Search results for: construction workers
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4936

Search results for: construction workers

4786 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 456
4785 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 622
4784 Investigations into Transition from Traditional Construction to Industrial Construction in Afghanistan

Authors: A. Latif Karimi

Abstract:

Since 2001, construction works, especially the construction of new homes and residential buildings, witnessed a dramatic boom across Afghanistan. More so, the construction industry and house builders are relied upon as important players in the country’s job market, economy and infrastructural development schemes. However, a lack of innovation, quality assurance mechanism, substandard construction and market dominance by traditional methods push all the parties in house building sector to shift for more advanced construction techniques and mass production technologies to meet the rising demands for proper accommodation. Meanwhile, rapid population growth and urbanization are widening the gap between the demand and supply of new and modern houses in urban areas like Kabul, Herat, etc. This paper investigates about current condition of construction practices in house building projects, the associated challenges, and the outcomes of transition to more reasonable and sustainable building methods. It is obvious, the introduction and use of Modern Methods of Construction (MMC) can help construction industry and house builders in Afghanistan to tackle the challenges and meet the desired standards for modern houses. This paper focuses on prefabrication, a popular MMC that is becoming more common, improving in quality and available in a variety of budgets. It is revealed that this method is the way forward to improving house building practices as it has been proven to reduce construction time, minimize waste and improve environmental performance of construction developments.

Keywords: modern houses, traditional construction, modern methods of construction, prefabrication, sustainable building

Procedia PDF Downloads 252
4783 Discrimination against Women in Workplace: A Case Study on Hotel Dress Code

Authors: A. R. Anwar

Abstract:

The development of discrimination case which is now extended to the issue of female workers dress code in the hotel industry seen as a challenging topic and a solution is needed. Discrimination generally gives a negative impact on the victim and has a direct impact on female workers if it involves the issue of this dress code. Hence it is not appropriate if these genders are subjected to discrimination that prohibits them from wearing a hijab and required to wear a short skirt during working hours. On this basis, this study discusses the major problems pertaining to dress code faced by female workers in the Malaysian hotel industry. An interview with qualified parties from human resource department in each selected hotels has been conducted in which later generated the findings and supported by materials that obtained from libraries, archives and other databases. Through the research findings, several recommendations were introduced to reduce and eliminate the discrimination issue in Malaysian working sector particularly in the hotel industry in order to achieve the equality among men and women in the workplace.

Keywords: discrimination, dress code in the hotel, impact on female workers, equality

Procedia PDF Downloads 166
4782 Economies of Scale of Worker's Continuing Professional Development in Selected Universities in South- South, Nigeria

Authors: Jonathan E. Oghenekohwo

Abstract:

The return to scale constitutes a significant investment index in the determination of the quantum of resources that is deployed in investment decision on worker’s continuing professional development. Such investment decision is always predicted on the expected outcomes to the individual, institution and the society in context. Several investments in the development of human capacity on the job have been made, but the return to the scale of such seems not to have been correlated positively with the quantum of resources invested in terms of productivity and performance among workers in many universities. This paper thus found out that, despite the commitment and policy instrument to avail workers the right of continuing professional development, the multiplier effects are not evident in diligence, commitment, honesty, dedication, productivity and improved performance on the job among most administrative staff in Nigerian Universities This author, therefore concludes that, given the policy on the right of workers to get trained on-the job, the outcomes of such training must reflect on the overall performance indices, otherwise, institutions should carry out a forensic analysis of the types of continuing professional development programmes that workers participate in, whether or not, they are consistent with the vision and mission of the institutions in terms of economies of scale of workers professional development to the individual, institution and the nation in context.

Keywords: continuing, professional development, economies of scale, worker’s education, administrative staff

Procedia PDF Downloads 289
4781 Examining the Racialisation of White Workers in Rural Louisiana as a Technology of Capitalist Management and Control

Authors: Kendall Artz

Abstract:

In the 1950s, a wave of violent labor unrest shook a small town in south-western Louisiana leading to the racialisation of workers—previously considered white—as ‘mixed-race’ or, in local terms, ‘Redbone.’ This paper examines why the group known as ‘Redbones’ were marked as non-white in relation to strike violence and their opposition to capitalist expansion. Utilising archival research, historiography and oral testimony, I examine how an instance of labor unrest was reinterpreted by local law enforcement, an interstate capitalist class and the national press as calling into question the racial integrity of a group of workers who had been formerly marked as white. This explosive and largely unstudied strike provides an opportunity to better understand how racialisation operates as a technology of control, even over individuals who appear phenotypically white. The strike at Elizabeth allows a glimpse at the tactics of representatives of white supremacy when white workers do not fully embrace the ‘wages of whiteness.

Keywords: American federation of labor, labor history, Louisiana history, wages of whiteness

Procedia PDF Downloads 158
4780 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 369
4779 Health Hazards in SME Garment Industries in India

Authors: Pranab Kumar Goswami

Abstract:

According to WHO, over 1000 million people worldwide are employed in small-scale industries. The ‘garment’ industry’ is one such industry in developing countries. These garment SMEs are mostly run by private establishments in the unorganized sector to avoid legal obligations of OSH provisions. The OSH standards are very poor and even basic health and safety provisions are not provided in such units. The study has been conducted in India among workers employed in the ‘garment’ industry with the objectives to analyze the types and extent of occupational health hazards of the garment workers and to assess the relationship of sociodemographic and occupational factors with various health hazards. The survey method, the tabular method followed by applying simple statistical technique, has been taken into account to analyze the data collected from three SME garment industries in Delhi (India-Asia). The study was conducted in Delhi from August-2019 to October-2020. A random sampling of 70 workers from three factories has been chosen for this study. The study shows that most of the workers were males (82%) and were in the 18-50 age group (78%), with none below 18 years of age. It was found that 26% of the workers were illiterate and most of them belonged to poor socioeconomic status. The study revealed that the nature of the hazards in garment industries in India is mostly physical and mechanical. We found that musculoskeletal problems (54%) were the commonest health problem. The body areas commonly affected were neck, low back, hand, wrist, finger, and shoulder. If garment workers’ health is affected by occupational hazards, it will impact on national health and economic growth of developing countries. Health is a joint responsibility of both government and employing authority.

Keywords: garment, MSD, health hazard, social factor

Procedia PDF Downloads 164
4778 Responding to the Mental Health Service Needs of Rural-to-Urban Migrant Workers in China: Current Situation and Future Directions

Authors: Yujun Liu, Maosheng Ran

Abstract:

Background: Chinese rural-to-urban migrant workers’ mental health problems raise attentions from different social sectors. However, situation of present mental health services provided to this population has not been discovered. This study attempts to describe the current mental health service situation, identify the gaps and give the future directions based on the quantitative data. Methods: Questionnaire surveys were conducted among 2017 rural-to-urban migrant workers in 13 cities and 100 social work service organizations in 5 cities in 2014. Data was collected by face-to-face structured interview by trained interviewers. Findings: Migrant workers’ mental health status was not good. Compared to the severity of mental distress, mental health service for this population was lacking and insufficient, which accounted for only 14.4% of all services in our sample. And the group work and case work were the most frequently-used methods. By estimating a series of regression models, we revealed that life experiences and working conditions were significantly associated with migrant workers’ mental health status. Therefore, the macro social work practices aimed at this whole group were advocated to promote their mental wellbeing. That is, practitioners should not only focus on the improvement of migrant workers’ emotion management capacity, but also pay attention to raise awareness and improve their living and working condition; not only concentrate on the solving of individuals’ dilemma, but also promote gradual reformation of present labor regime and hukou system in China.

Keywords: Chinese rural-to-urban migrant workers, macro social work practice, mental health service needs, mental health status

Procedia PDF Downloads 255
4777 Blue-Collar Workers’ Accidents and Close Call Situations Connected to the Use of Cell Phones among Finns Aged 18–65

Authors: L. Korpinen, R. Pääkkönen, F. Gobba

Abstract:

There has been discussion if the use of mobile phones causes accidents. We studied workers’ accidents and near accidents related to the use of phones. This study is part of a large cross-sectional study that was carried out on 15,000 working-age Finns. We noticed that there were 4–5 times more close call situations than accidents connected to mobile phones and also work related accidents were fewer than leisure related. There are confusing parameters like the use of mobile phones at work, differences in work content between women and men.

Keywords: blue-collar workers, accident, cell phone, close call situation

Procedia PDF Downloads 225
4776 Managing Projects in Practice. A Perspective of Stakeholder Management in Managing Stakeholders within the UK Construction Projects

Authors: Faraz Ali Memon

Abstract:

Stakeholders are a vital part of any organisation. It includes working on the demands of different stakeholders within the projects. However, the reality of construction projects is slightly different when it comes to practice. The UK construction projects have a history of failing to complete projects on time and within the budget. The purpose of this qualitative study is to enhance knowledge of stakeholder engagement. Semi-structured interviews will be carried out using a purposive sampling technique. It includes interviewing and getting knowledge from industry practitioners from top UK construction firms on how to manage stakeholders effectively. The findings from this study will help in understanding stakeholders' impact and how the engagement of stakeholders can affect construction projects. The conclusions of this study add value to the existing body of knowledge on stakeholder management, especially in the UK, where academic studies on construction projects are few. As a contribution, this study will provide a practical guide for the practitioners to engage stakeholders within the scope of the project. In addition, this study is limited to UK construction projects. Therefore, the outcome may not be generalised to other developing and underdeveloped countries.

Keywords: stakeholders, UK construction, project management, cost and time

Procedia PDF Downloads 59
4775 Lean Construction Techniques in Construction Projects of Pakistan

Authors: Aftab Hameed Memon, Shadab Noor, Muhammad Akram Akhund

Abstract:

Lean construction is a philosophy adopted in the construction industry to increase the value of a project by reducing waste and improving construction productivity. Lean emphasizes on maximizing the value of a project with less expenditure. Globally, lean philosophy has received wider popularity in construction sector. Lean construction has supported the practitioners with several tools and techniques to implement at various stages of a construction project. Following the global trends, this study has investigated the lean practice in Pakistan. The level of implementation of different lean tools and techniques altogether with potential benefits experienced by its implementation in construction projects of Pakistan is analyzed. To achieve the targets, the opinion was sought by the practitioners involved in handling construction projects representing four stakeholders that are a client, consultant, contractors and material suppliers through a structured questionnaire. A total of 34 completed questionnaires were collected and then statistically analyzed. The findings of the analysis have highlighted that pull approach, work standardization, just in time, increase visualization tools, integrated project delivery method and fail-safe for quality are common lean techniques implemented in the local construction industry. While reduction in waste, client’s satisfaction, improved communication, visual control and proper task management are major benefits of the lean construction application.

Keywords: lean construction, lean tools and techniques, lean benefits, waste reduction, Pakistan

Procedia PDF Downloads 262
4774 Changes in Serum Neopterin in Workers Exposed to Different Mineral Dust

Authors: Gospodinka Prakova, Pavlina Gidikova, Gergana Sandeva, Kamelia Haracherova, Emil Slavov

Abstract:

Neopterin was demonstrated to be a sensitive marker of cell-mediated immune reactions which plays a key role in the interaction of monocyte / macrophage activation. The purpose of this work was to investigate changes in serum neopterin in workers exposed to different composition of mineral dust. Material and Methods: Serum neopterin was studied in 193 exposed workers, divided into three groups, depending on the mineral dust and content of the quartz in the respirable fraction. The I-st group-coal dust containing less than 2% free crystalline silica (n=44), II-nd group-coal dust containing over 2% free crystalline silica (n=94) and the III-rd group-mixed dust with corundum and carborundum (n=55). The control group was composed of 21 individuals without exposure to dust. Serum neopterin was investigated by Elisa method in ng/ml according to the instructions of the manufacturer. Results and Discussion: It was found significantly higher level of serum neopterin in exposed workers of mineral dust (2,10 ± 0,62 ng / ml), compared with that of the control group (1,10 ± 0,85 ng/ml; p < 0,05). Neopterin levels in workers exposed to coal dust (1,87 ± 0,42 ng / ml-I-st and 3,32 ± 0,77 ng / ml-II-nd group) were significantly higher compared with those exposed to a mixed dust (1,31±0,68 mg / ml-third) and control group (p < 0,05). No significant difference in serum neopterin when exposed to a mixed dust composed of corundum and carborundum (III-rd) and a control group. Conclusion: The results of this study indicate activates a cell-mediated immune response when exposed to a mineral dust. The level of that activation depends mainly on the composition of the dust and is significantly highest in workers exposed to coal dust.

Keywords: mineral dust, neopterin, occupational exposure, respirable crystalline silica

Procedia PDF Downloads 244
4773 Planning of Construction Material Flow Using Hybrid Simulation Modeling

Authors: A. M. Naraghi, V. Gonzalez, M. O'Sullivan, C. G. Walker, M. Poshdar, F. Ying, M. Abdelmegid

Abstract:

Discrete Event Simulation (DES) and Agent Based Simulation (ABS) are two simulation approaches that have been proposed to support decision-making in the construction industry. Despite the wide use of these simulation approaches in the construction field, their applications for production and material planning is still limited. This is largely due to the dynamic and complex nature of construction material supply chain systems. Moreover, managing the flow of construction material is not well integrated with site logistics in traditional construction planning methods. This paper presents a hybrid of DES and ABS to simulate on-site and off-site material supply processes. DES is applied to determine the best production scenarios with information of on-site production systems, while ABS is used to optimize the supply chain network. A case study of a construction piling project in New Zealand is presented illustrating the potential benefits of using the proposed hybrid simulation model in construction material flow planning. The hybrid model presented can be used to evaluate the impact of different decisions on construction supply chain management.

Keywords: construction supply-chain management, simulation modeling, decision-support tools, hybrid simulation

Procedia PDF Downloads 175
4772 Stress Variation of Underground Building Structure during Top-Down Construction

Authors: Soo-yeon Seo, Seol-ki Kim, Su-jin Jung

Abstract:

In the construction of a building, it is necessary to minimize construction period and secure enough work space for stacking of materials during the construction especially in city area. In this manner, various top-down construction methods have been developed and widely used in Korea. This paper investigates the stress variation of underground structure of a building constructed by using SPS (Strut as Permanent System) known as a top-down method in Korea through an analytical approach. Various types of earth pressure distribution related to ground condition were considered in the structural analysis of an example structure at each step of the excavation. From the analysis, the most high member force acting on beams was found when the ground type was medium sandy soil and a stress concentration was found in corner area.

Keywords: construction of building, top-down construction method, earth pressure distribution, member force, stress concentration

Procedia PDF Downloads 268
4771 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 39
4770 Environmental Issues in Construction Projects in India

Authors: Gurbir Singh Khaira, Anmoldeep Singh Kang

Abstract:

Exposures to environmental pollution remain a major source of health risk throughout the world, though risks are generally higher in developing countries, where poverty, lack of investment in modern technology and weak environmental legislation combine to cause high pollution levels. This paper will tell us about the environment is threatened severely by so many problems, some of which are caused by the activities of Construction Projects. The research reveals major environmental impacts of building construction projects to include environmental pollution, resource depletion and habitat destruction causing Destruction of ecosystem, Desertification, Soil Erosion and increasing Material Wastage. Construction is considered as one of the main sources of environmental pollution in the world, the level of knowledge and awareness of project participants, especially project managers, with regards to environmental impacts of construction processes needs to be enhanced. It was found that ‘Transportation Resource’, ‘Noise Pollution’, and ‘Dust Generation with Construction Machinery’ are the greatest environmental impacts in INDIA respectively. The results of this study are useful for construction managers and other participants in construction sites to become aware of construction processes impacts on the environment.

Keywords: construction projects, environmental impacts, material waste age, awareness

Procedia PDF Downloads 338
4769 Work-Related Musculoskeletal Disorders Among Malaysian Office Workers in Klang Valley

Authors: Mohd Fadzly Yahya, Matthew Teo Yong Chang

Abstract:

Globally, the increasing life expectancy of human beings has brought more issues with non-communicable diseases, especially work-related musculoskeletal disorders (WMDs). WMSD also is one of the leading causes of health-related absence from work restricted work time in Malaysia. WMDs are cumulative disorders, resulting from repeated exposure to high or low-intensity loads over a long period. Evidence from a previous study showed that office workers in government and private sectors were showing high WRMDs prevalence in Malaysia. The objectives of this study were to determine the prevalence of MSDs among Malaysian office workers in Klang Valley and to identify the association between MSDs pain and working experience among office workers. This is a cross-sectional study focusing on officer workers in the Klang Valley area. The questionnaires consisted of the subject’s demographics, Nordic Musculoskeletal Questionnaire, and The Numeric Pain Rating Scale were distributed online via google forms to all consenting participants. The data were analyzed for descriptive analysis, parametric test, and student T-test using IBM SPSS Statistics Version 27. From a total of 244 participants, 95 (38.9%) were male and 149 (61.1%) were female. 57.8% of the total samples were government staff while private-sector workers were 42.2%. The highest MSDs prevalence was neck pain during the last 12 months which contributed to 69.3% (n=169) of total participants, which is male 38.5% (n=65) and female 61.5% (n=104). Our study revealed that female office workers have a higher prevalence of WMDs and there is a significant difference in elbow pain, wrist, and hands pain, and lower back pain across four different working experience groups. Office workers in this study were highly exposed to MSDs due to poor ergonomics implementation at the workplace. It is crucial to advocate preventative measures to employers such as workplace ergonomics and changes to work practices to reduce the incidence of MSDs cases in office settings.

Keywords: musculoskeletal disorders, pain, prevalence rate, office workers, risks

Procedia PDF Downloads 107
4768 Predictors of the Self-Reported Likelihood of Seeking Social Worker Help among People with Physical Disabilities

Authors: Maya Kagan, Michal Itzick, Patricia Tal-Katz

Abstract:

Social workers hold a variety of roles and practices, and one of these involves the care, treatment, and rehabilitation of disabled people. The current study assesses the association between demographic factors, attitudes towards social workers, the stigma attached to seeking social worker help, perceived social support, and psychological distress - and the self-reported likelihood of seeking social worker help, among people with physical disabilities (PWPD) in Israel. Data collection utilized structured questionnaires, administered to a sample of 435 PWPD. Statistical analyses were done using SPSS software. The findings suggest that women, older respondents, people with more positive attitudes towards social workers, with higher levels of psychological distress and of social support, and with a lower level of stigma, reported a greater likelihood of seeking social worker help. The study's conclusion is that there are certain avoidance factors among PWPD that might discourage them from seeking professional social worker help. Therefore, it is important that social workers identify these factors and develop interventions aimed at encouraging PWPD to seek professional social worker help in case of need, and also develop practices adjusted to PWPD's unique needs.

Keywords: attitudes towards social workers, people with physical disabilities, perceived social support, psychological distress, seeking help, stigma

Procedia PDF Downloads 309
4767 Application of the Best Technique for Estimating the Rest-Activity Rhythm Period in Shift Workers

Authors: Rakesh Kumar Soni

Abstract:

Under free living conditions, human biological clocks show a periodicity of 24 hour for numerous physiological, behavioral and biochemical variables. However, this period is not the original period; rather it merely exhibits synchronization with the solar clock. It is, therefore, most important to investigate characteristics of human circadian clock, essentially in shift workers, who normally confront with contrasting social clocks. Aim of the present study was to investigate rest-activity rhythm and to vouch for the best technique for the computation of periods in this rhythm in subjects randomly selected from different groups of shift workers. The rest-activity rhythm was studied in forty-eight shift workers from three different organizations, namely Newspaper Printing Press (NPP), Chhattisgarh State Electricity Board (CSEB) and Raipur Alloys (RA). Shift workers of NPP (N = 20) were working on a permanent night shift schedule (NS; 20:00-04:00). However, in CSEB (N = 14) and RA (N = 14), shift workers were working in a 3-shift system comprising of rotations from night (NS; 22:00-06:00) to afternoon (AS; 14:00-22:00) and to morning shift (MS; 06:00-14:00). Each subject wore an Actiwatch (AW64, Mini Mitter Co. Inc., USA) for 7 and/or 21 consecutive days, only after furnishing a certificate of consent. One-minute epoch length was chosen for the collection of wrist activity data. Period was determined by using Actiware sleep software (Periodogram), Lomb-Scargle Periodogram (LSP) and Spectral analysis software (Spectre). Other statistical techniques, such as ANOVA and Duncan’s multiple-range test were also used whenever required. A statistically significant circadian rhythm in rest-activity, gauged by cosinor, was documented in all shift workers, irrespective of shift work. Results indicate that the efficiency of the technique to determine the period (τ) depended upon the clipping limits of the τs. It appears that the technique of spectre is more reliable.

Keywords: biological clock, rest activity rhythm, spectre, periodogram

Procedia PDF Downloads 128
4766 Labor Productivity in the Construction Industry: Factors Influencing the Spanish Construction Labor Productivity

Authors: G. Robles, A. Stifi, José L. Ponz-Tienda, S. Gentes

Abstract:

This research paper aims to identify, analyze and rank factors affecting labor productivity in Spain with respect to their relative importance. Using a selected set of 35 factors, a structured questionnaire survey was utilized as the method to collect data from companies. Target population is comprised by a random representative sample of practitioners related with the Spanish construction industry. Findings reveal the top five ranked factors are as follows: (1) shortage or late supply of materials; (2) clarity of the drawings and project documents; (3) clear and daily task assignment; (4) tools or equipment shortages; (5) level of skill and experience of laborers. Additionally, this research also pretends to provide simple and comprehensive recommendations so that they could be implemented by construction managers for an effective management of construction labor forces.

Keywords: construction management, factors, improvement, labor productivity, lean construction

Procedia PDF Downloads 265
4765 Exploring the Relationship between Building Construction Activity and Road-Related Expenditure in Victoria

Authors: Md. Aftabuzzaman, Md. Kamruzzaman

Abstract:

Road-related expenditure and building construction activity are two significant drivers of the Victorian economy. This paper investigates the relationship between building construction activity and road-related expenditure. Data for construction activities were collected from Victorian Building Authority, and road-related expenditure data were explored by the Bureau of Infrastructure and Transport Research Economics. The trend between these two sectors was compared. The analysis found a strong relationship between road-related expenditure and the volume of construction activity, i.e., the more construction activities, the greater the requirement of road-related expenditure, or vice-versa. The road-related expenditure has a two-year lag period, suggesting that the road sector requires two years to respond to the growth in the building sector.

Keywords: building construction activity, infrastructure, road expenditure, Victorian Building Authority

Procedia PDF Downloads 101
4764 Hearing Threshold Levels among Steel Industry Workers in Samut Prakan Province, Thailand

Authors: Petcharat  Kerdonfag, Surasak Taneepanichskul, Winai Wadwongtham

Abstract:

Industrial noise is usually considered as the main impact of the environmental health and safety because its exposure can cause permanently serious hearing damage. Despite providing strictly hearing protection standards and campaigning extensively encouraging public health awareness among industrial workers in Thailand, hazard noise-induced hearing loss has dramatically been massive obstacles for workers’ health. The aims of the study were to explore and specify the hearing threshold levels among steel industrial workers responsible in which higher noise levels of work zone and to examine the relationships of hearing loss and workers’ age and the length of employment in Samut Prakan province, Thailand. Cross-sectional study design was done. Ninety-three steel industrial workers in the designated zone of higher noise (> 85dBA) with more than 1 year of employment from two factories by simple random sampling and available to participate in were assessed by the audiometric screening at regional Samut Prakan hospital. Data of doing screening were collected from October to December, 2016 by the occupational medicine physician and a qualified occupational nurse. All participants were examined by the same examiners for the validity. An Audiometric testing was performed at least 14 hours after the last noise exposure from the workplace. Workers’ age and the length of employment were gathered by the developed occupational record form. Results: The range of workers’ age was from 23 to 59 years, (Mean = 41.67, SD = 9.69) and the length of employment was from 1 to 39 years, (Mean = 13.99, SD = 9.88). Fifty three (60.0%) out of all participants have been exposing to the hazard of noise in the workplace for more than 10 years. Twenty-three (24.7%) of them have been exposing to the hazard of noise less than or equal to 5 years. Seventeen (18.3%) of them have been exposing to the hazard of noise for 5 to 10 years. Using the cut point of less than or equal to 25 dBA of hearing thresholds, the average means of hearing thresholds for participants at 4, 6, and 8 kHz were 31.34, 29.62, and 25.64 dB, respectively for the right ear and 40.15, 32.20, and 25.48 dB for the left ear, respectively. The more developing age of workers in the work zone with hazard of noise, the more the hearing thresholds would be increasing at frequencies of 4, 6, and 8 kHz (p =.012, p =.026, p =.024) for the right ear, respectively and for the left ear only at the frequency 4 kHz (p =.009). Conclusion: The participants’ age in the hazard of noise work zone was significantly associated with the hearing loss in different levels while the length of participants’ employment was not significantly associated with the hearing loss. Thus hearing threshold levels among industrial workers would be regularly assessed and needed to be protected at the beginning of working.

Keywords: hearing threshold levels, hazard of noise, hearing loss, audiometric testing

Procedia PDF Downloads 198
4763 'Disability' and Suffering: The Case of Workers Affected by Repetitive Strain Injury/Work Related Musculoskeletal Disorder in a Removal from Work Situation in Santos, São Paulo, Brazil

Authors: Maria Do Carmo Baracho De Alencar, Marciene Campos Fialho, Maria Do Carmo Vitório Ramos

Abstract:

The subjects affected by Repetitive Strain Injury/Work Related Musculoskeletal Disorder (RSI/WRMSD) face an everyday life marked by pain, feelings of worthlessness and incapacity caused by the disease, and aggravated often because of discrimination society. Aim: To investigate the experiences and feelings of workers affected by RSI/WRMSD in removal from work situations and to understand the repercussions on mental health. Methods: Clinical records of workers were consulted, opened from July 1, 2014, to July 1, 2015, at the Reference Center for Worker's Health, in Santos city-SP. Selection of workers affected by RSI /WRMSD and who had experienced the removal from work situation due to the disease, and invitation to participate in the study. Semi-structured and individual interviews were carried out based on a pre-elaborated script, and for thematic content analysis. Results: Of a total of 502 medical records, 157 were selected, and of these, 18 workers participated in the interviews, both gender, most of them with low education level, aged between 35 and 56 years, and from different professions. Diseases affected several physical body regions and some workers had more than one body region affected by chronic pain. In the testimonies emerged the psychic suffering by the process of illness at work, fear of dismissal, invisibility of pain, in medical expertise attendance, by the incapacity to perform tasks that were easily achievable, with feelings of uselessness, revolt, and injustice, among others. Conclusion: The workers need to be readapted to new life situations, and the study promotes reflections on the need for more interdisciplinary actions and of the Psychology to the workers affected by RSI/ WRMSD.

Keywords: repetitive strain injury, cumulative trauma disorder, absence from work, mental health, occupational health

Procedia PDF Downloads 128
4762 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 148
4761 Building a Lean Construction Body of Knowledge

Authors: Jyoti Singh, Ahmed Stifi, Sascha Gentes

Abstract:

The process of construction significantly contributes to high level of risks, complexity and uncertainties leading to cost and time overrun, customer dissatisfaction etc. lean construction is important as it is a comprehensive system of tools and concepts focusing on moving closer to customer satisfaction by understanding the process, identifying the waste and eliminating it. The proposed work includes identification of knowledge areas from lean perspective, lean tools/concepts used in lean construction and establishing a relationship matrix between knowledge areas and lean tools/concepts, thus developing and building up a lean construction body of knowledge (LCBOK), i.e. a guide to lean construction, aiming to provide guidelines to manage individual projects and also helping construction industry to minimise waste and maximize value to the customer. In this study, we identified 8 knowledge areas and 62 lean tools/concepts from lean perspective and also one tool can help to manage two or more knowledge areas.

Keywords: knowledge areas, lean body matrix, lean construction, lean tools

Procedia PDF Downloads 407
4760 Past, Present, and Future of Robotics Technology in Construction Industry (Literature Review)

Authors: Samira Haghbin, Behnam Daryayelaal, Zeinab Amiri

Abstract:

As a result of rapid progress of technology in various industries, the only way to survive in a competitive market of business is to update one's situation along with the said developments. During recent decades, Robotics and automation of the construction operation has emerged as one of the important technologies grabbing the attention of various industries and specially the construction industry. Because of the coming labor shortage of the aging society in the near future, robots will be used in construction fields more than ever. By predicting the condition of Robotics in world's future construction industry, we can make necessary preparations to face with needs imposed by the time and stay ahead. This article takes a library study approach and presents a literature review of existing studies with an aim to investigate the use of robotics in past, present and future of construction industry and make predictions on its' growth and change process. Therefore, to make familiar with this kind of technology and its' requirements in the construction industry, the status of Robotics in construction industry of different countries of the world has been studied and necessary context for its' future progress is expressed. It is hoped that identifying needs and required contexts will facilitate further development of advanced technologies such as robotics industry and lead to more preparation for future.

Keywords: future of robotics, construction industry, construction automation, trends of automation

Procedia PDF Downloads 358
4759 Hidden Critical Risk in the Construction Industry’s Technological Adoption: Cybercrime

Authors: Nuruddeen Usman, Usman Mohammed Gidado, Muhammad Ahmad Ibrahim

Abstract:

Construction industry is one of the sectors that are eyeing adoption of ICT for its development due to the advancement in technology. Though, many manufacturing sectors had been using it, but construction industry was left behind, especially in the developing nation like Nigeria. On account of that, the objective of this study is to conceptually and quantitatively synthesise whether the slow adoption of ICT by the construction industries can be attributable to cybercrime threats. The result of the investigation found that, the risk of cybercrime, and lack of adequate cyber security policies that can enforce and punish defaulters are among the things that hinder ICT adoption of the Nigerian construction industries. Therefore, there is need for the nations to educate their citizens on cybercrime risk, and to establish cybercrime police units that can be monitoring and controlling all online communications.

Keywords: construction industry, cybercrime, information and communication technology adoption, risk

Procedia PDF Downloads 474
4758 Play-Based Intervention Training Program for Daycare Workers Attending to Children with Autism

Authors: Raymond E. Raguindin

Abstract:

Objective: This research studied the teaching improvement of daycare workers in imitation, joint attention, and language activities using the play-based early intervention training program in Cabanatuan City, Nueva Ecija. Methods: Focus group discussions were developed to explore the attitude, beliefs, and practices of daycare workers. Results: Findings of the study revealed that daycare workers have existing knowledge and experience in teaching children with autism. Their workshops on managing inappropriate behaviors of children with autism resulting in a general positive perception of accepting and teaching children with autism in daycare centers. Play based activities were modelled and participated in by daycare workers. These include demonstration, modelling, prompting and providing social reinforcers as reward. Five lectures and five training days were done to implement the training program. Daycare workers’ levels of skill in teaching imitation, joint attention and language were gathered before and after the participation in the training program. Findings suggest significant differences between pre-test and post test scores. They have shown significant improvement in facilitating imitation, joint attention, and language children with autism after the play-based early intervention training. They were able to initiate and sustain imitation, joint attention, and language activities with adequate knowledge and confidence. Conclusions: 1. Existing attitudes and beliefs greatly influenced the positive delivery mode of instruction. 2. Teacher-directed approach to improve attention, imitation, joint attention, and language of children with autism can be acquired by daycare workers. 3. Teaching skills and experience can be used as reference and basis for identifying future training needs.

Keywords: early intervention, imitation, joint attention, language

Procedia PDF Downloads 93
4757 Managing Construction Wastes in Nigeria for Sustainable Development

Authors: Ezekiel Ejiofor Nnadi

Abstract:

Nigeria construction industry is known for its active construction activities. This has earmarked the industry to be the key to economic growth of the nation. It has largest employer of labour and gives sustenance to other industries like manufacturing industry. While this is a sign of growth and prosperity; the waste generated by the industry has always been a problem and a serious concern. It results in wastage of economic gain and has resultant health effect on the populace apart from injury being sustained on sites. This work provides a platform to learn more about construction waste, its management strategy and how to reduce waste production in Nigeria construction industry. Construction sites, waste management authority and public health institutions in Lagos as the centre of most construction activities in Nigeria were selected, and a set of questionnaire was administered to using the systematic sampling technique. Descriptive statistics and relative importance index (RII) technique were employed for the analysis of the data gathered. The findings of the analysis show that excessive wastes reduce contractors’ profit margin and also that some construction wastes contain hazardous and toxic elements such as lead, asbestos or radioactive materials which required proper handling and effective disposal. The conclusion was drawn that the check on waste on construction sites starts with the designers to the contractors who execute on site.

Keywords: construction cost, construction industry, economic growth, materials wastes

Procedia PDF Downloads 245