30263 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
30262 Sustainable Project Management Necessarily Implemented in the Chinese Wine Market Due to Climate Variation

Authors: Ruixin Zhang, Joel Carboni, Songchenchen Gong

Abstract:

Since the Sustainable Development Goals (SDGs) officially became the 17 development goals set by the United Nations in 2015, it has become an inevitable trend in project management development globally. Since Sustainability and glob-alization are the main focus and trends in the 21st century, project management contains system-based optimization, and or-ganizational humanities, environmental protection, and economic development. As a populous country globally, with the advanced development of economy and technology, China becomes one of the biggest markets in the wine industry. However, the develop-ment of society also brings specific environmental issues. Climate changes have already brought severe impacts on the Chinese wine market, including consumer behavior, wine production activities, and organizational humanities. Therefore, the implementation of sustainable project management in Chinese wine market is essential. Surveys based analysis is the primary method to interpret how the climate variation effect the Chinese wine market and the importance of sustainable project management implementation for green market growth in China. This paper proposes the CWW Conceptual model that can be used in the wine industry, the new 7 Drivers Model, and SPM Framework to interpret the main drivers that impact project management implementation in the wine industry and to offer the directions to wine companies in China which would help them to achieve the green growth.

Keywords: project management, sustainability, green growth, climate changes, Chinese wine market

Procedia PDF Downloads 99
30261 Social Networks in a Communication Strategy of a Large Company

Authors: Kherbache Mehdi

Abstract:

Within the framework of the validation of the Master in business administration marketing and sales in INSIM institute international in management Blida, we get the opportunity to do a professional internship in Sonelgaz Enterprise and a thesis. The thesis deals with the integration of social networking in the communication strategy of a company. The problematic is: How communicate with social network can be a solution for companies? The challenges stressed by this thesis were to suggest limits and recommendations to Sonelgaz Enterprise concerning social networks. The whole social networks represent more than a billion people as a potential target for the companies. Thanks to research and a qualitative approach, we have identified tree valid hypothesis. The first hypothesis allows confirming that using social networks cannot be ignored by any company in its communication strategy. However, the second hypothesis demonstrates that it’s necessary to prepare a strategy that integrates social networks in the communication plan of the company. The risk of this strategy is very limited because failure on social networks is not a restraint for the enterprise, social networking is not expensive and, a bad image which could result from it is not as important in the long-term. Furthermore, the return on investment is difficult to evaluate. Finally, the last hypothesis shows that firms establish a new relation between consumers and brands thanks to the proximity allowed by social networks. After the validation of the hypothesis, we suggested some recommendations to Sonelgaz Enterprise regarding the communication through social networks. Firstly, the company must use the interactivity of social network in order to have fruitful exchanges with the community. We also recommended having a strategy to treat negative comments. The company must also suggest delivering resources to the community thanks to a community manager, in order to have a good relation with the community. Furthermore, we advised using social networks to do business intelligence. Sonelgaz Enterprise can have some creative and interactive contents with some amazing applications on Facebook for example. Finally, we recommended to the company to be not intrusive with “fans” or “followers” and to be open to all the platforms: Twitter, Facebook, Linked-In for example.

Keywords: social network, buzz, communication, consumer, return on investment, internet users, web 2.0, Facebook, Twitter, interaction

Procedia PDF Downloads 383
30260 A Good Start for Digital Transformation of the Companies: A Literature and Experience-Based Predefined Roadmap

Authors: Batuhan Kocaoglu

Abstract:

Nowadays digital transformation is a hot topic both in service and production business. For the companies who want to stay alive in the following years, they should change how they do their business. Industry leaders started to improve their ERP (Enterprise Resource Planning) like backbone technologies to digital advances such as analytics, mobility, sensor-embedded smart devices, AI (Artificial Intelligence) and more. Selecting the appropriate technology for the related business problem also is a hot topic. Besides this, to operate in the modern environment and fulfill rapidly changing customer expectations, a digital transformation of the business is required and change the way the business runs, affect how they do their business. Even the digital transformation term is trendy the literature is limited and covers just the philosophy instead of a solid implementation plan. Current studies urge firms to start their digital transformation, but few tell us how to do. The huge investments scare companies with blur definitions and concepts. The aim of this paper to solidify the steps of the digital transformation and offer a roadmap for the companies and academicians. The proposed roadmap is developed based upon insights from the literature review, semi-structured interviews, and expert views to explore and identify crucial steps. We introduced our roadmap in the form of 8 main steps: Awareness; Planning; Operations; Implementation; Go-live; Optimization; Autonomation; Business Transformation; including a total of 11 sub-steps with examples. This study also emphasizes four dimensions of the digital transformation mainly: Readiness assessment; Building organizational infrastructure; Building technical infrastructure; Maturity assessment. Finally, roadmap corresponds the steps with three main terms used in digital transformation literacy as Digitization; Digitalization; and Digital Transformation. The resulted model shows that 'business process' and 'organizational issues' should be resolved before technology decisions and 'digitization'. Companies can start their journey with the solid steps, using the proposed roadmap to increase the success of their project implementation. Our roadmap is also adaptable for relevant Industry 4.0 and enterprise application projects. This roadmap will be useful for companies to persuade their top management for investments. Our results can be used as a baseline for further researches related to readiness assessment and maturity assessment studies.

Keywords: digital transformation, digital business, ERP, roadmap

Procedia PDF Downloads 132
30259 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 142
30258 Oracle JDE Enterprise One ERP Implementation: A Case Study

Authors: Abhimanyu Pati, Krishna Kumar Veluri

Abstract:

The paper intends to bring out a real life experience encountered during actual implementation of a large scale Tier-1 Enterprise Resource Planning (ERP) system in a multi-location, discrete manufacturing organization in India, involved in manufacturing of auto components and aggregates. The business complexities, prior to the implementation of ERP, include multi-product with hierarchical product structures, geographically distributed multiple plant locations with disparate business practices, lack of inter-plant broadband connectivity, existence of disparate legacy applications for different business functions, and non-standardized codifications of products, machines, employees, and accounts apart from others. On the other hand, the manufacturing environment consisted of processes like Assemble-to-Order (ATO), Make-to-Stock (MTS), and Engineer-to-Order (ETO) with a mix of discrete and process operations. The paper has highlighted various business plan areas and concerns, prior to the implementation, with specific focus on strategic issues and objectives. Subsequently, it has dealt with the complete process of ERP implementation, starting from strategic planning, project planning, resource mobilization, and finally, the program execution. The step-by-step process provides a very good learning opportunity about the implementation methodology. At the end, various organizational challenges and lessons emerged, which will act as guidelines and checklist for organizations to successfully align and implement ERP and achieve their business objectives.

Keywords: ERP, ATO, MTS, ETO, discrete manufacturing, strategic planning

Procedia PDF Downloads 217
30257 Social Enterprises in Rural Canada

Authors: Prescott C. Ensign

Abstract:

Social enterprises play a vital role in Canada’s rural and northern communities. Most operate as non-profit organizations, use market approaches, and generate revenue from services or goods to support goals that address social, cultural, and environmental issues. As provincial and federal governments make reductions to programs providing social services to local communities, rural and northern residents who already have fewer resources from which to draw will be especially affected. Social enterprises will be called on to take up the slack. The aim of this paper is to provide a more comprehensive picture of the social enterprise as an organization and to understand the impact that context/ecosystem has on a social enterprise as it develops.

Keywords: social enterprises, structuration, embeddedness, ecosystem

Procedia PDF Downloads 99
30256 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 279
30255 Towards the Ideal Life: Quantitative Study on the Impact of Social Enterprises towards Their Employees

Authors: Joseph Daniel Lumain

Abstract:

The Philippine business sector has witnessed the emergence of a new category that distinguishes itself from the common framework that most enterprises utilize as this new emerging player incorporates social needs as part of its mission and goals. Various literature has manifested the relevance of social enterprises as an instrument towards poverty alleviation, as it concretely increases the capabilities of individuals. This study aims to identify whether or not social enterprises creates an impact towards their employees by positively influencing their respective perceptions on their capabilities on income, health and education. Utilizing Amartya Sen’s Capabilities Framework, this study is grounded on the relationships between social enterprises and increased capabilities, and increased capabilities and developing towards living a life they truly desire. The data gathered was analyzed quantitatively, supplemented by qualitative interviews with one to two employees from the social enterprise itself. Focusing on three social enterprises found within GKonomics, or the platform of Gawad Kalinga for social enterprise development, this purposive study was able to show that employees’ perceptions on their employment positively influenced their perceptions on their capabilities, and that this result affected their improvement towards living a life they desire.

Keywords: social enterprise, Amartya Sen, capabilities framework, Gawad Kalinga

Procedia PDF Downloads 414
30254 Normalized Enterprises Architectures: Portugal's Public Procurement System Application

Authors: Tiago Sampaio, André Vasconcelos, Bruno Fragoso

Abstract:

The Normalized Systems Theory, which is designed to be applied to software architectures, provides a set of theorems, elements and rules, with the purpose of enabling evolution in Information Systems, as well as ensuring that they are ready for change. In order to make that possible, this work’s solution is to apply the Normalized Systems Theory to the domain of enterprise architectures, using Archimate. This application is achieved through the adaptation of the elements of this theory, making them artifacts of the modeling language. The theorems are applied through the identification of the viewpoints to be used in the architectures, as well as the transformation of the theory’s encapsulation rules into architectural rules. This way, it is possible to create normalized enterprise architectures, thus fulfilling the needs and requirements of the business. This solution was demonstrated using the Portuguese Public Procurement System. The Portuguese government aims to make this system as fair as possible, allowing every organization to have the same business opportunities. The aim is for every economic operator to have access to all public tenders, which are published in any of the 6 existing platforms, independently of where they are registered. In order to make this possible, we applied our solution to the construction of two different architectures, which are able of fulfilling the requirements of the Portuguese government. One of those architectures, TO-BE A, has a Message Broker that performs the communication between the platforms. The other, TO-BE B, represents the scenario in which the platforms communicate with each other directly. Apart from these 2 architectures, we also represent the AS-IS architecture that demonstrates the current behavior of the Public Procurement Systems. Our evaluation is based on a comparison between the AS-IS and the TO-BE architectures, regarding the fulfillment of the rules and theorems of the Normalized Systems Theory and some quality metrics.

Keywords: archimate, architecture, broker, enterprise, evolvable systems, interoperability, normalized architectures, normalized systems, normalized systems theory, platforms

Procedia PDF Downloads 330
30253 Gender-Based Violence Public Art Projects: An Analysis of the Value of Including Social Justice Topics in Tertiary Courses

Authors: F. Saptouw

Abstract:

This paper will examine the value of introducing social justice issues into the tertiary fine art curriculum at a first-year level. The paper will present detail of the conceptual impetus and the logistics related to the execution of a collaborative teaching project. The cohort of students was registered for the Fine Art Foundation course at the Michaelis School of Fine Art at the University of Cape Town. The course is dedicated to the development of critical thinking, communication skills, and varied approaches to knowledge construction within the first-year cohort. A core component of the course is the examination of the representation of gender, identity, politics, and power. These issues are examined within a range of public and private representations like art galleries, museum spaces, and contemporary popular culture. This particular project was a collaborative project with the Office of Inclusivity and Change, and the project leaders were Fabian Saptouw and Gabriel Khan. The paper will conclude by presenting an argument for the importance of such projects within the tertiary environment.

Keywords: art, education, gender-based violence, social responsiveness

Procedia PDF Downloads 111
30252 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
30251 Planning the Journey of Unifying Medical Record Numbers in Five Facilities and the Expected Challenges: Case Study in Saudi Arabia

Authors: N. Al Khashan, H. Al Shammari, W. Al Bahli

Abstract:

Patients who are eligible to receive treatment at the National Guard Health Affairs (NGHA), Saudi Arabia will typically have four medical record numbers (MRN), one in each of the geographical areas. More hospitals and primary healthcare facilities in other geographical areas will launch soon which means more MRNs. When patients own four MRNs, this will cause major drawbacks in patients’ quality of care such as creating new medical files in different regions for relocated patients and using referral system among regions. Consequently, the access to a patient’s medical record from other regions and the interoperability of health information between the four hospitals’ information system would be challenging. Thus, there is a need to unify medical records among these five facilities. As part of the effort to increase the quality of care, a new Hospital Information Systems (HIS) was implemented in all NGHA facilities by the end of 2016. NGHA’s plan is put to be aligned with the Saudi Arabian national transformation program 2020; whereby 70% citizens and residents of Saudi Arabia would have a unified medical record number that enables transactions between multiple Electronic Medical Records (EMRs) vendors. The aim of the study is to explore the plan, the challenges and barriers of unifying the 4 MRNs into one Enterprise Patient Identifier (EPI) in NGHA hospitals by December 2018. A descriptive study methodology was used. A journey map and a project plan are created to be followed by the project team to ensure a smooth implementation of the EPI. It includes the following: 1) Approved project charter, 2) Project management plan, 3) Change management plan, 4) Project milestone dates. Currently, the HIS is using the regional MRN. Therefore, the HIS and all integrated health care systems in all regions will need modification to move from MRN to EPI without interfering with patient care. For now, the NGHA have successfully implemented an EPI connected with the 4 MRNs that work in the back end in the systems’ database.

Keywords: consumer health, health informatics, hospital information system, universal medical record number

Procedia PDF Downloads 165
30250 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 192
30249 Integrating Sustainable Development Goals in Teaching Mathematics Using Project Based Learning

Authors: S. Goel

Abstract:

In the current scenario, education should be realistic and nature-friendly. The earlier definition of education was restricted to the holistic development of the child which help them to increase their capacity and helps in social upliftment. But such definition gives a more individualistic aim of education. Due to that individualistic aim, we have become disconnected from nature. So, a school should be a place which provides students with an area to explore. They should get practical learning or learning from nature which is also propounded by Rousseau in the mid-eighteenth century. Integrating Sustainable development goals in the school curriculum will make it possible to connect the nature with the lives of the children in the classroom. Then, students will be more aware and sensitive towards their social and natural surroundings. The research attempts to examine the efficiency of project-based learning in mathematics to create awareness around sustainable development goals. The major finding of the research was that students are less aware of sustainable development goals, but when given time and an appropriate learning environment, students can be made aware of these goals. In this research, project-based learning was used to make students aware of sustainable development goals. Students were given pre test and post test which helped in analyzing their performance. After the intervention, post test result showed that mathematics projects can create an awareness of sustainable development goals.

Keywords: holistic development, natural learning, project based learning, sustainable development goals

Procedia PDF Downloads 150
30248 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
30247 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 356
30246 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 285
30245 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 194
30244 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 439
30243 Establishing Community-Based Pro-Biodiversity Enterprise in the Philippines: A Climate Change Adaptation Strategy towards Agro-Biodiversity Conservation and Local Green Economic Development

Authors: Dina Magnaye

Abstract:

In the Philippines, the performance of the agricultural sector is gauged through crop productivity and returns from farm production rather than the biodiversity in the agricultural ecosystem. Agricultural development hinges on the overall goal of increasing productivity through intensive agriculture, monoculture system, utilization of high yielding varieties in plants, and genetic upgrading in animals. This merits an analysis of the role of agro-biodiversity in terms of increasing productivity, food security and economic returns from community-based pro-biodiversity enterprises. These enterprises conserve biodiversity while equitably sharing production income in the utilization of biological resources. The study aims to determine how community-based pro-biodiversity enterprises become instrumental in local climate change adaptation and agro-biodiversity conservation as input to local green economic development planning. It also involves an assessment of the role of agrobiodiversity in terms of increasing productivity, food security and economic returns from community-based pro-biodiversity enterprises. The perceptions of the local community members both in urban and upland rural areas on community-based pro-biodiversity enterprises were evaluated. These served as a basis in developing a planning modality that can be mainstreamed in the management of local green economic enterprises to benefit the environment, provide local income opportunities, conserve species diversity, and sustain environment-friendly farming systems and practices. The interviews conducted with organic farmer-owners, entrepreneur-organic farmers, and organic farm workers revealed that pro-biodiversity enterprise such as organic farming involved the cyclic use of natural resources within the carrying capacity of a farm; recognition of the value of tradition and culture especially in the upland rural area; enhancement of socio-economic capacity; conservation of ecosystems in harmony with nature; and climate change mitigation. The suggested planning modality for community-based pro-biodiversity enterprises for a green economy encompasses four (4) phases to include community resource or capital asset profiling; stakeholder vision development; strategy formulation for sustained enterprises; and monitoring and evaluation.

Keywords: agro-biodiversity, agro-biodiversity conservation, local green economy, organic farming, pro-biodiversity enterprise

Procedia PDF Downloads 333
30242 Enablers of Total Quality Management for Social Enterprises: A Study of UAE Social Organizations

Authors: Farhat Sultana

Abstract:

Originality: TQM principles are considered the tools to enhance organizational performance for most organizations. The paper contributes to the literature on the social enterprise because social organizations are still far behind in implementing TQM as compared to other private, public, and nonprofit organizations. Study design: The study is based on the data and information provided by two case studies and one focus group of social enterprises. Purpose: The purpose of the study is to get a deep understating of TQM implementation and to recognize the enablers of TQM in social enterprises that enhance the organizational performance of social enterprises located in UAE. Findings: As per the findings of the study, key enablers of Total Quality management in the case enterprises are leadership support, strategic approach for quality, continuous improvement, process improvement, employee empowerment and customer focus practices, though some inhibitors for TQM implementation such as managerial structure for quality assurance and performance appraisal mechanism are also pointed out by the study. Research limitations: The study findings are only based on two case studies and one focus group, which is not enough to generalize the findings to all social organizations. Practical Implications: Identified TQM enablers can help management to implement TQM successfully in social enterprises. Social implications: The study provides enabling path for Social enterprises to implement TQM to seek quality output to build a better society.

Keywords: TQM, social enterprise, enablers of TQM, UAE

Procedia PDF Downloads 73
30241 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 70
30240 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
30239 The Antecedents That Effect on Organizational Commitment of the Public Enterprises in Thailand

Authors: Mananya Meenakorn

Abstract:

The purpose of this study is to examine the impact of public enterprise reform policy on the attributes of organizational commitments in the public energy enterprises in Thailand. It compares three structural types of public energy enterprises: totally state-owned public enterprises, partially transformed public enterprises and totally transformed public enterprises, based on the degree of state ownership and the level of management control that exist in the public reformed organizations, by analyzing the presence of the desirable attributes of organizational commitment as perceived by employees. Findings indicate that there are statistically significant differences in the level of some dimensions of organizational commitment between the three types of public energy enterprises. The results also indicate empirical evidence concerning the causal relationship between the antecedents and organizational commitment. Whereas change-related behaviors show a direct negative influence on organizational commitment, both HRM practices and work-related values indicate direct positive influences on them also.

Keywords: affective commitment, organizational commitment, public enterprise reform organizations, public energy enterprises in Thailand

Procedia PDF Downloads 260
30238 Implementation of Video Education to Improve Patient’s Knowledge of Activating Emergency Medical System for Stroke Symptoms: Evidence- Based Practice Project on Inpatient Neurology Unit in the United States

Authors: V. Miller, T. Jariel, C. Cooper-Chadwick

Abstract:

Early treatment of stroke leads to higher survival and lower disability rates. Increasing knowledge to activate the emergency medical system for signs of stroke can improve outcomes for patients with stroke and decrease morbidity and mortality. Even though patients who get discharged from the hospital receive standard verbal and printed education, nearly 20% of them answer the question incorrectly when asked, “What will you do if you or someone you know have signs of stroke?” The main goal of this evidence-based project was to improve patients’ knowledge of what to do if they have signs of stroke. Evidence suggests that using video education in conjunction with verbal and printed education improves patient comprehension and retention. The percentage of patients who noted that they needed to call 911 for stroke symptoms increased from 80% to 87% in six months after project implementation. The results of this project demonstrate significant improvement in patients’ knowledge about the necessity of activation of emergency medical systems for stroke symptoms.

Keywords: emergency medical systems activation, evidence-based practice nursing, stroke education, video education

Procedia PDF Downloads 43
30237 Cultural Snapshot: A Reflection on Project-Based Model of Cross-Cultural Understanding in Teaching and Learning

Authors: Kunto Nurcahyoko

Abstract:

The fundamental perception used in this study is that teaching and learning activities in Indonesian classroom have potentially generated individual’s sensitivity on cross-cultural understanding. This study aims at investigating Indonesian university students’ perception on cross-cultural understanding after doing Cultural Snapshot Project. The data was critically analyzed through multicultural ideology and diversity theories. The subjects were 30 EFL college students in one of colleges in Indonesia. Each student was assigned to capture a photo which depicted the existence of any cultural manifestation in their surrounding such as discrimination, prejudice and stereotype. Students were then requested asked to reflect on the picture by writing a short description on the picture and make an exhibition using their pictures. In the end of the project, students were instructed to fill in questionnaires to show their perception before and after the project. The result reveals that Cultural Snapshot Project has given the opportunity for the students to better realize cross-cultural understanding in their environment. In conclusion, the study shows that Cultural Snapshot Project has specifically enhanced students’ perception of multiculturalism in three major areas: cultural sensitivity and empathy, social tolerance, and understanding of diversity.

Keywords: cultural snapshot, cross-cultural understanding, students’ perception, multiculturalism

Procedia PDF Downloads 285
30236 Near-Peer Mentoring/Curriculum and Community Enterprise for Environmental Restoration Science

Authors: Lauren B. Birney

Abstract:

The BOP-CCERS (Billion Oyster Project- Curriculum and Community Enterprise for Restoration Science) Near-Peer Mentoring Program provides the long-term (five-year) support network to motivate and guide students toward restoration science-based CTE pathways. Students are selected from middle schools with actively participating BOP-CCERS teachers. Teachers will nominate students from grades 6-8 to join cohorts of between 10 and 15 students each. Cohorts are comprised primarily of students from the same school in order to facilitate mentors' travel logistics as well as to sustain connections with students and their families. Each cohort is matched with an exceptional undergraduate or graduate student, either a BOP research associate or STEM mentor recruited from collaborating City University of New York (CUNY) partner programs. In rare cases, an exceptional high school junior or senior may be matched with a cohort in addition to a research associate or graduate student. In no case is a high school student or minor be placed individually with a cohort. Mentors meet with students at least once per month and provide at least one offsite field visit per month, either to a local STEM Hub or research lab. Keeping with its five-year trajectory, the near-peer mentoring program will seek to retain students in the same cohort with the same mentor for the full duration of middle school and for at least two additional years of high school. Upon reaching the final quarter of 8th grade, the mentor will develop a meeting plan for each individual mentee. The mentee and the mentor will be required to meet individually or in small groups once per month. Once per quarter, individual meetings will be substituted for full cohort professional outings. The mentor will organize the entire cohort on a field visit or educational workshop with a museum or aquarium partner. In addition to the mentor-mentee relationship, each participating student will also be asked to conduct and present his or her own BOP field research. This research is ideally carried out with the support of the students’ regular high school STEM subject teacher; however, in cases where the teacher or school does not permit independent study, the student will be asked to conduct the research on an extracurricular basis. Near-peer mentoring affects students’ social identities and helps them to connect to role models from similar groups, ultimately giving them a sense of belonging. Qualitative and quantitative analytics were performed throughout the study. Interviews and focus groups also ensued. Additionally, an external evaluator was utilized to ensure project efficacy, efficiency, and effectiveness throughout the entire project. The BOP-CCERS Near Peer Mentoring program is a peer support network in which high school students with interest or experience in BOP (Billion Oyster Project) topics and activities (such as classroom oyster tanks, STEM Hubs, or digital platform research) provide mentorship and support for middle school or high school freshmen mentees. Peer mentoring not only empowers those students being taught but also increases the content knowledge and engagement of mentors. This support provides the necessary resources, structure, and tools to assist students in finding success.

Keywords: STEM education, environmental science, citizen science, near peer mentoring

Procedia PDF Downloads 63
30235 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 377
30234 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 100