6084 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 301
6083 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 443
6082 Critical Success Factors for Sustainable Smart City Project in India

Authors: Debasis Sarkar

Abstract:

Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.

Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method

Procedia PDF Downloads 225
6081 Exploring Stakeholders’ Perceptions of the Implementation of the Door-to-Door Vaccination Campaign for the Oral Polio Vaccine (NOPV2) In Uganda: A Qualitative Study

Authors: Elizabeth B. Katana, Brenda N. Simbwa, Josephine Namayanja, Bob O. Amodan, Edirisa J. Nsubuga, Eva A. O. Laker

Abstract:

Background: Understanding stakeholders’ perceptions towards the implementation of a mass vaccination campaign is important to ensure the design of better strategies to address challenges. We explored stakeholders’ perceptions of the implementation of a nationwide door-to-door mass vaccination campaign for the oral polio vaccine (nOPV2) in Uganda for the two rounds that occurred in January and November 2022. Methods: A qualitative study was conducted among stakeholders who participated in the campaign implementation from 8 districts in Uganda using random sampling. We conducted 46 In-depth interviews lasting 30 – 40 minutes with 6 national/central supervisors, 12 district, 14 sub-county, and 14 parish-level supervisors. Stakeholders were asked about their experiences in the campaign implementation, including challenges faced and their opinions of the campaign impact and use of the door-to-door strategy. Data were analyzed thematically in line with the major campaign activities. Results: Most of the stakeholders were primarily concerned about poor planning, inadequate training of vaccination teams, community resistance including schools, challenges with recruitment and teaming of vaccinators, poor and delayed payments, lack of logistics and motivation for vaccination teams, the timing of the activities and implementing amidst COVID-19 and Ebola. The stakeholders believed that the first round was not well planned and implemented, while the second round was leveraged in their previous experiences. On the other hand, some positive experiences were noted with regard to communication, advocacy and mobilization, vaccine delivery and distribution, district readiness assessments, and cold chain management. Conclusion: This study identified many challenges that were faced in the implementation of the door-to-door mass campaign for nOPV2 in Uganda. This study identified that more needs to be done to improve door-to-door mass campaigns with a focus on motivating the implementers. These findings highlight the need for conducting performance reviews, improved planning, especially routine updates and verification of target populations and training in microplanning, and adequate mapping of community resistance to inform the implementation of future mass campaigns.

Keywords: mass polio vaccination campaigns, door-to-door strategy, stakeholders' perceptions, implementation challenges

Procedia PDF Downloads 42
6080 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 310
6079 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 369
6078 Tackling Inequalities in Regional Health Care: Accompanying an Inter-Sectoral Cooperation Project between University Medicine and Regional Care Structures

Authors: Susanne Ferschl, Peter Holzmüller, Elisabeth Wacker

Abstract:

Ageing populations, advances in medical sciences and digitalization, diversity and social disparities, as well as the increasing need for skilled healthcare professionals, are challenging healthcare systems around the globe. To address these challenges, future healthcare systems need to center on human needs taking into account the living environments that shape individuals’ knowledge of and opportunities to access healthcare. Moreover, health should be considered as a common good and an integral part of securing livelihoods for all people. Therefore, the adoption of a systems approach, as well as inter-disciplinary and inter-sectoral cooperation among healthcare providers, are essential. Additionally, the active engagement of target groups in the planning and design of healthcare structures is indispensable to understand and respect individuals’ health and livelihood needs. We will present the research project b4 – identifying needs | building bridges | developing health care in the social space, which is situated within this reasoning and accompanies the cross-sectoral cooperation project Brückenschlag (building bridges) in a Bavarian district. Brückenschlag seeks to explore effective ways of health care linking university medicine (Maximalversorgung | maximum care) with regional inpatient, outpatient, rehabilitative, and preventive care structures (Regionalversorgung | regional care). To create advantages for both (potential) patients and the involved cooperation partners, project b4 qualitatively assesses needs and motivations among professionals, population groups, and political stakeholders at individual and collective levels. Besides providing an overview of the project structure as well as of regional population and healthcare characteristics, the first results of qualitative interviews conducted with different health experts will be presented. Interviewed experts include managers of participating hospitals, nurses, medical specialists working in the hospital and registered doctors operating in practices in rural areas. At the end of the project life and based on the identified factors relevant to the success -and also for failure- of participatory cooperation in health care, the project aims at informing other districts embarking on similar systems-oriented and human-centered healthcare projects. Individuals’ health care needs in dependence on the social space in which they live will guide the development of recommendations.

Keywords: cross-sectoral collaboration in health care, human-centered health care, regional health care, individual and structural health conditions

Procedia PDF Downloads 77
6077 Food Service Waste Management In Nigeria: Emerging Opportunities And Policy Initiatives For Mitigation

Authors: Victor Oyewumi Ogunbiyi

Abstract:

Food waste is recognised as one of the major global challenges in achieving a sustainable future. Currently, very little is known about the multi-stakeholder approach to food waste management downstream of the supply chain, particularly in the foodservice sector. In order to better understand and explain the complex issues of food waste, a qualitative study was conducted on the generation of food waste in food services (restaurants, catering, canteens, and local food vendors) and policy initiatives to mitigate it from the perspective of the stakeholders. A semi-structured interview approach and observation were used to collect data from some 32 selected stakeholders in Garki, Abuja, Nigeria. Thematic analysis was employed to analyse the data from the qualitative instrument adopted in this study. Results revealed that the attitude of stakeholders, poor environmental hygiene, poor food cooking skills and handling, and lack of communication are the major causes of food waste. This study identified seven policy initiatives: regulations, information and education campaigns, economic instruments, mobile applications, stakeholders’ collaboration, firm internal action, and training. Finally, we link policy initiatives to food waste mitigation to provide a response to the damaging shock of food waste.

Keywords: food waste, foodservices, emerging opportunities, policy initiatives, food waste prevention, multistakeholder. garki district-abuja

Procedia PDF Downloads 54
6076 The Relevance of Corporate Governance Disclosure in Spanish Public Universities

Authors: Yolanda Ramirez, Angel Tejada, Agustin Baidez

Abstract:

There is currently a growing interest in the improvement of university governance and the disclosure of information on corporate governance processes as an essential part of the transparency and accountability of universities. This paper aims to know the importance given by Spanish university stakeholders to the disclosure of information about structure and mechanism of corporate governance. So as to meet this objective we propose a model for disclosing information on the main aspects of university governance in Spanish universities. This model will be validated using a questionnaire sent to members of the Social Councils of public universities in Spain. Our results show that Spanish university stakeholders attach great importance to the disclosure of specific information on aspects of corporate governance, which would result in improved transparency and accountability. According to the results of this study it may be concluded that the university stakeholders feel that it is relevant to publish information on corporate governance in the university accounting information model.

Keywords: corporate governance, transparency, accountability, universities, Spain

Procedia PDF Downloads 280
6075 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 70
6074 Education for Sustainable Development and Primary Education in China: A Case Study

Authors: Ronghui (Kevin) Zhou

Abstract:

This research intends to explore the enactment of Education for Sustainable Development (ESD), in term of the ESD concept, in primary schools in China, and investigate the factors that have positively or negatively impacted the outcome of ESD in urban primary schools in China. The proposed research question is: how is the ESD concept perceived and enacted by the local education stakeholders. This research is conducted in multiple primary schools in China and has questionnaired and interviewed multiple education stakeholders, including school principals, school teachers, and bureau from the municipal Ministry of Education. Factor analysis, regression analysis, and critical discourse analysis are adopted to interpret and analyze the data. The preliminary findings suggest that contested ESD definition, education system pressures, education policy enforcement, and power dynamics between stakeholders are the key factors that have determined to what degree is ESD enacted, and to what extent is ESD practiced in primary schools in China.

Keywords: education for sustainable development, China, primary education, case study

Procedia PDF Downloads 133
6073 Net Regularity and Its Ethical Implications on Internet Stake Holders

Authors: Nourhan Elshenawi

Abstract:

Net Neutrality (NN) is the principle of treating all online data the same without any prioritization of some over others. A research gap in current scholarship about “violations of NN” and the subsequent ethical concerns paves the way for the following research question: To what extent violations of NN entail ethical concerns and implications for Internet stakeholders? To answer this question, NR is examined using the two major action-based ethical theories, Kantian and Utilitarian, across the relevant Internet stakeholders. First some necessary IT background is provided that shapes how the Internet works and who the key stakeholders are. Following the IT background, the relationship between the stakeholders, users, Internet Service Providers (ISPs) and content providers is discussed and illustrated. Then some violations of NN that are currently occurring is covered, without attracting any attention from the general public from an ethical perspective, as a new term Net Regularity (NR). Afterwards, the current scholarship on NN and its violations are discussed, that are mainly from an economic and sociopolitical perspectives to highlight the lack of ethical discussions on the issue. Before moving on to the ethical analysis however, websites are presented as digital entities that are affected by NR and their happiness is measured using functionalism. The analysis concludes that NR is prone to an unethical treatment of Internet stakeholders in the perspective of both theories. Finally, the current Digital Divide in the world is presented to be able to better illustrate the implications of NR. The implications present the new Internet divide that will take place between individuals within society. Through answering the research question using ethical analysis, it attempts to shed some light on the issue of NR and what kind of society it would lead to. NR would not just lead to a divided society, but divided individuals that are separated by something greater than distance, the Internet.

Keywords: digital divide, digital entities, digital ontology, internet ethics, internet law, net neutrality, internet service providers, websites as beings

Procedia PDF Downloads 240
6072 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 24
6071 Status of Participative Governance Practices in Higher Education: Implications for Stakeholders' Transformative Role-Assumption

Authors: Endalew Fufa Kufi

Abstract:

The research investigated the role of stakeholders such as students, teachers and administrators in the practices of good governance in higher education by looking into the special contributions of top-officials, teachers and students in ensuring workable ties and productive interchanges in Adama Science and Technology University. Attention was given to participation, fairness and exemplariness as key indicators of good governance. The target university was chosen for its familiarity for the researcher to get dependable data, access to respondent and management of the processing of data. Descriptive survey design was used for the purpose of describing concerned roles the stakeholders in the university governance in order to reflect on the nature of participation of the practices. Centres of the research were administration where supportive groups such as central administrators and underlying service-givers had parts and academia where teachers and students were target. Generally, 60 teachers, 40 students and 15 administrative officers were referents. Data were collected in the form of self-report through open-ended questionnaires. The findings indicated that, while vertical interchanges in terms of academic and administrative routines were had normal flow on top-down basis, planned practices of stakeholders in decision-making and reasonably communicating roles and changes in decisions with top-officials were not efficiently practiced. Moreover, the practices of good modelling were not witnessed to have existed to the fullest extent. Rather, existence of a very wide gap between the academic and administrative staffs was witnessed as was reflected the case between teachers and students. The implication was such that for shortage in participative atmosphere and weaning of fairness in governance, routine practices have been there as the vicious circles of governance.

Keywords: governance, participative, stakeholders, transformative, role-assumption

Procedia PDF Downloads 359
6070 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms

Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela

Abstract:

The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.

Keywords: effective communication, project-based firms, communication practices, project success, communication strategies

Procedia PDF Downloads 32
6069 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 97
6068 Parents and Stakeholders’ Perspectives on Early Reading Intervention Implemented as a Curriculum for Children with Learning Disabilities

Authors: Bander Mohayya Alotaibi

Abstract:

The valuable partnerships between parents and teachers may develop positive and effective interactions between home and school. This will help these stakeholders share information and resources regarding student academics during ongoing interactions. Thus, partnerships will build a solid foundation for both families and schools to help children succeed in school. Parental involvement can be seen as an effective tool that can change homes and communities and not just schools’ systems. Seeking parents and stakeholders’ attitudes toward learning and learners can help schools design a curriculum. Subsequently, this information can be used to find ways to help improve the academic performance of students, especially in low performing schools. There may be some conflicts when designing curriculum. In addition, designing curriculum might bring more educational expectations to all the sides. There is a lack of research that targets the specific attitude of parents toward specific concepts on curriculum contents. More research is needed to study the perspective that parents of children with learning disabilities (LD) have regarding early reading curriculum. Parents and stakeholders’ perspectives on early reading intervention implemented as a curriculum for children with LD was studied through an advanced quantitative research. The purpose of this study seeks to understand stakeholders and parents’ perspectives of key concepts and essential early reading skills that impact the design of curriculum that will serve as an intervention for early struggler readers who have LD. Those concepts or stages include phonics, phonological awareness, and reading fluency as well as strategies used in house by parents. A survey instrument was used to gather the data. Participants were recruited through 29 schools and districts of the metropolitan area of the northern part of Saudi Arabia. Participants were stakeholders including parents of children with learning disability. Data were collected using distribution of paper and pen survey to schools. Psychometric properties of the instrument were evaluated for the validity and reliability of the survey; face validity, content validity, and construct validity including an Exploratory Factor Analysis were used to shape and reevaluate the structure of the instrument. Multivariate analysis of variance (MANOVA) used to find differences between the variables. The study reported the results of the perspectives of stakeholders toward reading strategies, phonics, phonological awareness, and reading fluency. Also, suggestions and limitations are discussed.

Keywords: stakeholders, learning disability, early reading, perspectives, parents, intervention, curriculum

Procedia PDF Downloads 125
6067 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 440
6066 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 41
6065 Policy Views of Sustainable Integrated Solution for Increased Synergy between Light Railways and Electrical Distribution Network

Authors: Mansoureh Zangiabadi, Shamil Velji, Rajendra Kelkar, Neal Wade, Volker Pickert

Abstract:

The EU has set itself a long-term goal of reducing greenhouse gas emissions by 80-95% of the 1990 levels by 2050 as set in the Energy Roadmap 2050. This paper reports on the European Union H2020 funded E-Lobster project which demonstrates tools and technologies, software and hardware in integrating the grid distribution, and the railway power systems with power electronics technologies (Smart Soft Open Point - sSOP) and local energy storage. In this context this paper describes the existing policies and regulatory frameworks of the energy market at European level with a special focus then at National level, on the countries where the members of the consortium are located, and where the demonstration activities will be implemented. By taking into account the disciplinary approach of E-Lobster, the main policy areas investigated includes electricity, energy market, energy efficiency, transport and smart cities. Energy storage will play a key role in enabling the EU to develop a low-carbon electricity system. In recent years, Energy Storage System (ESSs) are gaining importance due to emerging applications, especially electrification of the transportation sector and grid integration of volatile renewables. The need for storage systems led to ESS technologies performance improvements and significant price decline. This allows for opening a new market where ESSs can be a reliable and economical solution. One such emerging market for ESS is R+G management which will be investigated and demonstrated within E-Lobster project. The surplus of energy in one type of power system (e.g., due to metro braking) might be directly transferred to the other power system (or vice versa). However, it would usually happen at unfavourable instances when the recipient does not need additional power. Thus, the role of ESS is to enhance advantages coming from interconnection of the railway power systems and distribution grids by offering additional energy buffer. Consequently, the surplus/deficit of energy in, e.g. railway power systems, is not to be immediately transferred to/from the distribution grid but it could be stored and used when it is really needed. This will assure better energy management exchange between the railway power systems and distribution grids and lead to more efficient loss reduction. In this framework, to identify the existing policies and regulatory frameworks is crucial for the project activities and for the future development of business models for the E-Lobster solutions. The projections carried out by the European Commission, the Member States and stakeholders and their analysis indicated some trends, challenges, opportunities and structural changes needed to design the policy measures to provide the appropriate framework for investors. This study will be used as reference for the discussion in the envisaged workshops with stakeholders (DSOs and Transport Managers) in the E-Lobster project.

Keywords: light railway, electrical distribution network, Electrical Energy Storage, policy

Procedia PDF Downloads 108
6064 Exploring Exposed Political Economy in Disaster Risk Reduction Efforts in Bangladesh

Authors: Shafiqul Islam, Cordia Chu

Abstract:

Bangladesh is one of the most vulnerable countries to climate related disasters such as flood and cyclone. Exploring from the semi-structured in-depth interviews of 38 stakeholders and literature review, this study examined the public spending distribution process in DRR. This paper demonstrates how the processes of political economy-enclosure, exclusion, encroachment, and entrenchment hinder the Disaster Risk Reduction (DRR) efforts of Department of Disaster Management (DDM) such as distribution of flood centres, cyclone centres and 40 days employment generation programs. Enclosure refers to when DRR projects allocated to less vulnerable areas or expand the roles of influencing actors into the public sphere. Exclusion refers to when DRR projects limit affected people’s access to resources or marginalize particular stakeholders in decision-making activities. Encroachment refers to when allocation of DRR projects and selection of location and issues degrade the environmental affect or contribute to other forms of disaster risk. Entrenchment refers to when DRR projects aggravate the disempowerment of common people worsen the concentrations of wealth and income inequality within a community. In line with United Nations (UN) Sustainable Development Goals (SDGs), Hyogo and Sendai Frameworks, in the case of Bangladesh, DRR policies implemented under the country’s national five-year plan, disaster-related acts and rules. These policies and practices have somehow enabled influential-elites to mobilize and distribute resources through bureaucracies. Exclusionary forms of fund distribution of DRR exist at both the national and local scales. DRR related allocations have encroached through the low land areas development project without consulting local needs. Most severely, DRR related unequal allocations have entrenched social class trapping the backward communities vulnerable to climate related disasters. Planners and practitioners of DRR need to take necessary steps to eliminate the potential risks from the processes of enclosure, exclusion, encroachment, and entrenchment happens in project fund allocations.

Keywords: Bangladesh, disaster risk reduction, fund distribution, political economy

Procedia PDF Downloads 104
6063 The Urban Project: Metropolization Tool and Sustainability Vector - Case of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad, Chouabbia Khedidja

Abstract:

Cities grow, large or small; they seek to gain a place in the market competition, which talks to sell a product that is the city itself. The metropolis are large cities enjoying a legal status and assets providing their dominions elements on a territory larger than their range, do not escape this situation. Thus, the search for promising tool metropolises better development and durability meet the challenges as economic, social and environmental is timely. The urban project is a new way to build the city; it is involved in the metropolises of two ways, either to manage the crisis and to meet the internal needs of the metropolis, or by creating a regional attractiveness with their potential. This communication will address the issue of urban project as a tool that has and should find a place in the panoply of existing institutional tools. Based on the example of the modernization project of the metropolis of eastern Algeria "Constantine", we will examine what the urban project can bring to a city, the extent of its impact but also the relationship between the visions actors so metropolization a success.

Keywords: urban project, metropolis, institutional tools, Constantine

Procedia PDF Downloads 376
6062 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 294
6061 Entrepreneurship Training of Young People as a Pillar to Generate Income and Create Jobs: Progress Report of the Moroccan National Human Development Initiative in the Region of Meknes

Authors: Bennani Zoubir Nada, El Hiri Abderrazak, El Hajri Aimad

Abstract:

In context of economic and health crisis, sustainable entrepreneurship has become one of the best solutions to economic recovery. This study is about the third program of the Moroccan national human development initiative in her third phase which began in 2019 and continuous until 2023, and which deals with income improvement and social inclusion of young people, under the high patronage of his majesty the king of Morocco. What is the approach of this program and how entrepreneurship training of young people can be a pillar to generate income and create jobs? Starting on the effectuation theory, we adopted an exploratory qualitative approach through semi-structured interviews with national human development initiative stakeholders in the area of Meknes-Morocco, which allowed us the state of progress of this program. We carried out a survey based on a grid of questions to collect information that we processed using NVIVO software. The most relevant results are that people eligible are jobless young people, who are between 18 and 35 years old, who reside in Meknes and surroundings and who have a project idea. They are trained by experts in entrepreneurship and management through targeted and diversified courses. To ensure the sustainability of projects, the project organisers have provided measures to ensure the sustainability of the companies through continuous monitoring and evaluation as well as support during all phases from the project idea to the realisation and progress.

Keywords: sustainable entrepreneurship, training, social inclusion, national human development initiative in Morocco (INDH), youth entrepreneurship, the effectuation theory

Procedia PDF Downloads 78
6060 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 276
6059 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 74
6058 Collaborative Procurement in the Pursuit of Net- Zero: A Converging Journey

Authors: Bagireanu Astrid, Bros-Williamson Julio, Duncheva Mila, Currie John

Abstract:

The Architecture, Engineering, and Construction (AEC) sector plays a critical role in the global transition toward sustainable and net-zero built environments. However, the industry faces unique challenges in planning for net-zero while struggling with low productivity, cost overruns and overall resistance to change. Traditional practices fall short due to their inability to meet the requirements for systemic change, especially as governments increasingly demand transformative approaches. Working in silos and rigid hierarchies and a short-term, client-centric approach prioritising immediate gains over long-term benefit stands in stark contrast to the fundamental requirements for the realisation of net-zero objectives. These practices have limited capacity to effectively integrate AEC stakeholders and promote the essential knowledge sharing required to address the multifaceted challenges of achieving net-zero. In the context of built environment, procurement may be described as the method by which a project proceeds from inception to completion. Collaborative procurement methods under the Integrated Practices (IP) umbrella have the potential to align more closely with net-zero objectives. This paper explores the synergies between collaborative procurement principles and the pursuit of net zero in the AEC sector, drawing upon the shared values of cross-disciplinary collaboration, Early Supply Chain involvement (ESI), use of standards and frameworks, digital information management, strategic performance measurement, integrated decision-making principles and contractual alliancing. To investigate the role of collaborative procurement in advancing net-zero objectives, a structured research methodology was employed. First, the study focuses on a systematic review on the application of collaborative procurement principles in the AEC sphere. Next, a comprehensive analysis is conducted to identify common clusters of these principles across multiple procurement methods. An evaluative comparison between traditional procurement methods and collaborative procurement for achieving net-zero objectives is presented. Then, the study identifies the intersection between collaborative procurement principles and the net-zero requirements. Lastly, an exploration of key insights for AEC stakeholders focusing on the implications and practical applications of these findings is made. Directions for future development of this research are recommended. Adopting collaborative procurement principles can serve as a strategic framework for guiding the AEC sector towards realising net-zero. Synergising these approaches overcomes fragmentation, fosters knowledge sharing, and establishes a net-zero-centered ecosystem. In the context of the ongoing efforts to amplify project efficiency within the built environment, a critical realisation of their central role becomes imperative for AEC stakeholders. When effectively leveraged, collaborative procurement emerges as a powerful tool to surmount existing challenges in attaining net-zero objectives.

Keywords: collaborative procurement, net-zero, knowledge sharing, architecture, built environment

Procedia PDF Downloads 40
6057 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 327
6056 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 126
6055 Impacts of E-Learning on Educational Policy: Policy of Sensitization and Training in E-Learning in Saudi Arabia

Authors: Layla Albdr

Abstract:

Saudi Arabia instituted the policy of Sensitizing and Training Stakeholders for E-learning and witnessed wide adoption in many institutions. However, it is at the infancy stage and needs time to develop to mirror the US and UK. The majority of the higher education institutions in Saudi Arabia have adopted E-learning as an alternative to traditional methods to advance education. Conversely, effective implementation of the policy of sensitization and training of stakeholders for E-learning implementation has not been attained because of various challenges. The objectives included determining the challenges and opportunities of the E-learning policy of sensitization and training of stakeholders in Saudi Arabia's higher education and examining if sensitization and training of stakeholder's policy will help promote the implementation of E-learning in institutions. The study employed a descriptive research design based on qualitative analysis. The researcher recruited 295 students and 60 academic staff from four Saudi Arabian universities to participate in the study. An online questionnaire was used to collect the data. The data was then analyzed and reported both quantitatively and qualitatively. The analysis provided an in-depth understanding of the opportunities and challenges of E-learning policy in Saudi Arabian universities. The main challenges identified as internal challenges were the lack of educators’ interest in adopting the policy, and external challenges entailed lack of ICT infrastructure and Internet connectivity. The study recommends encouraging, sensitizing, and training all stakeholders to address these challenges and adopt the policy.

Keywords: e-learning, educational policy, Saudi Arabia, policy of sensitization and training

Procedia PDF Downloads 125