of a harmonized OHS standard applicable for all the operators and turbine suppliers, ii) encouragement of technicians’ active participation in the OHS management, iii) development of a good safety leadership, and, iv) sharing of experiences among the stakeholders (specially operators-operators-sub contractors) are the most vital strategies to overcome the existing challenges and to achieve the goal of 'zero accident/harm' in the offshore wind industry.

Keywords: green energy, offshore, safety, Denmark

Procedia PDF Downloads 186
7 Effect of Fresh Concrete Curing Methods on Its Compressive Strength

Authors: Xianghe Dai, Dennis Lam, Therese Sheehan, Naveed Rehman, Jie Yang

Abstract:

Concrete is one of the most used construction materials that may be made onsite as fresh concrete and then placed in formwork to produce the desired shapes of structures. It has been recognized that the raw materials and mix proportion of concrete dominate the mechanical characteristics of hardened concrete, and the curing method and environment applied to the concrete in early stages of hardening will significantly influence the concrete properties, such as compressive strength, durability, permeability etc. In construction practice, there are various curing methods to maintain the presence of mixing water throughout the early stages of concrete hardening. They are also beneficial to concrete in hot weather conditions as they provide cooling and prevent the evaporation of water. Such methods include ponding or immersion, spraying or fogging, saturated wet covering etc. Also there are various curing methods that may be implemented to decrease the level of water lost which belongs to the concrete surface, such as putting a layer of impervious paper, plastic sheeting or membrane on the concrete to cover it. In the concrete material laboratory, accelerated strength gain methods supply the concrete with heat and additional moisture by applying live steam, coils that are subject to heating or pads that have been warmed electrically. Currently when determining the mechanical parameters of a concrete, the concrete is usually sampled from fresh concrete on site and then cured and tested in laboratories where standardized curing procedures are adopted. However, in engineering practice, curing procedures in the construction sites after the placing of concrete might be very different from the laboratory criteria, and this includes some standard curing procedures adopted in the laboratory that can’t be applied on site. Sometimes the contractor compromises the curing methods in order to reduce construction costs etc. Obviously the difference between curing procedures adopted in the laboratory and those used on construction sites might over- or under-estimate the real concrete quality. This paper presents the effect of three typical curing methods (air curing, water immersion curing, plastic film curing) and of maintaining concrete in steel moulds on the compressive strength development of normal concrete. In this study, Portland cement with 30% fly ash was used and different curing periods, 7 days, 28 days and 60 days were applied. It was found that the highest compressive strength was observed from concrete samples to which 7-day water immersion curing was applied and from samples maintained in steel moulds up to the testing date. The research results implied that concrete used as infill in steel tubular members might develop a higher strength than predicted by design assumptions based on air curing methods. Wrapping concrete with plastic film as a curing method might delay the concrete strength development in the early stages. Water immersion curing for 7 days might significantly increase the concrete compressive strength.

Keywords: compressive strength, air curing, water immersion curing, plastic film curing, maintaining in steel mould, comparison

Procedia PDF Downloads 267
6 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 125
5 Verification of Geophysical Investigation during Subsea Tunnelling in Qatar

Authors: Gary Peach, Furqan Hameed

Abstract:

Musaimeer outfall tunnel is one of the longest storm water tunnels in the world, with a total length of 10.15 km. The tunnel will accommodate surface and rain water received from the drainage networks from 270 km of urban areas in southern Doha with a pumping capacity of 19.7m³/sec. The tunnel is excavated by Tunnel Boring Machine (TBM) through Rus Formation, Midra Shales, and Simsima Limestone. Water inflows at high pressure, complex mixed ground, and weaker ground strata prone to karstification with the presence of vertical and lateral fractures connected to the sea bed were also encountered during mining. In addition to pre-tender geotechnical investigations, the Contractor carried out a supplementary offshore geophysical investigation in order to fine-tune the existing results of geophysical and geotechnical investigations. Electric resistivity tomography (ERT) and Seismic Reflection survey was carried out. Offshore geophysical survey was performed, and interpretations of rock mass conditions were made to provide an overall picture of underground conditions along the tunnel alignment. This allowed the critical tunnelling area and cutter head intervention to be planned accordingly. Karstification was monitored with a non-intrusive radar system facility installed on the TBM. The Boring Electric Ahead Monitoring(BEAM) was installed at the cutter head and was able to predict the rock mass up to 3 tunnel diameters ahead of the cutter head. BEAM system was provided with an online system for real time monitoring of rock mass condition and then correlated with the rock mass conditions predicted during the interpretation phase of offshore geophysical surveys. The further correlation was carried by Samples of the rock mass taken from tunnel face inspections and excavated material produced by the TBM. The BEAM data was continuously monitored to check the variations in resistivity and percentage frequency effect (PFE) of the ground. This system provided information about rock mass condition, potential karst risk, and potential of water inflow. BEAM system was found to be more than 50% accurate in picking up the difficult ground conditions and faults as predicted in the geotechnical interpretative report before the start of tunnelling operations. Upon completion of the project, it was concluded that the combined use of different geophysical investigation results can make the execution stage be carried out in a more confident way with the less geotechnical risk involved. The approach used for the prediction of rock mass condition in Geotechnical Interpretative Report (GIR) and Geophysical Reflection and electric resistivity tomography survey (ERT) Geophysical Reflection surveys were concluded to be reliable as the same rock mass conditions were encountered during tunnelling operations.

Keywords: tunnel boring machine (TBM), subsea, karstification, seismic reflection survey

Procedia PDF Downloads 199
4 Anti-Graft Instruments and Their Role in Curbing Corruption: Integrity Pact and Its Impact on Indian Procurement

Authors: Jot Prakash Kaur

Abstract:

The paper aims to showcase that with the introduction of anti-graft instruments and willingness of the governments towards their implementation, a significant change can be witnessed in the anti-corruption landscape of any country. Since the past decade anti-graft instruments have been introduced by several international non-governmental organizations with the vision of curbing corruption. Transparency International’s ‘Integrity Pact’ has been one such initiative. Integrity Pact has been described as a tool for preventing corruption in public contracting. Integrity Pact has found its relevance in a developing country like India where public procurement constitutes 25-30 percent of Gross Domestic Product. Corruption in public procurement has been a cause of concern even though India has in place a whole architecture of rules and regulations governing public procurement. Integrity Pact was first adopted by a leading Oil and Gas government company in 2006. Till May 2015, over ninety organizations had adopted Integrity Pact, of which majority of them are central government units. The methodology undertaken to understand impact of Integrity Pact on Public procurement is through analyzing information received from important stakeholders of the instrument. Government, information was sought through Right to Information Act 2005 about the details of adoption of this instrument by various government organizations and departments. Contractor, Company websites and annual reports were used to find out the steps taken towards implementation of Integrity Pact. Civil Society, Transparency International India’s resource materials which include publications and reports on Integrity Pact were also used to understand the impact of Integrity Pact. Some of the findings of the study include organizations adopting Integrity pacts in all kinds of contracts such that 90% of their procurements fall under Integrity Pact. Indian State governments have found merit in Integrity Pact and have adopted it in their procurement contracts. Integrity Pact has been instrumental in creating a brand image of companies. External Monitors, an essential feature of Integrity Pact have emerged as arbitrators for the bidders and are the first line of procurement auditors for the organizations. India has cancelled two defense contracts finding it conflicting with the provisions of Integrity Pact. Some of the clauses of Integrity Pact have been included in the proposed Public Procurement legislation. Integrity Pact has slowly but steadily grown to become an integral part of big ticket procurement in India. Government’s commitment to implement Integrity Pact has changed the way in which public procurement is conducted in India. Public Procurement was a segment infested with corruption but with the adoption of Integrity Pact a number of clean up acts have been performed to make procurement transparent. The paper is divided in five sections. First section elaborates on Integrity Pact. Second section talks about stakeholders of the instrument and the role it plays in its implementation. Third section talks about the efforts taken by the government to implement Integrity Pact in India. Fourth section talks about the role of External Monitor as Arbitrator. The final section puts forth suggestions to strengthen the existing form of Integrity Pact and increase its reach.

Keywords: corruption, integrity pact, procurement, vigilance

Procedia PDF Downloads 308
3 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 90
2 Subcontractor Development Practices and Processes: A Conceptual Model for LEED Projects

Authors: Andrea N. Ofori-Boadu

Abstract:

The purpose is to develop a conceptual model of subcontractor development practices and processes that strengthen the integration of subcontractors into construction supply chain systems for improved subcontractor performance on Leadership in Energy and Environmental Design (LEED) certified building projects. The construction management of a LEED project has an important objective of meeting sustainability certification requirements. This is in addition to the typical project management objectives of cost, time, quality, and safety for traditional projects; and, therefore increases the complexity of LEED projects. Considering that construction management organizations rely heavily on subcontractors, poor performance on complex projects such as LEED projects has been largely attributed to the unsatisfactory preparation of subcontractors. Furthermore, the extensive use of unique and non-repetitive short term contracts limits the full integration of subcontractors into construction supply chains and hinders long-term cooperation and benefits that could enhance performance on construction projects. Improved subcontractor development practices are needed to better prepare and manage subcontractors, so that complex objectives can be met or exceeded. While supplier development and supply chain theories and practices for the manufacturing sector have been extensively investigated to address similar challenges, investigations in the construction sector are not that obvious. Consequently, the objective of this research is to investigate effective subcontractor development practices and processes to guide construction management organizations in their development of a strong network of high performing subcontractors. Drawing from foundational supply chain and supplier development theories in the manufacturing sector, a mixed interpretivist and empirical methodology is utilized to assess the body of knowledge within literature for conceptual model development. A self-reporting survey with five-point Likert scale items and open-ended questions is administered to 30 construction professionals to estimate their perceptions of the effectiveness of 37 practices, classified into five subcontractor development categories. Data analysis includes descriptive statistics, weighted means, and t-tests that guide the effectiveness ranking of practices and categories. The results inform the proposed three-phased LEED subcontractor development program model which focuses on preparation, development and implementation, and monitoring. Highly ranked LEED subcontractor pre-qualification, commitment, incentives, evaluation, and feedback practices are perceived as more effective, when compared to practices requiring more direct involvement and linkages between subcontractors and construction management organizations. This is attributed to unfamiliarity, conflicting interests, lack of trust, and resource sharing challenges. With strategic modifications, the recommended practices can be extended to other non-LEED complex projects. Additional research is needed to guide the development of subcontractor development programs that strengthen direct involvement between construction management organizations and their network of high performing subcontractors. Insights from this present research strengthen theoretical foundations to support future research towards more integrated construction supply chains. In the long-term, this would lead to increased performance, profits and client satisfaction.

Keywords: construction management, general contractor, supply chain, sustainable construction

Procedia PDF Downloads 90
1 Correlation of Unsuited and Suited 5ᵗʰ Female Hybrid III Anthropometric Test Device Model under Multi-Axial Simulated Orion Abort and Landing Conditions

Authors: Christian J. Kennett, Mark A. Baldwin

Abstract:

As several companies are working towards returning American astronauts back to space on US-made spacecraft, NASA developed a human flight certification-by-test and analysis approach due to the cost-prohibitive nature of extensive testing. This process relies heavily on the quality of analytical models to accurately predict crew injury potential specific to each spacecraft and under dynamic environments not tested. As the prime contractor on the Orion spacecraft, Lockheed Martin was tasked with quantifying the correlation of analytical anthropometric test devices (ATDs), also known as crash test dummies, against test measurements under representative impact conditions. Multiple dynamic impact sled tests were conducted to characterize Hybrid III 5th ATD lumbar, head, and neck responses with and without a modified shuttle-era advanced crew escape suit (ACES) under simulated Orion landing and abort conditions. Each ATD was restrained via a 5-point harness in a mockup Orion seat fixed to a dynamic impact sled at the Wright Patterson Air Force Base (WPAFB) Biodynamics Laboratory in the horizontal impact accelerator (HIA). ATDs were subject to multiple impact magnitudes, half-sine pulse rise times, and XZ - ‘eyeballs out/down’ or Z-axis ‘eyeballs down’ orientations for landing or an X-axis ‘eyeballs in’ orientation for abort. Several helmet constraint devices were evaluated during suited testing. Unique finite element models (FEMs) were developed of the unsuited and suited sled test configurations using an analytical 5th ATD model developed by LSTC (Livermore, CA) and deformable representations of the seat, suit, helmet constraint countermeasures, and body restraints. Explicit FE analyses were conducted using the non-linear solver LS-DYNA. Head linear and rotational acceleration, head rotational velocity, upper neck force and moment, and lumbar force time histories were compared between test and analysis using the enhanced error assessment of response time histories (EEARTH) composite score index. The EEARTH rating paired with the correlation and analysis (CORA) corridor rating provided a composite ISO score that was used to asses model correlation accuracy. NASA occupant protection subject matter experts established an ISO score of 0.5 or greater as the minimum expectation for correlating analytical and experimental ATD responses. Unsuited 5th ATD head X, Z, and resultant linear accelerations, head Y rotational accelerations and velocities, neck X and Z forces, and lumbar Z forces all showed consistent ISO scores above 0.5 in the XZ impact orientation, regardless of peak g-level or rise time. Upper neck Y moments were near or above the 0.5 score for most of the XZ cases. Similar trends were found in the XZ and Z-axis suited tests despite the addition of several different countermeasures for restraining the helmet. For the X-axis ‘eyeballs in’ loading direction, only resultant head linear acceleration and lumbar Z-axis force produced ISO scores above 0.5 whether unsuited or suited. The analytical LSTC 5th ATD model showed good correlation across multiple head, neck, and lumbar responses in both the unsuited and suited configurations when loaded in the XZ ‘eyeballs out/down’ direction. Upper neck moments were consistently the most difficult to predict, regardless of impact direction or test configuration.

Keywords: impact biomechanics, manned spaceflight, model correlation, multi-axial loading

Procedia PDF Downloads 89