Search results for: project team
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5880

Search results for: project team

5520 The Significance of Cultural Risks for Western Consultants Executing Gulf Cooperation Council Megaprojects

Authors: Alan Walsh, Peter Walker

Abstract:

Differences in commercial, professional and personal cultural traditions between western consultants and project sponsors in the Gulf Cooperation Council (GCC) region are potentially significant in the workplace, and this can impact on project outcomes. These cultural differences can, for example, result in conflict amongst senior managers, which can negatively impact the megaproject. New entrants to the GCC often experience ‘culture shock’ as they attempt to integrate into their unfamiliar environments. Megaprojects are unique ventures with individual project characteristics, which need to be considered when managing their associated risks. Megaproject research to date has mostly ignored the significance of the absence of cultural congruence in the GCC, which is surprising considering that there are large volumes of megaprojects in various stages of construction in the GCC. An initial step to dealing with cultural issues is to acknowledge culture as a significant risk factor (SRF). This paper seeks to understand the criticality for western consultants to address these risks. It considers the cultural barriers that exist between GCC sponsors and western consultants and examines the cultural distance between the key actors. Initial findings suggest the presence to a certain extent of ethnocentricity. Other cultural clashes arise out of a lack of appreciation of the customs, practices and traditions of ‘the Other’, such as the need for avoiding public humiliation and the hierarchal significance rankings. The concept and significance of cultural shock as part of the integration process for new arrivals are considered. Culture shock describes the state of anxiety and frustration resulting from the immersion in a culture distinctly different from one's own. There are potentially substantial project risks associated with underestimating the process of cultural integration. This paper examines two distinct but intertwined issues: the societal and professional culture differences associated with expatriate assignments. A case study examines the cultural congruences between GCC sponsors and American, British and German consultants, over a ten-year cycle. This provides indicators as to which nationalities encountered the most profound cultural issues and the nature of these. GCC megaprojects are typically intensive fast track demanding ventures, where consultant turnover is high. The study finds that building trust-filled relationships is key to successful project team integration and therefore, to successful megaproject execution. Findings indicate that both professional and social inclusion processes have steep learning curves. Traditional risk management practice is to approach any uncertainty in a structured way to mitigate the potential impact on project outcomes. This research highlights cultural risk as a significant factor in the management of GCC megaprojects. These risks arising from high staff turnover typically include loss of project knowledge, delays to the project, cost and disruption in replacing staff. This paper calls for cultural risk to be recognised as an SRF, as the first step to developing risk management strategies, and to reduce staff turnover for western consultants in GCC megaprojects.

Keywords: western consultants in megaprojects, national culture impacts on GCC megaprojects, significant risk factors in megaprojects, professional culture in megaprojects

Procedia PDF Downloads 108
5519 Installation of an Inflatable Bladder and Sill Walls for Riverbank Erosion Protection and Improved Water Intake Zone Smokey Hill River – Salina, Kansas

Authors: Jeffrey A. Humenik

Abstract:

Environmental, Limited Liability Corporation (EMR) provided civil construction services to the U.S. Army Corps of Engineers, Kansas City District, for the placement of a protective riprap blanket on the west bank of the Smoky Hill River, construction of 2 shore abutments and the construction of a 140 foot long sill wall spanning the Smoky Hill River in Salina, Kansas. The purpose of the project was to protect the riverbank from erosion and hold back water to a specified elevation, creating a pool to ensure adequate water intake for the municipal water supply. Geotextile matting and riprap were installed for streambank erosion protection. An inflatable bladder (AquaDam®) was designed to the specific river dimension and installed to divert the river and allow for dewatering during the construction of the sill walls and cofferdam. AquaDam® consists of water filled polyethylene tubes to create aqua barriers and divert water flow or prevent flooding. A challenge of the project was the fact that 100% of the sill wall was constructed within an active river channel. The threat of flooding of the work area, damage to the aqua dam by debris, and potential difficulty of water removal presented a unique set of challenges to the construction team. Upon completion of the West Sill Wall, floating debris punctured the AquaDam®. The manufacturing and delivery of a new AquaDam® would delay project completion by at least 6 weeks. To keep the project ahead of schedule, the decision was made to construct an earthen cofferdam reinforced with rip rap for the construction of the East Abutment and East Sill Wall section. During construction of the west sill wall section, a deep scour hole was encountered in the wall alignment that prevented EMR from using the natural rock formation as a concrete form for the lower section of the sill wall. A formwork system was constructed, that allowed the west sill wall section to be placed in two horizontal lifts of concrete poured on separate occasions. The first sectional lift was poured to fill in the scour hole and act as a footing for the second sectional lift. Concrete wall forms were set on the first lift and anchored to the surrounding riverbed in a manner that the second lift was poured in a similar fashion as a basement wall. EMR’s timely decision to keep the project moving toward completion in the face of changing conditions enabled project completion two (2) months ahead of schedule. The use of inflatable bladders is an effective and cost-efficient technology to divert river flow during construction. However, a secondary plan should be part of project design in the event debris transported by river punctures or damages the bladders.

Keywords: abutment, AquaDam®, riverbed, scour

Procedia PDF Downloads 122
5518 Synchronous Versus Asynchronous Telecollaboration in Intercultural Communication

Authors: Vita Kalnberzina, Lauren Miller Anderson

Abstract:

The aim of the paper is to report on the results of the telecollaboration project results carried out between the students of the University of Latvia, National Louis University in the US, and Austral University in Chili during the Intercultural Communication course. The objectives of the study are 1) to compare different forms of student telecollaboration and virtual exchange, 2) to collect and analyse the student feedback on the telecollaboration project, 3) to evaluate the products (films) produced during the telecollaboration project. The methods of research used are as follows: Survey of the student feedback after the project, video text analysis of the films produced by the students, and interview of the students participating in the project. We would like to compare the results of a three-year collaboration project, where we tried out synchronous telecollaboration and asynchronous collaboration. The different variables that were observed were the impact of the different time zones, different language proficiency levels of students, and different curricula developed for collaboration. The main findings suggest that the effort spent by students to organize meetings in different time zones and to get to know each other diminishes the quality of the product developed and thus reduces the students' feeling of accomplishment. Therefore, we would like to propose that asynchronous collaboration where the national teams work on a film project specifically developed by the students of one university for the students of another university ends up with a better quality film, which in its turn appeals more to the students of the other university and creates a deeper intercultural bond between the collaborating students.

Keywords: telecollaboration, intercultural communication, synchronous collaboration, asynchronous collaboration

Procedia PDF Downloads 71
5517 Employing a Flipped Classroom Approach to Support Project-Based Learning

Authors: Kian Jon Chua, Islam Md Raisul

Abstract:

Findings on a research study conducted for a group of year-2 engineering students participating in a flipped classroom (FC) experience that is judiciously incorporated into project-based learning (PBL) module are presented. The chief purpose of the research is to identify whether if the incorporation of flipped classroom approach to project-based learning indeed yields a positive learning experience for engineering students. Results are presented and compared from the two classes of students – one is subjected to a traditional PBL learning mode while the other undergoes a hybrid PBL-FC learning format. Some themes related to active learning, problem-solving ability, teacher as facilitator, and degree of self-efficacy are also discussed. This paper hopes to provide new knowledge and insights relating to the introduction of flipped classroom learning to a project-based engineering module. Some potential study limitations and future directions to address them are also presented.

Keywords: hybrid project-based learning, flipped classroom, problem-solving, active learning

Procedia PDF Downloads 115
5516 Unpacking the Summarising Event in Trauma Emergencies: The Case of Pre-briefings

Authors: Professor Jo Angouri, Polina Mesinioti, Chris Turner

Abstract:

In order for a group of ad-hoc professional to perform as a team, a shared understanding of the problem at hand and an agreed action plan are necessary components. This is particularly significant in complex, time sensitive professional settings such as in trauma emergencies. In this context, team briefings prior to the patient arrival (pre-briefings) constitute a critical event for the performance of the team; they provide the necessary space for co-constructing a shared understanding of the situation through summarising information available to the team: yet the act of summarising is widely assumed in medical practice but not systematically researched. In the vast teamwork literature, terms such as ‘shared mental model’, ‘mental space’ and ‘cognate labelling’ are used extensively, and loosely, to denote the outcome of the summarising process, but how exactly this is done interactionally remains under researched. This paper reports on the forms and functions of pre-briefings in a major trauma centre in the UK. Taking an interactional approach, we draw on 30 simulated and real-life trauma emergencies (15 from each dataset) and zoom in on the use of pre-briefings, which we consider focal points in the management of trauma emergencies. We show how ad hoc teams negotiate sharedness of future orientation through summarising, synthesising information, and establishing common understanding of the situation. We illustrate the role, characteristics, and structure of pre-briefing sequences that have been evaluated as ‘efficient’ in our data and the impact (in)effective pre-briefings have on teamwork. Our work shows that the key roles in the event own the act of summarising and we problematise the implications for leadership in trauma emergencies. We close the paper with a model for pre-briefing and provide recommendations for clinical practice, arguing that effective pre-briefing practice is teachable.

Keywords: summarising, medical emergencies, interaction analysis, shared/mental models

Procedia PDF Downloads 66
5515 Using the Clinical Decision Support Platform, Dem DX, to Assess the ‘Urgent Community Care Team’s Notes Regarding Clinical Assessment, Management, and Healthcare Outcomes

Authors: R. Tariq, R. Lee

Abstract:

Background: Heywood, Middleton & Rochdale Urgent Community Care Team (UCCT)1 is a great example of using a multidisciplinary team to cope with demand. The service reduces unnecessary admissions to hospitals and ensures that patients can leave the hospital quicker by making care more readily available within the community and patient’s homes. The team comprises nurses, community practitioners, and allied health professions, including physiotherapy, occupational therapy, pharmacy, and GPs. The main challenge for a team with a range of experiences and skill sets is to maintain consistency of care, which technology can help address. Allied healthcare professionals (HCPs) are often used in expanded roles with duties mainly involving patient consultations and decision making to ease pressure on doctors. The Clinical Reasoning Platform (CRP) Dem Dx is used to support new as well as experienced professionals in the decision making process. By guiding HCPs through diagnosing patients from an expansive directory of differential diagnoses, patients can receive quality care in the community. Actions on the platform are determined using NICE guidelines along with local guidance influencing the assessment and management of a patient. Objective: To compare the clinical assessment, decisions, and actions taken by the UCCT multidisciplinary team in the community and Dem Dx, using retrospective clinical cases. Methodology: Dem Dx was used to analyse 192 anonymised cases provided by the HMR UCCT. The team’s performance was compared with Dem Dx regarding the quality of the documentation of the clinical assessment and the next steps on the patient’s journey, including the initial management, actions, and any onward referrals made. The cases were audited by two medical doctors. Results: The study found that the actions outlined by the Dem Dx platform were appropriate in almost 87% of cases. When in a direct comparison between DemDX and the actions taken by the clinical team, it was found that the platform was suitable 83% (p<0.001) of the time and could lead to a potential improvement of 66% in the assessment and management of cases. Dem Dx also served to highlight the importance of comprehensive and high quality clinical documentation. The quality of documentation of cases by UCCT can be improved to provide a detailed account of the assessment and management process. By providing step-by-step guidance and documentation at every stage, Dem Dx may ensure that legal accountability has been fulfilled. Conclusion: With the ever expanding workforce in the NHS, technology has become a key component in driving healthcare outcomes. To improve healthcare provision and clinical reasoning, a decision support platform can be integrated into HCPs’ clinical practice. Potential assistance with clinical assessments, the most appropriate next step and actions in a patient’s care, and improvements in the documentation was highlighted by this retrospective study. A further study has been planned to ascertain the effectiveness of improving outcomes using the clinical reasoning platform within the clinical setting by clinicians.

Keywords: allied health professional, assessment, clinical reasoning, clinical records, clinical decision-making, ocumentation

Procedia PDF Downloads 141
5514 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 417
5513 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 134
5512 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 67
5511 Relevance of the Tokyo Trial: A Comparative Perspective

Authors: Nalanda Roy

Abstract:

The project will offer a fresh and critical perspective into the Tokyo Trial judgment led by the Indian Jurist Dr. Radha Binod Pal. The project will focus on the Third World Approach to International Law (TWAIL) methodology to examine the relevance of international law from the post-colonial perspectives. The project will analyze Pal’s dissenting arguments from a new and comparative perspective, apply for work from other disciplines, and create an understanding of the significance of the historic judgment considering its contemporary relevance, and fill in the gaps that exist in the call for global justice.

Keywords: Tokyo trial, third world, judgment, international law

Procedia PDF Downloads 66
5510 Extraction of Grapefruit Essential Oil from Grapefruit Peels

Authors: Adithya Subramanian, S. Ananthan, T. Prasanth, S. P. Selvabharathi

Abstract:

This project involves extraction of grapefruit essential oil from grapefruit peels using various oils like castor oil, gingelly oil, olive oil as carrier oils. The main aim of this project is to extract the oil which has numerous medicinal uses. The extraction can be performed by two methods. Project involves extraction of the oil with various carrier oil in a view to reduce the cost of production and the physical properties of the extracted oil are examined.

Keywords: essential oil, carrier oil, medicinal uses, cost of production

Procedia PDF Downloads 406
5509 Efficacy of Remote Sensing Application in Monitoring the Effectiveness of Afforestation Project in Northern Nigeria

Authors: T. Garba, Y. Y. Babanyara, K. G. Ilellah, M. A. Modibbo, T. O. Quddus, M. J. Sani

Abstract:

After the United Nation Convention on Desertification (UNCD) in 1977 which was preceded by extensive, regional, and local studies, and consultations with numerous scientists, decision-makers, and relevant institutions. Global Plan of Action to Combat Desertification (PACD) was formulated, endorsed by member Countries. The role of implementing PACD was vested with Governments of countries affected by desertification. The Federal Government of Nigeria as a signatory and World Bank funded and implement afforestation project aimed at combating desertification between 1988 and 1999. This research, therefore, applied remote sensing techniques to assess the effectiveness of the project. To achieve that a small portion of about 143,609 hectares was curved out from the project area. Normalized Difference of the Vegetative Index (NDVI) and Land Use Land Cover were derived from Landsat TM 1986, Landsat ETM 1999 and Nigeria Sat 1, 2007 of the project area. The findings show that there was an increase in cultivated area due to the project from 1986 through 1999 and 2007. This is further buttressed by the three NDVI imageries due to their high positive pixel value from 0.04 in 1986 to 0.22 in 1999 and to 0.32 in 2007 These signifies the gradual physical development of Afforestation project in the area. In addition, it was also verified by histograms of changes in vegetation which indicated an increased vegetative cover from 60,192 in 1986, to 102,476 in 1999 and then to 88,343 in 2007. The study concluded that Remote Sensing approach has actually confirmed that the project was indeed successful and effective.

Keywords: afforestation, desertification, landsat, vegetative index, remote sensing

Procedia PDF Downloads 296
5508 An Exploration of the Emergency Staff’s Perceptions and Experiences of Teamwork and the Skills Required in the Emergency Department in Saudi Arabia

Authors: Sami Alanazi

Abstract:

Teamwork practices have been recognized as a significant strategy to improve patient safety, quality of care, and staff and patient satisfaction in healthcare settings, particularly within the emergency department (ED). The EDs depend heavily on teams of interdisciplinary healthcare staff to carry out their operational goals and core business of providing care to the serious illness and injured. The ED is also recognized as a high-risk area in relation to service demand and the potential for human error. Few studies have considered the perceptions and experiences of the ED staff (physicians, nurses, allied health professionals, and administration staff) about the practice of teamwork, especially in Saudi Arabia (SA), and no studies have been conducted to explore the practices of teamwork in the EDs. Aim: To explore the practices of teamwork from the perspectives and experiences of staff (physicians, nurses, allied health professionals, and administration staff) when interacting with each other in the admission areas in the ED of a public hospital in the Northern Border region of SA. Method: A qualitative case study design was utilized, drawing on two methods for the data collection, comprising of semi-structured interviews (n=22) with physicians (6), nurses (10), allied health professionals (3), and administrative members (3) working in the ED of a hospital in the Northern Border region of SA. The second method is non-participant direct observation. All data were analyzed using thematic analysis. Findings: The main themes that emerged from the analysis were as follows: the meaningful of teamwork, reasons of teamwork, the ED environmental factors, the organizational factors, the value of communication, leadership, teamwork skills in the ED, team members' behaviors, multicultural teamwork, and patients and families behaviors theme. Discussion: Working in the ED environment played a major role in affecting work performance as well as team dynamics. However, Communication, time management, fast-paced performance, multitasking, motivation, leadership, and stress management were highlighted by the participants as fundamental skills that have a major impact on team members and patients in the ED. It was found that the behaviors of the team members impacted the team dynamics as well as ED health services. Behaviors such as disputes among team members, conflict, cooperation, uncooperative members, neglect, and emotions of the members. Besides that, the behaviors of the patients and their accompanies had a direct impact on the team and the quality of the services. In addition, the differences in the cultures have separated the team members and created undesirable gaps such the gender segregation, national origin discrimination, and similarity and different in interests. Conclusion: Effective teamwork, in the context of the emergency department, was recognized as an essential element to obtain the quality of care as well as improve staff satisfaction.

Keywords: teamwork, barrier, facilitator, emergencydepartment

Procedia PDF Downloads 105
5507 International E-Learning for Assuring Ergonomic Working Conditions of Orthopaedic Surgeons: First Research Outcomes from Train4OrthoMIS

Authors: J. Bartnicka, J. A. Piedrabuena, R. Portilla, L. Moyano - Cuevas, J. B. Pagador, P. Augat, J. Tokarczyk, F. M. Sánchez Margallo

Abstract:

Orthopaedic surgeries are characterized by a high degree of complexity. This is reflected by four main groups of resources: 1) surgical team which is consisted of people with different competencies, educational backgrounds and positions; 2) information and knowledge about medical and technical aspects of surgery; 3) medical equipment including surgical tools and materials; 4) space infrastructure which is important from an operating room layout point of view. These all components must be integrated and build a homogeneous organism for achieving an efficient and ergonomically correct surgical workflow. Taking this as a background, there was formulated a concept of international project, called “Online Vocational Training course on ergonomics for orthopaedic Minimally Invasive” (Train4OrthoMIS), which aim is to develop an e-learning tool available in 4 languages (English, Spanish, Polish and German). In the article, there is presented the first project research outcomes focused on three aspects: 1) ergonomic needs of surgeons who work in hospitals around different European countries, 2) the concept of structure of e-learning course, 3) the definition of tools and methods for knowledge assessment adjusted to users’ expectation. The methodology was based on the expert panels and two types of surveys: 1) on training needs, 2) on evaluation and self-assessment preferences. The major findings of the study allowed describing the subjects of four training modules and learning sessions. According to peoples’ opinion there were defined most expected test methods which are single choice test and right after quizzes: “True or False” and “Link elements”. The first project outcomes confirmed the necessity of creating a universal training tool for orthopaedic surgeons regardless of the country in which they work. Because of limited time that surgeons have, the e-learning course should be strictly adjusted to their expectation in order to be useful.

Keywords: international e-learning, ergonomics, orthopaedic surgery, Train4OrthoMIS

Procedia PDF Downloads 159
5506 Perceptions of Research Staff on the Implementation of Each-B Study: A Randomised Controlled Trial

Authors: Laila Khawaja

Abstract:

In recent years, an increasing emphasis has been placed on measuring program implementation, in part because of the great variability in how complex interventions are delivered in real-life settings. There is an increased awareness that while conducting process evaluations, one should aim to identify and understand the complexities of intervention if they are to be used for future intervention development or the strategies needed to implement the same intervention in a different setting. Complex interventions are public health interventions that are not drugs or surgical procedures but have many potential active aspects of intervention. In this paper, process evaluations are aligned with MRC guidelines to identify contextual factors related to outcomes to assess the quality of implementation. This paper briefly discusses the perceptions of research team on the implementation of the intervention of ‘Engaging Adolescents in Changing Behaviour’ (EACH-B), a school-based complex intervention study aiming to improve diet and physical activity among adolescents aged 12-13 years. Through qualitative interviews and focus groups with 10 staff members, we aimed to understand their experiences and reflections on implementing the EACH-B trial delivered in 49 Schools around Hampshire, England. Data were uploaded into NVivo, and analysis was conducted using thematic analysis. The investigation revealed two overarching themes: (a) how the communication patterns with teachers were impacted during the delivery of implementation and (b) what were the team’s strategies to keep logistics aligned with the research process that impacted the overall implementation of the trial. The paper informs adaptation strategies used by the research team to establish and maintain effective communication with the teachers as well as the thoughtfulness of the team’s logistic strategy for the successful delivery of the trial.

Keywords: complex interventions, process evaluation, adaptation strategies, randomised controlled trial

Procedia PDF Downloads 42
5505 Enhancing Nursing Students’ Communication Using TeamSTEPPS to Improve Patient Safety

Authors: Stefanie Santorsola, Natasha Frank

Abstract:

Improving healthcare safety necessitates examining current trends and beliefs about safety and devising strategies to improve. Errors in healthcare continue to increase and be experienced by patients, which is preventable and directly correlated to a breakdown in healthcare communication. TeamSTEPPS is an evidence-based process designed to improve the quality and safety of healthcare by improving communication and team processes. Communication is at the core of effective team collaboration and is vital for patient safety. TeamSTEPPS offers insights and strategies for improving communication and teamwork and reducing preventable errors to create a safer healthcare environment for patients. The academic, clinical, and educational environment for nursing students is vital in preparing them for professional practice by providing them with foundational knowledge and abilities. This environment provides them with a prime opportunity to learn about errors and the importance of effective communication to enhance patient safety, as nursing students are often unprepared to deal with errors. Proactively introducing and discussing errors through a supportive culture during the nursing student’s academic beginnings has the potential to carry key concepts into practice to improve and enhance patient safety. TeamSTEPPS has been used globally and has collectively positively impacted improvements in patient safety and teamwork. A workshop study was introduced in winter 2023 of registered practical nurses (RPN) students bridging to the baccalaureate nursing program; the majority of the RPNs in the bridging program were actively employed in a variety of healthcare facilities during the semester. The workshop study did receive academic institution ethics board approval, and participants signed a consent form prior to participating in the study. The premise of the workshop was to introduce TeamSTEPPS and a variety of strategies to these students and have students keep a reflective journal to incorporate the presented communication strategies in their practicum setting and keep a reflective journal on the effect and outcomes of the strategies in the healthcare setting. Findings from the workshop study supported the objective of the project, resulting in students verbalizing notable improvements in team functioning in the healthcare environment resulting from the incorporation of enhanced communication strategies from TeamSTEPPS that they were introduced to in the workshop study. Implication for educational institutions is the potential of further advancing the safety literacy and abilities of nursing students in preparing them for entering the workforce and improving safety for patients.

Keywords: teamstepps, education, patient safety, communication

Procedia PDF Downloads 30
5504 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants

Procedia PDF Downloads 58
5503 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 27
5502 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 105
5501 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector

Authors: Rawan K. Al-Duaij, Salem A. Al-Salem

Abstract:

Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.

Keywords: adjustment orders, data analysis, oil and gas sector, systems management

Procedia PDF Downloads 133
5500 Exploring Individual and Team Approaches in Crafting Workplace Inclusivity for Deaf and Hard of Hearing Employees in Malaysia

Authors: Nor Wahiza Abdul Wahat, Nor Haniza Abdul Wahat, Siti Noormi Alias, Mohamad Sazali Shaari

Abstract:

This study prepares the groundwork for the development of a strategic model and instrument for workplace inclusivity for deaf and hard-of-hearing employees in Malaysia. In the past, scholars have discussed inclusivity of workplaces to the extent to which employees feel they are significantly part of the organizational processes. Such processes include access to information, connectedness to colleagues and team members as well as their ability to participate in and influence decision-making processes. A qualitative study was conducted to explore on experiences of employed deaf and hard-of-hearing employees in a few Malaysian organizations. Data were collected from two focus group discussions involving male and female deaf and hard of hearing employees. Three in-depth interviews were also conducted with employer representatives. Generated themes highlighted individual, and team approaches towards crafting workplace inclusivity for deaf and hard of hearing employees in Malaysia. The adaptiveness of deaf and hard-of-hearing employees and social inclusion by colleagues were among the emerged sub-themes. This study allowed the researchers to further develop workplace inclusivity instruments and models for the benefit of deaf and hard of hearing Malaysian employees, as well as their employers.

Keywords: deaf, hard of hearing, workplace inclusivity, disabilities

Procedia PDF Downloads 153
5499 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 312
5498 Creative Culture to Innovative Culture: Transformal Operation

Authors: Peer M. Sathikh

Abstract:

Creativity and innovation have become an important phenomenon today, whose potential is being realized through the success of Apple, Google/Android, Nike, Virgin, Dyson and other multinationals that are a household name today. Creativity and Innovation are, many times, used interchangeably, causing confusion as to what each represents and are capable of. Attempts to understand creativity and innovation clearly point to the difference, and at the same time, inter-dependency of one on the other. The assumption that having more creative personnel in a team will translate into innovation sooner or later seems generally counterproductive. What helps define the role of creativity and innovation in an organization and how can one build an innovative team? This paper points to the importance of understanding creative culture and innovation culture in order to bring about the desired innovation outcome and proposes a means to transform one to another as ideas move from mere ideas to useful innovation.

Keywords: creativity, innovation, creative culture, innovation culture, transformal operators

Procedia PDF Downloads 370
5497 Ranking Theory-The Paradigm Shift in Statistical Approach to the Issue of Ranking in a Sports League

Authors: E. Gouya Bozorg

Abstract:

The issue of ranking of sports teams, in particular soccer teams is of primary importance in the professional sports. However, it is still based on classical statistics and models outside of area of mathematics. Rigorous mathematics and then statistics despite the expectation held of them have not been able to effectively engage in the issue of ranking. It is something that requires serious pathology. The purpose of this study is to change the approach to get closer to mathematics proper for using in the ranking. We recommend using theoretical mathematics as a good option because it can hermeneutically obtain the theoretical concepts and criteria needful for the ranking from everyday language of a League. We have proposed a framework that puts the issue of ranking into a new space that we have applied in soccer as a case study. This is an experimental and theoretical study on the issue of ranking in a professional soccer league based on theoretical mathematics, followed by theoretical statistics. First, we showed the theoretical definition of constant number Є = 1.33 or ‘golden number’ of a soccer league. Then, we have defined the ‘efficiency of a team’ by this number and formula of μ = (Pts / (k.Є)) – 1, in which Pts is a point obtained by a team in k number of games played. Moreover, K.Є index has been used to show the theoretical median line in the league table and to compare top teams and bottom teams. Theoretical coefficient of σ= 1 / (1+ (Ptx / Ptxn)) has also been defined that in every match between the teams x, xn, with respect to the ability of a team and the points of both of them Ptx, Ptxn, and it gives a performance point resulting in a special ranking for the League. And it has been useful particularly in evaluating the performance of weaker teams. The current theory has been examined for the statistical data of 4 major European Leagues during the period of 1998-2014. Results of this study showed that the issue of ranking is dependent on appropriate theoretical indicators of a League. These indicators allowed us to find different forms of ranking of teams in a league including the ‘special table’ of a league. Furthermore, on this basis the issue of a record of team has been revised and amended. In addition, the theory of ranking can be used to compare and classify the different leagues and tournaments. Experimental results obtained from archival statistics of major professional leagues in the world in the past two decades have confirmed the theory. This topic introduces a new theory for ranking of a soccer league. Moreover, this theory can be used to compare different leagues and tournaments.

Keywords: efficiency of a team, ranking, special table, theoretical mathematic

Procedia PDF Downloads 397
5496 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 131
5495 A Multi-Layer Based Architecture for the Development of an Open Source CAD/CAM Integration Virtual Platform

Authors: Alvaro Aguinaga, Carlos Avila, Edgar Cando

Abstract:

This article proposes a n-layer architecture, with a web client as a front-end, for the development of a virtual platform for process simulation on CNC machines. This Open-Source platform includes a CAD-CAM interface drawing primitives, and then used to furnish a CNC program that triggers a touch-screen virtual simulator. The objectives of this project are twofold. First one is an educational component that fosters new alternatives for the CAD-CAM/CNC learning process in undergrad and grade schools and technical and technological institutes emphasizing in the development of critical skills, discussion and collaborative work. The second objective puts together a research and technological component that will take the state of the art in CAD-CAM integration to a new level with the development of optimal algorithms and virtual platforms, on-line availability, that will pave the way for the long-term goal of this project, that is, to have a visible and active graduate school in Ecuador and a world wide Open-Innovation community in the area of CAD-CAM integration and operation of CNC machinery. The virtual platform, developed as a part of this study: (1) delivers improved training process of students, (2) creates a multidisciplinary team and a collaborative work space that will push the new generation of students to face future technological challenges, (3) implements industry standards for CAD/CAM, (4) presents a platform for the development of industrial applications. A protoype of this system was developed and implemented in a network of universities and technological institutes in Ecuador.

Keywords: CAD-CAM integration, virtual platforms, CNC machines, multi-layer based architecture

Procedia PDF Downloads 395
5494 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 448
5493 Distributed Leadership and Emergency Response: A Study on Seafarers

Authors: Delna Shroff

Abstract:

Merchant shipping is an occupation with a high rate of fatal injuries caused by organizational accidents and maritime disasters. In most accident investigations, the leader’s actions are under scrutiny and point out the necessity to investigate the leader’s decisions in critical conditions. While several leadership studies have been carried out in the past, there is a tendency for most research to focus on holders of formal positions. The unit of analysis in most studies has been the ‘individual.’ A need is, therefore, felt to adopt a practice-based perspective of leadership, understand how leadership emerges to affect maritime safety. This paper explores the phenomenon of distributed leadership among seafarers more holistically. It further examines the role of one form of distributed leadership, that is, planfully aligned leadership in the emergency response of the team. A mixed design will be applied. In the first phase, the data gathered by way of semi-structured interviews will be used to explore the seafarer’s implicit understanding of leadership. The data will be used to develop a conceptual framework of distributed leadership, specific to the maritime context. This framework will be used to develop a simulation. Experimental design will be used to examine the relationship between planfully aligned leadership and emergency response of the team members during navigation. Findings show that planfully aligned leadership significantly and positively predicts the emergency response of team members. Planfully aligned leadership leads to a better emergency response of the team members as compared to authoritarian leadership. In the third qualitative phase, additional data will be gathered through semi-structured interviews to further validate the findings to gain a more complete understanding of distributed leadership and its relation to emergency response. Above are the predictive results; the study expects to be a cornerstone of safety leadership research and has important implications for leadership development and training within the maritime industry.

Keywords: authoritarian leadership, distributed leadership, emergency response , planfully aligned leadership

Procedia PDF Downloads 141
5492 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 283
5491 A Development of Practice Guidelines for Surgical Safety Management to Reduce Undesirable Incidents from Surgical Services in the Operating Room of Songkhla Hospital, Thailand

Authors: Thitima Plejai

Abstract:

The practice in the operating room has been continually performed according to standards of services; however, undesirable incidents from surgical services are found such as surgical complications in the operating room. This participation action research aimed to develop practice guidelines for surgical safety management to reduce undesirable incidents from surgical services in the operating room of Songkhla Hospital. The target population was all 84 members of the multidisciplinary team who were involved in surgical services in the operating room consisting of 28 surgeons from five branches of surgery, 27 anesthetists and nurse anesthetists, and 29 surgical nurses. The data were collected through in-depth interviews, and non-participatory observations. The research instrument was tested by three experts, and the steps of the development consisted of four cycles, each consisting of assessment, planning, practice, practice reflection, and improvement until every step is practicable. The data were validated through triangulation research method, analyzed through content analysis and statistical analysis with number and percentage. The results of the development of practice guidelines surgical safety management to reduce undesirable incidents from surgical services could be concluded as follows. 1) The multidisciplinary team in surgery participated in the needs assessment for development of practice guidelines for surgical patient safety, and agreed on adapting the WHO Surgical Safety Checklists for use. 2) The WHO Surgical Safety Checklists was implemented, and meetings were held for the multidisciplinary team in surgery and the organizational risk committee to improve the practice guidelines to make them more practicable. 3) The multidisciplinary team consisting of surgeons from five branches of surgery, anesthetists, nurse anesthetists, surgical nurses, and the organizational risk committee announced policy on safety for surgical patients; the organizational risk committee designated the Surgical Safety Checklist as an instrument for surgical patient safety. The results of the safety management found that the surgical team members who could follow 100 percent of the guidelines were: professional nurses who checked patient identity and information before taking the patient to the operating room and kept complete records of data on the patients; surgical nurses who checked readiness of the patient before surgery; nurse anesthetists who assessed readiness before administering anesthetic drugs, and confirmed correctness of the patient; and circulating perioperative nurses who gave confirmation to the surgical team after completion of the surgery. The rates of undesirable incidents (surgical complications rates) before and after the implementation of the surgical safety management were 1.60 percent and 0.66 percent, respectively. The satisfaction of the surgery-related teams towards the use of the guidelines was 89 percent. The practice guidelines for surgical safety management to reduce undesirable incidents were taken as guidelines for surgical safety that the multidisciplinary team involved in the surgical process implemented correctly and in the same direction and clearly reduced undesirable incidents in surgical patients.

Keywords: practice guidelines, surgical safety management, reduce undesirable incidents, operating Room

Procedia PDF Downloads 273