10017 Using Building Information Modelling to Mitigate Risks Associated with Health and Safety in the Construction and Maintenance of Infrastructure Assets

Authors: Mohammed Muzafar, Darshan Ruikar

Abstract:

BIM, an acronym for Building Information Modelling relates to the practice of creating a computer generated model which is capable of displaying the planning, design, construction and operation of a structure. The resulting simulation is a data-rich, object-oriented, intelligent and parametric digital representation of the facility, from which views and data, appropriate to various users needs can be extracted and analysed to generate information that can be used to make decisions and to improve the process of delivering the facility. BIM also refers to a shift in culture that will influence the way the built environment and infrastructure operates and how it is delivered. One of the main issues of concern in the construction industry at present in the UK is its record on Health & Safety (H&S). It is, therefore, important that new technologies such as BIM are developed to help improve the quality of health and safety. Historically the H&S record of the construction industry in the UK is relatively poor as compared to the manufacturing industries. BIM and the digital environment it operates within now allow us to use design and construction data in a more intelligent way. It allows data generated by the design process to be re-purposed and contribute to improving efficiencies in other areas of a project. This evolutionary step in design is not only creating exciting opportunities for the designers themselves but it is also creating opportunity for every stakeholder in any given project. From designers, engineers, contractors through to H&S managers, BIM is accelerating a cultural change. The paper introduces the concept behind a research project that mitigates the H&S risks associated with the construction, operation and maintenance of assets through the adoption of BIM.

Keywords: building information modeling, BIM levels, health, safety, integration

Procedia PDF Downloads 221
10016 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 300
10015 Prioritization Ranking for Managing Moisture Problems in a Building

Authors: Sai Amulya Gollapalli, Dilip A. Patel, Parth Patel K., Lukman E. Mansuri

Abstract:

Accumulation of moisture is one of the most worrisome aspects of a building. Architects and engineers tend to ignore its vitality during the designing and construction stage. Major fatalities in buildings can be caused by it. People avoid spending a lot of money on waterproofing. If the same mistake is repeated, no deep thinking is done. The quality of workmanship and construction is depleting due to negligence. It is important to do an analysis of the water maintenance issues happening in the current buildings and give a database for all the factors that are causing the defect. In this research, surveys are done with two waterproofing consultants, two client engineers, and two project managers. The survey was based on a matrix that was based on the causes of water maintenance issues. There were around 100 causes that were identified. The causes were categorized into six, namely, manpower, finance, method, management, environment, and material. In the matrices, the causes on the x-direction matched with the causes on the y-direction. 3 Likert scale was used to make a pairwise comparison between causes on each cell. Matrices were evaluated for the main categories and for each category separately. A final ranking was done by the weights achieved, and ‘cracks arriving from various construction joints’ was the highest with 0.57 relative significance, and ‘usage of the material’ was the lowest with 0.03 relative significance. Twelve defects due to water leakage were identified, and interviewees were asked to make a pairwise comparison of them, too, to understand the priorities. When the list of causes is achieved, the prioritization as per the stratification analysis is done. This will be beneficial to the consultants and contractors as they will get a primary idea of which causes to focus on.

Keywords: water leakage, survey, causes, matrices, prioritization

Procedia PDF Downloads 68
10014 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 373
10013 Realization of a (GIS) for Drilling (DWS) through the Adrar Region

Authors: Djelloul Benatiallah, Ali Benatiallah, Abdelkader Harouz

Abstract:

Geographic Information Systems (GIS) include various methods and computer techniques to model, capture digitally, store, manage, view and analyze. Geographic information systems have the characteristic to appeal to many scientific and technical field, and many methods. In this article we will present a complete and operational geographic information system, following the theoretical principles of data management and adapting to spatial data, especially data concerning the monitoring of drinking water supply wells (DWS) Adrar region. The expected results of this system are firstly an offer consulting standard features, updating and editing beneficiaries and geographical data, on the other hand, provides specific functionality contractors entered data, calculations parameterized and statistics.

Keywords: GIS, DWS, drilling, Adrar

Procedia PDF Downloads 279
10012 An Exploration of Why Insider Fraud Is the Biggest Threat to Your Business

Authors: Claire Norman-Maillet

Abstract:

Insider fraud, otherwise known as occupational, employee, or internal fraud, is a financial crime threat. Perpetrated by defrauding (or attempting to defraud) one’s current, prospective, or past employer, an ‘employee’ covers anyone employed by the company, including board members and contractors. The Coronavirus pandemic has forced insider fraud into the spotlight, and it isn’t dimming. As the focus of most academics and practitioners has historically been on that of ‘external fraud’, insider fraud is often overlooked or not considered to be a real threat. However, since COVID-19 changed the working world, pushing most of us into remote or hybrid working, employers cannot easily keep an eye on what their staff are doing, which has led to reliance on trust and transparency. This, therefore, brings about an increased risk of insider fraud perpetration. The objective of this paper is to explore why insider fraud is, therefore, now the biggest threat to a business. To achieve the research objective, participating individuals within the financial crime sector (either as a practitioner or consultants) attended semi-structured interviews with the researcher. The principal recruitment strategy for these individuals was via the researcher’s LinkedIn network. The main findings in the research suggest that insider fraud has been ignored and rejected as a threat to a business, owing to a reluctance to admit that a colleague may perpetrate. A positive of the Coronavirus pandemic is that it has forced insider fraud into a more prominent position and giving it more importance on a business’ agenda and risk register. Despite insider fraud always having been a possibility (and therefore a risk) within any business, it is very rare that a business has given it the attention it requires until now, if at all. The research concludes that insider fraud needs to prioritised by all businesses, and even ahead of external fraud. The research also provides advice on how a business can add new or enhance existing controls to mitigate the risk.

Keywords: insider fraud, occupational fraud, COVID-19, COVID, coronavirus, pandemic, internal fraud, financial crime, economic crime

Procedia PDF Downloads 36
10011 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 25
10010 Dynamic Modeling of an Unmanned Aerial Vehicle with Petro-Engine

Authors: Khaled A. Alsaif, Mosaad A. Foda

Abstract:

In the following article, we present the dynamic simulation of an unmanned aerial vehicle with main fuel engine in the middle to carry most of the weight. This configuration will increase the flight time of the vehicle for a given payload size as opposed to the traditional quad rotor, where only DC motors are used. A parametric study to investigate the effect of the propellers ratio (main rotor propeller diameter to secondary rotor propeller diameter), the angle of incidence of the main rotor and the twist angle of the main rotor blades on selected performance criteria is presented.

Keywords: unmanned aerial vehicle (UAV), quadrotor, petrol quadcopter, flying robot

Procedia PDF Downloads 425
10009 The Role of Group Size, Public Employees’ Wages and Control Corruption Institutions in a Game-Theoretical Model of Public Corruption

Authors: Pablo J. Valverde, Jaime E. Fernandez

Abstract:

This paper shows under which conditions public corruption can emerge. The theoretical model includes variables such as the public employee wage (w), a control corruption parameter (c), and the group size of interactions (GS) between clusters of public officers and contractors. The system behavior is analyzed using phase diagrams based on combinations of such parameters (c, w, GS). Numerical simulations are implemented in order to contrast analytic results based on Nash equilibria of the theoretical model. Major findings include the functional relationship between wages and network topology, which attempts to reduce the emergence of corrupt behavior.

Keywords: public corruption, game theory, complex systems, Nash equilibrium.

Procedia PDF Downloads 206
10008 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 434
10007 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 316
10006 Comparative Studies on the Concentration of Some Heavy Metal in Urban Particulate Matter, Bangkok, Thailand

Authors: Sivapan Choo-In

Abstract:

The main objective of this study was investigate particulate matter concentration on main and secondary roadside in urban area. And studied on the concentration of some heavy metal including lead (Pb), zinc (Zn), copper (Cu) and cadmium (Cd) in particulate matter in Bangkok area. The averaged particle concentration for main roadside are higher than secondary roadside. The particulate matter less than 10 micron concentration contribute the majority of the Total Suspended Particulate for main road and zinc concentration were higher than copper and lead for both site.

Keywords: air pollution, air quality, polution, monitoring

Procedia PDF Downloads 295
10005 Design and Analysis of Universal Multifunctional Leaf Spring Main Landing Gear for Light Aircraft

Authors: Meiyuan Zheng, Jingwu He, Yuexi Xiong

Abstract:

A universal multi-function leaf spring main landing gear was designed for light aircraft. The main landing gear combined with the leaf spring, skidding, and wheels enables it to have a good takeoff and landing performance on various grounds such as the hard, snow, grass and sand grounds. Firstly, the characteristics of different landing sites were studied in this paper in order to analyze the load of the main landing gear on different types of grounds. Based on this analysis, the structural design optimization along with the strength and stiffness characteristics of the main landing gear has been done, which enables it to have good takeoff and landing performance on different types of grounds given the relevant regulations and standards. Additionally, the impact of the skidding on the aircraft during the flight was also taken into consideration. Finally, a universal multi-function leaf spring type of the main landing gear suitable for light aircraft has been developed.

Keywords: landing gear, multi-function, leaf spring, skidding

Procedia PDF Downloads 239
10004 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China

Authors: Junqi Zhao, Yongqiang Chen

Abstract:

The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.

Keywords: Chinese owner and contractor, conflict, construction project, conflict resolution styles

Procedia PDF Downloads 489
10003 Rapides-Des-Îles Main Spillway - Rehabilitation

Authors: Maryam Kamali Nezhad

Abstract:

As part of the project to rehabilitate the main spillway ("main") of the Rapides-des-Îles development in 2019, it was noted that there is a difference between the water level of the intake gauge and the level measured at the main spillway. The Rapides-des-Îles Generating Station is a Hydro-Québec hydroelectric generating station and dam located on the Ottawa River in the Abitibi-Témiscamingue administrative region of Québec. This plant, with an installed capacity of 176 MW, was commissioned in 1966. During the start-up meeting held at the site in May 2019, it was noticed that the water level upstream of the main spillway was considerably higher than the water level at the powerhouse intake. Measurements showed that the level was 229.46 m, whereas the normal operating level (NOL) and the critical maximum level (CML) used in the design were 228.60 m and 229.51 m, respectively. Considering that the water level had almost reached the maximum critical level of the structure despite a flood with a recurrence period of about 100 years, the work was suspended while the project was being decided. This is the first time since the Rapides des îles project was commissioned that a significant difference in elevation between the water level at the powerhouse (intake) and the main spillway has been observed. Following this observation, the contractor's work was suspended. The objective of this study is to identify the reason(s) for this problem and find solutions. Then determine the new upstream levels at the main spillway at which the safety of the structure is ensured and then adjust the engineering of the main spillway in the rehabilitation project accordingly.

Keywords: spillway, rehabilitation, water level, powerhouse, normal operating level, critical maximum level, safety of the structure

Procedia PDF Downloads 43
10002 On the Optimality of Blocked Main Effects Plans

Authors: Rita SahaRay, Ganesh Dutta

Abstract:

In this article, experimental situations are considered where a main effects plan is to be used to study m two-level factors using n runs which are partitioned into b blocks, not necessarily of same size. Assuming the block sizes to be even for all blocks, for the case n ≡ 2 (mod 4), optimal designs are obtained with respect to type 1 and type 2 optimality criteria in the class of designs providing estimation of all main effects orthogonal to the block effects. In practice, such orthogonal estimation of main effects is often a desirable condition. In the wider class of all available m two level even sized blocked main effects plans, where the factors do not occur at high and low levels equally often in each block, E-optimal designs are also characterized. Simple construction methods based on Hadamard matrices and Kronecker product for these optimal designs are presented.

Keywords: design matrix, Hadamard matrix, Kronecker product, type 1 criteria, type 2 criteria

Procedia PDF Downloads 341
10001 Mobile Application Tool for Individual Maintenance Users on High-Rise Residential Buildings in South Korea

Authors: H. Cha, J. Kim, D. Kim, J. Shin, K. Lee

Abstract:

Since 1980's, the rapid economic growth resulted in so many aged apartment buildings in South Korea. Nevertheless, there is insufficient maintenance practice of buildings. In this study, to facilitate the building maintenance the authors classified the building defects into three levels according to their level of performance and developed a mobile application tool based on each level's appropriate feedback. The feedback structure consisted of 'Maintenance manual phase', 'Online feedback phase', 'Repair work phase of the specialty contractors'. In order to implement each phase the authors devised the necessary database for each phase and created a prototype system that can develop on its own. The authors expect that the building users can easily maintain their buildings by using this application.

Keywords: building defect, maintenance practice, mobile application, system algorithm

Procedia PDF Downloads 170
10000 Tracing a Timber Breakthrough: A Qualitative Study of the Introduction of Cross-Laminated-Timber to the Student Housing Market in Norway

Authors: Marius Nygaard, Ona Flindall

Abstract:

The Palisaden student housing project was completed in August 2013 and was, with its eight floors, Norway’s tallest timber building at the time of completion. It was the first time cross-laminated-timber (CLT) was utilized at this scale in Norway. The project was the result of a concerted effort by a newly formed management company to establish CLT as a sustainable and financially competitive alternative to conventional steel and concrete systems. The introduction of CLT onto the student housing market proved so successful that by 2017 more than 4000 individual student residences will have been built using the same model of development and construction. The aim of this paper is to identify the key factors that enabled this breakthrough for CLT. It is based on an in-depth study of a series of housing projects and the role of the management company who both instigated and enabled this shift of CLT from the margin to the mainstream. Specifically, it will look at how a new building system was integrated into a marketing strategy that identified a market potential within the existing structure of the construction industry and within the economic restrictions inherent to student housing in Norway. It will show how a key player established a project model that changed both the patterns of cooperation and the information basis for decisions. Based on qualitative semi-structured interviews with managers, contractors and the interdisciplinary teams of consultants (architects, structural engineers, acoustical experts etc.) this paper will trace the introduction, expansion and evolution of CLT-based building systems in the student housing market. It will show how the project management firm’s position in the value chain enabled them to function both as a liaison between contractor and client, and between contractor and producer. A position that allowed them to improve the flow of information. This ensured that CLT was handled on equal terms to other structural solutions in the project specifications, enabling realistic pricing and risk evaluation. Secondly, this paper will describe and discuss how the project management firm established and interacted with a growing network of contractors, architects and engineers to pool expertise and broaden the knowledge base across Norway’s regional markets. Finally, it will examine the role of the client, the building typology, and the industrial and technological factors in achieving this breakthrough for CLT in the construction industry. This paper gives an in-depth view of the progression of a single case rather than a broad description of the state of the art of large-scale timber building in Norway. However, this type of study may offer insights that are important to the understanding not only of specific markets but also of how new technologies should be introduced in big and well-established industries.

Keywords: cross-laminated-timber (CLT), industry breakthrough, student housing, timber market

Procedia PDF Downloads 198
9999 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 40
9998 Main Puteri Traditional Malay Healing Ceremony

Authors: M. G. Nasuruddin, S. Ishak

Abstract:

This paper deals with the traditional Malay healing ritualistic ceremony known as Main Puteri. This non-invasive intervention uses the vehicle of performance to administer the healing process. It employs the performance elements of Makyung, that is, music, movements/dance, and dramatic dialogue to heal psychosomatic maladies. There are two perspectives to this therapeutic healing process, one traditional and the other scientific. From the traditional perspective, the psychosomatic illness is attributed to the infestations/possessions by malevolent spirits. To heal such patients, these spirits must be exorcised through placating them by making offerings. From the scientific perspective, the music (sonic orders), movements (kinetic energy), and smell (olfactory) connect with the brain waves to release the chemicals that would activate the internal healing energy. Currently, in Main Puteri, the therapeutic healing ritual is no longer relevant as modern clinical medicine has proven to be more effective. Thus, Main Puteri is an anachronism in today’s technologically advanced Malaysia.

Keywords: exorcism, main puteri, shamans, therapeutic healing

Procedia PDF Downloads 330
9997 ZVZCT PWM Boost DC-DC Converter

Authors: Ismail Aksoy, Haci Bodur, Nihan Altintaş

Abstract:

This paper introduces a boost converter with a new active snubber cell. In this circuit, all of the semiconductor components in the converter softly turns on and turns off with the help of the active snubber cell. Compared to the other converters, the proposed converter has advantages of size, number of components and cost. The main feature of proposed converter is that the extra voltage stresses do not occur on the main switches and main diodes. Also, the current stress on the main switch is acceptable level. Moreover, the proposed converter can operates under light load conditions and wide input line voltage. In this study, the operating principle of the proposed converter is presented and its operation is verified with the Proteus simulation software for a 1 kW and 100 kHz model.

Keywords: active snubber cell, boost converter, zero current switching, zero voltage switching

Procedia PDF Downloads 997
9996 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 68
9995 Ballistics of Main Seat Ejection Cartridges for Aircraft Application

Authors: B. A. Parate, K. D. Deodhar, V. K. Dixit, V. V. Rao

Abstract:

This article outlines the ballistics of main seat ejection cartridges for aircraft application. The ballistics of main seat ejection cartridges plays a vital role during the ejection of the pilot in an emergency. The ballistic parameters such as maximum pressure, time is taken to reach the maximum pressure, and time required to reach half the maximum pressure contributes to the spinal injury of the pilot. Therefore, the evaluations of these parameters are very critical during various stages of development. Elaborate testing was carried out for main seat ejection cartridges on seat ejection tower (SET) at different operating temperatures considering physiological limits. As these trials are cumbersome in nature, a vented vessel (VV) testing facility was devised to lay down the performance parameters at hot and cold temperature conditions. Single base (SB) propellant having hepta-tubular configuration is selected as the main filling. Gun powder plays the role of a booster based on ballistic requirements. The evaluation methodology of various performance parameters of main seat ejection cartridges is explained in this paper. Physiological parameters such as maximum seat ejection velocity, acceleration, and rate of rising of acceleration are also experimentally determined on seat ejection tower. All the parameters are observed well within physiological limits. This paper addresses the internal ballistic of main seat ejection cartridges, propellant selection, its calculation, and evaluation of various performance parameters for an aircraft application.

Keywords: ballistics of seat ejection, ejection seat, gas generator, gun propulsion, main seat ejection cartridges, maximum pressure, performance parameters, propellant, progressive burning and vented vessel

Procedia PDF Downloads 126
9994 Digitization of European SMEs in Tourism and Hospitality: The Case of Greek Hoteliers

Authors: Joanna K. Konstantinou

Abstract:

The aim of this study is to explore the need of small and medium-sized businesses in tourism and hospitality industry to adopt technology and enhance their degree of digitalization, along with the main benefits enjoyed by technology and the main challenges that hinder its adoption. Within a hermeneutic phenomenological perspective, semi-structured interviews were conducted with three hotel owners and the focus was to identify the main reasons of adoption of technology, enablers and barriers. The findings were grouped with the goal of identifying typology of business practices in using and adopting technology.

Keywords: digitization, SMEs, tourism and hospitality, challenges, benefits

Procedia PDF Downloads 226
9993 A Study on Coronary Artery Dominance and Divisions of Main Trunk of Left Coronary Artery in Adult Human Cadaveric Hearts of South Indian Population

Authors: Chethan Purushothama

Abstract:

Coronary artery disease is one of the major causes of death in developing countries. The coronary arteries show wide range of variations and these variations have not been dealt with different population groups. The present study aims to focus on the pattern and variations of coronary artery in south Indian population. The study was performed to analyze the coronary artery dominance and divisions of main trunk of left coronary artery in 81 isolated adult human cadaveric hearts of South Indian population. The specimens were fixed in 10% formalin and were dissected manually. In our specimens, 74.1% of the hearts were right dominant, 11.1% were left dominant, and 14.8% were co-dominant. Bifurcation, trifurcation, and quadrifurcation of main trunk of left coronary artery were seen in 49.4%, 48.1%, and 2.5% cases respectively. The right dominant hearts had bifurcation, trifurcation and quadrifurcation of main trunk of left coronary artery in 46.7%, 50% and 3.3% hearts respectively. The left dominant hearts had bifurcation and trifurcation of main trunk of left coronary artery in 55.6% and 44.4% cases respectively. The co-dominant hearts had bifurcation and trifurcation of main trunk of left coronary artery in 58.3% and 41.7% respectively. Quadrifurcation of main trunk of left coronary artery were seen only in right dominant hearts. We believe that the data obtained from the present study are important to the interventional cardiologists and radiologists. The details obtained will also be helpful for the clinical anatomists.

Keywords: bifurcation, coronary artery, trifurcation, quadrifurcation

Procedia PDF Downloads 363
9992 Application of Acid Base Accounting to Predict Post-Mining Drainage Quality in Coalfields of the Main Karoo Basin and Selected Sub-Basins, South Africa

Authors: Lindani Ncube, Baojin Zhao, Ken Liu, Helen Johanna Van Niekerk

Abstract:

Acid Base Accounting (ABA) is a tool used to assess the total amount of acidity or alkalinity contained in a specific rock sample, and is based on the total S concentration and the carbonate content of a sample. A preliminary ABA test was conducted on 14 sandstone and 5 coal samples taken from coalfields representing the Main Karoo Basin (Highveld, Vryheid and Molteno/Indwe Coalfields) and the Sub-basins (Witbank and Waterberg Coalfields). The results indicate that sandstone and coal from the Main Karoo Basin have the potential of generating Acid Mine Drainage (AMD) as they contain sufficient pyrite to generate acid, with the final pH of samples relatively low upon complete oxidation of pyrite. Sandstone from collieries representing the Main Karoo Basin are characterised by elevated contents of reactive S%. All the studied samples were characterised by an Acid Potential (AP) that is less than the Neutralizing Potential (NP) except for two samples. The results further indicate that the sandstone from the Main Karoo Basin is prone to acid generation as compared to the sandstone from the Sub-basins. However, the coal has a relatively low potential of generating any acid. The application of ABA in this study contributes to an understanding of the complexities governing water-rock interactions. In general, the coalfields from the Main Karoo Basin have much higher potential to produce AMD during mining processes than the coalfields in the Sub-basins.

Keywords: Main Karoo Basin, sub-basin, coal, sandstone, acid base accounting (ABA)

Procedia PDF Downloads 403
9991 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 620
9990 Impact of Transportation on the Economic Growth of Nigeria

Authors: E. O. E. Nnadi

Abstract:

Transportation is a critical factor in the economic growth and development of any nation, region or state. Good transportation network supports every sector of the economy like the manufacturing, transportation and encourages investors thereby affect the overall economic prosperity. The paper evaluates the impact of transportation on the economic growth of Nigeria using south eastern states as a case study. The choice of the case study is its importance as the commercial and industrial nerve of the country. About 200 respondents who are of different professions such as dealers in goods, transporters, contractors, consultants, bankers were selected and a set of questionnaire were administered to using the systematic sampling technique in the five states of the region. Descriptive statistics and relative importance index (RII) technique was employed for the analysis of the data gathered. The findings of the analysis reveal that Nigeria has the least effective ratio per population in Africa of 949.91 km/Person. Conclusion was drawn to improve road network in the area and the country as a whole to enhance the economic activities of the people.

Keywords: economic growth, south-east, transportation, transportation cost, Nigeria

Procedia PDF Downloads 250
9989 An Approach to Manage and Evaluate Asset Performance

Authors: Mohammed Saif Al-Saidi, John P. T. Mo

Abstract:

Modern engineering assets are complex and very high in value. They are expected to function for years to come, with ability to handle the change in technology and ageing modification. The aging of an engineering asset and continues increase of vendors and contractors numbers forces the asset operation management (or Owner) to design an asset system which can capture these changes. Furthermore, an accurate performance measurement and risk evaluation processes are highly needed. Therefore, this paper explores the nature of the asset management system performance evaluation for an engineering asset based on the System Support Engineering (SSE) principles. The research work explores the asset support system from a range of perspectives, interviewing managers from across a refinery organisation. The factors contributing to complexity of an asset management system are described in context which clusters them into several key areas. It is proposed that SSE framework may then be used as a tool for analysis and management of asset. The paper will conclude with discussion of potential application of the framework and opportunities for future research.

Keywords: asset management, performance, evaluation, modern engineering, System Support Engineering (SSE)

Procedia PDF Downloads 654
9988 Comparing Productivity of the Foreign versus Local Construction Workers Based on Their Level of Technical Training and Cultural Characteristics: Case Study of Kish Island, Iran

Authors: Mansour Rezvani, Mohammad Mahdi Mortaheb

Abstract:

This study considers the employment of foreign workforce in Kish Free Trade and Industrial Zone and aims to investigate the productivity of foreign construction labours as compared to their local counterpart. Moreover, this study compares work skills and experience of foreign and local Iranian construction workers to optimize construction working conditions. The results and findings have been effectively applied to develop a training program to optimize and promote Iranian workforce productivity and effectiveness in construction industry in comparison with foreign workforce. It is hoped that the accumulated findings contribute to decrease demand for foreign workers and skills shortages in construction sectors. Therefore, job vacancies for local residents in Kish and other looking for job people in main lands will be increased. The method of collecting data has been conducted by distributing a questionnaire and interviewing most foreign construction workers, local Iranian construction works and the project managers of five mega projects in Kish Island including Mica mall, Basak, Persian, Damoon and Sarina mall. All data have been analyzed by SPSS and Excel software. A topic-related survey was conducted through a structured questionnaire including 54 employers, 20 contractors and 13 consultants. About 56 factors were identified. After implementing the context validity test, 52 factors were stated in 52 questions based on five major groups consist of: (1) economical, (2) social and cultural, (3) individual, (4) technical, (5) organizational, environmental and legal. Based on the quantified Relative Importance Index, the ten most important factors, ten less important factors, and three most important categories were identified. To date, there is not any comprehensive study that explores the important critical factors in mega construction projects on Kish Island to identify the major problems to decrease demand for foreign workers.

Keywords: cultural characteristics, foreign worker, local construction workers, productivity, technical training

Procedia PDF Downloads 120