Search results for: post construction

5998 Study on the Model Predicting Post-Construction Settlement of Soft Ground

Authors: Pingshan Chen, Zhiliang Dong

Abstract:

In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.

Keywords: prediction, model, post-construction settlement, soft ground

Procedia PDF Downloads 334
5997 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 510
5996 Health Post A Sustainable Prototype for the Third World

Authors: Chizzoniti Domenico, Beggiora Klizia, Cattani Letizia, Moscatelli Monica

Abstract:

This paper concerns the study of sustainable construction materials applied on the "Health Post", a prototype for the primary health care situated in alienated areas of the world. It's suitable for social and climatic Sub-Saharan context; however, it could be moved in other countries of the world with similar urgent needs. The idea is to create a Health Post with local construction materials that have a low environmental impact and promote the local workforce allowing reuse of traditional building techniques lowering production costs and transport. The aim of Primary Health Care Centre is to be a flexible and expandable structure identifying a modular form that can be repeated several times to expand its existing functions. In this way it could be not only a health care centre but also a socio-cultural facility.

Keywords: low costs building, sustainable construction materials, green construction system, prototype, health care, emergency

Procedia PDF Downloads 377
5995 Research Methodology and Mixed Methods (Qualitative and Quantitative) for Ph.D. Construction Management – Post-Disaster Reconstruction

Authors: Samuel Quashie

Abstract:

Ph.D. Construction Management methodology and mixed methods are organized to guide the researcher to assemble and assess data in the research activities. Construction management research is close to business management and social science research. It also contributes to researching the phenomenon and answering the research question, generating an integrated management system for post-disaster reconstruction in construction and related industries. Research methodology and methods drive the research to achieve the goal or goals, contribute to knowledge, or increase knowledge. This statement means the research methodology, mixed methods, aim, objectives, and processes address the research question, facilitate its achievement and foundation to conduct the study. Mixed methods use project-based case studies, interviews, observations, literature and archival document reviews, research questionnaires, and surveys, and evaluation of integrated systems used in the construction industry and related industries to address the research work. The research mixed methods (qualitative, quantitative) define the research topic and establish a more in-depth study. The research methodology is action research, which involves the collaboration of participants and service users to collect and evaluate data, studying the phenomenon, research question(s) to improve the situation in post-disaster reconstruction phase management.

Keywords: methodology, Ph.D. research, post-disaster reconstruction, mixed-methods qualitative and quantitative

Procedia PDF Downloads 82
5994 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 56
5993 Post-Disaster Recovery and Impacts on Construction Resources: Case Studies of Queensland Catastrophic Events

Authors: Scott A. Abbott

Abstract:

This paper examines the increase in the occurrence of natural disasters worldwide and the need to support vulnerable communities in post-disaster recovery. Preparation and implementation of post-disaster recovery projects need to be improved to allow communities to recover infrastructure, housing, economically and socially following a catastrophe. With the continual rise in catastrophic events worldwide due to climate change, impacts on construction resources affect the ability for post-disaster recovery to be undertaken. This research focuses on case studies of catastrophic events in Queensland, Australia, to contribute to the body of knowledge and gain valuable insights on lessons learned from past events and how they have been managed. The aim of this research is to adopt qualitative data using semi-structured interviews from participants predominantly from the insurance sector to understand barriers that have previously and currently exist in post-disaster recovery. Existing literature was reviewed to reveal gaps in knowledge that needed to be tested. Qualitative data was collected and summarised from field research with the results analysed and discussed. Barriers that impacted post-disaster recovery included time, cost, and resource capability and capacity. Causal themes that impacted time and cost were identified as decision making, pre-planning, and preparedness, as well as effective communication across stakeholders. The research study applied a qualitative approach to the existing literature and case studies across Queensland, Australia, to identify existing and new barriers that impact post-disaster recovery. It was recommended to implement effective procurement strategies to assist in cost control; implement pre-planning and preparedness strategies across funder, contractor, and local governments; more effective and timely decision making to reduce time and cost impacts.

Keywords: construction recovery, cost, disaster recovery, resources, time

Procedia PDF Downloads 41
5992 Social Capital in Housing Reconstruction Post Disaster Case of Yogyakarta Post Earthquake

Authors: Ikaputra

Abstract:

This paper will focus on the concept of social capital for especially housing reconstruction Post Disaster. The context of the study is Indonesia and Yogyakarta Post Earthquake 2006 as a case, but it is expected that the concept can be adopted in general post disaster reconstruction. The discussion will begin by addressing issues on House Reconstruction Post Disaster in Indonesia and Yogyakarta; defining Social Capital as a concept for effective management capacity based on community; Social Capital Post Java Earthquake utilizing Gotong Royong—community mutual self-help, and Approach and Strategy towards Community-based Reconstruction.

Keywords: community empowerment, Gotong Royong, post disaster, reconstruction, social capital, Yogyakarta-Indonesia

Procedia PDF Downloads 194
5991 The Idea of Reputation in a Post-Truth Era

Authors: Karen Armstrong

Abstract:

This paper considers the importance of acquiring, cultivating, and protecting one’s personal online reputation in a post-truth era. Although the idea of the individual is essential psychological construct, the concept necessarily now includes our online reputation. The idea of this online reputation has expanded to become almost more important than any other factor in terms of our professional, social and psychological development. The discussion will first consider philosophical ideas of the self, followed by an examination of underlying concepts of perception and interpretation in a post-truth world. Then, the idea of the recent shift to a consideration of posted images, through words and photos, in the construction of self, will be discussed. Next, the relation between private personal life and exterior social life, including our reputation in a variety of realms will be addressed. This will include the adoption of specific strategies and behaviors, which facilitate accuracy, currency and necessary modifications with regard to our online reputation. Finally, specific ways in which we can negotiate the fluid dynamic between reputation, and inner and outer selves to optimum effect will conclude the discussion.

Keywords: image, post-truth, privacy, reputation, surveillance

Procedia PDF Downloads 174
5990 Major Constraints to Adoption of Improved Post-harvest Technologies among Smallholder Farmers in Developing Countries: A Systematic Review

Authors: Muganyizi Jonas Bisheko, G. Rejikumar

Abstract:

Reducing post-harvest losses could be a sustainable solution to enhance the food and income security of smallholder farmers in developing countries. While various research institutions have come up with a number of innovative post-harvest technologies for reducing post-harvest losses, most of them have not been extensively adopted by smallholder farmers. Despite this gap, the synthesized information about the major constraints of post-harvest technology is scarce. This study has been conducted to fill this gap and show the implications of the findings for future post-harvest research. The developed search strategy retrieved 2201 studies. However, after excluding duplicates, title, abstract and full article screening, a total of 41 documents were identified. The major findings are: (i) there is an outstanding deficiency of systematic evidence of the effect of climate change, off-farm income and sources of post-harvest information on the adoption of improved post-harvest technologies; (ii) there is very limited information on adoption constraints pertaining to matters of policy, rules and regulations; (iii) there is very thin literature on behavioral constraints associated with limited adoption of improved post-harvest technologies; (iv) most of the studies focused on post-harvest storage technologies (47%) followed by overall post-harvest management practices (25%), processing technologies (19%) and packaging technologies (3%). Much of the information was found on Cereals (58%), especially maize (44%); (v) geographically, Sub-Saharan Africa accounted for 79% of the reviewed interventions, while South Asia occupied only 21%. The findings of this review are intended to guide various post-harvest technologists and decision-makers in addressing the challenge of huge post-harvest losses.

Keywords: constraints, post-harvest loss, post-harvest technology , smallholder farmer

Procedia PDF Downloads 80
5989 Evolution of Propiconazole and Tebuconazole Residues through the Post-Harvest Application in 'Angeleno' Plum

Authors: M. J. Rodríguez, F. M. Sánchez, B. Velardo, P. Calvo, M. J. Serradilla, J. Delgado, J. M. López

Abstract:

The main problems in storage and later transport of fruits, are the decays developed that reduce the quality on destination’s markets. Nowadays, there is an increasing interest in the use of compounds to avoid decays in post-harvest. Triazole fungicides are agrochemicals widely used in the agricultural industry due to their wide spectrum of actions, and in some case, they are used in citrus fruit post-harvest. Moreover, its use is not authorized in plum post-harvest, but in order to a future possible authorization, the evolutions of propiconazole and tebuconazole residues are studied after its post-harvest application in ‘Angeleno’ plum.

Keywords: maximum residue limit (MRL), triazole fungicides, decay, Prunus salicina

Procedia PDF Downloads 219
5988 Prevalence of Depression among Post Stroke Survivors in South Asian Region: A Systematic Review and Meta-Analysis

Authors: Roseminu Varghese, Laveena Anitha Barboza, Jyothi Chakrabarty, Ravishankar

Abstract:

Depression among post-stroke survivors is prevalent, but it is unidentified. The purpose of this review was to determine the pooled prevalence of depression among post-stroke survivors in the South Asian region from all published health sciences research articles. The review also aimed to analyze the disparities in the prevalence of depression among the post-stroke survivors from different study locations. Data search to identify the relevant research articles published from 2005 to 2016 was done by using mesh terms and keywords in Web of Science, PubMed Medline, CINAHL, Scopus, J gate, IndMED databases. The final analysis comprised of 9 studies, including a population of 1,520 men and women. Meta-analysis was performed in STATA version 13.0. The overall pooled post-stroke depression prevalence was 0.46, 95% (CI), (0.3- 0.62). The prevalence rate in this systematic review is evident of depression among post-stroke survivors in the South Asian Region. Identifying the prevalence of post-stroke depression at an early stage is important to improve outcomes of the rehabilitative process of stroke survivors and for its early intervention.

Keywords: depression, post stroke survivors, prevalence, systematic review

Procedia PDF Downloads 66
5987 Effect of Passive Pectoralis Minor Stretching on Scapular Kinematics in Scapular Dyskinesia

Authors: Seema Saini, Nidhi Chandra, Tushar Palekar

Abstract:

Objective: To determine the effect of Passive pectoralis minor muscle stretching on scapular kinematics in individuals with scapular dyskinesia. Design: A randomized controlled study was conducted in Pune. The sample size was 30 subjects, which were randomly allocated to either Group A, the experimental group in which passive pectoralis minor stretch was given, or Group B, the control group, in which conventional exercises were given for 3 days a week over 4 weeks. Pre and Post treatment readings of the outcome measures, pectoralis minor length, scapular upward rotation, and lateral scapular slide test were recorded. Results: The results obtained prove a significant difference between pre and post mean values of pectoralis minor length in group A (pre 21.91, post 22.87) and in group B (pre 23.55 post 23.99); scapular upward rotation in group A (pre 49.95, post 50.61) and group B (pre 52.64, post 53.51); lateral scapular slide test at 0° abduction in group A (pre 6.613, post 6.14) and group B (pre 6.84, post 6.22); lateral scapular slide test at 45° abduction in group A (pre 7.14 and post 7.12) and group B (pre 8.18, post 7.53). With an inter-group analysis, it was found that mean of pectoralis minor length, scapular upward rotation, and LSST at 0° abduction in group A was significant than group B (p<0.05). Conclusion: Passive pectoralis minor stretching along with conventional strengthening exercises was shown to be more effective in improving scapular kinematics among patients with scapular dyskinesia.

Keywords: scapulohumeral rhythm, scapular upward rotation, rounded shoulders, scapular strengthening

Procedia PDF Downloads 80
5986 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 281
5985 Applications of Drones in Infrastructures: Challenges and Opportunities

Authors: Jin Fan, M. Ala Saadeghvaziri

Abstract:

Unmanned aerial vehicles (UAVs), also referred to as drones, equipped with various kinds of advanced detecting or surveying systems, are effective and low-cost in data acquisition, data delivery and sharing, which can benefit the building of infrastructures. This paper will give an overview of applications of drones in planning, designing, construction and maintenance of infrastructures. The drone platform, detecting and surveying systems, and post-data processing systems will be introduced, followed by cases with details of the applications. Challenges from different aspects will be addressed. Opportunities of drones in infrastructure include but not limited to the following. Firstly, UAVs equipped with high definition cameras or other detecting equipment are capable of inspecting the hard to reach infrastructure assets. Secondly, UAVs can be used as effective tools to survey and map the landscape to collect necessary information before infrastructure construction. Furthermore, an UAV or multi-UVAs are useful in construction management. UVAs can also be used in collecting roads and building information by taking high-resolution photos for future infrastructure planning. UAVs can be used to provide reliable and dynamic traffic information, which is potentially helpful in building smart cities. The main challenges are: limited flight time, the robustness of signal, post data analyze, multi-drone collaboration, weather condition, distractions to the traffic caused by drones. This paper aims to help owners, designers, engineers and architects to improve the building process of infrastructures for higher efficiency and better performance.

Keywords: bridge, construction, drones, infrastructure, information

Procedia PDF Downloads 49
5984 Recovery of Post-Consumer PET Bottles in a Composite Material Preparation

Authors: Rafenomananjara Tsinjo Nirina, Tomoo Sekito, Andrianaivoravelona Jaconnet Oliva

Abstract:

Manufacturing a composite material from post-consumer bottles is an interesting outlet since Madagascar is still facing the challenges of managing plastic waste on the one hand and appropriate waste treatment facilities are not yet developed on the other hand. New waste management options are needed to divert End-Of-Life (EOL) soft plastic wastes from landfills and incineration. Waste polyethylene terephthalate (PET) bottles might be considered as a valuable resource and recovered into polymer concrete. The methodology is easy to implement and appropriate to the local context in Madagascar. This approach will contribute to the production of ecological building materials that might be profitable for the environment and the construction sector. This work aims to study the feasibility of using the post-consumer PET bottles as an alternative binding agent instead of the conventional Portland cement and water. Then, the mechanical and physical properties of the materials were evaluated.

Keywords: PET recycling, polymer concrete, ecological building materials, pollution mitigation

Procedia PDF Downloads 37
5983 Sustainable Reconstruction: Towards Guidelines of Post-Disaster Vulnerability Reduction for Permanent Informal Housing in Malaysia Due to Flooding

Authors: Ruhizal Roosli, Julaihi Wahid, Abu Hassan Abu Bakar, Faizal Baharum

Abstract:

This paper reports on the progress of a study on the reconstruction project after the ‘Yellow Flood’ disaster in Kelantan, Malaysia. Malaysia still does not have guidelines to build housing after a disaster especially in disaster-prone areas. At the international level, many guidelines have been prepared that is found suitable for post-disaster housing. Which guidelines can be adapted that best describes the situation in Malaysia? It was reported that the houses should be built on stilts, which can withstand certain level of impact during flooding. Unfortunately, until today no specific guideline was available to assist homeowners to rebuild their homes after disaster. In addition, there is also no clear operational procedure to monitor the progress of this construction work. This research is an effort to promoting resilient housing; safety and security; and secure tenure in a prone area. At the end of this study, key lessons will be emerged from the review process and data analysis. These inputs will then have influenced to the content that will be developed and presented as guidelines. An overall objective is to support humanitarian responses to disaster and conflicts for resilience house construction to flood prone area. Interviews with the field based staff were from recent post-disaster housing workforce (disaster management mechanism in Malaysia especially in Kelantan). The respondents were selected based on their experiences in disaster response particularly related to housing provision. These key lessons are perhaps the best practical (operational and technical) guidelines comparing to other International cases to be adapted to the national situations.

Keywords: disaster, guideline, housing, Malaysia, reconstruction

Procedia PDF Downloads 369
5982 Correction Requirement to AISC Design Guide 31: Case Study of Web Post Buckling Design for Castellated Beams

Authors: Kitjapat Phuvoravan, Phattaraphong Ponsorn

Abstract:

In the design of Castellated beams (CB), the web post buckling acted by horizontal shear force is one of the important failure modes that have to be considered. It is also a dominant governing mode when design following the AISC 31 design guideline which is just published. However, the equation of the web post buckling given by the guideline is still questionable for most of the engineers. So the purpose of this paper is to study and provide a proposed equation for design the web post buckling with more simplified and convenient to use. The study is also including the improper of the safety factor given by the guideline. The proposed design equation is acquired by regression method based on the results of finite element analysis. An amount of Cellular beam simulated to study is modelled by using shell element, analysis with both geometric and material nonlinearity. The results of the study show that the use of the proposed equation to design the web post buckling in Castellated beams is more simple and precise for computation than the equations provided from the guideline.

Keywords: castellated beam, web opening, web post buckling, design equation

Procedia PDF Downloads 215
5981 Effect of Post Treatment Temperature on Ni-20Cr Wire Arc Spray Coating to Thermal Resistance

Authors: Ken Ninez Nurpramesti Prinindya, Yuli Setiyorini

Abstract:

Crown enclosure high temperature flares damaged and reduced dimensions crown. Generally crown on EHTF could have a life time up to twenty years. Therefore, this study aims to increase the value of thermal resistance with the effect post treatment on NiCr coated arc spray method. The variation of post treatment temperature, was at 650°C, 750°C, and 850°C. Morphology on the surface and the adhesion strength was analyzed by SEM-EDX, Surface Roughness and Pull - off test. XRD testing was conducted to determine the contained in NiCr coated. Thermal stability of NiCr coated was tested by DSC-TGA. The most optimal results was owned by NiCr coating with post treated at 850°C. It has good thermal stability until 1000°C because of Cr2O3 formation in coated specimen. The higher temperature of post treatment coating was showed better result on porosity and roughness surface value.

Keywords: Arc spray process, NiCr wire, post-treatment coating, high temperature-corrosion resistance

Procedia PDF Downloads 355
5980 Electro-Thermo-Mechanical Behaviour of Functionally Graded Material Usage in Lead Acid Storage Batteries and the Benefits

Authors: Sandeep Das

Abstract:

Terminal post is one of the most important features of a Battery. The design and manufacturing of post are very much critical especially when threaded inserts (Bolt-on type) are used since all the collected energy is delivered from the lead part to the threaded insert (Cu or Cu alloy). Any imperfection at the interface may cause Voltage drop, high resistance, high heat generation, etc. This may be because of sudden change of material properties from lead to Cu alloys. To avoid this problem, a scheme of material gradation is proposed for achieving continuous variation of material properties for the Post used in commercially available lead acid battery. The Functionally graded (FG) material for the post is considered to be composed of different layers of homogeneous material. The volume fraction of the materials used corresponding to each layer is calculated by considering its variation along the direction of current flow (z) according to a power law. Accordingly, the effective properties of the homogeneous layers are estimated and the Post composed of this FG material is modeled using the commercially available ANSYS software. The solid 186 layered structural solid element has been used for discretization of the model of the FG Post. A thermal electric analysis is performed on the layered FG model. The model developed has been validated by comparing the results of the existing Post model& experimental analysis

Keywords: ANSYS, functionally graded material, lead-acid battery, terminal post

Procedia PDF Downloads 58
5979 Improving Post Release Outcomes

Authors: Michael Airton

Abstract:

This case study examines the development of a new service delivery model for prisons that focuses on using NGO’s to provide more effective case management and post release support functions. The model includes the co-design of the service delivery model and innovative commercial agreements that encourage embedded service providers within the prison and continuity of services post release with outcomes based payment mechanisms. The collaboration of prison staff, probation and parole officers and NGO’s is critical to the success of the model and its ability to deliver value and positive outcomes in relation to desistance from offending.

Keywords: collaborative service delivery, desistance, non-government organisations, post release support services

Procedia PDF Downloads 309
5978 The Impact of Level and Consequence of Service Co-Recovery on Post-Recovery Satisfaction and Repurchase Intent

Authors: Chia-Ching Tsai

Abstract:

In service delivery, interpersonal interaction is the key to customer satisfaction, and apparently, the factor of human is critical in service delivery. Besides, customers quite care about the consequences of co-recovery. Thus, this research focuses on service failure caused by other customers and uses a 2x2 factorial design to investigate the impact of consequence and level of service co-recovery on post-recovery satisfaction and repurchase intent. 150 undergraduates were recruited as participants, and assigned to one of the four cells randomly. Every participant was requested to read the scenario and then rated the post-recovery satisfaction and repurchase intent. The results show that under the condition of failed co-recovery, level of co-recovery has no effect on post-recovery satisfaction, while under the condition of successful co-recovery, high-level co-recovery causes significantly higher post-recovery satisfaction than low-level co-recovery. Moreover, post-recovery satisfaction has significantly positive impact on repurchase intent. In the system of service delivery, customers interact with other customers frequently. Therefore, comparing with the literature, this research focuses on the service failure caused by other customers. This research also supplies a better understanding of customers’ view on consequences of different levels of co-recovery, which is helpful for the practitioners to make use of co-recovery.

Keywords: service failure, service co-recovery, consequence of co-recovery, level of co-recovery, post-recovery satisfaction, repurchase intent

Procedia PDF Downloads 340
5977 The Impact of Floods and Typhoons on Housing Welfare: Case Study of Thua Thien Hue Province, Vietnam

Authors: Seyeon Lee, Suyeon Lee, Julia Rogers

Abstract:

This research investigates and records post-flood and typhoon conditions of low income housing in the Thua Thien Hue Province, Vietnam; area prone to extreme flooding in Central Vietnam. The cost of rebuilding houses after flood and typhoon has been always a burden for low income households. These costs often lead to the elimination of essential construction practices for disaster resistance. Despite relief efforts from international non-profit organizations and Vietnam government, the impacts of flood and typhoon damages to residential construction has been reoccurring to the same neighborhood annually. Notwithstanding its importance, this topic has not been systematically investigated. The study is limited to assistance provided to low income households documenting existing conditions of low income homes impacted by post flood and typhoon conditions in the Thua Thien Hue Province. The research identifies leading causes of the building failure from the natural disasters. Relief efforts and progress made since the last typhoon is documented. The quality of construction and repairs are assessed based on Home Builders Guide to Coastal Construction by Federal Emergency Management Agency. Focus group discussions and individual interviews with local residents from four different communities were conducted to get incites on repair effort by the non-profit organizations and Vietnam government, and their needs post flood and typhoon. The findings from the field study informed that many of the local people are now aware of the importance of improving housing conditions as one of the key coping strategies to withstand flood and typhoon events as it makes housing and community more resilient to future events. While there has been a remarkable improvement of housing and infrastructure with the support from the local government as well as the non-profit organizations, many households in the study areas are found to still live in weak and fragile housing conditions without gaining access to the aid to repair and strengthen the houses. Given that the major immediate recovery action taken by the local people tends to focus on repairing damaged houses, and on this ground, low-income households spend a considerable amount of their income on housing repair, providing proper and applicable construction practices will not only improve the housing condition, but also contribute to reducing poverty in Vietnam.

Keywords: disaster coping mechanism, housing welfare, low-income housing, recovery reduction

Procedia PDF Downloads 206
5976 Resourcing for Post-Disaster Housing Reconstruction: The Case of Cyclone Sidr and Aila in Bangladesh

Authors: Zahidul Islam

Abstract:

This study investigates the effectiveness of resourcing in post-disaster housing reconstruction with reference to Cyclones Sidr and Aila in Bangladesh. Through evaluating three key theories- Build Back Better approach, Balance Scorecard approach and Dynamic Competency theories, the synthesis of literature, and empirical fieldwork, this research develops a dynamic theoretical framework that moves the trajectory of post-disaster housing reconstruction towards the reconstruction of more resilient houses. The ultimate goal of any post-disaster housing reconstruction project is to provide quality houses and to achieve high levels of satisfaction for beneficiaries. However, post-disaster reconstruction projects often fail in their stated objectives; only 10-20% housing needs are met, with most houses constructed on a temporary rather than permanent basis. A number of scholars have argued that access to resources can significantly increase the capacity and capability of disaster victims to rebuild their lives, including the construction of new homes. This study draws on structured interviews of 285 villagers affected by cyclones to investigate the effectiveness of resourcing in rebuilding houses after Cyclone Sidr in 2007 and Cyclone Aila in 2009. Furthermore, semi-structured interviews were conducted with 20 key stakeholders in UNDP, Oxfam, government officials, and national and international NGOs. The results of this study show that recovery rate of cyclone resilient houses that can withstand cyclone is very low and majority of the population are still vulnerable. Furthermore, hierarchical regression of survey data and thematic analyses of qualitative data indicate that access to resources, level of education, quality of building materials and income generating activities of the respondents are critical for effective post-disaster recovery. Conversely, resource availability, lack of coordination among participant organisations, corruption and lack of access to appropriate land constituted significant obstacles to livelihood recovery. Finally, this study makes significant theoretical contributions to theories of post-disaster recovery by introducing new variables and measures for evaluating the quality and effectiveness of post-disaster housing.

Keywords: disaster, resourcing, housing, resilience

Procedia PDF Downloads 70
5975 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 374
5974 Audit of Post-Caesarean Section Analgesia

Authors: Rachel Ashwell, Sally Millett

Abstract:

Introduction: Adequate post-operative pain relief is a key priority in the delivery of caesarean sections. This improves patient experience, reduces morbidity and enables optimal mother-infant interaction. Recommendations outlined in the NICE guidelines for caesarean section (CS) include offering peri-operative intrathecal/epidural diamorphine and post-operative opioid analgesics; offering non-steroidal anti-inflammatory drugs (NSAIDs) unless contraindicated and taking hourly observations for 12 hours following intrathecal diamorphine. Method: This audit assessed the provision of post-CS analgesia in 29 women over a two-week period. Indicators used were the use of intrathecal/epidural opioids, use of post-operative opioids and NSAIDs, frequency of observations and patient satisfaction with pain management on post-operative days 1 and 2. Results: All women received intrathecal/epidural diamorphine, 97% were prescribed post-operative opioids and all were prescribed NSAIDs unless contraindicated. Hourly observations were not maintained for 12 hours following intrathecal diamorphine. 97% of women were satisfied with their pain management on post-operative day 1 whereas only 75% were satisfied on day 2. Discussion: This service meets the proposed standards for the provision of post-operative analgesia, achieving high levels of patient satisfaction 1 day after CS. However, patient satisfaction levels are significantly lower on post-operative day 2, which may be due to reduced frequency of observations. The lack of an official audit standard for patient satisfaction on postoperative day 2 may result in reduced incentive to prioritise pain management at this stage.

Keywords: Caesarean section, analgesia, postoperative care, patient satisfaction

Procedia PDF Downloads 302
5973 Study on Effectiveness of Strategies to Re-Establish Landscape Connectivity of Expressways with Reference to Southern Expressway Sri Lanka

Authors: N. G. I. Aroshana, S. Edirisooriya

Abstract:

Construction of highway is the most emerging development tendency in Sri Lanka. With these development activities, there are a lot of environmental and social issues started. Landscape fragmentation is one of the main issues that highly effect to the environment by the construction of expressways. Sri Lankan expressway system getting effort to treat fragmented landscape by using highway crossing structures. This paper designates, a highway post construction landscape study on the effectiveness of the landscape connectivity structures to restore connectivity. Geographic Information Systems (GIS), least cost path tool has been used in the selected two plots; 25km alone the expressway to identify animal crossing paths. Animal accident data use as measure for determining the most contributed plot for landscape connectivity. Number of patches, Mean patch size, Class area use as a parameter to determine the most effective land use class to reestablish the landscape connectivity. The findings of the research express scrub, grass and marsh were the most positively affected land use typologies for increase the landscape connectivity. It represents the growth increased by 8% within the 12 years of time. From the least cost analysis within the plot one, 28.5% of total animal crossing structures are within the high resistance land use classes. Southern expressway used reinforced compressed earth technologies for construction. It has been controlled the growth of the climax community. According to all findings, it could assume that involvement of the landscape crossing structures contributes to re-establish connectivity, but it is not enough to restore the majority of disturbance performed by the expressway. Connectivity measures used within the study can use as a tool for re-evaluate future involvement of highway crossing structures. Proper placement of the highway crossing structures leads to increase the rate of connectivity. The study recommends that monitoring the all stages (preconstruction, construction and post construction) of the project and preliminary design, and the involvement of the research applied connectivity assessment strategies helps to overcome the complication regarding the re-establishment of landscape connectivity using the highway crossing structures that facilitate the growth of flora and fauna.

Keywords: landscape fragmentation, least cost path, land use analysis, landscape connectivity structures

Procedia PDF Downloads 85
5972 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 51
5971 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 396
5970 Green Construction in EGYPT

Authors: Hanan A. Anwar

Abstract:

This paper introduces green building construction in Egypt with different concepts and practices. The following study includes green building applied definition, guidelines, regulations and Standards. Evaluation of cost/benefit of green construction methods and green construction rating systems are presented. Relevant case studies will be reviewed. Four sites will be included.

Keywords: green construction, ecofreindly, self-sufficient town, carbon neutral atmosphere

Procedia PDF Downloads 434
5969 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 57