16581 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 240
16580 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 130
16579 Study of Causes and Effects of Road Projects Abandonment in Nigeria

Authors: Monsuru Oyenola Popoola, Oladapo Samson Abiola, Wusamotu Alao Adeniji

Abstract:

The prevalent and incessant abandonment of road construction projects are alarming that it creates several negative effects to social, economic and environmental values of the project. The purpose of this paper is to investigate and determined the various causes and effects of abandoning road construction projects in Nigeria. Likert Scale questionnaire design was used to administered and analysed the data obtained for the stydy. 135 (Nr) questionnaires were completed and retrieved from the respondents, out of 200 (Nr) questionnaires sent out, representing a response rate of 67.5%. The analysis utilized the Relative Importance Index (R.I.I.) method and the results are presented in tabular form. The findings confirms that at least 20 factors were the causes of road projects abandonment in Nigeria with most including Leadership Instability, Improper Project Planning, Inconsistence in government policies and Design, Contractor Incompetence, Economy Instability and Inflation, Delay in remittance of money, Improper financial analysis, Poor risk management, Climatic Conditions, Improper Project Estimates etc. The findings also show that at least eight (8) effect were identified on the system, and these include; Waste of Financial Resources, Loss of economic value, Environmental degradation, Loss of economic value, Reduction in standard of living, Litigation and Arbitration, etc. The reflection is that allocating reasonable finance, developing appropriate and effective implementation plans and monitoring, evaluation and reporting on development project activities by key actors should enhance in resolving the problem of road projects abandonment.

Keywords: road construction, abandonment of road projects, climatic condition, project planning, contractor

Procedia PDF Downloads 269
16578 Development of Value Based Planning Methodology Incorporating Risk Assessment for Power Distribution Network

Authors: Asnawi Mohd Busrah, Au Mau Teng, Tan Chin Hooi, Lau Chee Chong

Abstract:

This paper describes value based planning (VBP) methodology incorporating risk assessment as an enhanced and more practical approach to evaluate distribution network projects in Peninsular Malaysia. Assessment indicators associated with economics, performance and risks are formulated to evaluate distribution projects to quantify their benefits against investment. The developed methodology is implemented in a web-based software customized to capture investment and network data, compute assessment indicators and rank the proposed projects according to their benefits. Value based planning approach addresses economic factors in the power distribution planning assessment, so as to minimize cost solution to the power utility while at the same time provide maximum benefits to customers.

Keywords: value based planning, distribution network, value of loss load (VoLL), energy not served (ENS)

Procedia PDF Downloads 453
16577 Application of Value Engineering Approach for Improving the Quality and Productivity of Ready-Mixed Concrete Used in Construction and Hydraulic Projects

Authors: Adel Mohamed El-Baghdady, Walid Sayed Abdulgalil, Ahmad Asran, Ibrahim Nosier

Abstract:

This paper studies the effectiveness of applying value engineering to actual concrete mixtures. The study was conducted in the State of Qatar on a number of strategic construction projects with international engineering specifications for the 2022 World Cup projects. The study examined the concrete mixtures of Doha Metro project and the development of KAHRAMAA’s (Qatar Electricity and Water Company) Abu Funtas Strategic Desalination Plant, in order to generally improve the quality and productivity of ready-mixed concrete used in construction and hydraulic projects. The application of value engineering to such concrete mixtures resulted in the following: i) improving the quality of concrete mixtures and increasing the durability of buildings in which they are used; ii) reducing the waste of excess materials of concrete mixture, optimizing the use of resources, and enhancing sustainability; iii) reducing the use of cement, thus reducing CO₂ emissions which ensures the protection of environment and public health; iv) reducing actual costs of concrete mixtures and, in turn, reducing the costs of construction projects; and v) increasing the market share and competitiveness of concrete producers. This research shows that applying the methodology of value engineering to ready-mixed concrete is an effective way to save around 5% of the total cost of concrete mixtures supplied to construction and hydraulic projects, improve the quality according to the technical requirements and as per the standards and specifications for ready-mixed concrete, improve the environmental impact, and promote sustainability.

Keywords: value management, cost of concrete, performance, optimization, sustainability, environmental impact

Procedia PDF Downloads 323
16576 Analyzing Competition in Public Construction Projects

Authors: Khaled Hesham Hyari, Amjad Almani

Abstract:

Construction projects in the public sector are commonly awarded through competitive bidding. In the last decade, the Construction projects environment in the Middle East went through many changes. These changes have been caused by different factors including the economic crisis, delays in monthly payments, international competition and reduced number of projects. These factors had a great impact on the bidding behaviors of contractors and their pricing strategies. This paper examines the competition characteristics in public construction projects through an analysis of bidding results of contractors in public construction projects over a period of 6 years (2006-2011) in Jordan. The analyzed projects include all categories of projects such as infrastructure, buildings, transportation and engineering services (design and supervision contracts). Data for the projects were obtained from the General Tender’s Directorate in Jordan and includes 462 projects. The analysis performed in this projects includes, studying the bid spread in all projects as it is an indication of the level of competition in the analyzed bids. The analysis studied the factors that affect bid spread such as number of bidders, Value of the project, Project category and years. It also studying the “Signal to Noise Ratio” in all projects as it is an indication of the accuracy of cost estimating performed by competing bidders and bidder´s evaluation of project risks. The analysis performed includes the relationship between signal to noise ratio and different parameters such as project category, number of bidders and changes over years. Moreover, the analysis includes determining the bidder´s aggressiveness in bidding as it is an indication of competition level in such projects. This was performed by determining the pack price which can be considered as the true value of the project and comparing it with the lowest bid submitted for each project to determine the level of aggressiveness in submitted bids. The analysis performed in this project should prove to be useful to owners in understanding bidding behaviors of contractors and pointing out areas that needs improvement in preparing bidding documents. Also the project should be useful to contractors in understanding the competitive bidding environment and should help them to improve their bidding strategies to maximize the success rate in obtaining contracts.

Keywords: construction projects, competitive bidding, public construction, competition

Procedia PDF Downloads 304
16575 Surveying Apps in Dam Excavation

Authors: Ali Mohammadi

Abstract:

Whenever there is a need to dig the ground, the presence of a surveyor is required to control the map. In projects such as dams and tunnels, these controls are more important because any mistakes can increase the cost. Also, time is great importance in These projects have and one of the ways to reduce the drilling time is to use techniques that can reduce the mapping time in these projects. Nowadays, with the existence of mobile phones, we can design apps that perform calculations and drawing for us on the mobile phone. Also, if we have a device that requires a computer to access its information, by designing an app, we can transfer its information to the mobile phone and use it, so we will not need to go to the office.

Keywords: app, tunnel, excavation, dam

Procedia PDF Downloads 21
16574 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
16573 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 355
16572 Elderly Health Care Process by Community Participation: A Sub-District in the Lower Northern Region of Thailand

Authors: Amaraporn Puraya, Roongtiva Boonpracom, Somsak Thojampa, Sirikanok Klankhajhon, Kittisak Kumpeera

Abstract:

The objective of this qualitative research was to study the elderly health care process by community participation. Data were collected by quality research methods, including secondary data study, observation, in-depth interviews, and focus group discussions and analyzed by content analysis, reflection and review of information. The research results pointed out that the important elderly health care process by community participation consisted of 2 parts, namely the community participation development process in elderly health care and the outcomes from the participation development process. The community participation development process consisted of 4 steps as follows: 1) Building the leadership team, an important social capital of the community, which started from searching for both formal and informal leaders by giving the opportunity for public participation and creating clear agreements defining roles, duties and responsibilities; 2) investigating the problems and the needs of the community, 3) designing the elderly health care activities under the concept of self-care potential development of the elderly through participation in community forums and meetings to exchange knowledge with common goals, plans and operation and 4) the development process of sustainable health care agreement at the local level, starting from opening communication channels to create awareness and participation in various activities at both individual and group levels as well as pushing activities/projects into the community development plan consistent with the local administration policy. The outcomes from the participation development process were as follows. 1) There was the integration of the elderly for doing the elderly health care activities/projects in the community managed by the elderly themselves. 2) The service system was changed from the passive to the proactive one, focusing on health promotion rather than treating diseases or illnesses. 3) The registered nurses / the public health officers can provide care for the elderly with chronic illnesses through the implementation of activities/projects of elderly health care so that the elderly can access the services more. 4) The local government organization became the main mechanism in driving the elderly health care process by community participation.

Keywords: elderly health care process, community participation, elderly, Thailand

Procedia PDF Downloads 170
16571 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 481
16570 Experimental Study on Stabilisation of a Soft Soil by Alkaline Activation of Industrial By-Products

Authors: Mohammadjavad Yaghoubi, Arul Arulrajah, Mahdi M. Disfani, Suksun Horpibulsuk, Myint W. Bo, Stephen P. Darmawan

Abstract:

Utilising waste materials, such as fly ash (FA) and slag (S) stockpiled in landfills, has drawn the attention of researchers and engineers in the recent years. There is a great potential for usage of these wastes in ground improvement projects, especially where deep deposits of soft compressible soils exist. This paper investigates the changes in the strength development of a high water content soft soil stabilised with alkaline activated FA and S, termed as geopolymer binder, to use in deep soil mixing technology. The strength improvement and the changes in the microstructure of the mixtures have been studied. The results show that using FA and S-based geopolymers can increases the strength significantly. Furthermore, utilising FA and S in ground improvement projects, where large amounts of binders are required, can be a solution to the disposal of these wastes.

Keywords: alkaline activation, fly ash, geopolymer, slag, strength development

Procedia PDF Downloads 233
16569 Raising Awareness of Education for Sustainable Development Oriented School Programs and Curriculum

Authors: Dina L. DiSantis

Abstract:

The Japan-U.S. Teacher Exchange Program for Education for Sustainable Development (ESD) provides an opportunity for teachers from the United States and Japan to travel to each other’s countries in order to experience and learn how each country is implementing efforts to educate for sustainability. By offering programs such as the Japan-U.S. Teacher Exchange Program for Education for Sustainable Development (ESD); teachers from both countries become more aware of what ESD school programs and curricula are being implemented in both countries. Teachers gain a greater sense of global interconnectedness when they are given the opportunity to share in each other’s culture and life. The primary objectives of the program are to foster a mutual exchange between the teachers in the United States and Japan, to increase an understanding of culture and educational systems, to give teachers opportunities to collaborate on lessons and projects in areas of sustainability and to enhance professional development opportunities for both U.S and Japanese teachers. The two areas of focus for teachers, are food education and environmental education. Teachers from both countries collaborate and design curriculum and projects for their students in order to help them become more aware of the importance of global sustainability. An overview of the program and the results of an international collaborative project, encouraging local eating and forging a cultural connection to food will be presented.

Keywords: education for sustainable development, environmental education, food education, international collaboration

Procedia PDF Downloads 134
16568 Green Building Delivery: Exploring Lessons and the State of Practice in Nigeria

Authors: Ayodele E. Ikudayisi, Yomi M. D. Adedeji, Olumuyiwa B. Adegun

Abstract:

The level of adoption of green building (GB) schemes in Nigeria is low. The prevailing focus on economic development has overshadowed sustainability concerns. Despite these, few project cases exist in Nigeria in which sustainability goals have been achieved. This study aims to draw lessons from these in order to understand the project attributes, certification status, and the delivery process. Through an exploratory case study approach, fifteen project cases across five cities in Nigeria were examined. These represent the first-generation of green buildings in Nigeria, a verifiable reference for future initiatives in Sub-Saharan Africa. From the result, three categories of green buildings were identified, namely certified projects, demonstration projects, and potential projects with varying delivery attributes. Then, it is concluded by setting research and practice agenda towards aligning Nigeria’s building industry with the global trends in sustainable building delivery.

Keywords: LEED, green building, Nigeria, project attributes

Procedia PDF Downloads 130
16567 Regulatory Guidelines to Support the Design of Nanosatellite Projects in Mexican Academic Contexts

Authors: Alvaro Armenta-Ramade, Arturo Serrano-Santoyo, Veronica Rojas-Mendizabal, Roberto Conte-Galvan

Abstract:

The availability and affordability of commercial off-the-shell products have brought a major impetus in the development of university projects related to the design, construction and launching of small satellites on a global scale. Universities in emerging economies as well as in least developed countries have been able to develop prototypes of small satellites (cubesats and cansats) with limited budgets. The experience gained in the development of small satellites gives rise to capacity building for designing more complex aerospace systems. This trend has significantly increased the pace and number of aerospace university projects around the world. In the case of Mexico, projects funded by different agencies have been very effective in accelerating the capacity building and technology transfer initiatives in the aerospace ecosystem. However, many of this initiatives have centered their efforts in technology development matters with minimum or no considerations of key regulatory issues related to frequency assignment, management and licensing, as well as launching requirements and measures of mitigation of space debris. These regulatory concerns are fundamental to accomplish successful missions that take into account the complete value chain of an aerospace project. The purpose of this paper is to develop a regulatory framework to support the efforts of educational institutions working on the development of small satellites in Mexico. We base our framework on recommendations from the International Telecommunications Union (ITU), the United Nations Office for Outer Space Affairs (UNOOSA) and other major actors of the Mexican regulatory ecosystem. In order to develop an integrated and cohesive framework, we draw on complexity science to identify the agents, their role and interactions. Our goal is to create a guiding instrument available both in print and online that can also be used in other regions of the world

Keywords: capacity building, complexity science, cubesats, space regulations, small satellites

Procedia PDF Downloads 223
16566 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 225
16565 A Framework Based Blockchain for the Development of a Social Economy Platform

Authors: Hasna Elalaoui Elabdallaoui, Abdelaziz Elfazziki, Mohamed Sadgal

Abstract:

Outlines: The social economy is a moral approach to solidarity applied to the projects’ development. To reconcile economic activity and social equity, crowdfunding is as an alternative means of financing social projects. Several collaborative blockchain platforms exist. It eliminates the need for a central authority or an inconsiderate middleman. Also, the costs for a successful crowdfunding campaign are reduced, since there is no commission to be paid to the intermediary. It improves the transparency of record keeping and delegates authority to authorities who may be prone to corruption. Objectives: The objectives are: to define a software infrastructure for projects’ participatory financing within a social and solidarity economy, allowing transparent, secure, and fair management and to have a financial mechanism that improves financial inclusion. Methodology: The proposed methodology is: crowdfunding platforms literature review, financing mechanisms literature review, requirements analysis and project definition, a business plan, Platform development process and implementation technology, and testing an MVP. Contributions: The solution consists of proposing a new approach to crowdfunding based on Islamic financing, which is the principle of Mousharaka inspired by Islamic financing, which presents a financial innovation that integrates ethics and the social dimension into contemporary banking practices. Conclusion: Crowdfunding platforms need to secure projects and allow only quality projects but also offer a wide range of options to funders. Thus, a framework based on blockchain technology and Islamic financing is proposed to manage this arbitration between quality and quantity of options. The proposed financing system, "Musharaka", is a mode of financing that prohibits interests and uncertainties. The implementation is offered on the secure Ethereum platform as investors sign and initiate transactions for contributions using their digital signature wallet managed by a cryptography algorithm and smart contracts. Our proposal is illustrated by a crop irrigation project in the Marrakech region.

Keywords: social economy, Musharaka, blockchain, smart contract, crowdfunding

Procedia PDF Downloads 51
16564 Farmers Perception on the Level of Participation in Agricultural Project: The Case of a Community Garden Project in Imphendhle Municipality of Kwazulu-Natal Province, South Africa

Authors: Jorine T. Ndoro, Marietjie Van Der Merwe

Abstract:

Rural poverty remains a critical challenge in most developing countries and the participation of farmers in agricultural projects has taken a key role in development initiatives. Farmers’ participation in agricultural initiatives is crucial towards poverty alleviation and food security. Farmers’ involvement directly contributes towards sustainable agricultural development and livelihoods. This study focuses on investigating the perceptions of farmers’ participation in a community garden project. The study involved farmers belonging to community garden project in Imphendhle municipality in Mgungundlvu district of KwaZulu-Natal in South Africa. The study followed a qualitative research design using an interpretive research paradigm. The data was collected through conducting in-depth semi-structured interviews and a focus group was conducted with the eight farmers belonging to the community garden project. The findings show that the farmers are not involved in decision makings in the project. The farmers are passive participants. Participation of the farmers was mainly to carry out the activities from the extension officers. The study recommends that farmers be actively involved in projects and programmes introduced in their communities. Farmers’ active participation contributes to the sustainability of the projects through a sense of ownership.

Keywords: farmers, participation, agricultural extension, community garden

Procedia PDF Downloads 219
16563 Trends of Conservation and Development in Mexican Biosphere Reserves: Spatial Analysis and Linear Mixed Model

Authors: Cecilia Sosa, Fernanda Figueroa, Leonardo Calzada

Abstract:

Biosphere reserves (BR) are considered as the main strategy for biodiversity and ecosystems conservation. Mexican BR are mainly inhabited by rural communities who strongly depend on forests and their resources. Even though the dual objective of conservation and development has been sought in BR, land cover change is a common process in these areas, while most rural communities are highly marginalized, partly as a result of restrictions imposed by conservation to the access and use of resources. Achieving ecosystems conservation and social development face serious challenges. Factors such as financial support for development projects (public/private), environmental conditions, infrastructure and regional economic conditions might influence both land use change and wellbeing. Examining the temporal trends of conservation and development in BR is central for the evaluation of outcomes for these conservation strategies. In this study, we analyzed changes in primary vegetation cover (as a proxy for conservation) and the index of marginalization (as a proxy for development) in Mexican BR (2000-2015); we also explore the influence of various factors affecting these trends, such as conservation-development projects financial support (public or private), geographical distribution in ecoregions (as a proxy for shared environmental conditions) and in economic zones (as a proxy for regional economic conditions). We developed a spatial analysis at the municipal scale (2,458 municipalities nationwide) in ArcGIS, to obtain road densities, geographical distribution in ecoregions and economic zones, the financial support received, and the percent of municipality area under protection by protected areas and, particularly, by BR. Those municipalities with less than 25% of area under protection were regarded as part of the protected area. We obtained marginalization indexes for all municipalities and, using MODIS in Google Earth Engine, the number of pixels covered by primary vegetation. We used a linear mixed model in RStudio for the analysis. We found a positive correlation between the marginalization index and the percent of primary vegetation cover per year (r=0.49-0.5); i.e., municipalities with higher marginalization also show higher percent of primary vegetation cover. Also, those municipalities with higher area under protection have more development projects (r=0.46) and some environmental conditions were relevant for percent of vegetation cover. Time, economic zones and marginalization index were all important. Time was particularly, in 2005, when both marginalization and deforestation decreased. Road densities and financial support for conservation-development projects were irrelevant as factors in the general correlation. Marginalization is still being affected by the conservation strategies applied in BR, even though that this management category considers both conservation and development of local communities as its objectives. Our results suggest that roads densities and support for conservation-development projects have not been a factor of poverty alleviation. As better conservation is being attained in the most impoverished areas, we face the dilemma of how to improve wellbeing in rural communities under conservation, since current strategies have not been able to leave behind the conservation-development contraposition.

Keywords: deforestation, local development, marginalization, protected areas

Procedia PDF Downloads 103
16562 Sustainable Development in India: Towards a New Paradigm

Authors: Raghav Srivastava, Namrata Ramachandran

Abstract:

Strong sustainability has been, by consensus, imagined as comprising economic and extra-economic variables and cannot be viewed merely in terms of a trade-off between the economic needs of today and the potential left for tomorrow. Specifically, the cultural as well the ecological impacts of development projects on the affected communities should be evaluated, in addition to the economic. In developing and densely populated economies such as India, energy intensive development is seen as a sine qua non – a necessary trade off with ecological conservation. Although social impact assessment has been included as an inalienable part of the Environmental Impact Assessment required to be conducted under Indian law, it seems that the same is unable to meet the ends it seeks to achieve. The dissociation between those bearing the costs of development, and those reaping its benefits, lies at the heart of this failure. This paper attempts to study the various cost–benefit relationships for these minority stakeholders using the proposed Nyamjang Chhu hydroelectric power plant in Tawang District of Arunachal Pradesh (in North-east India) as the chief object of study, and discusses whether the current model of sustainable development is truly sustainable, given the level of social dissociation and disintegration that occurs between affected communities and their environment. The economic allure of hydroelectric projects in the hilly regions of India very rarely results in a proper assessment of their ecological and social externalities. Examining the various issues that have been agitated in the course of litigation over the Nyamjang Chhu hydroelectric project, the authors argue that there is a pressing need to re-evaluate the current Indian model of sustainable development going forward.

Keywords: hydroelectric power, socio-cultural dissociation, sustainable development, trade offs

Procedia PDF Downloads 261
16561 Evaluation of Environmental Management System Implementation of Construction Projects in Turkey

Authors: Aydemir Akyürek, Osman Nuri Ağdağ

Abstract:

Construction industry is in a rapid development for many years around the world and especially in Turkey. In the last three years sector has 10% growth and provides significant support on Turkey’s national economy. Many construction projects are on-going at urban and rural areas of Turkey which have substantial environmental impacts. Environmental impacts during construction phase are quite diversified and widespread. Environmental impacts of construction industry cannot be inspected properly in all cases and negative impacts may occur frequently in many projects in Turkey. In this study, implementation of ISO 14001 Environmental Management System (EMS) in construction plants is evaluated. In the beginning stage quality management systems generally reviewed and ISO 14001 EMS is selected for implementation. Standard requirements are examined first and implementation of every standard requirement is elaborated for the selected construction plant in the following stage. Key issues and common problems, gained benefits by execution of this type of international EMS standard are examined. As can be seen in sample projects, construction projects are being completed very fast and contractors are working in a highly competitive environment with low profit ratios in our country and mostly qualified work force cannot be accessible. Addition to this there are deficits on waste handling and environmental infrastructure. Besides construction companies which have substantial investments on EMSs can be faced with difficulties on competitiveness in domestic market, however professional Turkish contractors which implementing managements systems in larger scale at international projects are gaining successful results. Also the concept of ‘construction project management’ which is being implemented in successful projects worldwide cannot be implemented except larger projects in Turkey. In case of nonexistence of main management system (quality) implementation of EMSs cannot be managed. Despite all constraints, EMSs that will be implemented in this industry with commitment of top managements and demand of customers will be an enabling, facilitating tool to determine environmental aspects and impacts of construction sites, will provide higher compliance levels for environmental legislation, to establish best available methods for operational control on waste management, chemicals management etc. and to plan monitoring and measurement, to prioritize environmental aspects for investment schedules and waste management.

Keywords: environmental management system, construction projects, ISO 14001, quality

Procedia PDF Downloads 331
16560 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 83
16559 The South Looking East: The New Geopolitics of Latin America

Authors: Heike Pintor Pirzkall

Abstract:

The positive economic evolution of many countries in the Latin American Continent, mainly in South America, has changed the geopolitical position of the region in the world. It is no longer the Hinterland or backyard of the United States, now it has become the Heartland for Europe and Asia. This position has favored the interest of countries like China or India, who are combining trade agreements with special assistance and aid agreements in many fields like agriculture, alternative energy resources, defense and mining. As many countries in the region are no longer low income countries, a more equal relationship in development aid has been created were the donor and the recipient have become partners and where new actors intervene in a triangular relationship that promotes new alternative aid structures. Triangular co-operation brings together the best of different actors who are providers of development co-operation, partners in SouthSouth co-operation and international organizations. The objective is to share knowledge and implement projects that support the common goal of reducing poverty and promoting development. The intention of this paper is to explain the reasons for Latin America´s “virage” to the east and to give examples of projects and agreements between Latin American countries, China and India which will help to understand the intensification of south-east relations in recent years.

Keywords: development cooperation, China, Latin America, triangular cooperation, natural resources, partnership

Procedia PDF Downloads 353
16558 Identification of Social Responsibility Factors within Mega Construction Projects

Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /

Abstract:

Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.

Keywords: social responsibility, construction projects, economic, social, environmental, indicators

Procedia PDF Downloads 133
16557 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 433
16556 A Taxonomy Proposal on Criterion Structure for Evaluating Freight Village Concepts in Early-Stage Design Projects

Authors: Rıza Gürhan Korkut, Metin Çelik, Süleyman Özkaynak

Abstract:

The early-stage design and development projects for the freight village initiatives require a comprehensive analysis of both qualitative and quantitative data. Considering the literature review on structural and operational management requirements, this study proposed an original taxonomy on criterion structure to assess freight village conceptualization. The potential challenges and uncertainties of the developed taxonomy are extended. Besides requirement analysis, this study is also expected to contribute to forthcoming research on benchmarking of freight villages in different regions. The methodology used in this research is a systematic review on several articles as per their modelling approaches, sustainability, entities and decisions made together with the uncertainties and features of their models taken into consideration. The major findings of the study that are the categories for assessing the projects attributes on their environmental, socio-economical, accessibility and location aspects.

Keywords: logistics centers, freight village, operational management, taxonomy

Procedia PDF Downloads 153
16555 An Analysis on Aid for Migrants: A Descriptive Analysis on Official Development Assistance During the Migration Crisis

Authors: Elena Masi, Adolfo Morrone

Abstract:

Migration has recently become a mainstream development sector and is currently at the forefront in institutional and civil society context. However, no consensus exists on how the link between migration and development operates, that is how development is related to migration and how migration can promote development. On one hand, Official Development Assistance is recognized to be one of the levers to development. On the other hand, the debate is focusing on what should be the scope of aid programs targeting migrants groups and in general the migration process. This paper provides a descriptive analysis on how development aid for migration was allocated in the recent past, focusing on the actions that were funded and implemented by the international donor community. In the absence of an internationally shared methodology for defining the boundaries of development aid on migration, the analysis based on lexical hypotheses on the title or on the short description of initiatives funded by several Organization for Economic Co-operation and Development (OECD) countries. Moreover, the research describes and quantifies aid flows for each country according to different criteria. The terms migrant and refugee are used to identify the projects in accordance with the most internationally agreed definitions and only actions in countries of transit or of origin are considered eligible, thus excluding the amount sustained for refugees in donor countries. The results show that the percentage of projects targeting migrants, in terms of amount, has followed a growing trend from 2009 to 2016 in several European countries, and is positively correlated with the flows of migrants. Distinguishing between programs targeting migrants and programs targeting refugees, some specific national features emerge more clearly. A focus is devoted to actions targeting the root causes of migration, showing an inter-sectoral approach in international aid allocation. The analysis gives some tentative solutions to the lack of consensus on language on migration and development aid, and emphasizes the need to internationally agree on a criterion for identifying programs targeting both migrants and refugees, to make action more transparent and in order to develop effective strategies at the global level.

Keywords: migration, official development assistance, ODA, refugees, time series

Procedia PDF Downloads 107
16554 Identification of Successful Criteria for Measuring Large Infrastructure Projects Performance in Malaysia

Authors: M. A. N. Masrom, M. H. I. A. Rahim, G. K. Chen, S. Mohamed

Abstract:

Large infrastructure project is one of significant category in the development of Malaysian construction industry. This type of project has been recognized as a high complexity project with numerous construction risks, large cost involvement, highly technical requirements and divers of resources. Besides, the development of large infrastructure such as highway, railway, Mass Rapid Transit (MRT) and airport are also needed a large investment of public and private sector. To accomplish the development successfully, several challenges has to be determined prior the project commencement. To date, a comprehensive assessment of key success criteria particularly for large infrastructure in developing country such as Malaysia, is still not systematically defined and therefore, it needs further investigation. This paper aims to explore the potential success criteria that would be useful in gauging overall performance of large infrastructure implementation particularly in developing country. Previous successful criteria studies were used to develop a conceptual framework that possibly suitable for measuring large infrastructure performance. The findings show that successful criteria of infrastructure projects implementation could be grouped according to several key elements as it seems significant to the participants in prioritizing project challenges more systematically.

Keywords: successful criteria, performance, large infrastructure, Malaysia

Procedia PDF Downloads 377
16553 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 123
16552 Willingness to Pay for the Preservation of Geothermal Areas in Iceland: The Contingent Valuation Studies of Eldvörp and Hverahlíð

Authors: David Cook, Brynhildur Davidsdottir, Dadi. M. Kristofersson

Abstract:

The approval of development projects with significant environmental impacts implies that the economic costs of the affected environmental resources must be less than the financial benefits, but such irreversible decisions are frequently made without ever attempting to estimate the monetary value of the losses. Due to this knowledge gap in the processes informing decision-making, development projects are commonly approved despite the potential for social welfare to be undermined. Heeding a repeated call by the OECD to commence economic accounting of environmental impacts as part of the cost-benefit analysis process for Icelandic energy projects, this paper sets out the results pertaining to the nation’s first two contingent valuation studies of geothermal areas likely to be developed in the near future. Interval regression using log-transformation was applied to estimate willingness to pay (WTP) for the preservation of the high-temperature Eldvörp and Hverahlíð fields. The estimated mean WTP was 8,333 and 7,122 ISK for Eldvörp and Hverahlíð respectively. Scaled up to the Icelandic population of national taxpayers, this equates to estimated total economic value of 2.10 and 1.77 billion ISK respectively. These results reinforce arguments in favour of accounting for the environmental impacts of Iceland’s future geothermal power projects as a mandatory component of the exploratory and production license application process. Further research is necessary to understand the economic impacts to specific ecosystem services associated with geothermal environments, particularly connected to changes in recreational amenity. In so doing, it would be possible to gain greater comprehension of the various components of total economic value, evolving understanding of why one geothermal area – in this case, Eldvörp – has a higher preservation value than another.

Keywords: decision-making, contingent valuation, geothermal energy, preservation

Procedia PDF Downloads 186