2234 A Review: The Impact of Core Quality the Empirical Review of Critical Factors on the Causes of Delay in Road Constructions Projects in the GCC Countries

Authors: Sulaiman Al-Hinai, Setyawan Widyarto

Abstract:

The aim of this study is to identify the critically dominating factors on the delays of road constructions in the GCC countries and their effects on project delivery in Arab countries. Towards the achieved of the objectives the study used the empirical literature from the all relevant online sources and database as many as possible. The findings of this study have summarized and short listed of the success factors in the two categories such as internal and external factors have caused to be influenced to delay of road constructions in the Arab regions. However, in the category of internal factors, there are 63 factors short listed from seven group of factors which has revealed to effects on the delay of road constructions especially, the consultant related factors, the contractor related factors, designed related factors, client related factors, labor related factors, material related issues, equipment related issues respectively. Moreover, for external related factors are also considered to summarized especially natural disaster (flood, hurricanes and cyclone etc.), conflict, war, global financial crisis, compensation delay to affected property owner, price fluctuated, unexpected ground conditions (soil and high-water level), changing of government regulations and laws, delays in obtaining permission from municipality, loss of time by traffic control and restrictions at job site, problem with inhabitant of community, delays in providing service from utilities (water and electricity’s) and accident during constructions accordingly. The present study also concluded the effects of above factors which has delay road constructions through increasing of cost and overrun it, taken overtime, creating of disputes, going for lawsuits, finally happening of abandon of projects. Thus, the present study has given the following recommendations to overcome of above problems by increasing of detailed site investigations, ensure careful monitoring and regular meetings, effective site management, collaborative working and effective coordination’s, proper and comprehensive planning and scheduling and ensure full and intensive commitment from all parties accordingly.

Keywords: Arab GCC countries, critical success factors, road constructions delay, project management

Procedia PDF Downloads 92
2233 Controller Design for Active Suspension System of 1/4 Car with Unknown Mass and Time-Delay

Authors: Ali Al-Zughaibi

Abstract:

The purpose of this paper is to present a modeling and control of the quarter car active suspension system with unknown mass, unknown time-delay and road disturbance. The objective of designing the controller by deriving a control law to achieve stability of the system and convergence that can considerably improve the ride comfort and road disturbance handling. Thus is accomplished by using Routh-Herwitz criterion and based on some assumptions. A mathematical proof is given to show the ability of the designed controller to ensure stability and convergence of the active suspension system and dispersion oscillation of system with unknown mass, time-delay and road disturbances. Simulations were also performed for controlling quarter car suspension, where the results obtained from these simulations verify the validity of the proposed design.

Keywords: active suspension system, time-delay, disturbance rejection, dynamic uncertainty

Procedia PDF Downloads 294
2232 A Study of Mandarin Ba Constructions from the Perspective of Event Structure

Authors: Changyin Zhou

Abstract:

Ba constructions are a special type of constructions in Chinese. Their syntactic behaviors are closely related to their event structural properties. The existing study which treats the semantic function of Ba as causative meets difficulty in treating the discrepancy between Ba constructions and their corresponding constructions without Ba in expressing causativity. This paper holds that Ba in Ba constructions is a functional category expressing affectedness. The affectedness expressed by Ba can be positive or negative. The functional category Ba expressing negative affectedness has the semantic property of being 'expected'. The precondition of Ba construction is the boundedness of the event concerned. This paper, holding the parallelism between motion events and change-of-state events, proposes a syntactic model based on the notions of boundedness and affectedness, discusses the transformations between Ba constructions and the related resultative constructions, and derivates the various Ba constructions concerned.

Keywords: affectedness, Ba constructions, boundedness, event structure, resultative constructions

Procedia PDF Downloads 395
2231 Expert System for Road Bridge Constructions

Authors: Michael Dimmer, Holger Flederer

Abstract:

The basis of realizing a construction project is a technically flawless concept which satisfies conditions regarding environment and costs, as well as static-constructional terms. The presented software system actively supports civil engineers during the setup of optimal designs, by giving advice regarding durability, life-cycle costs, sustainability and much more. A major part of the surrounding conditions of a design process is gathered and assimilated by experienced engineers subconsciously. It is a question about eligible building techniques and their practicability by considering emerging costs. Planning engineers have acquired many of this experience during their professional life and use them for their daily work. Occasionally, the planning engineer should disassociate himself from his experience to be open for new and better solutions which meet the functional demands, as well. The developed expert system gives planning engineers recommendations for preferred design options of new constructions as well as for existing bridge constructions. It is possible to analyze construction elements and techniques regarding sustainability and life-cycle costs. This way the software provides recommendations for future constructions. Furthermore, there is an option to design existing road bridges especially for heavy duty transport. This implies a route planning tool to get quick and reliable information as to whether the bridge support structures of a transport route have been measured sufficiently for a certain heavy duty transport. The use of this expert system in bridge planning companies and building authorities will save costs massively for new and existent bridge constructions. This is achieved by consequently considering parameters like life-cycle costs and sustainability for its planning recommendations.

Keywords: expert system, planning process, road bridges, software system

Procedia PDF Downloads 246
2230 Performance Evaluation of Diverging Diamond Interchange Compared to Single Point Diamond Interchange in Riyadh City

Authors: Maged A. Mogalli, Abdullah I. Al-Mansour, Seongkwan Mark Lee

Abstract:

In the last decades, population growth has gradually exceeded transportation infrastructure growth, and today’s transportation professionals are facing challenge on how to meet the mobility needs of a rising population especially in the absence of adequate public transport, as is the case in Saudi Arabia. The traffic movement congestion can be decreased by carrying out some appropriate alternative designs of interchanges such as diverging diamond interchange (DDI) and single diamond interchange (SPDI). In this paper, evaluation of newly implemented DDIs at the interchange of Makkah road with Prince Turki road and the interchange of King Khaled road with Prince Saud Ibn Mohammed Ibn Mugrin road in Riyadh city was carried out. The comparison between the DDI and SPDI is conducted by evaluating different measures of effectiveness (MOE) such as stop delay, average queue length, and number of stops. In this connection, each interchange type was evaluated for traffic flow at peak hours using micro-simulation program namely 'Synchro/SimTarffic' to measure its effectiveness such as stop delay, average queue length, and number of stops. The results of this study show that DDI provides a better result when compared with SPDI in terms of stope delay, average queue length, and number of stops. The stop delay for the SPDI is greater than DDI by three times. Also, the average queue length is approximately twice that of the SPDI when compared to the DDI. Furthermore, the number of stops for the SPDI is about twice as the DDI.

Keywords: single point diamond interchange, diverging diamond interchange, measures of effectiveness, simulation

Procedia PDF Downloads 221
2229 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 37
2228 Comparison Constructions in the Language of the Qur'an

Authors: Safiah Ahmed Yahya Madkhali

Abstract:

The aim of the present paper is to provide a characterization of the expression of comparison in the language of the Qur’an, the language of the Divine Book of the Muslim nation. It focuses on quantitative as well as qualitative comparisons. While works on comparison constructions in Arabic focus on a type(s) of the comparison construction and exclude another and investigate its behaviour in Standard Arabic, the paper aims to be inclusive of the varied instances that are scalar comparison constructions and describe its aspects in the language of the Qur’an. To the best of my knowledge, comparative constructions in the language of the Qur’an has not been tackled before and hence the characterization provided in the paper would be the contribution of the present work. The paper highlights the several rhetorical features of the construction as present in the different verses in the Qur’an which set them distinct from the ordinary use of the construction in the different verities of the Arabic language.

Keywords: comparison constructions, inequality, comparative, superlative, equality

Procedia PDF Downloads 42
2227 Review of the Road Crash Data Availability in Iraq

Authors: Abeer K. Jameel, Harry Evdorides

Abstract:

Iraq is a middle income country where the road safety issue is considered one of the leading causes of deaths. To control the road risk issue, the Iraqi Ministry of Planning, General Statistical Organization started to organise a collection system of traffic accidents data with details related to their causes and severity. These data are published as an annual report. In this paper, a review of the available crash data in Iraq will be presented. The available data represent the rate of accidents in aggregated level and classified according to their types, road users’ details, and crash severity, type of vehicles, causes and number of causalities. The review is according to the types of models used in road safety studies and research, and according to the required road safety data in the road constructions tasks. The available data are also compared with the road safety dataset published in the United Kingdom as an example of developed country. It is concluded that the data in Iraq are suitable for descriptive and exploratory models, aggregated level comparison analysis, and evaluation and monitoring the progress of the overall traffic safety performance. However, important traffic safety studies require disaggregated level of data and details related to the factors of the likelihood of traffic crashes. Some studies require spatial geographic details such as the location of the accidents which is essential in ranking the roads according to their level of safety, and name the most dangerous roads in Iraq which requires tactic plan to control this issue. Global Road safety agencies interested in solve this problem in low and middle-income countries have designed road safety assessment methodologies which are basing on the road attributes data only. Therefore, in this research it is recommended to use one of these methodologies.

Keywords: road safety, Iraq, crash data, road risk assessment, The International Road Assessment Program (iRAP)

Procedia PDF Downloads 225
2226 A Low-Power Comparator Structure with Arbitrary Pre-Amplification Delay

Authors: Ata Khorami, Mohammad Sharifkhani

Abstract:

In the dynamic comparators, the pre-amplifier amplifies the input differential voltage and when the output Vcm of the pre-amplifier becomes larger than Vth of the latch input transistors, the latch is activated and finalizes the comparison. As a result, the pre-amplification delay is fixed to a value and cannot be set at the minimum required delay, thus, significant power and delay are imposed. In this paper, a novel structure is proposed through which the pre-amplification delay can be set at any low value saving power and time. Simulations show that using the proposed structure, by setting the pre-amplification delay at the minimum required value the power and comparison delay can be reduced by 55% and 100ps respectively.

Keywords: dynamic comparator, low power comparator, analog to digital converter, pre-amplification delay

Procedia PDF Downloads 178
2225 Building Bridges on Roads With Major Constructions

Authors: Mohamed Zaidour

Abstract:

In this summary, we are going to look in brief at the bridges and their building and construction on most roads and we have followed a simple method to explain each field clearly because the geographical and climatic diversity of an area leads to different methods and types of roads and installation engineering in other areas In mountain areas we need to build retaining walls in areas of rain. It needs to construct ferries to discharge water from roads in areas of temporary or permanent rivers. There is a need to build bridges and construct road installations in the process of collecting the necessary information, such as soil type. This information needs it, engineer, when designing the constructor and in this section, we will identify the types and methods of calculation bridge columns rules phrases the walls are chock.

Keywords: bridges, buildings, concrete, constructions, roads

Procedia PDF Downloads 74
2224 Ray Tracing Modified 3D Image Method Simulation of Picocellular Propagation Channel Environment

Authors: Fathi Alwafie

Abstract:

In this paper we present the simulation of the propagation characteristics of the picocellular propagation channel environment. The first aim has been to find a correct description of the environment for received wave. The result of the first investigations is that the environment of the indoor wave significantly changes as we change the electric parameters of material constructions. A modified 3D ray tracing image method tool has been utilized for the coverage prediction. A detailed analysis of the dependence of the indoor wave on the wide-band characteristics of the channel: Root Mean Square (RMS) delay spread characteristics and mean excess delay, is also investigated.

Keywords: propagation, ray tracing, network, mobile computing

Procedia PDF Downloads 364
2223 Examples from a Traditional Sismo-Resistant Architecture

Authors: Amira Zatir, Abderahmane Mokhtari, Amina Foufa, Sara Zatir

Abstract:

It exists in several regions in the world, of numerous historic monuments, buildings and housing environment, built in traditional ways which survive for earthquakes, even in zones where the seismic risk is particularly raised. These constructions, stemming from vernacular architecture, allow, through their resistances in the time earthquakes, to identify the various sismo-resistant "local" techniques. Through the examples and the experiences presented, the remark which can be made, is that in the traditional built, two major principles in a way opposite, govern the constructions in earthquake-resistant. It is about the very big flexibility, whom answer very light constructions, like the Japanese wooden constructions, Turkish and even Chinese; that of the very big rigidity to which correspond constructions in masonry in particular stone, more or less heavy and massive, which we meet in particular in the Mediterranean Basin, and in the historic sanctuary of Machu Pacchu. In it sensible and well-reflected techniques of construction are added, of which the use of the humble materials such as the earth and the adobe. The ancient communities were able to face the seismic risks, thanks to them know-how reflected in their intelligently designed constructions, testifying of a local seismic culture.

Keywords: earthquake, architecture, traditional, construction, resistance

Procedia PDF Downloads 381
2222 Safety Analysis and Accident Modeling of Transportation in Srinagar City

Authors: Adinarayana Badveeti, Mohammad Shafi Mir

Abstract:

In Srinagar city, in India, road safety is an important aspect that creates ecological balance and social well being. A road accident creates a situation that leaves behind distress, sorrow, and sufferings. Therefore identification of causes of road accidents becomes highly essential for adopting necessary preventive measures against a critical event. The damage created by road accidents to large extent is unrepairable and therefore needs attention to eradicate this continuously increasing trend of awful 'epidemic'. Road accident in India is among the highest in the world, with at least approximately 142.000 people killed each year on the road. Kashmir region is an ecologically sensitive place but lacks necessary facilities and infrastructure regarding road transportation, ultimately resulting in the critical event-road accidents creating a major problem for common people in the region. The objective of this project is to study the safety aspect of Srinagar City and also model the accidents with different aspect that causes accidents and also to suggest the possible remedies for lessening/eliminating the road accidents.

Keywords: road safety, road accident, road infrastructure, accident modeling

Procedia PDF Downloads 219
2221 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 406
2220 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria

Authors: Md. Aftabuzzaman, Md. Kamruzzaman

Abstract:

Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.

Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority

Procedia PDF Downloads 96
2219 Estimation of Delay Due to Loading–Unloading of Passengers by Buses and Reduction of Number of Lanes at Selected Intersections in Dhaka City

Authors: Sumit Roy, A. Uddin

Abstract:

One of the significant reasons that increase the delay time in the intersections at heterogeneous traffic condition is a sudden reduction of the capacity of the roads. In this study, the delay for this sudden capacity reduction is estimated. Two intersections at Dhaka city were brought in to thestudy, i.e., Kakrail intersection, and SAARC Foara intersection. At Kakrail intersection, the sudden reduction of capacity in the roads is seen at three downstream legs of the intersection, which are because of slowing down or stopping of buses for loading and unloading of passengers. At SAARC Foara intersection, sudden reduction of capacity was seen at two downstream legs. At one leg, it was due to loading and unloading of buses, and at another leg, it was for both loading and unloading of buses and reduction of the number of lanes. With these considerations, the delay due to intentional stoppage or slowing down of buses and reduction of the number of lanes for these two intersections are estimated. Here the delay was calculated by two approaches. The first approach came from the concept of shock waves in traffic streams. Here the delay was calculated by determining the flow, density, and speed before and after the sudden capacity reduction. The second approach came from the deterministic analysis of queues. Here the delay is calculated by determining the volume, capacity and reduced capacity of the road. After determining the delay from these two approaches, the results were compared. For this study, the video of each of the two intersections was recorded for one hour at the evening peak. Necessary geometric data were also taken to determine speed, flow, and density, etc. parameters. The delay was calculated for one hour with one-hour data at both intersections. In case of Kakrail intersection, the per hour delay for Kakrail circle leg was 5.79, and 7.15 minutes, for Shantinagar cross intersection leg they were 13.02 and 15.65 minutes, and for Paltan T intersection leg, they were 3 and 1.3 minutes for 1st and 2nd approaches respectively. In the case of SAARC Foara intersection, the delay at Shahbag leg was only due to intentional stopping or slowing down of busses, which were 3.2 and 3 minutes respectively for both approaches. For the Karwan Bazar leg, the delays for buses by both approaches were 5 and 7.5 minutes respectively, and for reduction of the number of lanes, the delays for both approaches were 2 and 1.78 minutes respectively. Measuring the delay per hour for the Kakrail leg at Kakrail circle, it is seen that, with consideration of the first approach of delay estimation, the intentional stoppage and lowering of speed by buses contribute to 26.24% of total delay at Kakrail circle. If the loading and unloading of buses at intersection is made forbidden near intersection, and any other measures for loading and unloading of passengers are established far enough from the intersections, then the delay at intersections can be reduced at significant scale, and the performance of the intersections can be enhanced.

Keywords: delay, deterministic queue analysis, shock wave, passenger loading-unloading

Procedia PDF Downloads 145
2218 A Statistical Study on Young UAE Driver’s Behavior towards Road Safety

Authors: Sadia Afroza, Rakiba Rouf

Abstract:

Road safety and associated behaviors have received significant attention in recent years, reflecting general public concern. This paper portrays a statistical scenario of the young drivers in UAE with emphasis on various concern points of young driver’s behavior and license issuance. Although there are many factors contributing to road accidents, statistically it is evident that age plays a major role in road accidents. Despite ensuring strict road safety laws enforced by the UAE government, there is a staggering correlation among road accidents and young driver’s at UAE. However, private organizations like BMW and RoadSafetyUAE have extended its support on conducting surveys on driver’s behavior with an aim to ensure road safety. Various strategies such as road safety law enforcement, license issuance, adapting new technologies like safety cameras and raising awareness can be implemented to improve the road safety concerns among young drivers.

Keywords: driving behavior, Graduated Driver Licensing System (GLDS), road safety, UAE drivers, young drivers

Procedia PDF Downloads 217
2217 The Design of Imaginable Urban Road Landscape

Authors: Wang Zhenzhen, Wang Xu, Hong Liangping

Abstract:

With the rapid development of cities, the way that people commute has changed greatly, meanwhile, people turn to require more on physical and psychological aspects in the contemporary world. However, the current urban road landscape ignores these changes, for example, those road landscape elements are boring, confusing, fragmented and lack of integrity and hierarchy. Under such current situation, in order to shape beautiful, identifiable and unique road landscape, this article concentrates on the target of imaginability. This paper analyses the main elements of the urban road landscape, the concept of image and its generation mechanism, and then discusses the necessity and connotation of building imaginable urban road landscape as well as the main problems existing in current urban road landscape in terms of imaginability. Finally, this paper proposes how to design imaginable urban road landscape in details based on a specific case.

Keywords: identifiability, imaginability, road landscape, the image of the city

Procedia PDF Downloads 387
2216 Perception of Risk toward Traffic Violence among Road Users in Makassar, Indonesia

Authors: Sulasmi Sudirman, Rachmadanty Mujah Hartika

Abstract:

Traffic violence is currently a big issue in Indonesia. However, the road users perceived risk that is caused by traffic violence is low. The lack of safety driving awareness is one of the factors that road users committed to traffic violence. There are several lists of common traffic violence in Indonesia such as lack of physical fitness, not wearing helmet, unfasten seatbelt, breaking through the traffic light, not holding a driving license, and some more violence. This research sought to explore the perception of road users toward traffic violence. The participants were road users in Makassar, Indonesia who were using cars and motorbikes. The method of the research was a qualitative approach by using a personal interview to collect data. The research showed that there three main ideas of perceiving traffic violence which are motives, environment that supported traffic violence, and reinforcement. The road users committed traffic violence had particular motive, for example, rushing. The road users committed to traffic violence when other road users and significant other did the same. The road users committed traffic violence when the police were not there to give a ticket. It can be concluded that the perception of road users toward traffic violence determined by internal aspect, the social aspect, and regulation.

Keywords: perception, road users, traffic, violence

Procedia PDF Downloads 183
2215 Numerical Simulation and Experimental Validation of the Tire-Road Separation in Quarter-car Model

Authors: Quy Dang Nguyen, Reza Nakhaie Jazar

Abstract:

The paper investigates vibration dynamics of tire-road separation for a quarter-car model; this separation model is developed to be close to the real situation considering the tire is able to separate from the ground plane. A set of piecewise linear mathematical models is developed and matches the in-contact and no-contact states to be considered as mother models for further investigations. The bound dynamics are numerically simulated in the time response and phase portraits. The separation analysis may determine which values of suspension parameters can delay and avoid the no-contact phenomenon, which results in improving ride comfort and eliminating the potentially dangerous oscillation. Finally, model verification is carried out in the MSC-ADAMS environment.

Keywords: quarter-car vibrations, tire-road separation, separation analysis, separation dynamics, ride comfort, ADAMS validation

Procedia PDF Downloads 52
2214 Applications of Social Marketing in Road Safety of Georgia

Authors: Charita Jashi

Abstract:

The aim of the paper is to explore the role of social marketing in changing the behavior of consumers on road safety, identify critical aspects and priority needs which impede the implementation of road safety program in Georgia. Given the goals of the study, a quantitative method was used to carry out interviews for primary data collection. This research identified the awareness level of road safety, legislation base, and marketing interventions to change behavior of drivers and pedestrians. During several years the non-governmental sector together with the local authorities and media have been very intensively working on the road safety issue in Georgia, but only seat-belts campaign should be considered rather successful. Despite achievements in this field, efficiency of road safety programs far from fulfillment and needs strong empowering.

Keywords: road safety, social marketing interventions, behavior change, well-being

Procedia PDF Downloads 160
2213 A Study on Establishing Criteria for Installation of Small Road Signs

Authors: Sang-KeunBaik, Kyu-Soo Chong, Joon-Yeop Na

Abstract:

This study attempts to reduce the wind load of road signs, improve roadside landscaping, and enhance the safety of road users by establishing criteria for the installation of small road signs. First, we derive the minimum font size that can be used on road signs according to the road’s design speed by considering the visibility and legibility of such road signs. We classify road junctions into eight types based on junction type (intersection, interchange, and expressway) and on the number of road lanes. Furthermore, we propose small sign alternatives, to which the minimum font size is applied, to be placed by each road junction. To verify the effects of the small signs, we implemented a 3D simulation road environment, to which the small road signs were applied, and performed experiments using the driving simulator targeting 50 drivers. The experiments compared and analyzed the effects, whether the driver proceeds to the desired exit and the average driving time, between the existing large road signs and the improved small road signs under the same road conditions and intersection type. We conducted a survey with the participants of the simulation experiment on the preference between graphical signs (large road signs) and exit-centric signs (small road signs). The results show that the participants prefer the exit-centric signs (60%) to the graphical signs (40%). We propose installation criteria for small road signs for intersections, interchanges, and expressways based on the results of the experiment and the survey.

Keywords: 3D simulation, driving simulator, legibility distance, minimum font size, small road signs

Procedia PDF Downloads 447
2212 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects

Authors: Akerele Akintunde Hareef

Abstract:

GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.

Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment

Procedia PDF Downloads 510
2211 Contention Window Adjustment in IEEE 802.11-based Industrial Wireless Networks

Authors: Mohsen Maadani, Seyed Ahmad Motamedi

Abstract:

The use of wireless technology in industrial networks has gained vast attraction in recent years. In this paper, we have thoroughly analyzed the effect of contention window (CW) size on the performance of IEEE 802.11-based industrial wireless networks (IWN), from delay and reliability perspective. Results show that the default values of CWmin, CWmax, and retry limit (RL) are far from the optimum performance due to the industrial application characteristics, including short packet and noisy environment. An adaptive CW algorithm (payload-dependent) has been proposed to minimize the average delay. Finally a simple, but effective CW and RL setting has been proposed for industrial applications which outperforms the minimum-average-delay solution from maximum delay and jitter perspective, at the cost of a little higher average delay. Simulation results show an improvement of up to 20%, 25%, and 30% in average delay, maximum delay and jitter respectively.

Keywords: average delay, contention window, distributed coordination function (DCF), jitter, industrial wireless network (IWN), maximum delay, reliability, retry limit

Procedia PDF Downloads 383
2210 Estimation and Comparison of Delay at Signalized Intersections Based on Existing Methods

Authors: Arpita Saha, Satish Chandra, Indrajit Ghosh

Abstract:

Delay implicates the time loss of a traveler while crossing an intersection. Efficiency of traffic operation at signalized intersections is assessed in terms of delay caused to an individual vehicle. Highway Capacity Manual (HCM) method and Webster’s method are the most widely used in India for delay estimation purpose. However, in India, traffic is highly heterogeneous in nature with extremely poor lane discipline. Therefore, to explore best delay estimation technique for Indian condition, a comparison was made. In this study, seven signalized intersections from three different cities where chosen. Data was collected for both during morning and evening peak hours. Only under saturated cycles were considered for this study. Delay was estimated based on the field data. With the help of Simpson’s 1/3 rd rule, delay of under saturated cycles was estimated by measuring the area under the curve of queue length and cycle time. Moreover, the field observed delay was compared with the delay estimated using HCM, Webster, Probabilistic, Taylor’s expansion and Regression methods. The drawbacks of the existing delay estimation methods to be use in Indian heterogeneous traffic conditions were figured out, and best method was proposed. It was observed that direct estimation of delay using field measured data is more accurate than existing conventional and modified methods.

Keywords: delay estimation technique, field delay, heterogeneous traffic, signalised intersection

Procedia PDF Downloads 265
2209 Autoignition Delay Characterstic of Hydrocarbon (n-Pentane) from Lean to Rich Mixtures

Authors: Sunil Verma

Abstract:

This report is concerned with study of autoignition delay characterstics of n-pentane. Experiments are done for different equivalents ratio on Rapid compression machine. Dependence of autoignition delay period is clearly explained from lean to rich mixtures. Equivalence ratio is varied from 0.33 to 0.6.

Keywords: combustion, autoignition, ignition delay, rapid compression machine

Procedia PDF Downloads 315
2208 Modification of Fick’s First Law by Introducing the Time Delay

Authors: H. Namazi, H. T. N. Kuan

Abstract:

Fick's first law relates the diffusive flux to the concentration field, by postulating that the flux goes from regions of high concentration to regions of low concentration, with a magnitude that is proportional to the concentration gradient (spatial derivative). It is clear that the diffusion of flux cannot be instantaneous and should be some time delay in this propagation. But Fick’s first law doesn’t consider this delay which results in some errors especially when there is a considerable time delay in the process. In this paper, we introduce a time delay to Fick’s first law. By this modification, we consider that the diffusion of flux cannot be instantaneous. In order to verify this claim an application sample in fluid diffusion is discussed and the results of modified Fick’s first law, Fick’s first law and the experimental results are compared. The results of this comparison stand for the accuracy of the modified model. The modified model can be used in any application where the time delay has considerable value and neglecting its effect reflects in undesirable results.

Keywords: Fick's first law, flux, diffusion, time delay, modified Fick’s first law

Procedia PDF Downloads 370
2207 Study of Causes and Effects of Road Projects Abandonment in Nigeria

Authors: Monsuru Oyenola Popoola, Oladapo Samson Abiola, Wusamotu Alao Adeniji

Abstract:

The prevalent and incessant abandonment of road construction projects are alarming that it creates several negative effects to social, economic and environmental values of the project. The purpose of this paper is to investigate and determined the various causes and effects of abandoning road construction projects in Nigeria. Likert Scale questionnaire design was used to administered and analysed the data obtained for the stydy. 135 (Nr) questionnaires were completed and retrieved from the respondents, out of 200 (Nr) questionnaires sent out, representing a response rate of 67.5%. The analysis utilized the Relative Importance Index (R.I.I.) method and the results are presented in tabular form. The findings confirms that at least 20 factors were the causes of road projects abandonment in Nigeria with most including Leadership Instability, Improper Project Planning, Inconsistence in government policies and Design, Contractor Incompetence, Economy Instability and Inflation, Delay in remittance of money, Improper financial analysis, Poor risk management, Climatic Conditions, Improper Project Estimates etc. The findings also show that at least eight (8) effect were identified on the system, and these include; Waste of Financial Resources, Loss of economic value, Environmental degradation, Loss of economic value, Reduction in standard of living, Litigation and Arbitration, etc. The reflection is that allocating reasonable finance, developing appropriate and effective implementation plans and monitoring, evaluation and reporting on development project activities by key actors should enhance in resolving the problem of road projects abandonment.

Keywords: road construction, abandonment of road projects, climatic condition, project planning, contractor

Procedia PDF Downloads 264
2206 Impact of Intelligent Transportation System on Planning, Operation and Safety of Urban Corridor

Authors: Sourabh Jain, S. S. Jain

Abstract:

Intelligent transportation system (ITS) is the application of technologies for developing a user–friendly transportation system to extend the safety and efficiency of urban transportation systems in developing countries. These systems involve vehicles, drivers, passengers, road operators, managers of transport services; all interacting with each other and the surroundings to boost the security and capacity of road systems. The goal of urban corridor management using ITS in road transport is to achieve improvements in mobility, safety, and the productivity of the transportation system within the available facilities through the integrated application of advanced monitoring, communications, computer, display, and control process technologies, both in the vehicle and on the road. Intelligent transportation system is a product of the revolution in information and communications technologies that is the hallmark of the digital age. The basic ITS technology is oriented on three main directions: communications, information, integration. Information acquisition (collection), processing, integration, and sorting are the basic activities of ITS. In the paper, attempts have been made to present the endeavor that was made to interpret and evaluate the performance of the 27.4 Km long study corridor having eight intersections and four flyovers. The corridor consisting of six lanes as well as eight lanes divided road network. Two categories of data have been collected such as traffic data (traffic volume, spot speed, delay) and road characteristics data (no. of lanes, lane width, bus stops, mid-block sections, intersections, flyovers). The instruments used for collecting the data were video camera, stop watch, radar gun, and mobile GPS (GPS tracker lite). From the analysis, the performance interpretations incorporated were the identification of peak and off-peak hours, congestion and level of service (LOS) at midblock sections and delay followed by plotting the speed contours. The paper proposed the urban corridor management strategies based on sensors integrated into both vehicles and on the roads that those have to be efficiently executable, cost-effective, and familiar to road users. It will be useful to reduce congestion, fuel consumption, and pollution so as to provide comfort, safety, and efficiency to the users.

Keywords: ITS strategies, congestion, planning, mobility, safety

Procedia PDF Downloads 151
2205 Pragmatic Discoursal Study of Hedging Constructions in English Language

Authors: Mohammed Hussein Ahmed, Bahar Mohammed Kareem

Abstract:

This study is concerned with the pragmatic discoursal study of hedging constructions in English language. Hedging is a mitigated word used to lessen the impact of the utterance uttered by the speakers. Hedging could be either adverbs, adjectives, verbs and sometimes it may consist of clauses. It aims at finding out the extent to which speakers and participants of the discourse use hedging constructions during their conversations. The study also aims at finding out whether or not there are any significant differences in the types and functions of the frequency of hedging constructions employed by male and female. It is hypothesized that hedging constructions are frequent in English discourse more than any other languages due to its formality and that the frequency of the types and functions are influenced by the gender of the participants. To achieve the aims of the study, two types of procedures have been followed: theoretical and practical. The theoretical procedure consists of presenting a theoretical background of hedging topic which includes its definitions, etymology and theories. The practical procedure consists of selecting a sample of texts and analyzing them according to an adopted model. A number of conclusions will be drawn based on the findings of the study.