Search results for: construction sector
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6371

Search results for: construction sector

6011 Comparison the Energy Consumption with Sustainability in Campus: Case Study of Four American Universities

Authors: Bifeng Zhu, Zhekai Wang, Chaoyang Sun, Bart Dewancker

Abstract:

Under the tide of promoting sustainable development in the world, American universities that have been committed to sustainable practice and innovation, not only have its sustainable campus construction been in the forefront of the world, but also have developed STARS (The Sustainability Tracking, Assessment & Rating System), which is widely used in the world and highly recognized. At the same time, in the process of global sustainable campus construction, energy problem is often regarded as one of the most important sustainable aspects, even equivalent to the sustainability of campus. Therefore, the relationship between campus energy and sustainability is worth discussing. In this study, four American universities with the highest level evaluated by STARS are selected as examples to compare and analyze the campus energy consumption and the use of new energy, GHG emissions and the overall sustainability of the campus, in order to explore the relationship between campus energy and sustainable construction. It is found that the advantages of sustainable campus construction in the United States are mainly focused on the "software" of management, education, activities, etc. Although different energy-saving measures have been taken in campus energy, the construction results are quite different. Moreover, as an important aspect of sustainable campus, energy can not fully represent the sustainability of campus, but because of the various measures it takes, it can greatly promote the sustainable construction of the whole campus. These measures and construction experiences are worthy of summary and promotion, and have positive reference significance for other universities even communities around the world.

Keywords: sustainable campus, energy consumption, STARS assessment, GHG emissions

Procedia PDF Downloads 239
6010 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 367
6009 Planning Method Study on the Ecological Restrained Construction Area from the Perspective of Governance: A Case from Yangzijin, Yangzhou, China

Authors: Rushi Tan, Yilun Xu, Xiaohui Wang

Abstract:

The restrained construction zoning, an important part in the urban master plan, is a necessary planning tool to control the city sprawl, to guarantee the reservation implementation of the various types of protective elements, and to realize the storage of the essential urban spatial resources. Simultaneously, owing to the diverse constitutes of restrained construction area and the various stakeholders involved in, its planning requires an overall consideration of all elements from the perspective of coordination, balance and practicability to deal with the problems and conflicts in this process. Taking Yangzijin Ecological Restrained Construction Area in Yangzhou as an example, this study analyzes all the potential actors, agencies and stakeholders in this restrained construction area, as well as the relevant conflicts between each other. Besides, this study tries to build up a planning procedure based on the framework of governance theory, and proposes a possible planning method that combines "rigidity" and "flexibility" to protect the ecological limitation boundary, to take every interest into account, and to promote economic development in a harmonious society.

Keywords: restrained construction area, governance, stakeholder, flexible stratagem, China

Procedia PDF Downloads 383
6008 Identifying Reforms Required in Construction Contracts from Resolved Disputed Cases

Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi

Abstract:

The construction industry is plagued with disputes and litigation in India with many stalled projects seeking dispute resolution. This has an adverse effect on the performance and overall project delivery and impacts future investments within the industry. While construction industry is the major driver of growth, there has not been major reforms in the government construction contracts. The study is aimed at identifying the proactive means of dispute avoidance, focusing on reforms required within the construction contracts, by studying 49 arbitration awards of construction disputes. The claims presented in the awards are aggregated to study the causes linked to the contract document and are referred against the prospective recommendation and practices as surveyed from literature review of research papers. Within contract administration, record keeping has been a major concern as they are required by the parties to substantiate the claims or the counterclaims and therefore are essential in any dispute redressal process. The study also observes that the right judgment is inhibited when the record keeping is improper and due to lack of coherence between documents, the dispute resolution period is also prolonged. The finding of the research will be relevant to industry practitioners in contract drafting with a view to avoid disputes.

Keywords: construction contract, contract administration, contract management, dispute avoidance

Procedia PDF Downloads 235
6007 Reflection on the Resilience Construction of Megacities Under the Background of Territorial Space Governance

Authors: Xin Jie Li

Abstract:

Due to population agglomeration, huge scale, and complex activities, megacities have become risk centers. To resist the risks brought by development uncertainty, the construction of resilient cities has become a common strategic choice for megacities. As a key link in promoting the modernization of the national governance system and governance capacity, optimizing the layout of national land space that focuses on ecology, production, and life and improving the rationality of spatial resource allocation are conducive to fundamentally promoting the resilience construction of megacities. Therefore, based on the perspective of territorial space governance, this article explores the potential risks faced by the territorial space of megacities and proposes possible paths for the resilience construction of megacities from four aspects: promoting the construction of a resilience system throughout the entire life cycle, constructing a disaster prevention and control system with ecological resilience, creating an industrial spatial pattern with production resilience, and enhancing community resilience to anchor the front line of risk response in megacities.

Keywords: mega cities, potential risks, resilient city construction, territorial and spatial governance

Procedia PDF Downloads 10
6006 Three or Four Tonics and a Wave: The Trajectory of Health Insurance Regulation in Brazil

Authors: João Boaventura Branco De Matos

Abstract:

Currently, in Brazil, there is a considerable collection of publications on the supplementary health sector, but the vast majority is limited to retrospective examination of the sector. The present contribution starts from the diagnosis of an overwhelming change in the role of the State and its institutions, as well as an accelerated and no less forceful change in the way of producing goods and services, resulting in a clash between these different waves (state and market). This shock produces unique energy, capable of imposing major changes in the most varied sectors. Based on this diagnosis, there was an opportunity to offer the perspective and propositional study of regulatory measures relevant to the best conduct and performance of this sector in the future.

Keywords: private health regulation, state and market, forecasts in Brazilian regulation, political economy

Procedia PDF Downloads 121
6005 International Integration in Innovative Development of Economy

Authors: Tatyana Kolmykova, Elvira Sitnikova

Abstract:

Globalization is one of the key processes that are shaping the modern world. There are different often quite opposite attitudes toward globalization. However, it is impossible to avoid the effects of international integration, and they should be addressed in the process of formation and development of the national industrial sector.

Keywords: integrated structures, industrial sector, globalization, national

Procedia PDF Downloads 479
6004 Influence of Recycled Polymer-Based Aggregates on Mechanical Properties of Polymer Concrete

Authors: Ahmet Kurklu, Abdussamed Sarp, Gokmen Arikan, Akin Eren, Arif Ulu, Ferit Cakir

Abstract:

Our natural resources are diminishing day by day with the needs of the growing world population. There is a danger that these resources will be depleted if they are not used in a controlled manner. As a result of the rapid increase in the consumption of limited natural resources, one of the issues where studies have gained importance is recycling. Many countries have carried out various research and development activities on recycling and reuse to prevent wastage of resources. For sustainable and healthy living, the limited amount of raw material resources in nature should be consumed consciously, and the necessary awareness should be given for recycling activities. One of the sectors where the consumption of raw materials is high is the construction sector. With the changing consumption habits of the evolving technology in the construction sector, the need to use special concrete along with the normal concrete has arisen. With the increasing need for specialty concretes, polymer concrete, which was discovered in the early 1900s, has evolved to the present day. Polymer concretes are special concretes with high strength, water impermeability, resistance to chemical action, and low surface roughness. Thanks to these properties, they find wide applications in many fields such as swimming pools, drainage systems, repair works. In the study, the effect of using recycled aggregates instead of natural aggregates in the production of polymer concrete on the performance of polymer concrete is investigated. In the experiments conducted for this purpose, the use of natural aggregate is reduced at certain rates, and instead, recycled aggregate is added at the same rate. The recycled aggregate to be used in the study is obtained from the polymer concrete drainage channel production facility of Mert Casting Co., Istanbul, Turkey. In order to clearly observe the effect of recycled materials on the product in the study, the other components (resin, hardener, accelerator, and additive) are kept constant in the concrete mix. In the study, fresh and hardened concrete tests are to be carried out on the mixes to be prepared.

Keywords: concrete, mechanical properties, polymer concrete, recycle aggregate

Procedia PDF Downloads 113
6003 Permissible Horizontal Displacements during the Construction of Vertical Shafts in Soft Soils at the Valley of Mexico: Case History

Authors: Joel M. De La Rosa R.

Abstract:

In this paper, the results obtained when monitoring the horizontal deformations of the soil mass are detailed, during each of the construction stages of several vertical shafts located in the soft soils of the Valley of Mexico, by means of the flotation method. From the analysis of these results, the magnitude and percentage relationship with respect to the diameter and depth of excavation of the horizontal deformations that occurred during the monitoring period is established. Based on the horizontal deformation monitoring system and the information provided by the supervisor's site log, the construction stages that have the greatest impact on deformations are established. Additionally, an analysis of the deformations is carried out, which takes into account the resistance and deformability characteristics of the excavated soils, as well as the prevailing hydraulic conditions. This work will allow construction engineers and institutions in charge of infrastructure works in the Valley of Mexico to establish permissible ranges for horizontal deformations that can occur in very soft and saturated soils, during the different construction stages; improving response protocols to potentially dangerous behaviors.

Keywords: vertical shaft, flotation method, very soft clays, construction supervision

Procedia PDF Downloads 159
6002 Basic Research on Applying Temporary Work Engineering at the Design Phase

Authors: Jin Woong Lee, Kyuman Cho, Taehoon Kim

Abstract:

The application of constructability is increasingly required not only in the construction phase but also in the whole project stage. In particular, the proper application of construction experience and knowledge during the design phase enables the minimization of inefficiencies such as design changes and improvements in constructability during the construction phase. In order to apply knowledge effectively, engineering technology efforts should be implemented with design progress. Among many engineering technologies, engineering for temporary works, including facilities, equipment, and other related construction methods, is important to improve constructability. Therefore, as basic research, this study investigates the applicability of temporary work engineering during the design phase in the building construction industry. As a result, application of temporary work engineering has a greater impact on construction cost reduction and constructability improvement. In contrast to the existing design-bid-build method, the turn-key and CM (construct management) procurement methods currently being implemented in Korea are expected to have a significant impact on the direction of temporary work engineering. To introduce temporary work engineering, expert/professional organization training is first required, and a lack of client awareness should be preferentially improved. The results of this study are expected to be useful as reference material for the development of more effective temporary work engineering tasks and work processes in the future.

Keywords: Temporary Work Engineering, Design Phase, Constructability, Building Construction

Procedia PDF Downloads 357
6001 Factors Influencing the Use of Green Building Practices in the South African Residential Apartment Construction

Authors: Mongezi Nene, Emma Ayesu-Koranteng, Christopher Amoah, Ayo Adeniran

Abstract:

Although its use has been criticized over the years as being unencouraging, the green building concept is quickly overtaking other concepts, particularly in the construction of commercial properties. The goal of the study is to identify the variables influencing the use of green building practices when developing residential structures. A qualitative methodology, using interviews with semi-structured open-ended questions to 35 property practitioners operating residential apartments in Bloemfontein, South Africa, was used to collect primary data which was analysed using thematic content analysis. The findings show that while respondents have a good understanding of green building principles, they are not being used in the construction of residential buildings in South Africa due to issues with green building approval procedures, the potential for tenant rent increases, the cost of materials, technical issues, contractual issues, and a lack of awareness, among others. This paper recommends among others an urgent need to implement measures by stakeholders towards enhancing the adoption of green building concepts in the construction of residential buildings as well as incentivising its construction through lowered property rates.

Keywords: green building, residential apartments, construction, South Africa

Procedia PDF Downloads 56
6000 Development and Characterization of a Bio-Sourced Composite Material Based on Phase Change Material and Hemp Shives

Authors: Hachmi Toifane, Pierre Tittelein, Anh Dung Tran Le, Laurent Zalewsi

Abstract:

This study introduces a composite material composed of bio-sourced phase-change material (PCM) of plant origin combined with hemp shives, developed in response to environmental challenges in the construction sector. The state of the art emphasizes the low thermal storage capacity of bio-based materials and highlights increasing need for developing sustainable materials that offer optimal thermal, mechanical, and hydric performances. The combining of PCM's thermal properties and hygric properties of hemp shives results in a material that combines lightness, strength, and hygrothermal regulation. Various formulations are being assessed and compared to conventional hemp concrete. Thermal characterization includes the measurements of thermal conductivity and numerical simulations to evaluate the thermal storage capacity. The results indicate that the addition of PCM significantly enhances the material's thermal storage capacity, positioning this one as a promising, eco-friendly solution for sustainable construction and for improving the energy efficiency of buildings.

Keywords: hemp composite, bio-sourced phase change material, thermal storage, hemp shives

Procedia PDF Downloads 13
5999 Integration of LCA and BIM for Sustainable Construction

Authors: Laura Álvarez Antón, Joaquín Díaz

Abstract:

The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.

Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability

Procedia PDF Downloads 419
5998 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 305
5997 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 527
5996 A Conceptual Stakeholder Engagement Model for Change Management in the South African Public Sector

Authors: Mokgata Matjie, Sibo Mayime

Abstract:

The 4IR brought with it an inevitable need for change in all organisations, regardless of sector. As a member of the global community, South African organisations are bound to experience the 4IR pressure, and the need to digitize becomes unavoidable. The South African government sector has various departments, of which one of them is the land administration solely responsible for the registration, management, and maintenance of the property registry of South Africa. For the past many years, the registration of deeds was done manually, ranging from 7-10 days, with lots and loads of paperwork handled manually by conveyancers and Registry Clerks. Some information might get lost during the registration period, thus delaying the whole process. This conceptual paper proposes ways to digitalize the land administration office by consulting all relevant literature and ultimately developing a theoretical change management framework for all public sector organisations in South Africa. Change is inevitable, but careful consideration is necessary in terms of consulting all relevant stakeholders for their buy-in and successful implementation of digitalization. The developed framework will serve as a theoretical basis for the empirical research envisaged as a PhD study.

Keywords: stakeholders, engagement, change management, land administration, digitalisation, South African public sector

Procedia PDF Downloads 72
5995 Reduce the Environmental Impacts of the Intensive Use of Glass in New Buildings in Khartoum, Sudan

Authors: Sawsan Domi

Abstract:

Khartoum is considering as one of the hottest cities all over the world, the mean monthly outdoor temperature remains above 30 ºC. Solar Radiation on Building Surfaces considered within the world highest values. Buildings in Khartoum is receiving huge amounts of watts/m2. Northern, eastern and western facades always receive a greater amount than the south ones. Therefore, these facades of the building must be better protected than the others. One of the most important design limits affecting indoor thermal comfort and energy conservation are building envelope design, self-efficiency in building materials and optical and thermo-physical properties of the building envelope. A small sun-facing glazing area is very important to provide thermal comfort in hot dry climates because of the intensive sunshine. This study aims to propose a work plan to help minimize the negative environmental effect of the climate on buildings taking the intensive use of glazing. In the last 15 years, there was a rapid growth in building sector in Khartoum followed by many of wrong strategies getting away of being environmental friendly. The intensive use of glazing on facades increased to commercial, industrial and design aspects, while the glass envelope led to quick increase in temperature by the reflection affects the sun on faces, cars and bodies. Logically, being transparent by using glass give a sense of open spaces, allowing natural lighting and sometimes natural ventilation keeping dust and insects away. In the other hand, it costs more and give more overheated. And this is unsuitable for a hot dry climate city like Khartoum. Many huge projects permitted every year from the Ministry of Planning in Khartoum state, with a design based on the intensive use of glazing on facades. There are no Laws or Regulations to control using materials in construction, the last building code -building code 2008- Khartoum state- only focused in using sustainable materials with no consider to any environmental aspects. Results of the study will help increase the awareness for architects, engineers and public about this environmentally problem. Objectives vary between Improve energy performance in buildings and Provide high levels of thermal comfort in the inner environment. As a future project, what are the changes that can happen in building permits codes and regulations. There could be recommendations for the governmental sector such as Obliging the responsible authorities to version environmental friendly laws in building construction fields and Support Renewable energy sector in buildings.

Keywords: building envelope, building regulations, glazed facades, solar radiation

Procedia PDF Downloads 180
5994 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 251
5993 Development a Battery of Measurements to Assess Giftedness Initiatives in Light of the Objectives of Saudi Arabia's Future Vision of Gifted Education

Authors: Saeed M. Al Qahtani, Alaa Eldin A. Ayoub

Abstract:

The study aimed to develop a battery of measures to assessment gifted initiatives in Saudi Arabia. The battery consisted of 17 measures developed in light of Saudi Arabia's future vision objectives for gifted education. A battery was applied to 193 gifted students who benefit from gifted initiatives and programs, 42 teachers of gifted as well as, 40 experts of gifted. Samples were taken from three main regions: Riyadh, Sharqia, Gharbia in Saudi Arabia. The results indicated that battery measures have a reliability and stability index ranging from 0.6 to 0.87. Besides that, results showed that the educational environment lacks many basic components such as facilities, laboratories, and activities that may stimulate creativity and innovation. Furthermore, results showed that there is a weakness in private sector involvement in the construction of educational buildings, special centers for gifted people and the provision of certain facilities that support talented programs. The recommendations of the study indicate the need for the private sector participation in the provision of services and projects for the care of gifted students in Saudi Arabia.

Keywords: battery of measures, gifted care initiatives, Saudi future vision, gifted student

Procedia PDF Downloads 143
5992 Environmental Impact of Autoclaved Aerated Concrete in Modern Construction: A Case Study from the New Egyptian Administrative Capital

Authors: Esraa A. Khalil, Mohamed N. AbouZeid

Abstract:

Building materials selection is critical for the sustainability of any project. The choice of building materials has a huge impact on the built environment and cost of projects. Building materials emit huge amount of carbon dioxide (CO2) due to the use of cement as a basic component in the manufacturing process and as a binder, which harms our environment. Energy consumption from buildings has increased in the last few years; a huge amount of energy is being wasted from using unsustainable building and finishing materials, as well as from the process of heating and cooling of buildings. In addition, the construction sector in Egypt is taking a good portion of the economy; however, there is a lack of awareness of buildings environmental impacts on the built environment. Using advanced building materials and different wall systems can help in reducing heat consumption, the project’s initial and long-term costs, and minimizing the environmental impacts. Red Bricks is one of the materials that are being used widely in Egypt. There are many other types of bricks such as Autoclaved Aerated Concrete (AAC); however, the use of Red Bricks is dominating the construction industry due to its affordability and availability. This research focuses on the New Egyptian Administrative Capital as a case study to investigate the potential of the influence of using different wall systems such as AAC on the project’s cost and the environment. The aim of this research is to conduct a comparative analysis between the traditional and most commonly used bricks in Egypt, which is Red Bricks, and AAC wall systems. Through an economic and environmental study, the difference between the two wall systems will be justified to encourage the utilization of uncommon techniques in the construction industry to build more affordable, energy efficient and sustainable buildings. The significance of this research is to show the potential of using AAC in the construction industry and its positive influences. The study analyzes the factors associated with choosing suitable building materials for different projects according to the need and criteria of each project and its nature without harming the environment and wasting materials that could be saved or recycled. The New Egyptian Administrative Capital is considered as the country’s new heart, where ideas regarding energy savings and environmental benefits are taken into consideration. Meaning that, Egypt is taking good steps to move towards more sustainable construction. According to the analysis and site visits, there is a potential in reducing the initial costs of buildings by 12.1% and saving energy by using different techniques up to 25%. Interviews with the mega structures project engineers and managers reveal that they are more open to introducing sustainable building materials that will help in saving the environment and moving towards green construction as well as to studying more effective techniques for energy conservation.

Keywords: AAC blocks, building material, environmental impact, modern construction, new Egyptian administrative capital

Procedia PDF Downloads 95
5991 Establishing a Sustainable Construction Industry: Review of Barriers That Inhibit Adoption of Lean Construction in Lesotho

Authors: Tsepiso Mofolo, Luna Bergh

Abstract:

The Lesotho construction industry fails to embrace environmental practices, which has then lead to excessive consumption of resources, land degradation, air and water pollution, loss of habitats, and high energy usage. The industry is highly inefficient, and this undermines its capability to yield the optimum contribution to social, economic and environmental developments. Sustainable construction is, therefore, imperative to ensure the cultivation of benefits from all these intrinsic themes of sustainable development. The development of a sustainable construction industry requires a holistic approach that takes into consideration the interaction between Lean Construction principles, socio-economic and environmental policies, technological advancement and the principles of construction or project management. Sustainable construction is a cutting-edge phenomenon, forming a component of a subjectively defined concept called sustainable development. Sustainable development can be defined in terms of attitudes and judgments to assist in ensuring long-term environmental, social and economic growth in society. The key concept of sustainable construction is Lean Construction. Lean Construction emanates from the principles of the Toyota Production System (TPS), namely the application and adaptation of the fundamental concepts and principles that focus on waste reduction, the increase in value to the customer, and continuous improvement. The focus is on the reduction of socio-economic waste, and protestation of environmental degradation by reducing carbon dioxide emission footprint. Lean principles require a fundamental change in the behaviour and attitudes of the parties involved in order to overcome barriers to cooperation. Prevalent barriers to adoption of Lean Construction in Lesotho are mainly structural - such as unavailability of financing, corruption, operational inefficiency or wastage, lack of skills and training and inefficient construction legislation and political interferences. The consequential effects of these problems trigger down to quality, cost and time of the project - which then result in an escalation of operational costs due to the cost of rework or material wastage. Factor and correlation analysis of these barriers indicate that they are highly correlated, which then poses a detrimental potential to the country’s welfare, environment and construction safety. It is, therefore, critical for Lesotho’s construction industry to develop a robust governance through bureaucracy reforms and stringent law enforcement.

Keywords: construction industry, sustainable development, sustainable construction industry, lean construction, barriers to sustainable construction

Procedia PDF Downloads 252
5990 The Way of the English Use of Businessmen for the ASEAN Economic Community in Chonburi Province

Authors: Kittivate Boonyopakorn

Abstract:

The purposes of this study were to investigate the method of the English use of the businessmen and to study their behavior of the utilization for the ASEAN economic community. The participants were divided into the three types of the merchants including the construction contractors, the construction material traders, and SME entrepreneurs. Survey questionnaires and interviews were used in this study. The findings showed that in the type of traders, 23 of the participants are construction contractors, 121 are construction material traders, and 206 are SME entrepreneurs. The study of English in language institute is highly 51.4%. The use of Google in translating English into Thai is 41.7%. Learning English themselves is 41.1% respectively. The businessmen study English for readiness for their trade.

Keywords: way of rnglish use, businessmen, ASEAN economic community, Chonburi province

Procedia PDF Downloads 214
5989 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 482
5988 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 25
5987 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 239
5986 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 123
5985 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 222
5984 Corporate Social Responsibility: A Comparative Study of Two Largest Banks in India

Authors: Navdeep Kaur

Abstract:

Corporate Social Responsibility is the process through which the organizations execute their philanthropic visions for social welfare. This paper considers the data of one Public Sector Bank–State Bank of India (SBI) and one Private Sector Bank-Industrial Credit and Investment Corporation of India (ICICI) from the year 2008 to 2016. The study is based on descriptive research design, and secondary data collected from the annual report of respective bank from website and different literature are reviewed. Least Square Method is used for estimating CSR spending for the financial year 2017-18. The analysis shows that these banks are making efforts for the implementation of CSR, but are not spending their 2% share of profits on CSR. There is a need for better CSR activities by the banks, which is possible by concentrating more on the prevailing social issues. The finding reveals that the percentage of profit after tax spends for CSR by SBI is more compare to ICICI. The estimated Spending for CSR for 2017-18 is also more in SBI as compared to ICICI.

Keywords: banking sector, corporate social responsibility in India, financial institution, public sector banks, SBI, ICICI

Procedia PDF Downloads 161
5983 The Continuing Saga of Poverty Reduction and Food Security in the Philippines

Authors: Shienna Marie Esteban

Abstract:

The economic growth experience of the Philippines is one of the fastest in Asia. However, the said growth has not yet trickled down to every Filipino. This is evident to agricultural-dependent population. Moreover, the contribution of the agriculture sector to GDP has been dwindling while large number of labor force is still dependent on a relatively small share of GDP. As a result, poverty incidence worsened among rural poor causing hunger and malnutrition. Therefore, the existing agricultural policies in the Philippines are pushing to achieve greater food production and productivity to alleviate poverty and food insecurity. Through a review of related literature and collection and analysis of secondary data from DA, DBM, BAS - CountrySTAT, PSA, NSCB, PIDS, IRRI, UN-FAO, IFPRI, and World Bank among others, the study revealed that Philippines is still far from its goals of poverty reduction and food security. In addition, the agricultural sector is underperforming. The productivity growth of the sector comes out mediocre. The common observation is that weakness is attributed to the failures of policy and institutional environments of the agriculture sector. The policy environment failed to create a structure appropriate for the rapid growth of the sector due to institutional and governance weaknesses. A recommendation is to go through institutional and policy reforms through legislative or executive mandates should take form to improve the implementation and enforcement of existing policies.

Keywords: agriculture, food security, policy, poverty

Procedia PDF Downloads 291
5982 Identifying Barriers of Implementing Building Information Modelling in Construction

Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh

Abstract:

BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.

Keywords: building information modelling, construction, design and construction, designers

Procedia PDF Downloads 146