16124 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 233
16123 Systems Strengthening for Sustainable Family Planning Service Provision in Uganda

Authors: D. Muyama, M. Luyiga, P. Buyungo, D. Chemonges, M. Namukwaya, L. Ssekabembe, B. Lukwago, D. Kyamagwa

Abstract:

Context: The study focuses on the sustainability of health interventions in Uganda, particularly in the private sector, beyond donor-funded project periods. The Population Services International (PSI) implemented the Women Health Project (WHP) to ensure continued access to quality family planning, cervical cancer screening, and post-abortion care services through private clinics. Research Aim: The aim of the study is to assess the continued access to quality family planning, cervical cancer screening, and post-abortion care services through the private sector after the closure or reduction in funding of the WHP. Methodology: PSI trained and mentored 83 clinics to establish functional systems in self-regulatory quality improvement, supply chain, referral, and demand creation. The clinics were also connected to the national reporting system and utilized Ministry of Health reporting tools. An assessment tool with six criteria was designed and used to evaluate the progress of the clinics. Clinics scoring 75% and above were considered independent and graduated from the program. Findings: Out of the 83 private clinics, 56 successfully met the graduation criteria and graduated from the program, while 25 lost interest and were gradually dropped. Two clinics failed to achieve the criteria due to leadership challenges. The 59 graduating clinics continued to provide high-quality family planning services, including IUD, implant, Depo-Provera, oral contraceptives, and post-abortion care. All graduating clinics were reassessed and found to still be capable of offering services, attributing their success to government stock availability and acquired skills through mentorships. The clinics expressed appreciation to PSI for the sustainable plan that allowed them to operate beyond the project period. Theoretical Importance: This study contributes to the understanding of sustainability planning and the importance of clinic owners' attitudes and buy-in for continued service provision. It emphasizes the implementation of sustainability plans through existing structures to leverage available resources and ensure continuity of care. Data Collection and Analysis Procedures: The study collected data through the assessment tool that evaluated the progress of clinics based on the established criteria. The tool was scored out of 100%, and clinics scoring above 75% were deemed independent. The findings were analyzed quantitatively to determine the success rate of clinics in meeting the graduation criteria. Questions Addressed: The study addresses the question of whether private clinics in Uganda can sustain the provision of family planning, cervical cancer screening, and post-abortion care services after the closure or reduction in funding of the WHP. Conclusion: The study concludes that the attitude and buy-in of clinic owners are essential for sustainability planning. Implementing sustainability plans through existing structures and leveraging available resources are crucial for the continuity of care after the end of a project or reduced funding. The findings highlight the importance of establishing sustainable plans to ensure continued access to essential health services beyond the project period. Contributions: This study contributes to the existing knowledge for programmers implementing or intending to implement donor-funded projects. It provides insights into designing sustainable plans that enable the independent operation of clinics even after the end of a project.

Keywords: graduation, family planning, systems strengthening, sustainability

Procedia PDF Downloads 37
16122 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
16121 The Use of Rotigotine to Improve Hemispatial Neglect in Stroke Patients at the Charing Cross Neurorehabilitation Unit

Authors: Malab Sana Balouch, Meenakshi Nayar

Abstract:

Hemispatial Neglect is a common disorder primarily associated with right hemispheric stroke, in the acute phase of which it can occur up to 82% of the time. Such individuals fail to acknowledge or respond to people and objects in their left field of vision due to deficits in attention and awareness. Persistent hemispatial neglect significantly impedes post-stroke recovery, leading to longer hospital stays post-stroke, increased functional dependency, longer-term disability in ADLs and increased risk of falls. Recently, evidence has emerged for the use of dopamine agonist Rotigotine in neglect. The aim of our Quality Improvement Project (QIP) is to evaluate and better the current protocols and practice in assessment, documentation and management of neglect and rotigotine use at the Neurorehabilitation unit at Charing Cross Hospital (CNRU). In addition, it brings light to rotigotine use in the management of hemispatial neglect and paves the way for future research in the field. Our QIP was based in the CNRU. All patients admitted to the CNRU suffering from a right-sided stroke from 2nd of February 2018 to the 2nd of February 2021 were included in the project. Each patient’s multidisciplinary team report and hospital notes were searched for information, including bio-data, fulfilment of the inclusion criteria (having hemispatial neglect) and data related to rotigotine use. This includes whether or not the drug was administered, any contraindications to drug in patients that did not receive it, and any therapeutic benefits(subjective or objective improvement in neglect) in those that did receive the rotigotine. Data was simultaneously entered into excel sheet and further statistical analysis was done on SPSS 20.0. Out of 80 patients suffering from right sided strokes, 72.5% were infarcts and 27.5% were hemorrhagic strokes, with vast majority of both types of strokes were in the middle cerebral artery territory (MCA). A total of 31 (38.8%) of our patients were noted to have hemispatial neglect, with the highest number of cases being associated with MCA strokes. Almost half of our patients with MCA strokes suffered from neglect. Neglect was more common in male patients. Out of the 31 patients suffering from visuospatial neglect, only 16% actually received rotigotine and 80% of them were noted to have an objective improvement in their neglect tests and 20% revealed subjective improvement. After thoroughly going through neglect-associated documentation, the following recommendations/plans were put in place for the future. We plan to liaise with the occupational therapy team at our rehab unit to set a battery of tests that would be done on all patients presenting with neglect and recommend clear documentation of outcomes of each neglect screen under it. Also to create two proformas; one for the therapy team to aid in systematic documentation of neglect screens done prior to and after rotigotine administration and a second proforma for the medical team with clear documentation of rotigotine use, its benefits and any contraindications if not administered.

Keywords: hemispatial Neglect, right hemispheric stroke, rotigotine, neglect, dopamine agonist

Procedia PDF Downloads 46
16120 Development of the Internal Educational Quality Assurance System of Suan Sunandha Rajabhat University

Authors: Nipawan Tharasak, Sajeewan Darbavasu

Abstract:

This research aims 1) to study the opinion, problems and obstacles to internal educational quality assurance system for individual and the university levels, 2) to propose an approach to the development of quality assurance system of Suan Sunandha Rajabhat University. A study of problems and obstacles to internal educational quality assurance system of the university conducted with sample group consisting of staff and quality assurance committee members of the year 2010. There were 152 respondents. 5 executives were interviewed. Tool used in the research was document analysis. The structure of the interview questions and questionnaires with 5-rate scale. Reliability was 0.981. Data analysis were percentage, mean and standard deviation with content analysis. Results can be divided into 3 main points: (1) The implementation of the internal quality assurance system of the university. It was found that in overall, input, process and output factors received high scores. Each item is considered, the preparation, planning, monitoring and evaluation. The results of evaluation to improve the reporting and improvement according to an evaluation received high scores. However, the process received an average score. (2) Problems and obstacles. It was found that the personnel responsible for the duty still lack understanding of indicators and criteria of the quality assurance. (3) Development approach: -Staff should be encouraged to develop a better understanding of the quality assurance system. -Database system for quality assurance should be developed. -The results and suggestions should be applied in the next year development planning.

Keywords: development system, internal quality assurance, education, educational quality assurance

Procedia PDF Downloads 269
16119 Flexible Coupling between Gearbox and Pump (High Speed Machine)

Authors: Naif Mohsen Alharbi

Abstract:

This paper present failure occurred on flexible coupling installed at oil anf gas operation. Also it presents maintenance ideas implemented on the flexible coupling installed to transmit high torque from gearbox to pump. Basically, the machine train is including steam turbine which drives the pump and there is gearbox located in between for speed reduction. investigation are identifying the root causes, solving and developing the technology designs or bad actor. This report provides the study intentionally for continues operation optimization, utilize the advanced opportunity and implement a improvement. Objective: The main objectives of the investigation are identifying the root causes, solving and developing the technology designs or bad actor. Ultimately, fulfilling the operation productivity, also ensuring better technology, quality and design by solutions. This report provides the study intentionally for continues operation optimization, utilize the advanced opportunity and implemet improvement. Method: The method used in this project was a very focused root cause analysis procedure that incorporated engineering analysis and measurements. The analysis method extensively covers the measuring of the complete coupling dimensions. Including the membranes thickness, hubs, bore diameter and total length, dismantle flexible coupling to diagnose how deep the coupling has been affected. Also, defining failure modes, so that the causes could be identified and verified. Moreover, Vibration analysis and metallurgy test. Lastly applying several solutions by advanced tools (will be mentioned in detail). Results and observation: Design capacity: Coupling capacity is an inadequate to fulfil 100% of operating conditions. Therefore, design modification of service factor to be at least 2.07 is crucial to address this issue and prevent recurrence of similar scenario, especially for the new upgrading project. Discharge fluctuation: High torque flexible coupling encountered during the operation. Therefore, discharge valve behaviour, tuning, set point and general conditions revaluated and modified subsequently, it can be used as baseline for upcoming Coupling design project. Metallurgy test: Material of flexible coupling membrane (discs) tested at the lab, for a detailed metallurgical investigation, better material grade has been selected for our operating conditions,

Keywords: high speed machine, reliabilty, flexible coupling, rotating equipment

Procedia PDF Downloads 43
16118 Environmental Quality On-Line Monitoring Based on Enterprises Resource Planning on Implementation ISO 14001:2004

Authors: Ahmad Badawi Saluy

Abstract:

This study aims to develop strategies for the prevention or elimination of environmental pollution as well as changes in external variables of the environment in order to implement the environmental management system ISO 14001:2004 by integrating analysis of environmental issues data, RKL-RPL transactional data and regulation as part of ERP on the management dashboard. This research uses a quantitative descriptive approach with analysis method comparing with air quality standard (PP 42/1999, LH 21/2008), water quality standard (permenkes RI 416/1990, KepmenLH 51/2004, kepmenLH 55/2013 ), and biodiversity indicators. Based on the research, the parameters of RPL monitoring have been identified, among others, the quality of emission air (SO₂, NO₂, dust, particulate) due to the influence of fuel quality, combustion performance in a combustor and the effect of development change around the generating area. While in water quality (TSS, TDS) there was an increase due to the flow of water in the cooling intake carrying sedimentation from the flow of Banjir Kanal Timur. Including compliance with the ISO 14001:2004 clause on application design significantly contributes to the improvement of the quality of power plant management.

Keywords: environmental management systems, power plant management, regulatory compliance , enterprises resource planning

Procedia PDF Downloads 156
16117 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 143
16116 Achieving Quality of Life and Sustainability in Mexican Cities, the Case of the Housing Complex “Villa del Campo”, Tijuana, Mexico

Authors: María de los Ángeles Zárate López, Juan Antonio Pitones Rubio

Abstract:

Quality of life and sustainability in cities are among the most important challenges faced by designers, city planners and urban managers. The Mexican city of Tijuana has a particular dynamic in its demographics which has been accelerated by its border city condition, putting to the test the ability from authorities to provide the population with the necessary services to aspire for a deserving quality of life. In the recent story of Tijuana, we found that the housing policy and the solutions presented by private housing developers have not met the best living conditions for end users by far, thereby adding issues to current social problems which impact the whole metropolitan area, including damage to the natural environment. Therefore this research presents the case study about the situation of a suburban housing development near Tijuana named “Villa del Campo” and exposes the problems of this specific project (originally labelled as a “sustainable” proposal) demonstrating that, once built, the place does not reflect the quality of life that it promised as a project. Currently, this housing development has a number of problematic issues such as the faulty operating conditions of public utilities and serious cases of crime inside the neighborhood. There is no intention to only expose the negative side of this case study, but to explore some alternatives which could help solving the most serious problems at the place, considering possible architectural and landscape interventions within the housing complex to help achieve the optimal conditions of livability and sustainability required by their inhabitants.

Keywords: suburban, housing, quality of life, sustainability, Tijuana, demographics

Procedia PDF Downloads 360
16115 Application of Production Planning to Improve Operation in Local Factory

Authors: Bashayer Al-Enezi, Budoor Al-Sabti, Eman Al-Durai, Fatmah Kalban, Meshael Ahmed

Abstract:

Production planning and control principles are concerned with planning, controlling and balancing all aspects of manufacturing including raw materials, finished goods, production schedules, and equipment requirements. Hence, an effective production planning and control system is very critical to the success of any factory. This project will focus on the application of production planning and control principles on “The National Canned Food Production and Trading Company (NCFP)” factory to find problems or areas for improvement.

Keywords: production planning, operations improvement, inventory management, National Canned Food Production and Trading Company (NCFP)

Procedia PDF Downloads 469
16114 Implementation of Video Education to Improve Patient’s Knowledge of Activating Emergency Medical System for Stroke Symptoms: Evidence- Based Practice Project on Inpatient Neurology Unit in the United States

Authors: V. Miller, T. Jariel, C. Cooper-Chadwick

Abstract:

Early treatment of stroke leads to higher survival and lower disability rates. Increasing knowledge to activate the emergency medical system for signs of stroke can improve outcomes for patients with stroke and decrease morbidity and mortality. Even though patients who get discharged from the hospital receive standard verbal and printed education, nearly 20% of them answer the question incorrectly when asked, “What will you do if you or someone you know have signs of stroke?” The main goal of this evidence-based project was to improve patients’ knowledge of what to do if they have signs of stroke. Evidence suggests that using video education in conjunction with verbal and printed education improves patient comprehension and retention. The percentage of patients who noted that they needed to call 911 for stroke symptoms increased from 80% to 87% in six months after project implementation. The results of this project demonstrate significant improvement in patients’ knowledge about the necessity of activation of emergency medical systems for stroke symptoms.

Keywords: emergency medical systems activation, evidence-based practice nursing, stroke education, video education

Procedia PDF Downloads 43
16113 Spaces in the City to Practice Physical Activities: Case Study of Conchal, São Paulo, Brazil

Authors: Ana Maria Girotti Sperandio, Jussara Conceição Guarnieri, Lauro Luiz Francisco Filho, Ana Claudia Martins Alves, Adriana Aparecida Carneiro Rosa

Abstract:

The urban planning of a city should contemplate the construction of healthy spaces to provide quality of life for people. In a Brazilian municipality located 180 km from the capital of São Paulo with around 27,000 thousand inhabitants, the federal government made possible a program that allows the improvement of the quality of life of the inhabitants through the practice of physical activity. To describe health promotion strategies in the city that collaborate in the reduction of chronic non-communicable diseases (CDNT) and the improvement the quality of its residents. Considering the CDNT as a fundamental public health concern in different countries, the methodology of this work considered the different actions of health promotion that occurred in the city for the implementation of the Polo Health Academy with the objective of increasing the population's access to places that could develop targeted physical activities. As an instrument, it used records of participants of this academy such as: assessment sheets, evolution, photos, filming and daily reports of physical activities. Results: The implantation and implementation process of the Polo Health Academy in the city of Conchal / SP / Brazil was in accordance with the principles and values of the National Health Promotion Policy (PNaPS) in Brazil and with the city statute, that provides improvement in the quality of life of the Brazilian population. An increase was observed in the number of participants in different hours practicing physical activities in the territory linked to one of the five Health Units, showing the program provides that happiness and well-being to the students. The Brazilian health promotion policy, combined with the city’s development policy, provides the population with access to programs that stimulate the reduction of CDNTs, confirming the urban planning of a healthy city.

Keywords: health city, health promotion, physical activity, urban planning

Procedia PDF Downloads 168
16112 Strengthening Social and Psychological Resources - Project "Herausforderung" as a (Sports-) Pedagogical Concept in Adolescence

Authors: Kristof Grätz

Abstract:

Background: Coping with crisis situations (e.g., the identity crisis in adolescence) is omnipresent in today's socialization and should be encouraged as a child. For this reason, students should be given the opportunity to create, endure and manage these crisis situations in a sporting context within the project “Herausforderung.” They should prove themselves by working on a self-assigned task, accompanied by ‚coaches’ in a place outside of their hometown. The aim of the project is to observe this process from a resource-oriented perspective. Health promotion, as called for by the WHO in the Ottawa Charter since 1986, includes strengthening psychosocial resources. These include cognitive, emotional, and social potentials that contribute to improving the quality of life, provide favourable conditions for coping with health burdens and enable people to influence their physical performance and well-being self-confidently and actively. A systematic strengthening of psychosocial resources leads to an improvement in mental health and contributes decisively to the regular implementation and long-term maintenance of this health behavior. Previous studies have already shown significant increases in self-concept following experiential educational measures [Fengler, 2007; Eberle & Fengler, 2018] and positive effects of experience-based school trips on the social competence of students [Reuker, 2009]. Method: The research project examines the influence of the project “Herausforderung” on psychosocial resources such as self-efficacy, self-concept, social support, and group cohesion. The students participating in the project will be tested in a pre-post design in the context of the challenge. This test includes specific questions to capture the different psychosocial resources. For the measurement, modifications of existing scales with good item selectivity and reliability are used to a large extent, so that acceptable item and scale values can be expected. If necessary, the scales were adapted or shortened to the specific context in order to ensure a balanced relationship between reliability and test economy. Specifically, these are already tested scales such as FRKJ 8-16, FSKN, GEQ, and F-SozU. The aim is to achieve a sample size of n ≥ 100. Conclusion: The project will be reviewed with regard to its effectiveness, and implications for a resource-enhancing application in sports settings will be given. Conclusions are drawn as to which extent to specific experiential educational content in physical education can have a health-promoting effect on the participants.

Keywords: children, education, health promotion, psychosocial resources

Procedia PDF Downloads 121
16111 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 226
16110 Environmental Performance Improvement of Additive Manufacturing Processes with Part Quality Point of View

Authors: Mazyar Yosofi, Olivier Kerbrat, Pascal Mognol

Abstract:

Life cycle assessment of additive manufacturing processes has evolved significantly since these past years. A lot of existing studies mainly focused on energy consumption. Nowadays, new methodologies of life cycle inventory acquisition came through the literature and help manufacturers to take into account all the input and output flows during the manufacturing step of the life cycle of products. Indeed, the environmental analysis of the phenomena that occur during the manufacturing step of additive manufacturing processes is going to be well known. Now it becomes possible to count and measure accurately all the inventory data during the manufacturing step. Optimization of the environmental performances of processes can now be considered. Environmental performance improvement can be made by varying process parameters. However, a lot of these parameters (such as manufacturing speed, the power of the energy source, quantity of support materials) affect directly the mechanical properties, surface finish and the dimensional accuracy of a functional part. This study aims to improve the environmental performance of an additive manufacturing process without deterioration of the part quality. For that purpose, the authors have developed a generic method that has been applied on multiple parts made by additive manufacturing processes. First, a complete analysis of the process parameters is made in order to identify which parameters affect only the environmental performances of the process. Then, multiple parts are manufactured by varying the identified parameters. The aim of the second step is to find the optimum value of the parameters that decrease significantly the environmental impact of the process and keep the part quality as desired. Finally, a comparison between the part made by initials parameters and changed parameters is made. In this study, the major finding claims by authors is to reduce the environmental impact of an additive manufacturing process while respecting the three quality criterion of parts, mechanical properties, dimensional accuracy and surface roughness. Now that additive manufacturing processes can be seen as mature from a technical point of view, environmental improvement of these processes can be considered while respecting the part properties. The first part of this study presents the methodology applied to multiple academic parts. Then, the validity of the methodology is demonstrated on functional parts.

Keywords: additive manufacturing, environmental impact, environmental improvement, mechanical properties

Procedia PDF Downloads 258
16109 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 130
16108 Functional Outcome and Quality of Life of Conservative versus Surgical Management of Adult Potts Disease: A Prospective Cohort Study

Authors: Mark Angelo Maranon, David Endriga

Abstract:

Objective: The aim of the study is to determine the differences in functional outcome and quality of life of adult patients with Potts disease who have undergone surgical versus non-surgical management. Methods: In this prospective cohort study, 45 patients were followed up for 1 year after undergoing pharmacologic treatment alone versus a combination of anti-Kochs and surgery for Potts disease. Oswestry Disability Index (ODI) and Short Form-36 (SF-36) were obtained on initiation of treatment, after three months, six months and one year. Results: ASIA scores from the onset of treatment and after 1 year significantly improved (p<0.001) for both non-surgical and surgical patients. ODI scores significantly improved after 6 months of treatment for both surgical and non-surgical patients. Both surgical and non-surgical patients showed significant improvement in their SF-36 scores, but scores were noted to be higher in patients who underwent surgery. Conclusions: Significant improvement with regards to functional outcome and quality of life was noted from both surgical and non-surgical patients after 1 year of treatment, with earlier improvements and better final scores in SF 36 and ODI in patients who underwent surgery.

Keywords: tuberculosis, spinal, potts disease, functional outcome

Procedia PDF Downloads 124
16107 Application of GPRS in Water Quality Monitoring System

Authors: V. Ayishwarya Bharathi, S. M. Hasker, J. Indhu, M. Mohamed Azarudeen, G. Gowthami, R. Vinoth Rajan, N. Vijayarangan

Abstract:

Identification of water quality conditions in a river system based on limited observations is an essential task for meeting the goals of environmental management. The traditional method of water quality testing is to collect samples manually and then send to laboratory for analysis. However, it has been unable to meet the demands of water quality monitoring today. So a set of automatic measurement and reporting system of water quality has been developed. In this project specifies Water quality parameters collected by multi-parameter water quality probe are transmitted to data processing and monitoring center through GPRS wireless communication network of mobile. The multi parameter sensor is directly placed above the water level. The monitoring center consists of GPRS and micro-controller which monitor the data. The collected data can be monitor at any instant of time. In the pollution control board they will monitor the water quality sensor data in computer using Visual Basic Software. The system collects, transmits and processes water quality parameters automatically, so production efficiency and economy benefit are improved greatly. GPRS technology can achieve well within the complex environment of poor water quality non-monitored, and more specifically applicable to the collection point, data transmission automatically generate the field of water analysis equipment data transmission and monitoring.

Keywords: multiparameter sensor, GPRS, visual basic software, RS232

Procedia PDF Downloads 369
16106 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 433
16105 EU-SOLARIS: The European Infrastructure for Concentrated Solar Thermal and Solar Chemistry Technologies

Authors: Vassiliki Drosou, Theoni Oikonomou

Abstract:

EU-SOLARIS will form a new legal entity to explore and implement improved rules and procedures for Research Infrastructures (RI) for Concentrated Solar Thermal (CST) and solar chemistry technologies, in order to optimize RI development and R&D coordination. It is expected to be the first of its kind, where industrial needs and private funding will play a significant role. The success of EU-SOLARIS initiative will be the establishment of a new governance body, aided by sustainable financial models. EU-SOLARIS is expected to be an important tool, which will provide the most complete, high quality scientific infrastructure portfolio at international level and to facilitate researchers' access to highly specialised research infrastructure through a single access point. This will be accomplished by linking scientific communities, industry and universities involved in the CST sector. The access to be offered by EU-SOLARIS will guarantee the direct contact of experienced scientists with newcomers and interested students. The set of RIs participating in EU-SOLARIS will offer access to state of the art infrastructures, high-quality services, and will enable users to conduct high quality research. Access to these facilities will contribute to the enhancement of the European research area by: -Opening installations to European and non-European scientists, coming from both academia and industry, thus improving co-operation. -Improving scientific critical mass in domains where knowledge is now widely dispersed. -Generating strong Europe-wide R&D project consortia, increasing the competitiveness of each member alone. EU-SOLARIS will be created in the framework of a European project, co-funded by the 7th Framework Programme of the European Union –whose initiative is to foster, contribute and promote the scientific and technological development of the CST and solar chemistry technologies. Primary objective of EU-SOLARIS is to contribute to the improvement of the state of the art of these technologies with the aim of preserving and reinforcing the European leadership in this field, in which EU-SOLARIS is expected to be a valuable instrument. EU-SOLARIS scope, activities, objectives, current status and vision will be given in the article. Moreover, the rules, processes and criteria regulating the access to the research infrastructures included in EU-SOLARIS will be presented.

Keywords: concentrated solar thermal (CST) technology, renewable energy sources, research infrastructures, solar chemistry

Procedia PDF Downloads 213
16104 Study on Practice of Improving Water Quality in Urban Rivers by Diverting Clean Water

Authors: Manjie Li, Xiangju Cheng, Yongcan Chen

Abstract:

With rapid development of industrialization and urbanization, water environmental deterioration is widespread in majority of urban rivers, which seriously affects city image and life satisfaction of residents. As an emergency measure to improve water quality, clean water diversion is introduced for water environmental management. Lubao River and Southwest River, two urban rivers in typical plain tidal river network, are identified as technically and economically feasible for the application of clean water diversion. One-dimensional hydrodynamic-water quality model is developed to simulate temporal and spatial variations of water level and water quality, with satisfactory accuracy. The mathematical model after calibration is applied to investigate hydrodynamic and water quality variations in rivers as well as determine the optimum operation scheme of water diversion. Assessment system is developed for evaluation of positive and negative effects of water diversion, demonstrating the effectiveness of clean water diversion and the necessity of pollution reduction.

Keywords: assessment system, clean water diversion, hydrodynamic-water quality model, tidal river network, urban rivers, water environment improvement

Procedia PDF Downloads 249
16103 Decision-Making in Higher Education: Case Studies Demonstrating the Value of Institutional Effectiveness Tools

Authors: Carolinda Douglass

Abstract:

Institutional Effectiveness (IE) is the purposeful integration of functions that foster student success and support institutional performance. IE is growing rapidly within higher education as it is increasingly viewed by higher education administrators as a beneficial approach for promoting data-informed decision-making in campus-wide strategic planning and execution of strategic initiatives. Specific IE tools, including, but not limited to, project management; impactful collaboration and communication; commitment to continuous quality improvement; and accountability through rigorous evaluation; are gaining momentum under the auspices of IE. This research utilizes a case study approach to examine the use of these IE tools, highlight successes of this use, and identify areas for improvement in the implementation of IE tools within higher education. The research includes three case studies: (1) improving upon academic program review processes including the assessment of student learning outcomes as a core component of program quality; (2) revising an institutional vision, mission, and core values; and (3) successfully navigating an institution-wide re-accreditation process. Several methods of data collection are embedded within the case studies, including surveys, focus groups, interviews, and document analyses. Subjects of these methods include higher education administrators, faculty, and staff. Key findings from the research include areas of success and areas for improvement in the use of IE tools associated with specific case studies as well as aggregated results across case studies. For example, the use of case management proved useful in all of the case studies, while rigorous evaluation did not uniformly provide the value-added that was expected by higher education decision-makers. The use of multiple IE tools was shown to be consistently useful in decision-making when applied with appropriate awareness of and sensitivity to core institutional culture (for example, institutional mission, local environments and communities, disciplinary distinctions, and labor relations). As IE gains a stronger foothold in higher education, leaders in higher education can make judicious use of IE tools to promote better decision-making and secure improved outcomes of strategic planning and the execution of strategic initiatives.

Keywords: accreditation, data-informed decision-making, higher education management, institutional effectiveness tools, institutional mission, program review, strategic planning

Procedia PDF Downloads 91
16102 Future Sustainable Mobility for Colorado

Authors: Paolo Grazioli

Abstract:

In this paper, we present the main results achieved during an eight-week international design project on Colorado Future Sustainable Mobilitycarried out at Metropolitan State University of Denver. The project was born with the intention to seize the opportunity created by the Colorado government’s plan to promote e-bikes mobility by creating a large network of dedicated tracks. The project was supported by local entrepreneurs who offered financial and professional support. The main goal of the project was to engage design students with the skills to design a user-centered, original vehicle that would satisfy the unarticulated practical and emotional needs of “Gen Z” users by creating a fun, useful, and reliablelife companion that would helps users carry out their everyday tasks in a practical and enjoyable way. The project was carried out with the intention of proving the importance of the combination of creative methods with practical design methodologies towards the creation of an innovative yet immediately manufacturable product for a more sustainable future. The final results demonstrate the students' capability to create innovative and yet manufacturable products and, especially, their ability to create a new design paradigm for future sustainable mobility products. The design solutions explored n the project include collaborative learning and human-interaction design for future mobility. The findings of the research led students to the fabrication of two working prototypes that will be tested in Colorado and developed for manufacturing in the year 2024. The project showed that collaborative design and project-based teaching improve the quality of the outcome and can lead to the creation of real life, innovative products directly from the classroom to the market.

Keywords: sustainable transportation design, interface design, collaborative design, user -centered design research, design prototyping

Procedia PDF Downloads 68
16101 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 195
16100 Improvement of Overall Equipment Effectiveness of Load Haul Dump Machines in Underground Coal Mines

Authors: J. BalaRaju, M. Govinda Raj, C. S. N. Murthy

Abstract:

Every organization in the competitive world tends to improve its economy by increasing their production and productivity rates. Unequivocally, the production in Indian underground mines over the years is not satisfactory, due to a variety of reasons. There are manifold of avenues for the betterment of production, and one such approach is through enhanced utilization of mechanized equipment such as Load Haul Dumper (LHD). This is used as loading and hauling purpose in underground mines. In view of the aforementioned facts, this paper delves into identification of the key influencing factors such as LHDs maintenance effectiveness, vehicle condition, operator skill and utilization of the machines on performance of LHDs. An attempt has been made for improvement of performance of the equipment through evaluation of Overall Equipment Effectiveness (OEE). Two different approaches for evaluation of OEE have been adopted and compared under various operating conditions. The use of OEE calculation in terms of percentage availability, performance and quality and the hitherto existing situation of the underground mine production is evaluated. Necessary recommendations are suggested to mining industry on the basis of OEE.

Keywords: utilization, maintenance, availability, performance and quality

Procedia PDF Downloads 194
16099 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
16098 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
16097 Improving Neonatal Abstinence Syndrome Assessments

Authors: Nancy Wilson

Abstract:

In utero, fetal drug exposure is prevalent amongst birthing facilities. Assessment tools for neonatal abstinence syndrome (NAS) are often cumbersome and ill-fitting, harboring immense subjectivity. This paradox often leads the clinical assessor to be hypervigilant when assessing the newborn for subtle symptoms of NAS, often mistaken for normal newborn behaviors. As a quality improvement initiative, this project led to a more adaptable NAS tool termed eat, sleep, console (ESC). This function-based NAS assessment scores the infant based on the ability to accomplish three basic newborn necessities- to sleep, to eat, and to be consoled. Literature supports that ESC methodology improves patient and family outcomes while providing more cost-effective care.

Keywords: neonatal abstinence syndrome, neonatal opioid withdrawal, maternal substance abuse, pregnancy, and addiction, Finnegan neonatal abstinence syndrome tool, eat, sleep, console

Procedia PDF Downloads 115
16096 Improving Depression Symptoms and Antidepressant Medication Adherence Using Encrypted Short Message Service Text Message Reminders

Authors: Ogbonna Olelewe

Abstract:

This quality improvement project seeks to address the background and significance of promoting antidepressant (AD) medication adherence to reduce depression symptoms in patients diagnosed with major depression. This project aims to substantiate using daily encrypted short message service (SMS) text reminders to take prescribed antidepressant medications with the goal of increasing medication adherence to reduce depression scores in patients diagnosed with major depression, thereby preventing relapses and increasing remission rates. Depression symptoms were measured using the Patient Health Questionnaire-9 (PHQ-9) scale. The PHQ-9 provides a total score of depression symptoms from mild to severe, ranging from 0 to 27. A -pretest/post-test design was used, with a convenience sample size of 35 adult patients aged 18 years old to 45 years old, diagnosed with MDD, and prescribed at least one antidepressant for one year or more. Pre- and post-test PHQ-9 scores were conducted to compare depression scores before and after the four-week intervention period. The results indicated improved post-intervention PHQ-9 scores, improved AD medication adherence, and a significant reduction in depression symptoms.

Keywords: major depressive disorder, antidepressants, short message services, text reminders, Medication adherence/non-adherence, Patient Health Questionnaire 9

Procedia PDF Downloads 126
16095 Real-Time Water Quality Monitoring and Control System for Fish Farms Based on IoT

Authors: Nadia Yaghoobi, Seyed Majid Esmaeilzadeh

Abstract:

Due to advancements in wireless communication, new sensor capabilities have been created. In addition to the automation industry, the Internet of Things (IoT) has been used in environmental issues and has provided the possibility of communication between different devices for data collection and exchange. Water quality depends on many factors which are essential for maintaining the minimum sustainability of water. Regarding the great dependence of fishes on the quality of the aquatic environment, water quality can directly affect their activity. Therefore, monitoring water quality is an important issue to consider, especially in the fish farming industry. The conventional method of water quality testing is to collect water samples manually and send them to a laboratory for testing and analysis. This time-consuming method is a waste of manpower and is not cost-effective. The water quality measurement system implemented in this project monitors water quality in real-time through various sensors (parameters: water temperature, water level, dissolved oxygen, humidity and ambient temperature, water turbidity, PH). The Wi-Fi module, ESP8266, transmits data collected by sensors wirelessly to ThingSpeak and the smartphone app. Also, with the help of these instantaneous data, water temperature and water level can be controlled by using a heater and a water pump, respectively. This system can have a detailed study of the pollution and condition of water resources and can provide an environment for safe fish farming.

Keywords: dissolved oxygen, IoT, monitoring, ThingSpeak, water level, water quality, WiFi module

Procedia PDF Downloads 157