18 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry

Authors: Aynur Kazaz, Yusif Inusah

Abstract:

In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.

Keywords: barriers, challenges, construction industry, e-procurement, e-tendering

Procedia PDF Downloads 85
17 Development of E-Tendering Models for Nigerian Public Procuring Entities

Authors: Bello Abdullahi, Kabir Bala, Yahaya M. Ibrahim, Ahmed D. Ibrahim

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent, and more prone to manipulations and errors. However, the advent of the Internet and its associated technologies has led to the development of numerous e-Tendering systems that addressed many of the problems associated with the manual paper-based tendering system. Currently, in Nigeria, the public tendering processes are largely conducted based on manual paper-based system that is bedevilled by a number of problems such as inordinate delays, inefficiencies, manipulation of the tender evaluation process, corruption, lack of transparency and competition, among other problems. These problems can be addressed through the adoption of existing web-based e-Tendering systems which are known to address most of these problems. However, these existing e-Tendering systems that have been developed are not based on the Nigerian legal procurement processes and as such their suitability for local application is very limited. This paper is part of a larger study that attempt to address this problem through the development of an e-Tendering system that is based on the requirements of the Nigerian public procuring entities. In this paper, the identified tendering processes commonly used by Nigerian public procuring entities in the selection of construction sources are presented. A multi-methods research approach was used to identify those tendering processes. Specifically, 19 existing business use cases used by Nigerian public procuring entities were identified and 61 system use cases were prescribed based on the identified business use cases. The use cases were used as the basis for the development of domain and software conceptual models. The models were successfully used to guide the development of an e-Tendering system called NPS-eTender. Ripple and Unified Process were adopted as the software development methodologies.

Keywords: e-tendering, e-procurement, requirement model, conceptual model, public sector tendering, public procurement

Procedia PDF Downloads 159
16 Evaluating the Implementation of Public Procurement Principles at Tendering Stage: SME Contractors' Perspective

Authors: Charles Poleni Mukumba, Kahilu Kajimo-Shakantu

Abstract:

Purpose: Principles of public procurement are the foundation of good public procurement, representing best practices in delivering public services by the government and its organs. They provide guidance in the public procurement cycle to achieve the best value for public resources. Tendering stage in the procurement cycle is the most critical, as tendering information is made available to bidders. The paper evaluates the implementation of public procurement principles at the tendering stage. Design/Methodology/Approach: The research was conducted by using qualitative methods with 18 SME contractors in Lusaka as the sample. The samples are business owners and managers of purposively selected SME contractors. The collected data was analysed using thematic and content analysis. Findings: The findings indicate inconsistency in accessing information critical for tendering success by bidders. Further, the findings suggest that adjustments to technical specifications are made to suit certain preferred bidders by procuring officials. Research Limitations/Implications: The interviews were limited to SME contractors registered with the national council for construction and involved in public sector construction works in Lusaka, Zambia. Practical Implications: Implementing principles of public procurement at the tendering stage creates equal, open, and fair competition for the bidders in cost terms to deliver standardised and quality works to the public sector. Original/Value: The findings reveal how principles of public procurement play a critical role in enhancing the efficient performance of the procurement cycle at the tendering stage.

Keywords: evaluating, implementation, public procurement principles, tendering stage, SME contractors

Procedia PDF Downloads 51
15 Developing a Web-Based Tender Evaluation System Based on Fuzzy Multi-Attributes Group Decision Making for Nigerian Public Sector Tendering

Authors: Bello Abdullahi, Yahaya M. Ibrahim, Ahmed D. Ibrahim, Kabir Bala

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent and more prone to manipulations and errors. The advent of the Internet and the World Wide Web has led to the development of numerous e-Tendering systems that addressed some of the problems associated with the manual paper-based tendering system. However, most of these systems rarely support the evaluation of tenders and where they do it is mostly based on the single decision maker which is not suitable in public sector tendering, where for the sake of objectivity, transparency, and fairness, it is required that the evaluation is conducted through a tender evaluation committee. Currently, in Nigeria, the public tendering process in general and the evaluation of tenders, in particular, are largely conducted using manual paper-based processes. Automating these manual-based processes to digital-based processes can help in enhancing the proficiency of public sector tendering in Nigeria. This paper is part of a larger study to develop an electronic tendering system that supports the whole tendering lifecycle based on Nigerian procurement law. Specifically, this paper presents the design and implementation of part of the system that supports group evaluation of tenders based on a technique called fuzzy multi-attributes group decision making. The system was developed using Object-Oriented methodologies and Unified Modelling Language and hypothetically applied in the evaluation of technical and financial proposals submitted by bidders. The system was validated by professionals with extensive experiences in public sector procurement. The results of the validation showed that the system called NPS-eTender has an average rating of 74% with respect to correct and accurate modelling of the existing manual tendering domain and an average rating of 67.6% with respect to its potential to enhance the proficiency of public sector tendering in Nigeria. Thus, based on the results of the validation, the automation of the evaluation process to support tender evaluation committee is achievable and can lead to a more proficient public sector tendering system.

Keywords: e-Tendering, e-Procurement, group decision making, tender evaluation, tender evaluation committee, UML, object-oriented methodologies, system development

Procedia PDF Downloads 236
14 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 301
13 Barriers to Competitive Tenders in Building Conservation Works

Authors: Yoke-Mui Lim, Yahaya Ahmad

Abstract:

Conservation works in Malaysia that is procured by public organisation usually follow the traditional approach where the works are tendered based on Bills of Quantities (BQ). One of the purposes of tendering is to enable the selection of a competent contractor that offers a competitive price. While competency of the contractors are assessed by their technical knowledge, experience and track records, the assessment of pricing will be dependent on the tender amount. However, the issue currently faced by the conservation works sector is the difficulty in assessing the competitiveness and reasonableness of the tender amount due to the high variance between the tenders amount. Thus, this paper discusses the factors that cause difficulty to the tenderers in pricing competitively in a bidding exercise for conservation tenders. Data on tendering is collected from interviews with conservation works contractors to gain in-depth understanding of the barriers faced in pricing tenders of conservation works. Findings from the study lent support to the contention that the variance of tender amount is very high amongst tenderers. The factors identified in the survey are the format of BQ, hidden works, experience and labour and material costs.

Keywords: building conservation, Malaysia, bill of quantities, tender

Procedia PDF Downloads 346
12 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities

Procedia PDF Downloads 264
11 Tender Systems and Processes within the Mauritian Construction Industry: Investigating the Predominance of International Firms and the Lack of Absorptive Capacity in Local Firms

Authors: K. Appasamy, P. Paul

Abstract:

Mauritius, a developing small-island-state, is facing a recession which is having a considerable economic impact particularly on its construction sector. Further, the presence of foreign entities, both as companies and workers, within this sector is creating a very competitive environment for local firms. This study investigates the key drivers that allow foreign firms to participate in this sector, in particular looking at the international and local tender processes, and the capacity of local industry to participate. This study also looks at how the current set up may hinder the latter’s involvement. The methodology used included qualitative semi-structured interviews conducted with established foreign companies, local companies, and public bodies. Study findings indicate: there is an adequate availability of professional skills and expertise within the Mauritian construction industry but a lack of skilled labour especially at the operative level; projects awarded to foreign firms are either due to their uniqueness and hence lack of local knowledge, or due to foreign firms having lower tender bids; tendering systems and processes are weak, including monitoring and enforcement, which encourages corruption and favouritism; a high level of ignorance of this sector’s characteristics and opportunities exists amongst the local population; local entities are very profit oriented and have short term strategies that discourage long term investment in workforce training and development; but most importantly, stakeholders do not grasp the importance of encouraging youngsters to join this sector, they have no long term vision, and there is a lack of mutual involvement and collaboration between them. Although local industry is highly competent, qualified and experienced, the tendering and procurement systems in Mauritius are not conducive enough to allow for effective strategic planning and an equitable allocation of projects during an economic downturn so that the broadest spread of stakeholders’ benefit. It is of utmost importance that all sector and government entities collaborate to formulate strategies and reforms on tender processes and capacity building to ensure fairness and continuous growth of this sector in Mauritius.

Keywords: construction industry, tender process, international firms, local capacity, Mauritius

Procedia PDF Downloads 295
10 Contributing to Accuracy of Bid Cost Estimate in Construction Projects

Authors: Abdullah Alhomidan

Abstract:

This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.

Keywords: cost estimate, accuracy, pretender, estimating, bid estimate

Procedia PDF Downloads 532
9 Evaluation and Selection of Construction Contractors by Polish Public Clients

Authors: Kozik Renata, Leśniak Agnieszka, Plebankiewicz Edyta

Abstract:

Contracting authorities in the public sector are obligated to apply the principles provided for in the Polish law for the evaluation and selection of contractors. To analyze the methods of contractors, applied in practice by public clients, the notices of contract award results for construction works were analyzed. The analysis shows that the procedure selected more and more often is open to competitive bidding, where the assessment of the competence of contractors is not very precise, as well as non-competitive bidding, i.e. single source procurement. The share of procurement procedures, where the only criterion is price, is increasing. The solution to the problems existing here might be the introduction of one of the forms of pre-selection of contractors. The article also briefly discusses verification systems for companies applying for public contracts used in EU countries.

Keywords: certification, contractors selection, open tendering, public investors

Procedia PDF Downloads 258
8 Filling the Gap of Extraction of Digital Evidence from Emerging Platforms Without Forensics Tools

Authors: Yi Anson Lam, Siu Ming Yiu, Kam Pui Chow

Abstract:

Digital evidence has been tendering to courts at an exponential rate in recent years. As an industrial practice, most digital evidence is extracted and preserved using specialized and well-accepted forensics tools. On the other hand, the advancement in technologies enables the creation of quite a few emerging platforms such as Telegram, Signal etc. Existing (well-accepted) forensics tools were not designed to extract evidence from these emerging platforms. While new forensics tools require a significant amount of time and effort to be developed and verified, this paper tries to address how to fill this gap using quick-fix alternative methods for digital evidence collection (e.g., based on APIs provided by Apps) and discuss issues related to the admissibility of this evidence to courts with support from international courts’ stance and the circumstances of accepting digital evidence using these proposed alternatives.

Keywords: extraction, digital evidence, laws, investigation

Procedia PDF Downloads 38
7 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 147
6 Strategies for Medium Sized Construction Firms to Survive the Current Economic Conditions That Is Compounded by the Most Recent COVID-19 Pandemic in Nigeria

Authors: Aloysius Colman Chukwuemeka Ezeabasili, Chibuike Patrick Ezeabasili

Abstract:

Medium Sized Construction Companies in Nigeria are those employing 50-250 workers that are mostly involved in roads, Commercial and domestic building Construction, among others. These companies are in the majority and contribute immensely to infrastructural development in Nigeria. Despite the last eight years of economic downturn and the past years of COVID-19 pandemic, signs of these Companies recovering from the economic recession and pandemic seem bright. Nigeria has recorded 213,000 confirmed cases 3968 deaths from COVID-19 as at now. These medium sized companies are currently trying to explore various opportunities to grow their businesses to achieve competitive advantages over others by studying and improving on their bidding efficiency, Strategies for selecting businesses, bidding markup Strategies, and cash flow. These strategies were studied through the recruitment of construction experts and professionals. Many of them have acquired new technologies that have impacted positively on their strategies. The impact of these technologies like the BIM, e-tendering, conditions of contract, and claim management strategies are advantages to them and has given them good advantages over their peers. Monte Carlo solution, Swot analysis, and average bid methods have also clearly added advantages to bidding practices. New and existing strategies are Scrutinized, and training of young Nigerians in advanced countries to acquire knowledge in best practices have elevated some of these companies. The Covid-19 has not been very harsh to Nigeria, and the country is surely not as devastated as the advanced countries. Nigeria has therefore been able to cope with the combination of the downturn and the pandemic.

Keywords: medium sized construction companies, competitive advantage, new bidding technologies, Nigeria

Procedia PDF Downloads 107
5 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 345
4 Optimization Technique for the Contractor’s Portfolio in the Bidding Process

Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry

Abstract:

Selection between the available projects in bidding processes for the contractor is one of the essential areas to concentrate on. It is important for the contractor to choose the right projects within its portfolio during the tendering stage based on certain criteria. It should align the bidding process with its origination strategies and goals as a screening process to have the right portfolio pool to start with. Secondly, it should set the proper framework and use a suitable technique in order to optimize its selection process for concertation purpose and higher efforts during the tender stage with goals of success and winning. In this research paper, a two steps framework proposed to increase the efficiency of the contractor’s bidding process and the winning chance of getting the new projects awarded. In this framework, initially, all the projects pass through the first stage screening process, in which the portfolio basket will be evaluated and adjusted in accordance with the organization strategies to the reduced version of the portfolio pool, which is in line with organization activities. In the second stage, the contractor uses linear programming to optimize the portfolio pool based on available resources such as manpower, light equipment, heavy equipment, financial capability, return on investment, and success rate of winning the bid. Therefore, this optimization model will assist the contractor in utilizing its internal resource to its maximum and increase its winning chance for the new project considering past experience with clients, built-relation between two parties, and complexity in the exertion of the projects. The objective of this research will be to increase the contractor's winning chance in the bidding process based on the success rate and expected return on investment.

Keywords: bidding process, internal resources, optimization, contracting portfolio management

Procedia PDF Downloads 117
3 Basics for Corruption Reduction and Fraud Prevention in Industrial/Humanitarian Organizations through Supplier Management in Supply Chain Systems

Authors: Ibrahim Burki

Abstract:

Unfortunately, all organizations (Industrial and Humanitarian/ Non-governmental organizations) are prone to fraud and corruption in their supply chain management routines. The reputational and financial fallout can be disastrous. With the growing number of companies using suppliers based in the local market has certainly increased the threat of fraud as well as corruption. There are various potential threats like, poor or non-existent record keeping, purchasing of lower quality goods at higher price, excessive entertainment of staff by suppliers, deviations in communications between procurement staff and suppliers, such as calls or text messaging to mobile phones, staff demanding extended periods of notice before they allow an audit to take place, inexperienced buyers and more. But despite all the above-mentioned threats, this research paper emphasize upon the effectiveness of well-maintained vendor/s records and sorting/filtration of vendor/s to cut down the possible threats of corruption and fraud. This exercise is applied in a humanitarian organization of Pakistan but it is applicable to whole South Asia region due to the similarity of culture and contexts. In that firm, there were more than 550 (five hundred and fifty) registered vendors. As during the disasters or emergency phases requirements are met on urgent basis thus, providing golden opportunities for the fake companies or for the brother/sister companies of the already registered companies to be involved in the tendering process without declaration or even under some different (new) company’s name. Therefore, a list of required documents (along with checklist) was developed and sent to all of the vendor(s) in the current database and based upon the receipt of the requested documents vendors were sorted out. Furthermore, these vendors were divided into active (meeting the entire set criterion) and non-active groups. This initial filtration stage allowed the firm to continue its work without a complete shutdown that is only vendors falling in the active group shall be allowed to participate in the tenders by the time whole process is completed. Likewise only those companies or firms meeting the set criterion (active category) shall be allowed to get registered in the future along with a dedicated filing system (soft and hard shall be maintained), and all of the companies/firms in the active group shall be physically verified (visited) by the Committee comprising of senior members of at least Finance department, Supply Chain (other than procurement) and Security department.

Keywords: corruption reduction, fraud prevention, supplier management, industrial/humanitarian organizations

Procedia PDF Downloads 518
2 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 311
1 Public Procurement Development Stages in Georgia

Authors: Giorgi Gaprindashvili

Abstract:

One of the best examples, in evolution of the public procurement, from post-soviet countries are reforms carried out in Georgia, which brought them close to international standards of procurement. In Georgia, public procurement legislation started functioning in 1998. The reform has passed several stages and came in the form as it is today. It should also be noted, that countries with economy in transition, including Georgia, implemented all the reforms in public procurement based on recommendations and support of World Bank, the United Nations and other international organizations. The first law on public procurement in Georgia was adopted on December 9, 1998 which aimed regulation of the procurement process of budget-organizations, transparent and competitive environment for private companies to access state funds legally. The priorities were identified quite clearly in the wording of the law, but operation/function of this law could not be reached on its level, because of some objective and subjective reasons. The high level of corruption in all levels of governance, can be considered as a main obstacle reason and of course, it is natural, that it had direct impact on the procurement process, as well as on transparency and rational use of state funds. This circumstances were the reasons that reforms in this sphere continued, to improve procurement process, in particular, the first wave of reforms began in 2001. Public procurement agency carried out reform with World Bank with main purpose of smartening the procurement legislation and its harmonization with international treaties and agreements. Also with the support of World Bank various activities were carried out to raise awareness of participants involved in procurement system. Further major changes in the legislation were filed in May 2005, which was also directed towards the improvement and smarten of the procurement process. The third wave of the reform began in 2010, which more or less guaranteed the transparency of the procurement process, which later became the basis for the rational spending of state funds. The reform of the procurement system completely changed the procedures. Carried out reform in Georgia resulted in introducing new electronic tendering system, which benefit the transparency of the process, after this became the basis for the further development of a competitive environment, which become a prerequisite for the state rational spending. Increased number of supplier organizations participating in the procurement process resulted in reduction of the estimated cost and the actual cost from 20% up to 40%, it is quite large saving for the procuring organizations and allows them to use the freed-up funds for their other needs. Assessment of the reforms in Georgia in the field of public procurement can be concluded, that proper regulation of the sector and relevant policy may proceed to rational and transparent spending of the budget from country’s state institutions. Also, the business sector has the opportunity to work in competitive market conditions and to make a preliminary analysis, which is a prerequisite for future strategy and development.

Keywords: public administration, public procurement, reforms, transparency

Procedia PDF Downloads 336