Search results for: alternative construction delivery
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8817

Search results for: alternative construction delivery

8697 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 433
8696 Achieving Sustainable Rapid Construction Using Lean Principles

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

There is the need to take the holistic approach in achieving sustainable construction for a contemporary practice. Sustainable construction is the practice that involved method of human preservation of the environment, whether economically or socially through responsibility, management of resources and maintenance utilizing support. This paper shows the correlation of achieving rapid construction with sustainable concepts using lean principles. Lean principles being used widely in the manufacturing industry, but this research will demonstrate the principles into building construction. Lean principle offers the benefits of stabilizing work flow and elimination of unnecessary work. Therefore, this principle contributes to time and waste reduction. The correlation shows that pulling factor provides the improvement of progress curve and stabilizing the time-quality relation. The finding shows the lean principles offer the elements of rapid construction synchronized with the elements of sustainability.

Keywords: sustainable construction, rapid construction, time reduction, lean construction

Procedia PDF Downloads 212
8695 Optimizing Bridge Deck Construction: A deep Neural Network Approach for Limiting Exterior Grider Rotation

Authors: Li Hui, Riyadh Hindi

Abstract:

In the United States, bridge construction often employs overhang brackets to support the deck overhang, the weight of fresh concrete, and loads from construction equipment. This approach, however, can lead to significant torsional moments on the exterior girders, potentially causing excessive girder rotation. Such rotations can result in various safety and maintenance issues, including thinning of the deck, reduced concrete cover, and cracking during service. Traditionally, these issues are addressed by installing temporary lateral bracing systems and conducting comprehensive torsional analysis through detailed finite element analysis for the construction of bridge deck overhang. However, this process is often intricate and time-intensive, with the spacing between temporary lateral bracing systems usually relying on the field engineers’ expertise. In this study, a deep neural network model is introduced to limit exterior girder rotation during bridge deck construction. The model predicts the optimal spacing between temporary bracing systems. To train this model, over 10,000 finite element models were generated in SAP2000, incorporating varying parameters such as girder dimensions, span length, and types and spacing of lateral bracing systems. The findings demonstrate that the deep neural network provides an effective and efficient alternative for limiting the exterior girder rotation for bridge deck construction. By reducing dependence on extensive finite element analyses, this approach stands out as a significant advancement in improving safety and maintenance effectiveness in the construction of bridge decks.

Keywords: bridge deck construction, exterior girder rotation, deep learning, finite element analysis

Procedia PDF Downloads 31
8694 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 476
8693 Feasibility of Using Bike Lanes in Conjunctions with Sidewalks for Ground Drone Applications in Last Mile Delivery for Dense Urban Areas

Authors: N. Bazyar Shourabi, K. Nyarko, C. Scott, M. Jeihnai

Abstract:

Ground drones have the potential to reduce the cost and time of making last-mile deliveries. They also have the potential to make a huge impact on human life. Despite this potential, little work has gone into developing a suitable feasibility model for ground drone delivery in dense urban areas. Today, most of the experimental ground delivery drones utilize sidewalks only, with just a few of them starting to use bike lanes, which a significant portion of some urban areas have. This study works on the feasibility of using bike lanes in conjunction with sidewalks for ground drone applications in last-mile delivery for dense urban areas. This work begins with surveying bike lanes and sidewalks within the city of Boston using Geographic Information System (GIS) software to determine the percentage of coverage currently available within the city. Then six scenarios are examined. Based on this research, a mathematical model is developed. The daily cost of delivering packages using each scenario is calculated by the mathematical model. Comparing the drone delivery scenarios with the traditional method of package delivery using trucks will provide essential information concerning the feasibility of implementing routing protocols that combine the use of sidewalks and bike lanes. The preliminary results of the model show that ground drones that can travel via sidewalks or bike lanes have the potential to significantly reduce delivery cost.

Keywords: ground drone, intelligent transportation system, last-mile delivery, sidewalk robot

Procedia PDF Downloads 108
8692 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 519
8691 Formulation and Evaluation of Ethosomes of Plumeria indica Linn. Flowers

Authors: Sumeet Dwivedi, Shweta Shriwas, Raghvendra Dubey

Abstract:

The number of products based on new drug delivery systems has significantly increased in the past few years, and this growth is expected to continue in the near future. These biopharmaceuticals present challenges to drug delivery scientists because of their unique nature and difficulty in delivery through conventional routes. Therefore, future research will focus on the delivery of these complex molecules through different routes, including oral, nasal, pulmonary, vaginal, rectal, etc. The aim of present study was to formulate and evaluate ethosomes of Plumeria indica flowers which may deliver the drug to targeted site more efficiently than marketed preparation and also overcome the problems related with oral administration of drug. The formulations were prepared with ethanol, lecithin, propylene glycol and were evaluated.

Keywords: ethosomes, herbal extract, plumeria alba, lecithin

Procedia PDF Downloads 233
8690 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 566
8689 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 298
8688 Alternative Ways of Knowing and the Construction of a Department Around a Common Critical Lens

Authors: Natalie Delia

Abstract:

This academic paper investigates the transformative potential of incorporating alternative ways of knowing within the framework of Critical Studies departments. Traditional academic paradigms often prioritize empirical evidence and established methodologies, potentially limiting the scope of critical inquiry. In response to this, our research seeks to illuminate the benefits and challenges associated with integrating alternative epistemologies, such as indigenous knowledge systems, artistic expressions, and experiential narratives. Drawing upon a comprehensive review of literature and case studies, we examine how alternative ways of knowing can enrich and diversify the intellectual landscape of Critical Studies departments. By embracing perspectives that extend beyond conventional boundaries, departments may foster a more inclusive and holistic understanding of critical issues. Additionally, we explore the potential impact on pedagogical approaches, suggesting that alternative ways of knowing can stimulate alternative way of teaching methods and enhance student engagement. Our investigation also delves into the institutional and cultural shifts necessary to support the integration of alternative epistemologies within academic settings. We address concerns related to validation, legitimacy, and the potential clash with established norms, offering insights into fostering an environment that encourages intellectual pluralism. Furthermore, the paper considers the implications for interdisciplinary collaboration and the potential for cultivating a more responsive and socially engaged scholarship. By encouraging a synthesis of diverse perspectives, Critical Studies departments may be better equipped to address the complexities of contemporary issues, encouraging a dynamic and evolving field of study. In conclusion, this paper advocates for a paradigm shift within Critical Studies departments towards a more inclusive and expansive approach to knowledge production. By embracing alternative ways of knowing, departments have the opportunity to not only diversify their intellectual landscape but also to contribute meaningfully to broader societal dialogues, addressing pressing issues with renewed depth and insight.

Keywords: critical studies, alternative ways of knowing, academic department, Wallerstein

Procedia PDF Downloads 30
8687 Fear of Childbirth According to Parity

Authors: Ozlem Karabulutlu, Kiymet Yesilcicek Calik, Nazli Akar

Abstract:

Objectives: To examine fear of childbirth according to parity, gestational age, prenatal education, and obstetric history. Methods: The study was performed as a questionnaire design in a State Hospital in Kars, Turkey with 403 unselected pregnant who were recruited from the delivery unit. The data were collected via 3 questionnaires; the first with sociodemographic and obstetric features, the second with Wijma Delivery Expectance/Experience Questionnaire (W-DEQ) scale, and the third with the scale of Beck Anxiety Inventory (BAI). Results: The W-DEQ and BAI scores were higher in nulliparous than multiparous woman (W-DEQ 67.08±28.33, 59.87±26.91, P=0.039<0.05, BAI 18.97±9.5, 16.65±11.83, P=0.0009<0.05 respectively). Moreover, W-DEQ and BAI scores of pregnant whose gestational week was ≤37 / ≥41 and who didn’t receive training and had vaginal delivery was higher than those whose gestational week was 38-40 weeks and who received prenatal training and had cesarean delivery (W-DEQ 67.54±29.20, 56.44±22.59, 69.72±25.53 p<0.05, BAI 21.41±9.07; 15.77±11.20, 18.36±10.57 p<0.05 respectively). Both in nulliparous and multiparous, as W-DEQ score increases BAI score increases too (r=0.256; p=0.000<0.05). Conclusions: Severe fear of childbirth and anxiety was more common in nulliparous women, preterm and post-term pregnancy and who did not receive prenatal training and had vaginal delivery.

Keywords: Beck Anxiety Inventory (BAI), fear of birth, parity, pregnant women, Wijma Delivery Expectance/Experience Questionnaire (W-DEQ)

Procedia PDF Downloads 258
8686 Service Delivery Disparity Conundrum at Winnie Madikizela Mandela Local Municipality: Exploration of the Enhanced Future

Authors: Mandisi Matyana

Abstract:

Although the South African local government is doing all the best in ensuring improved service delivery for the citizens, service delivery disparity still remains the real challenge for other municipalities. The unequal distribution of services within municipal wards is causing unequal happiness among the citizens; hence others do enjoy different provided municipal services, while others do not. It is acknowledged that less access to municipal services infringes one’s rights, such as the right to human dignity and the right to life. Some of the municipal services are basic services and they are the mainstay of human survival, such as water, housing, etc. It is quite evident that the service delivery disparity could be caused by the various factors within the local municipality affairs, including both administrative and political factors. Therefore, this study is undertaken to check and evaluate the main foundations of service delivery disparity in ensuring equal development of the state, particularly for local communities. The study used the qualitative method to collect the data from the citizens of Winnie Madikizela Mandela Local Municipality. An extensive literature was also conducted in understanding the causes of service delivery disparity. Study findings prove that the service delivery disparity could be caused by factors such as political interference in administration, corruption and fraud, elevated unemployment levels, inadequate institutional capacity, etc. Therefore, the study recommends strong community participation and constant external supervision in the local government so as to encourage openness in local government to ensure fair administration towards services to be provided.

Keywords: administration, development, municipal services, service delivery disparity, Winnie Madikizela Mandela local municipality

Procedia PDF Downloads 86
8685 Application of the EU Commission Waste Management Methodology Level(s) to a Construction and a Demolition in North-West Romania.

Authors: Valean Maria

Abstract:

Construction and demolition waste management is a timely topic, due to the urgency of its transition to sustainability. This sector is responsible for over a third of the waste generated in the E.U., while the legislation requires a proportion of at least 70% preparation for reuse and recycle, excluding backfilling. To this end, the E.U. Commission has provided the Level(s) methodology, allowing for the standardized planning and reporting of waste quantities across all levels of the construction process, from the architecture, to the demolition, from the estimation stage, to the actual measurements at the end of the operations. We applied Level(s) for the first time to the Romanian context, a developing E.U. country in which illegal dumping of contruction waste in nature and landfills, are still common practice. We performed the desk study of the buildings’ documents, followed by field studies of the sites, and finally the insertion and calculation of statistical data of the construction and demolition waste. We learned that Romania is far from the E.U. average in terms of the initial estimations of waste, with some numbers being higher, others lower, and that the price of evacuation to landfills is significantly lower in the developing country, a possible barrier to adopting the new regulations. Finally, we found that concrete is the predominant type waste, in terms of quantity as well as cost of disposal. Further directions of research are provided, such as mapping out all of the alternative facilities in the region and the calculation of the financial costs and of the CO2 footprint, for preparing and delivering waste sustainably, for a more sound and locally adapted model of waste management.

Keywords: construction, waste, management, levels, EU

Procedia PDF Downloads 47
8684 Predictors of Ante-Natal Care and Health Facility Delivery Services Utilization in a Rural Area in Plateau State

Authors: Lilian A. Okeke, I. Okeke, N. Waziri, S. Balogun, P. Nguku, O. Fawole

Abstract:

Background: Access to ante-natal care services promotes safe motherhood and delivery with improved maternal and neonatal outcome. We conducted this study to identify factors influencing the utilization of antenatal care (ANC) and health delivery services. Methods: We conducted a cross sectional study. Households were numbered and a one in three sample was selected using a systematic sampling method. One hundred and ninety eight women who were either pregnant or had previous deliveries were interviewed using pretested structured questionnaires to obtain information on their socio-demographic characteristics, and reasons for non-utilization of ANC and health delivery services. We performed univariate and bivariate analysis using Epi info version 3.5.3. Results: The age of respondents ranged from (17-55 years) with a median age of 29 years. One hundred and ninety two (97%) utilized antenatal care services. Ninety three (47.9%) attended ANC at second trimester. More than half (58.6%) had ≥ 4 visits to ANC. One hundred and thirty one (66.2%) had their last delivery at home by a traditional birth attendant. Factors associated with ANC and health facility delivery services utilization were: age group 45-55 (OR 0.01; 95% CI: 0.00-0.16) and > 55 years (OR 0.03; 95% CI: 0.00-0.60), wife’s educational status (OR 3.17; 95% CI: 1.66-8.30), husband’s permission (OR 11.8; 95% CI 2.19-63.62), and distance ≥ 5km (OR 0.33; 95% CI: 0.16-0.60). Conclusion: ANC services were well utilized. Most women did not book early and had their last delivery at home. Predictors of ANC use and health facility delivery were age, wife’s educational status, husband's permission and long distance from health facility. A one-day health sensitization of the benefits of ANC utilization and the dangers of delivering at home was implemented.

Keywords: ante natal care, health facility, delivery services, rural area, Plateau state

Procedia PDF Downloads 341
8683 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 401
8682 A Review of the Fundamental Aspects and Dimensions of Alternative Dispute Resolution (ADR) as Important Components in the Promotion of Social Justice in Nigeria

Authors: Odoh Ben Uruchi

Abstract:

Access to Justice implies access to social and distributive Justice. Access to social justice in Nigeria remains an illusion where cases last in courts for unduly long period of time, as is currently the situation in the country. As the popular saying goes– justice delayed is justice denied. It is, however, important to underscore the point that these perspectives are not necessarily disconnected since the extent to which one can have distributive justice in any system is largely determined by the level and effectiveness of social justice in the country. Generally, Alternative Dispute Resolution (ADR) Processes are increasingly being accepted in Nigeria as appropriate mechanisms for resolving disputes. While some jurisdictions have institutionalized ADR through the concept of a Multidoor Courthouse, many other are at different stages of doing same. With these developments, it is obvious that stakeholders in the administration of justice in Nigeria, can no longer be indifferent about understanding and fully mainstreaming ADR into their various activities and professional practice. Any framework for promoting social justice in Nigeria should therefore of necessity include provision of avenues for use of ADR in the protection and enforcement of citizen’s rights. The constitutional and other legal provisions that guarantee various rights of citizens cannot of itself ensure the enjoyment of the rights in the absence of an effective framework for dispute resolution. Excessive reliance on litigation and other adversarial approaches will also fail to ensure a sound regime of social justice. There should be structured mainstreaming of alternative dispute resolution mechanisms in justice delivery if the society must provide and guarantee social justice to the citizens. This paper seeks to address some of the fundamental issues affecting the perception, knowledge and skills of ADR in the provision of social justice. In doing this, the paper proposes to unlock the full enormous potentials of Alternative Dispute Resolution (ADR) in promoting access to justice in Nigeria.

Keywords: aspects, dimensions, alternative dispute resolution, social justice

Procedia PDF Downloads 400
8681 A Mathematical Model for a Two-Stage Assembly Flow-Shop Scheduling Problem with Batch Delivery System

Authors: Saeedeh Ahmadi Basir, Mohammad Mahdavi Mazdeh, Mohammad Namakshenas

Abstract:

Manufacturers often dispatch jobs in batches to reduce delivery costs. However, sending several jobs in batches can have a negative effect on other scheduling-related objective functions such as minimizing the number of tardy jobs which is often used to rate managers’ performance in many manufacturing environments. This paper aims to minimize the number of weighted tardy jobs and the sum of delivery costs of a two-stage assembly flow-shop problem in a batch delivery system. We present a mixed-integer linear programming (MILP) model to solve the problem. As this is an MILP model, the commercial solver (the CPLEX solver) is not guaranteed to find the optimal solution for large-size problems at a reasonable amount of time. We present several numerical examples to confirm the accuracy of the model.

Keywords: scheduling, two-stage assembly flow-shop, tardy jobs, batched delivery system

Procedia PDF Downloads 430
8680 Methodology for the Multi-Objective Analysis of Data Sets in Freight Delivery

Authors: Dale Dzemydiene, Aurelija Burinskiene, Arunas Miliauskas, Kristina Ciziuniene

Abstract:

Data flow and the purpose of reporting the data are different and dependent on business needs. Different parameters are reported and transferred regularly during freight delivery. This business practices form the dataset constructed for each time point and contain all required information for freight moving decisions. As a significant amount of these data is used for various purposes, an integrating methodological approach must be developed to respond to the indicated problem. The proposed methodology contains several steps: (1) collecting context data sets and data validation; (2) multi-objective analysis for optimizing freight transfer services. For data validation, the study involves Grubbs outliers analysis, particularly for data cleaning and the identification of statistical significance of data reporting event cases. The Grubbs test is often used as it measures one external value at a time exceeding the boundaries of standard normal distribution. In the study area, the test was not widely applied by authors, except when the Grubbs test for outlier detection was used to identify outsiders in fuel consumption data. In the study, the authors applied the method with a confidence level of 99%. For the multi-objective analysis, the authors would like to select the forms of construction of the genetic algorithms, which have more possibilities to extract the best solution. For freight delivery management, the schemas of genetic algorithms' structure are used as a more effective technique. Due to that, the adaptable genetic algorithm is applied for the description of choosing process of the effective transportation corridor. In this study, the multi-objective genetic algorithm methods are used to optimize the data evaluation and select the appropriate transport corridor. The authors suggest a methodology for the multi-objective analysis, which evaluates collected context data sets and uses this evaluation to determine a delivery corridor for freight transfer service in the multi-modal transportation network. In the multi-objective analysis, authors include safety components, the number of accidents a year, and freight delivery time in the multi-modal transportation network. The proposed methodology has practical value in the management of multi-modal transportation processes.

Keywords: multi-objective, analysis, data flow, freight delivery, methodology

Procedia PDF Downloads 156
8679 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 100
8678 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 140
8677 Optimization Model for Identification of Assembly Alternatives of Large-Scale, Make-to-Order Products

Authors: Henrik Prinzhorn, Peter Nyhuis, Johannes Wagner, Peter Burggräf, Torben Schmitz, Christina Reuter

Abstract:

Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent process interruptions induced by e.g. delayed material deliveries or missing availability of resources. This leads to a negative impact on the logistical performance of a producer of xxl-products. In industrial practice, in case of interruptions, the identification, evaluation and eventually the selection of an alternative order of assembly activities (‘assembly alternative’) leads to an enormous challenge, especially if an optimized logistical decision should be reached. Therefore, in this paper, an innovative, optimization model for the identification of assembly alternatives that addresses the given problem is presented. It describes make-to-order, large-scale product assembly processes as a resource constrained project scheduling (RCPS) problem which follows given restrictions in practice. For the evaluation of the assembly alternative, a cost-based definition of the logistical objectives (delivery reliability, inventory, make-span and workload) is presented.

Keywords: assembly scheduling, large-scale products, make-to-order, optimization, rescheduling

Procedia PDF Downloads 422
8676 Eco-Design of Construction Industrial Park in China with Selection of Candidate Tenants

Authors: Yang Zhou, Kaijian Li, Guiwen Liu

Abstract:

Offsite construction is an innovative alternative to conventional site-based construction, with wide-ranging benefits. It requires building components, elements or modules were prefabricated and pre-assembly before installed into their final locations. To improve efficiency and achieve synergies, in recent years, construction companies were clustered into construction industrial parks (CIPs) in China. A CIP is a community of construction manufacturing and service businesses located together on a common property. Companies involved in industrial clusters can obtain environment and economic benefits by sharing resources and information in a given region. Therefore, the concept of industrial symbiosis (IS) can be applied to the traditional CIP to achieve sustainable industrial development or redevelopment through the implementation of eco-industrial parks (EIP). However, before designing a symbiosis network between companies in a CIP, candidate support tenants need to be selected to complement the existing construction companies. In this study, an access indicator system and a linear programming model are established to select candidate tenants in a CIP while satisfying the degree of connectivity among the enterprises in the CIP, minimizing the environmental impact, and maximizing the annualized profit of the CIP. The access indicator system comprises three primary indicators and fifteen secondary indicators, is proposed from the perspective of park-based level. The fifteen indicators are classified as three primary indicators including industrial symbiosis, environment performance and economic benefit, according to the three dimensions of sustainability (environment, economic and social dimensions) and the three R's of the environment (reduce, reuse and recycle). The linear programming model is a method to assess the satisfactoriness of all the indicators and to make an optimal multi-objective selection among candidate tenants. This method provides a practical tool for planners of a CIP in evaluating which among the candidate tenants would best complement existing anchor construction tenants. The reasonability and validity of the indicator system and the method is worth further study in the future.

Keywords: construction industrial park, China, industrial symbiosis, offsite construction, selection of support tenants

Procedia PDF Downloads 240
8675 Dynamic Properties of Recycled Concrete Aggregate from Resonant Column Tests

Authors: Wojciech Sas, Emil Soból, Katarzyna Gabryś, Andrzej Głuchowski, Alojzy Szymański

Abstract:

Depleting of natural resources is forcing the man to look for alternative construction materials. One of them is recycled concrete aggregates (RCA). RCA from the demolition of buildings and crushed to proper gradation can be a very good replacement for natural unbound granular aggregates, gravels or sands. Physical and the mechanical properties of RCA are well known in the field of basic civil engineering applications, but to proper roads and railways design dynamic characteristic is need as well. To know maximum shear modulus (GMAX) and the minimum damping ratio (DMIN) of the RCA dynamic loads in resonant column apparatus need to be performed. The paper will contain literature revive about alternative construction materials and dynamic laboratory research technique. The article will focus on dynamic properties of RCA, but early studies conducted by the authors on physical and mechanical properties of this material also will be presented. The authors will show maximum shear modulus and minimum damping ratio. Shear modulus and damping ratio degradation curves will be shown as well. From exhibited results conclusion will be drawn at the end of the article.

Keywords: recycled concrete aggregate, shear modulus, damping ratio, resonant column

Procedia PDF Downloads 369
8674 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 455
8673 Application of Bim Model Data to Estimate ROI for Robots and Automation in Construction Projects

Authors: Brian Romansky

Abstract:

There are many practical, commercially available robots and semi-autonomous systems that are currently available for use in a wide variety of construction tasks. Adoption of these technologies has the potential to reduce the time and cost to deliver a project, reduce variability and risk in delivery time, increase quality, and improve safety on the job site. These benefits come with a cost for equipment rental or contract fees, access to specialists to configure the system, and time needed for set-up and support of the machines while in use. Calculation of the net ROI (Return on Investment) requires detailed information about the geometry of the site, the volume of work to be done, the overall project schedule, as well as data on the capabilities and past performance of available robotic systems. Assembling the required data and comparing the ROI for several options is complex and tedious. Many project managers will only consider the use of a robot in targeted applications where the benefits are obvious, resulting in low levels of adoption of automation in the construction industry. This work demonstrates how data already resident in many BIM (Building Information Model) projects can be used to automate ROI estimation for a sample set of commercially available construction robots. Calculations account for set-up and operating time along with scheduling support tasks required while the automated technology is in use. Configuration parameters allow for prioritization of time, cost, or safety as the primary benefit of the technology. A path toward integration and use of automatic ROI calculation with a database of available robots in a BIM platform is described.

Keywords: automation, BIM, robot, ROI.

Procedia PDF Downloads 55
8672 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 621
8671 Investigations into Transition from Traditional Construction to Industrial Construction in Afghanistan

Authors: A. Latif Karimi

Abstract:

Since 2001, construction works, especially the construction of new homes and residential buildings, witnessed a dramatic boom across Afghanistan. More so, the construction industry and house builders are relied upon as important players in the country’s job market, economy and infrastructural development schemes. However, a lack of innovation, quality assurance mechanism, substandard construction and market dominance by traditional methods push all the parties in house building sector to shift for more advanced construction techniques and mass production technologies to meet the rising demands for proper accommodation. Meanwhile, rapid population growth and urbanization are widening the gap between the demand and supply of new and modern houses in urban areas like Kabul, Herat, etc. This paper investigates about current condition of construction practices in house building projects, the associated challenges, and the outcomes of transition to more reasonable and sustainable building methods. It is obvious, the introduction and use of Modern Methods of Construction (MMC) can help construction industry and house builders in Afghanistan to tackle the challenges and meet the desired standards for modern houses. This paper focuses on prefabrication, a popular MMC that is becoming more common, improving in quality and available in a variety of budgets. It is revealed that this method is the way forward to improving house building practices as it has been proven to reduce construction time, minimize waste and improve environmental performance of construction developments.

Keywords: modern houses, traditional construction, modern methods of construction, prefabrication, sustainable building

Procedia PDF Downloads 252
8670 Ocular Delivery of Charged Drugs Using Iontophoresis

Authors: Abraham J. Domb

Abstract:

Nearly every eye disorder and treatment of post operated eyes evolve around ocular drug delivery. Most ocular diseases are treated with repeated topical applications administered as eye drops. Various attempts have been made to improve drug bioavailability by increasing both the retention of the drug in the pre-corneal area and the penetration of the drug through the cornea. However, currently marketed products are associated with vision blurring, irritability, patient discomfort, toxicity, low drug bioavailability, manufacturing difficulties and inadequate aqueous stability. It has been suggested to use iontophoresis for the non-invasive delivery of drugs. The iontophoretic device is composed of a control panel, two electrodes, a cylindrical well for the insertion of a disposable hydrogel, and a disposable hydrogel pellet. The drug-loaded hydrogel is attached to a cylindrical well at the edge of the electrode of the device and placed onto the eye. The device applies a variable electrical current that can vary from 0.1 mA to 1.5 mA for pre-set periods from 10 seconds to 300 seconds. The iontophoretic device developed in the lab was found to be effective in the delivery of the drugs: gentamicin, water-soluble steroids, and various anticancer agents. When testing in rabbits for safety, the device was considered to be non-toxic and effective.

Keywords: iontophoresis, eye disorder, drug delivery, hydrogel

Procedia PDF Downloads 49
8669 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 369
8668 The Interrelationship between Formal and Informal Institutions and Its Impacts on the Autonomy of Public Service Delivery Units: The Case of Vietnam

Authors: Minh Thi Hai Vo

Abstract:

This article draws on in-depth interviews with state employees at public hospitals and universities in its institutional analysis of the autonomy practices of public service delivery units in Vietnam. Unlike many empirical and theoretical studies that view formal and informal institutions as complements or substitutes, this article finds no evidence of complementary or substitutive relationships. Instead, the article finds that formal institutions accommodate informal ones and that informal institutions tend to compete and interfere, with the existing and ineffective formal institutions. The result of such conflicting relationship is that the actual autonomy of public service delivery units is, in most cases, perceived to be greater than the formal autonomy they are given. In the condition of poor regulation, the informal autonomy may result in unethical practices including rent-seeking and corruption. The implication of the study finding is policy-makers need to redesign and reorganize the autonomisation of public service delivery units to make informal institutions support and reinforce formal ones in a complementary manner.

Keywords: autonomy, formal institutions, informal institutions, public service delivery units, Vietnam

Procedia PDF Downloads 173