Search results for: maintenance and rehabilitation
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2207

Search results for: maintenance and rehabilitation

2117 Cognitive Rehabilitation in Schizophrenia: A Review of the Indian Scenario

Authors: Garima Joshi, Pratap Sharan, V. Sreenivas, Nand Kumar, Kameshwar Prasad, Ashima N. Wadhawan

Abstract:

Schizophrenia is a debilitating disorder and is marked by cognitive impairment, which deleteriously impacts the social and professional functioning along with the quality of life of the patients and the caregivers. Often the cognitive symptoms are in their prodromal state and worsen as the illness progresses; they have proven to have a good predictive value for the prognosis of the illness. It has been shown that intensive cognitive rehabilitation (CR) leads to improvements in the healthy as well as cognitively-impaired subjects. As the majority of population in India falls in the lower to middle socio-economic status and have low education levels, using the existing packages, a majority of which are developed in the West, for cognitive rehabilitation becomes difficult. The use of technology is also restricted due to the high costs involved and the limited availability and familiarity with computers and other devices, which pose as an impedance for continued therapy. Cognitive rehabilitation in India uses a plethora of retraining methods for the patients with schizophrenia targeting the functions of attention, information processing, executive functions, learning and memory, and comprehension along with Social Cognition. Psychologists often have to follow an integrative therapy approach involving social skills training, family therapy and psychoeducation in order to maintain the gains from the cognitive rehabilitation in the long run. This paper reviews the methodologies and cognitive retaining programs used in India. It attempts to elucidate the evolution and development of methodologies used, from traditional paper-pencil based retraining to more sophisticated neuroscience-informed techniques in cognitive rehabilitation of deficits in schizophrenia as home-based or supervised and guided programs for cognitive rehabilitation.

Keywords: schizophrenia, cognitive rehabilitation, neuropsychological interventions, integrated approached to rehabilitation

Procedia PDF Downloads 336
2116 Comparison of Two Maintenance Policies for a Two-Unit Series System Considering General Repair

Authors: Seyedvahid Najafi, Viliam Makis

Abstract:

In recent years, maintenance optimization has attracted special attention due to the growth of industrial systems complexity. Maintenance costs are high for many systems, and preventive maintenance is effective when it increases operations' reliability and safety at a reduced cost. The novelty of this research is to consider general repair in the modeling of multi-unit series systems and solve the maintenance problem for such systems using the semi-Markov decision process (SMDP) framework. We propose an opportunistic maintenance policy for a series system composed of two main units. Unit 1, which is more expensive than unit 2, is subjected to condition monitoring, and its deterioration is modeled using a gamma process. Unit 1 hazard rate is estimated by the proportional hazards model (PHM), and two hazard rate control limits are considered as the thresholds of maintenance interventions for unit 1. Maintenance is performed on unit 2, considering an age control limit. The objective is to find the optimal control limits and minimize the long-run expected average cost per unit time. The proposed algorithm is applied to a numerical example to compare the effectiveness of the proposed policy (policy Ⅰ) with policy Ⅱ, which is similar to policy Ⅰ, but instead of general repair, replacement is performed. Results show that policy Ⅰ leads to lower average cost compared with policy Ⅱ. 

Keywords: condition-based maintenance, proportional hazards model, semi-Markov decision process, two-unit series systems

Procedia PDF Downloads 94
2115 Multidisciplinary Rehabilitation Algorithm after Mandibular Resection for Ameloblastoma

Authors: Joaquim de Almeida Dultra, Daiana Cristina Pereira Santana, Fátima Karoline Alves Araújo Dultra, Liliane Akemi Kawano Shibasaki, Mariana Machado Mendes de Carvalho, Ieda Margarida Crusoé Rocha Rebello

Abstract:

Defects originating from mandibular resections can cause significant functional impairment and facial disharmony, and they have complex rehabilitation. The aim of this report is to demonstrate the authors' experience facing challenging rehabilitation after mandibular resection in a patient with ameloblastoma. Clinical and surgical steps are described simultaneously, highlighting the adaptation of the final fixed prosthesis, reported in an unprecedented way in the literature. A 37-year-old male patient was seen after a sports accident, where a pathological fracture in the symphysis and left mandibular body was identified, where a large radiolucent lesion was found. The patient underwent resection, bone graft, distraction osteogenesis, rehabilitation with dental implants, prosthesis, and finally, orofacial harmonization, in an interval of six years. Rehabilitation should consider the patient's needs individually and should have as the main objective to provide similar aesthetics and function to that present before the disease. We also emphasize the importance of interdisciplinary work during the course of rehabilitation.

Keywords: ameloblastoma, mandibular reconstruction, distraction osteogenesis, dental implants. dental prosthesis, implant-supported, treatment outcome

Procedia PDF Downloads 76
2114 A Forearm-Wrist Rehabilitation Module for Stroke and Spinal Cord Injuries

Authors: Vahid Mehrabi, Iman Sharifi, H. A. Talebi

Abstract:

The automation of rehabilitation procedure by the implementation of robotic devices can overcome the limitation in conventional physiotherapy methods by increasing training sessions and duration of process. In this paper, the design of a simple rehabilitation robot for forearm-wrist therapy in stroke and spinal cord injuries is presented. Wrist’s biological joint motion is modeled by a gimbal-like mechanism which resembles the human arm anatomy. Presented device is an exoskeleton robot with rotation axes corresponding to human skeleton anatomy. The mechanical structure, actuator and sensor selection, system kinematics and comparison between our device range of motion and required active daily life values is illustrated.

Keywords: rehabilitation, robotic devices, physiotherapy, forearm-wrist

Procedia PDF Downloads 245
2113 Airport Pavement Crack Measurement Systems and Crack Density for Pavement Evaluation

Authors: Ali Ashtiani, Hamid Shirazi

Abstract:

This paper reviews the status of existing practice and research related to measuring pavement cracking and using crack density as a pavement surface evaluation protocol. Crack density for pavement evaluation is currently not widely used within the airport community and its use by the highway community is limited. However, surface cracking is a distress that is closely monitored by airport staff and significantly influences the development of maintenance, rehabilitation and reconstruction plans for airport pavements. Therefore crack density has the potential to become an important indicator of pavement condition if the type, severity and extent of surface cracking can be accurately measured. A pavement distress survey is an essential component of any pavement assessment. Manual crack surveying has been widely used for decades to measure pavement performance. However, the accuracy and precision of manual surveys can vary depending upon the surveyor and performing surveys may disrupt normal operations. Given the variability of manual surveys, this method has shown inconsistencies in distress classification and measurement. This can potentially impact the planning for pavement maintenance, rehabilitation and reconstruction and the associated funding strategies. A substantial effort has been devoted for the past 20 years to reduce the human intervention and the error associated with it by moving toward automated distress collection methods. The automated methods refer to the systems that identify, classify and quantify pavement distresses through processes that require no or very minimal human intervention. This principally involves the use of a digital recognition software to analyze and characterize pavement distresses. The lack of established protocols for measurement and classification of pavement cracks captured using digital images is a challenge to developing a reliable automated system for distress assessment. Variations in types and severity of distresses, different pavement surface textures and colors and presence of pavement joints and edges all complicate automated image processing and crack measurement and classification. This paper summarizes the commercially available systems and technologies for automated pavement distress evaluation. A comprehensive automated pavement distress survey involves collection, interpretation, and processing of the surface images to identify the type, quantity and severity of the surface distresses. The outputs can be used to quantitatively calculate the crack density. The systems for automated distress survey using digital images reviewed in this paper can assist the airport industry in the development of a pavement evaluation protocol based on crack density. Analysis of automated distress survey data can lead to a crack density index. This index can be used as a means of assessing pavement condition and to predict pavement performance. This can be used by airport owners to determine the type of pavement maintenance and rehabilitation in a more consistent way.

Keywords: airport pavement management, crack density, pavement evaluation, pavement management

Procedia PDF Downloads 164
2112 An Assessment of Airport Collaborative Decision-Making System Using Predictive Maintenance

Authors: Faruk Aras, Melih Inal, Tansel Cinar

Abstract:

The coordination of airport staff especially in the operations and maintenance departments is important for the airport operation. As a result, this coordination will increase the efficiency in all operation. Therefore, a Collaborative Decision-Making (CDM) system targets on improving the overall productivity of all operations by optimizing the use of resources and improving the predictability of actions. Enlarged productivity can be of major benefit for all airport operations. It also increases cost-efficiency. This study explains how predictive maintenance using IoT (Internet of Things), predictive operations and the statistical data such as Mean Time To Failure (MTTF) improves airport terminal operations and utilize airport terminal equipment in collaboration with collaborative decision making system/Airport Operation Control Center (AOCC). Data generated by the predictive maintenance methods is retrieved and analyzed by maintenance managers to predict when a problem is about to occur. With that information, maintenance can be scheduled when needed. As an example, AOCC operator would have chance to assign a new gate that towards to this gate all the equipment such as travellator, elevator, escalator etc. are operational if the maintenance team is in collaboration with AOCC since maintenance team is aware of the health of the equipment because of predictive maintenance methods. Applying predictive maintenance methods based on analyzing the health of airport terminal equipment dramatically reduces the risk of downtime by on time repairs. We can classify the categories as high priority calls for urgent repair action, as medium priority requires repair at the earliest opportunity, and low priority allows maintenance to be scheduled when convenient. In all cases, identifying potential problems early resulted in better allocation airport terminal resources by AOCC.

Keywords: airport, predictive maintenance, collaborative decision-making system, Airport Operation Control Center (AOCC)

Procedia PDF Downloads 327
2111 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: water pipe networks, maintenance management, reliability analysis, optimum maintenance plan

Procedia PDF Downloads 122
2110 Optimal Opportunistic Maintenance Policy for a Two-Unit System

Authors: Nooshin Salari, Viliam Makis, Jane Doe

Abstract:

This paper presents a maintenance policy for a system consisting of two units. Unit 1 is gradually deteriorating and is subject to soft failure. Unit 2 has a general lifetime distribution and is subject to hard failure. Condition of unit 1 of the system is monitored periodically and it is considered as failed when its deterioration level reaches or exceeds a critical level N. At the failure time of unit 2 system is considered as failed, and unit 2 will be correctively replaced by the next inspection epoch. Unit 1 or 2 are preventively replaced when deterioration level of unit 1 or age of unit 2 exceeds the related preventive maintenance (PM) levels. At the time of corrective or preventive replacement of unit 2, there is an opportunity to replace unit 1 if its deterioration level reaches the opportunistic maintenance (OM) level. If unit 2 fails in an inspection interval, system stops operating although unit 1 has not failed. A mathematical model is derived to find the preventive and opportunistic replacement levels for unit 1 and preventive replacement age for unit 2, that minimize the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. Numerical example is provided to illustrate the performance of the proposed model and the comparison of the proposed model with an optimal policy without opportunistic maintenance level for unit 1 is carried out.

Keywords: condition-based maintenance, opportunistic maintenance, preventive maintenance, two-unit system

Procedia PDF Downloads 170
2109 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities

Authors: J. Kaabi, Y. Harrath

Abstract:

This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm.

Keywords: flow shop scheduling, genetic algorithm, maintenance, priority rules

Procedia PDF Downloads 447
2108 Efficacy of Cognitive Rehabilitation Therapy on Poststroke Depression among Survivors of Stroke; A Systematic Review

Authors: Zahra Hassani

Abstract:

Background and Purpose: Poststroke depression (PSD) is one of the complications of a stroke that reduces the patient's chance of recovery, becomes irritable, and changes personality. Cognitive rehabilitation is one of the non-pharmacological methods that improve deficits such as attention, memory, and symptoms of depression. Therefore, the purpose of the present study is to evaluate the Efficacy of Cognitive Rehabilitation Therapy on Poststroke Depression among Survivors of stroke. Method: In this study, a systematic review of the databases Google Scholar, PubMed, Science Direct, Elsevier between the years 2015 and 2019 with the keywords cognitive rehabilitation therapy, post-stroke, depression Search is done. In this process, studies that examined the Efficacy of Cognitive Rehabilitation Therapy on Poststroke Depression among Survivors of stroke were included in the study. Results: Inclusion criteria were full-text availability, interventional study, and non-review articles. There was a significant difference between the articles in terms of the indices studied, sample number, method of implementation, and so on. A review of studies have shown that cognitive rehabilitation therapy has a significant role in reducing the symptoms of post-stroke depression. The use of these interventions is also effective in improving problem-solving skills, improving memory, and improving attention and concentration. Conclusion: This study emphasizes on the development of efficient and flexible adaptive skills through cognitive processes and its effect on reducing depression in patients after stroke.

Keywords: cognitive therapy, depression, stroke, rehabilitation

Procedia PDF Downloads 96
2107 Physical Activity Patterns during Inpatient Rehabilitation in Patients with Recent Brain Injury

Authors: Nikita Pasricha, Karen Smith, Simone Marshall, Vincent DePaul, Jessica Trier

Abstract:

Understanding that physical activity in rehabilitation programs shapes outcomes in acquired brain injury (ABI) populations is not a new concept. However, there is a void in understanding the physical activity patterns of inpatients in ABI rehabilitation, the trajectory of physical activity recovery, and factors that contribute to the recovery of physical activity over the initial months post-ABI. The purpose of this study was to determine if physical activity patterns vary in people with recent ABI in inpatient rehabilitation. The study also investigated differences in physical activity patterns in ABI patients compared to age-related healthy participants. Results revealed that ABI patients spent approximately 6.7 times longer per day in sedentary postures than in active positions. In comparison, the control group spent only 2.8 times longer in sedentary postures compared to active positions. Patients with ABI took significantly fewer steps than age-matched health control participants. Within the ABI population, patients took 0.78 times fewer steps on weekends compared to weekdays. Participants with greater mobility limitations had a greater difference in WD to WE steps taken. Potential reasons could be from no structured weekend rehabilitation programs, lower availability of staff, or varying schedules. Given that the rehabilitation program is only structured on weekdays, further research to investigate the benefits of structured physical activities like group walking programs on weekends for ABI patients in inpatient rehabilitation programs is warranted.

Keywords: brain, ABI, TBI, rehabilitation

Procedia PDF Downloads 24
2106 The Application of Maintenance Strategy in Energy Power Plant: A Case Study

Authors: Steven Vusmuzi Mashego, Opeyeolu Timothy Laseinde

Abstract:

This paper presents a case study on applying maintenance strategies observed in a turbo-generator at a coal power plant. Turbo generators are one of the primary and critical components in energy generation. It is essential to apply correct maintenance strategies and apply operational procedures accordingly. The maintenance strategies are implemented to ensure the high reliability of the equipment. The study was carried out at a coal power station which will transit to a cleaner energy source in the nearest future. The study is relevant as lessons learned in this system will support plans and operational models implemented when cleaner energy sources replace coal-powered turbines. This paper first outlines different maintenance strategies executed on the turbo-generator modules. Secondly, the impacts of human factors on a coal power station are discussed, and the findings prompted recommendations for future actions.

Keywords: maintenance strategies, turbo generator, operational error, human factor, electricity generation

Procedia PDF Downloads 81
2105 The Rehabilitation of Drug Addiction by Thai Indigenous Knowledge: A Case Study of Thamkrabok Monastery

Authors: Wanwimon Mekwimon

Abstract:

Drug addiction is a serious problem in Thailand which has occurred continuously and repeatedly and enormously impacting health and economy of drug users. The indigenous wisdom and folk medicine is an attractive alternative choice, especially in detoxification and rehabilitation period. There are two objectives: First is to study about rehabilitation process and the curing for drug eaters and 2nd is to investigate the effectiveness of the curing and rehabilitation process by indigenous wisdom at Tamkrabok monastery, Pra-Puttabat district, Saraburi province. The main informants are 10 curers, 15 patients and 17 after-1-year rehabilitators. In the process, the semi-structured questionnaire is administered, the data are analyzed and proved by triangulation. The curing and rehabilitation process which use herbal remedies has a period of 15 days (5 days for detoxification and 10 days for recovery period) and the occupational training and self-consciousness awakening were delivered. The follow-up process includes twice-a-month recall for 6 months, follow-up letters and in depth interview with their families. The outcome of 1 year post-treatment was 94% (16 from 17). There are many reasons for not relapsing: the recovering patients have drawn on their inner strength, self-awareness and coping skill as well as their family and social support while rehabilitation process which includes difficulties in contacting with family members. They can void themselves from high risk situations to relapse. Recommendations: The follow-up system should be improved for continuous quality improvement, there should be the qualification standard for herbal remedies and the comparison among rehabilitation process of Tamkrabok and another methods are to be guideline for the further development.

Keywords: rehabilitation, drug addiction, Thai indigenous knowledge, herbal remedies

Procedia PDF Downloads 223
2104 Intelligent Platform for Photovoltaic Park Operation and Maintenance

Authors: Andreas Livera, Spyros Theocharides, Michalis Florides, Charalambos Anastassiou

Abstract:

A main challenge in the quest for ensuring the quality of operation, especially for photovoltaic (PV) systems, is to safeguard the reliability and optimal performance by detecting and diagnosing potential failures and performance losses at early stages or before occurrence through real-time monitoring, supervision, fault detection and predictive maintenance. The purpose of this work is to present the functionalities and results related to the development and validation of a software platform for PV assets diagnosis and maintenance. The platform brings together proprietary hardware sensors and software algorithms to enable the early detection and prediction of the most common and critical faults in PV systems. It was validated using field measurements from operating PV systems. The results showed the effectiveness of the platform for detecting faults and losses (e.g., inverter failures, string disconnections and potential induced degradation) at early stages, forecasting the PV power production while also providing recommendations for maintenance actions. Increased PV energy yield production and revenue can be thus achieved while also minimizing operation and maintenance (O&M) costs.

Keywords: failure detection and prediction, operation and maintenance, performance monitoring, photovoltaic, platform, recommendations, predictive maintenance

Procedia PDF Downloads 10
2103 Presentation of the Model of Reliability of the Signaling System with Emphasis on Determining Best Time Schedule for Repairments and Preventive Maintenance in the Iranian Railway

Authors: Maziar Yazdani, Ahmad Khodaee, Fatemeh Hajizadeh

Abstract:

The purpose of this research was analysis of the reliability of the signaling system in the railway and planning repair and maintenance of its subsystems. For this purpose, it will be endeavored to introduce practical strategies for activities control and appropriate planning for repair and preventive maintenance by statistical modeling of reliability. Therefore, modeling, evaluation, and promotion of reliability of the signaling system appear very critical. Among the key goals of the railway is provision of quality service for passengers and this purpose is gained by increasing reliability, availability, maintainability and safety of (RAMS). In this research, data were analyzed, and the reliability of the subsystems and entire system was calculated and with emphasis on preservation of performance of each of the subsystems with a reliability of 80%, a plan for repair and preventive maintenance of the subsystems of the signaling system was introduced.

Keywords: reliability, modeling reliability, plan for repair and preventive maintenance, signaling system

Procedia PDF Downloads 143
2102 Predictive Maintenance Based on Oil Analysis Applicable to Transportation Fleets

Authors: Israel Ibarra Solis, Juan Carlos Rodriguez Sierra, Ma. del Carmen Salazar Hernandez, Isis Rodriguez Sanchez, David Perez Guerrero

Abstract:

At the present paper we try to explain the analysis techniques use for the lubricating oil in a maintenance period of a city bus (Mercedes Benz Boxer 40), which is call ‘R-24 route’, line Coecillo Centro SA de CV in Leon Guanajuato, to estimate the optimal time for the oil change. Using devices such as the rotational viscometer and the atomic absorption spectrometer, they can detect the incipient form when the oil loses its lubricating properties and, therefore, cannot protect the mechanical components of diesel engines such these trucks. Timely detection of lost property in the oil, it allows us taking preventive plan maintenance for the fleet.

Keywords: atomic absorption spectrometry, maintenance, predictive velocity rate, lubricating oils

Procedia PDF Downloads 534
2101 GIS Pavement Maintenance Selection Strategy

Authors: Mekdelawit Teferi Alamirew

Abstract:

As a practical tool, the Geographical information system (GIS) was used for data integration, collection, management, analysis, and output presentation in pavement mangement systems . There are many GIS techniques to improve the maintenance activities like Dynamic segmentation and weighted overlay analysis which considers Multi Criteria Decision Making process. The results indicated that the developed MPI model works sufficiently and yields adequate output for providing accurate decisions. Hence considering multi criteria to prioritize the pavement sections for maintenance, as a result of the fact that GIS maps can express position, extent, and severity of pavement distress features more effectively than manual approaches, lastly the paper also offers digitized distress maps that can help agencies in their decision-making processes.

Keywords: pavement, flexible, maintenance, index

Procedia PDF Downloads 27
2100 The Voice Rehabilitation Program Following Ileocolon Flap Transfer for Voice Reconstruction after Laryngectomy

Authors: Chi-Wen Huang, Hung-Chi Chen

Abstract:

Total laryngectomy affects swallowing, speech functions and life quality in the head and neck cancer. Voice restoration plays an important role in social activities and communication. Several techniques have been developed for voice restoration and reported to improve the life quality. However, the rehabilitation program for voice reconstruction by using the ileocolon flap still unclear. A retrospective study was done, and the patients' data were drawn from the medical records between 2010 and 2016 who underwent voice reconstruction by ileocolon flap after laryngectomy. All of them were trained to swallow first; then, the voice rehabilitation was started. The outcome of voice was evaluated after 6 months using the 4-point scoring scale. In our result, 9.8% patients could give very clear voice so everyone could understand their speech, 61% patients could be understood well by families and friends, 20.2% patients could only talk with family, and 9% patients had difficulty to be understood. Moreover, the 57% patients did not need a second surgery, but in 43% patients voice was made clear by a second surgery. In this study, we demonstrated that the rehabilitation program after voice reconstruction with ileocolon flap for post-laryngectomy patients is important because the anatomical structure is different from the normal larynx.

Keywords: post-laryngectomy, ileocolon flap, rehabilitation, voice reconstruction

Procedia PDF Downloads 128
2099 Minimizing Unscheduled Maintenance from an Aircraft and Rolling Stock Maintenance Perspective: Preventive Maintenance Model

Authors: Adel A. Ghobbar, Varun Raman

Abstract:

The Corrective maintenance of components and systems is a problem plaguing almost every industry in the world today. Train operators’ and the maintenance repair and overhaul subsidiary of the Dutch railway company is also facing this problem. A considerable portion of the maintenance activities carried out by the company are unscheduled. This, in turn, severely stresses and stretches the workforce and resources available. One possible solution is to have a robust preventive maintenance plan. The other possible solution is to plan maintenance based on real-time data obtained from sensor-based ‘Health and Usage Monitoring Systems.’ The former has been investigated in this paper. The preventive maintenance model developed for train operator will subsequently be extended, to tackle the unscheduled maintenance problem also affecting the aerospace industry. The extension of the model to the aerospace sector will be dealt with in the second part of the research, and it would, in turn, validate the soundness of the model developed. Thus, there are distinct areas that will be addressed in this paper, including the mathematical modelling of preventive maintenance and optimization based on cost and system availability. The results of this research will help an organization to choose the right maintenance strategy, allowing it to save considerable sums of money as opposed to overspending under the guise of maintaining high asset availability. The concept of delay time modelling was used to address the practical problem of unscheduled maintenance in this paper. The delay time modelling can be used to help with support planning for a given asset. The model was run using MATLAB, and the results are shown that the ideal inspection intervals computed using the extended from a minimal cost perspective were 29 days, and from a minimum downtime, perspective was 14 days. Risk matrix integration was constructed to represent the risk in terms of the probability of a fault leading to breakdown maintenance and its consequences in terms of maintenance cost. Thus, the choice of an optimal inspection interval of 29 days, resulted in a cost of approximately 50 Euros and the corresponding value of b(T) was 0.011. These values ensure that the risk associated with component X being maintained at an inspection interval of 29 days is more than acceptable. Thus, a switch in maintenance frequency from 90 days to 29 days would be optimal from the point of view of cost, downtime and risk.

Keywords: delay time modelling, unscheduled maintenance, reliability, maintainability, availability

Procedia PDF Downloads 106
2098 Comparison Of Data Mining Models To Predict Future Bridge Conditions

Authors: Pablo Martinez, Emad Mohamed, Osama Mohsen, Yasser Mohamed

Abstract:

Highway and bridge agencies, such as the Ministry of Transportation in Ontario, use the Bridge Condition Index (BCI) which is defined as the weighted condition of all bridge elements to determine the rehabilitation priorities for its bridges. Therefore, accurate forecasting of BCI is essential for bridge rehabilitation budgeting planning. The large amount of data available in regard to bridge conditions for several years dictate utilizing traditional mathematical models as infeasible analysis methods. This research study focuses on investigating different classification models that are developed to predict the bridge condition index in the province of Ontario, Canada based on the publicly available data for 2800 bridges over a period of more than 10 years. The data preparation is a key factor to develop acceptable classification models even with the simplest one, the k-NN model. All the models were tested, compared and statistically validated via cross validation and t-test. A simple k-NN model showed reasonable results (within 0.5% relative error) when predicting the bridge condition in an incoming year.

Keywords: asset management, bridge condition index, data mining, forecasting, infrastructure, knowledge discovery in databases, maintenance, predictive models

Procedia PDF Downloads 164
2097 Aspects on the Problems of Road Asset Management and Maintenance in Albania

Authors: Diana Bardhi

Abstract:

Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis.

Keywords: infrastructure, maintenance, depreciation, efficiency

Procedia PDF Downloads 128
2096 Requirements for a Shared Management of State-Owned Building in the Archaeological Park of Pompeii

Authors: Maria Giovanna Pacifico

Abstract:

Maintenance, in Italy, is not yet a consolidated practice despite the benefits that could come from. Among the main reasons, there are the lack of financial resources and personnel in the public administration and a general lack of knowledge about how to activate and to manage a prevented and programmed maintenance. The experimentation suggests that users and tourists could be involved in the maintenance process from the knowledge phase to the monitoring ones by using mobile devices. The goal is to increase the quality of Facility Management for cultural heritage, prioritizing usage needs, and limiting interference between the key stakeholders. The method simplifies the consolidated procedures for the Information Systems, avoiding a loss in terms of quality and amount of information by focusing on the users' requirements: management economy, user safety, accessibility, and by receiving feedback information to define a framework that will lead to predictive maintenance. This proposal was designed to be tested in the Archaeological Park of Pompeii on the state property asset.

Keywords: asset maintenance, key stakeholders, Pompeii, user requirement

Procedia PDF Downloads 93
2095 Restorative Justice Programmes in South African Prison Environment: A Qualitative Enquiry

Authors: Clarice Zimbili Zondi

Abstract:

This study investigates the effect of restorative justice programmes offered to offenders in prison environment (Correctional Centres) during their rehabilitation. The study looks specifically to programmes offered by a Non-Profit Organisation (NPO), Phoenix Zululand (PZ) in twelve (12) different prisons in Zululand, South Africa. Document analysis, interviews and participant observation methods were used to test whether the work done by Phoenix Zululand is in line with the remarks made on restorative justice as encapsulated in the White Paper on Corrections 2005 in South Africa. Also tested was whether a better understanding of restorative justice programmes assists in coming up with better strategies to change the behaviour of offenders. The study findings discovered that the work that is done by PZ is not in line with the remarks made in the White Paper on Corrections. Also the importance of a full comprehension of what one is doing in order to be effective in rehabilitation. However, rehabilitation that is aimed at only changing the decision-making processes of offenders not to reoffend, does not serve as a total rehabilitation programme. Rehabilitation is only successful if ex-offenders, whilst still in prison, have developed market-related skills and become employed or self-employed. Restorative Justice Programmes offered by PZ, although they play a critical role, appears to be lacking in equipping offenders with skills for effective reintegration into society and, subsequently, self-reliance.

Keywords: offender, rehabilitation, restorative justice, prison

Procedia PDF Downloads 303
2094 Study on the Pavement Structural Performance of Highways in the North China Region Based on Pavement Distress and Ground Penetrating Radar

Authors: Mingwei Yi, Liujie Guo, Zongjun Pan, Xiang Lin, Xiaoming Yi

Abstract:

With the rapid expansion of road construction mileage in China, the scale of road maintenance needs has concurrently escalated. As the service life of roads extends, the design of pavement repair and maintenance emerges as a crucial component in preserving the excellent performance of the pavement. The remaining service life of asphalt pavement structure is a vital parameter in the lifecycle maintenance design of asphalt pavements. Based on an analysis of pavement structural integrity, this study introduces a characterization and assessment of the remaining life of existing asphalt pavement structures. It proposes indicators such as the transverse crack spacing and the length of longitudinal cracks. The transverse crack spacing decreases with an increase in maintenance intervals and with the extended use of semi-rigid base layer structures, although this trend becomes less pronounced after maintenance intervals exceed 4 years. The length of longitudinal cracks increases with longer maintenance intervals, but this trend weakens after five years. This system can support the enhancement of standardization and scientific design in highway maintenance decision-making processes.

Keywords: structural integrity, highways, pavement evaluation, asphalt concrete pavement

Procedia PDF Downloads 31
2093 Component-Based Approach in Assessing Sewer Manholes

Authors: Khalid Kaddoura, Tarek Zayed

Abstract:

Sewer networks are constructed to protect the communities and the environment from any contact with the sewer mediums. Pipelines, being laterals or sewer mains, and manholes form the huge underground infrastructure in every urban city. Due to the sewer networks importance, the infrastructure asset management field has extensive advancement in condition assessment and rehabilitation decision models. However, most of the focus was devoted to pipelines giving little attention toward manholes condition assessment. In fact, recent studies started to emerge in this area to preserve manholes from any malfunction. Therefore, the main objective of this study is to propose a condition assessment model for sewer manholes. The model divides the manhole into several components and determines the relative importance weight of each component using the Analytic Network Process (ANP) decision-making method. Later, the condition of the manhole is computed by aggregating the condition of each component with its corresponding weight. Accordingly, the proposed assessment model will enable decision-makers to have a final index suggesting the overall condition of the manhole and a backward analysis to check the condition of each component. Consequently, better decisions are made pertinent to maintenance, rehabilitation, and replacement actions.

Keywords: Analytic Network Process (ANP), condition assessment, decision-making, manholes

Procedia PDF Downloads 325
2092 A Condition-Based Maintenance Policy for Multi-Unit Systems Subject to Deterioration

Authors: Nooshin Salari, Viliam Makis

Abstract:

In this paper, we propose a condition-based maintenance policy for multi-unit systems considering the existence of economic dependency among units. We consider a system composed of N identical units, where each unit deteriorates independently. Deterioration process of each unit is modeled as a three-state continuous time homogeneous Markov chain with two working states and a failure state. The average production rate of units varies in different working states and demand rate of the system is constant. Units are inspected at equidistant time epochs, and decision regarding performing maintenance is determined by the number of units in the failure state. If the total number of units in the failure state exceeds a critical level, maintenance is initiated, where units in failed state are replaced correctively and deteriorated state units are maintained preventively. Our objective is to determine the optimal number of failed units to initiate maintenance minimizing the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. A numerical example is developed to demonstrate the proposed policy and the comparison with the corrective maintenance policy is presented.

Keywords: reliability, maintenance optimization, semi-Markov decision process, production

Procedia PDF Downloads 117
2091 Intensive Neurophysiological Rehabilitation System: New Approach for Treatment of Children with Autism

Authors: V. I. Kozyavkin, L. F. Shestopalova, T. B. Voloshyn

Abstract:

Introduction: Rehabilitation of children with Autism is the issue of the day in psychiatry and neurology. It is attributed to constantly increasing quantity of autistic children - Autistic Spectrum Disorders (ASD) Existing rehabilitation approaches in treatment of children with Autism improve their medico- social and social- psychological adjustment. Experience of treatment for different kinds of Autistic disorders in International Clinic of Rehabilitation (ICR) reveals the necessity of complex intensive approach for healing this malady and wider implementation of a Kozyavkin method for treatment of children with ASD. Methods: 19 children aged from 3 to 14 years were examined. They were diagnosed ‘Autism’ (F84.0) with comorbid neurological pathology (from pyramidal insufficiency to para- and tetraplegia). All patients underwent rehabilitation in ICR during two weeks, where INRS approach was used. INRS included methods like biomechanical correction of the spine, massage, physical therapy, joint mobilization, wax-paraffin applications. They were supplemented by art- therapy, ergotherapy, rhythmical group exercises, computer game therapy, team Olympic games and other methods for improvement of motivation and social integration of the child. Estimation of efficacy was conducted using parent’s questioning and done twice- on the onset of INRS rehabilitation course and two weeks afterward. For efficacy assessment of rehabilitation of autistic children in ICR standardized tool was used, namely Autism Treatment Evaluation Checklist (ATEC). This scale was selected because any rehabilitation approaches for the child with Autism can be assessed using it. Results: Before the onset of INRS treatment mean score according to ATEC scale was 64,75±9,23, it reveals occurrence in examined children severe communication, speech, socialization and behavioral impairments. After the end of the rehabilitation course, the mean score was 56,5±6,7, what indicates positive dynamics in comparison to the onset of rehabilitation. Generally, improvement of psychoemotional state occurred in 90% of cases. Most significant changes occurred in the scope of speech (16,5 before and 14,5 after the treatment), socialization (15.1 before and 12,5 after) and behavior (20,1 before and 17.4 after). Conclusion: As a result of INRS rehabilitation course reduction of autistic symptoms was noted. Particularly improvements in speech were observed (children began to spell out new syllables, words), there was some decrease in signs of destructiveness, quality of contact with the surrounding people improved, new skills of self-service appeared. The prospect of the study is further, according to evidence- based medicine standards, deeper examination of INRS and assessment of its usefulness in treatment for Autism and ASD.

Keywords: intensive neurophysiological rehabilitation system (INRS), international clinic od rehabilitation, ASD, rehabilitation

Procedia PDF Downloads 141
2090 Increasing the Capacity of Plant Bottlenecks by Using of Improving the Ratio of Mean Time between Failures to Mean Time to Repair

Authors: Jalal Soleimannejad, Mohammad Asadizeidabadi, Mahmoud Koorki, Mojtaba Azarpira

Abstract:

A significant percentage of production costs is the maintenance costs, and analysis of maintenance costs could to achieve greater productivity and competitiveness. With this is mind, the maintenance of machines and installations is considered as an essential part of organizational functions and applying effective strategies causes significant added value in manufacturing activities. Organizations are trying to achieve performance levels on a global scale with emphasis on creating competitive advantage by different methods consist of RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance) etc. In this study, increasing the capacity of Concentration Plant of Golgohar Iron Ore Mining & Industrial Company (GEG) was examined by using of reliability and maintainability analyses. The results of this research showed that instead of increasing the number of machines (in order to solve the bottleneck problems), the improving of reliability and maintainability would solve bottleneck problems in the best way. It should be mention that in the abovementioned study, the data set of Concentration Plant of GEG as a case study, was applied and analyzed.

Keywords: bottleneck, golgohar iron ore mining & industrial company, maintainability, maintenance costs, reliability

Procedia PDF Downloads 322
2089 Critical Investigation on Performance of Polymeric Materials in Rehabilitation of Metallic Components

Authors: Parastou Kharazmi

Abstract:

Failure and leakage of metallic components because of corrosion in infrastructure structures is a considerably problematic and expensive issue and the traditional solution of replacing the component is costly and time-consuming. Rehabilitation techniques by using advanced polymeric materials are an alternative solution towards this problem. This paper provides a summary of analyses on relined rehabilitated metallic samples after exposure in practice and real condition to study the composite material performance when it is exposed to water, heat and chemicals in real condition. The study was carried out by using different test methods such as microscopy, thermal and chemical as well as mechanical analyses.

Keywords: composite, material, rehabilitation, structure

Procedia PDF Downloads 212
2088 Total Productive Maintenance (TPM) as a Strategy for Competitiveness

Authors: Ignatio Madanhire, Charles Mbohwa

Abstract:

This research examines the effect of a human resource strategy and the overall equipment effectiveness as well as assessing how the combination of the two can increase a firm’s productivity. The human resource aspect is looked at in detail to assess motivation of operators through training to reduce wastage on the manufacturing shop floor. The waste was attributed to operators, maintenance personal, idle machines, idle manpower and break downs. This work seeks to investigate the concept of Total Productive Maintenance (TPM) in addressing these short comings in the manufacturing case study. The impact of TPM to increase production while, as well as increasing employee morale and job satisfaction is assessed. This can be resource material for practitioners who seek to improve overall equipment efficiency (OEE) to achieve higher level productivity and competitiveness.

Keywords: maintenance, TPM, efficiency, productivity, strategy

Procedia PDF Downloads 391