Search results for: project management tools
16173 Project-Based Learning and Evidence Based Nursing as Tools for Developing Students' Integrative Critical Thinking Skills: Content Analysis of Final Students' Projects
Authors: E. Maoz
Abstract:
Background: As a teaching method, project-based learning is strongly linked to developing students’ critical thinking skills. It combines creative independent thinking, team work, and disciplinary subject-field integration. In the 'Introduction to Nursing Research Methods' course (year 3, Generic Track), project based learning is used to teach the topic of 'Evidence-Based Nursing'. This topic examines a clinical care issue encountered by students in the field. At the end of their project, students present proposals for managing the said issue. Proposals are the product of independent integrative thinking integrating a wide range of factors influencing the issue’s management. Method: Papers by 27 groups of students (165 students) were content analyzed to identify which themes emerged from the students' recommendations for managing the clinical issue. Findings: Five main themes emerged—current management approach; adapting procedures in line with current recent research recommendations; training for change (veteran nursing staff, beginner students, patients, significant others); analysis of 'economic benefit vs. patient benefit'; multidisciplinary team engagement in implementing change in practice. Two surprising themes also emerged: advertising and marketing using new technologies, which reflects how the new generation thinks. Summary and Recommendations: Among the main challenges in nursing education is training nursing graduates to think independently, integratively, and critically. Combining PBL with classical teaching methods stimulates students cognitively while opening new vistas with implications on all levels of the profession: management, research, education, and practice. Advanced students can successfully grasp and interpret the current state of clinical practice. They are competent and open to leading change and able to consider the diverse factors and interconnections that characterize the nurse's work.Keywords: evidence based nursing, critical thinking skills, project based learning, students education
Procedia PDF Downloads 9116172 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector
Authors: Rawan K. Al-Duaij, Salem A. Al-Salem
Abstract:
Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.Keywords: adjustment orders, data analysis, oil and gas sector, systems management
Procedia PDF Downloads 16316171 ArcGIS as a Tool for Infrastructure Documentation and Asset Management: Establishing a GIS for Computer Network Documentation
Authors: John Segars
Abstract:
Built out of a real-world need to have better, more detailed, asset and infrastructure documentation, this project will lay out the case for using the database functionality of ArcGIS as a tool to track and maintain infrastructure location, status, maintenance and serviceability. Workflows and processes will be presented and detailed which may be applied to an organizations’ infrastructure needs that might allow them to make use of the robust tools which surround the ArcGIS platform. The end result is a value-added information system framework with a geographic component e.g., the spatial location of various I.T. assets, a detailed set of records which not only documents location but also captures the maintenance history for assets along with photographs and documentation of these various assets as attachments to the numerous feature class items. In addition to the asset location and documentation benefits, the staff will be able to log into the devices and pull SNMP (Simple Network Management Protocol) based query information from within the user interface. The entire collection of information may be displayed in ArcGIS, via a JavaScript based web application or via queries to the back-end database. The project is applicable to all organizations which maintain an IT infrastructure but specifically targets post-secondary educational institutions where access to ESRI resources is generally already available in house.Keywords: ESRI, GIS, infrastructure, network documentation, PostgreSQL
Procedia PDF Downloads 18116170 Inclusive Cultural Heritage Tourism Project
Authors: L. Cruz-Lopes, M. Sell, P. Escudeiro, B. Esteves
Abstract:
It might be difficult for deaf people to communicate since spoken and written languages are different from sign language. When it comes to getting information, going to places of cultural heritage, or using services and infrastructure, there is a clear lack of inclusiveness. By creating assistive technology that enables deaf individuals to get around communication hurdles and encourage inclusive tourism, the ICHT- Inclusive Cultural Heritage Tourism initiative hopes to increase knowledge of sign language. The purpose of the Inclusive Cultural Heritage Tourism (ICHT) project is to develop online and on-site sign language tools and material for usage at popular tourist destinations in the northern region of Portugal, including Torre dos Clérigos, the Lello bookstore, Maia Zoo, Porto wine cellars, and São Pedro do Sul (Viseu) thermae. The ICHT system consists of an application using holography, a mobile game, an online platform for collaboration with deaf and hearing users, and a collection of International Sign training courses. The project also offers a prospect for a more inclusive society by introducing a method of teaching sign languages to tourism industry professionals. As a result, the teaching and learning of sign language along with the assistive technology tools created by the project sets up an inclusive environment for the deaf community, producing results in the area of automatic sign language translation and aiding in the global recognition of the Portuguese tourism industry.Keywords: inclusive tourism, games, international sign training, deaf community
Procedia PDF Downloads 11616169 Decision Making during the Project Management Life Cycle of Infrastructure Projects
Authors: Karrar Raoof Kareem Kamoona, Enas Fathi Taher AlHares, Zeynep Isik
Abstract:
The various disciplines in the construction industry and the co-existence of the people in the various disciplines are what builds well-developed, closely-knit interpersonal skills at various hierarchical levels thus leading to a varied way of leadership. The varied decision making aspects during the lifecycle of a project include: autocratic, participatory and last but not least, free-rein. We can classify some of the decision makers in the construction industry in a hierarchical manner as follows: project executive, project manager, superintendent, office engineer and finally the field engineer. This survey looked at how decisions are made during the construction period by the key stakeholders in the project. From the paper it is evident that the three decision making aspects can be used at different times or at times together in order to bring out the best leadership decision. A blend of different leadership styles should be used to enhance the success rate during the project lifecycle.Keywords: leadership style, construction, decision-making, built environment
Procedia PDF Downloads 35916168 A New Suburb Renovation Concept
Authors: Anu Soikkelii, Laura Sorri
Abstract:
Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated
Procedia PDF Downloads 33416167 Boosting Project Manager Retention: Lessons from the Volunteering Sector
Authors: Julia Wicker, Alexander Lang
Abstract:
The shortage of skilled workers is no longer unique to Europe; Australia now faces similar challenges, particularly in the field of project management. Project managers, essential to the success of a wide range of industries, frequently operate under intense stress and, as a result, may choose to leave their positions before the completion of their projects. This trend poses significant risks to project continuity, budget stability, and the long-term success of organizations. Consequently, it is crucial to explore strategies aimed at improving the retention of project managers, with a specific focus on fostering intrinsic motivation -an essential factor for achieving sustained success and commitment within project-based roles. The aim of this paper is to investigate retention strategies from other industries to identify effective practices that could be adapted to the unique challenges faced by project managers. In particular, the paper draws inspiration from the volunteer sector, an industry also heavily reliant on intrinsic motivation to drive commitment and performance. By examining how the volunteer sector sustains retention through a focus on intrinsic motivation, this paper seeks to highlight potential parallels and offer actionable insights for improving the retention of project managers. The paper includes an overview of the current landscape of retention challenges in project management, highlighting key factors that contribute to early departures and their impacts on organizations. This is followed by an analysis of interviews conducted with both active volunteers and those who have left their roles, leading to the development of a model that categorizes different types of volunteers and explores their behaviours. The model identifies specific reasons for volunteer terminating their assignments and proposes strategies to mitigate these issues. The paper then adapts these volunteer retention strategies to address the challenges faced by project managers, concluding with actionable recommendations for fostering an intrinsically motivated and resilient project management workforce. Ultimately, this research aims to contribute to broader efforts in mitigating skilled workforce shortages by offering sustainable retention strategies.Keywords: skilled workforce shortages, retention challenges in project management, retention strategies in the volunteering sector, retention strategies for project managers
Procedia PDF Downloads 616166 Connecting Students and Faculty Research Efforts through the Research and Projects Portal
Authors: Havish Nalapareddy, Mark V. Albert, Ranak Bansal, Avi Udash, Lin Lin
Abstract:
Students engage in many course projects during their degree programs. However, impactful projects often need a time frame longer than a single semester. Ideally, projects are documented and structured to be readily accessible to future students who may choose to continue the project, with features that emphasize the local community, university, or course structure. The Research and Project Portal (RAPP) is a place where students can post both their completed and ongoing projects with all the resources and tools used. This portal allows students to see what other students have done in the past, in the same university environment, related to their domain of interest. Computer science instructors or students selecting projects can use this portal to assign or choose an incomplete project. Additionally, this portal allows non-computer science faculty and industry collaborators to document their project ideas for students in courses to prototype directly, rather than directly soliciting the help of instructors in engaging students. RAPP serves as a platform linking students across classes and faculty both in and out of computer science courses on joint projects to encourage long-term project efforts across semesters or years.Keywords: education, technology, research, academic portal
Procedia PDF Downloads 13716165 Bridging Minds, Building Success Beyond Metrics: Uncovering Human Influence on Project Performance: Case Study of University of Salford
Authors: David Oyewumi Oyekunle, David Preston, Florence Ibeh
Abstract:
The paper provides an overview of the impacts of the human dimension in project management and team management on projects, which is increasingly affecting the performance of organizations. Recognizing its crucial significance, the research focuses on analyzing the psychological and interpersonal dynamics within project teams. This research is highly significant in the dynamic field of project management, as it addresses important gaps and offers vital insights that align with the constantly changing demands of the profession. A case study was conducted at the University of Salford to examine how human activity affects project management and performance. The study employed a mixed methodology to gain a deeper understanding of the real-world experiences of the subjects and project teams. Data analysis procedures to address the research objectives included the deductive approach, which involves testing a clear hypothesis or theory, as well as descriptive analysis and visualization. The survey comprised a sample size of 40 participants out of 110 project management professionals, including staff and final students in the Salford Business School, using a purposeful sampling method. To mitigate bias, the study ensured diversity in the sample by including both staff and final students. A smaller sample size allowed for more in-depth analysis and a focused exploration of the research objective. Conflicts, for example, are intricate occurrences shaped by a multitude of psychological stimuli and social interactions and may have either a deterrent perspective or a positive perspective on project performance and project management productivity. The study identified conflict elements, including culture, environment, personality, attitude, individual project knowledge, team relationships, leadership, and team dynamics among team members, as crucial human activities to minimize conflict. The findings are highly significant in the dynamic field of project management, as they address important gaps and offer vital insights that align with the constantly changing demands of the profession. It provided project professionals with valuable insights that can help them create a collaborative and high-performing project environment. Uncovering human influence on project performance, effective communication, optimal team synergy, and a keen understanding of project scope are necessary for the management of projects to attain exceptional performance and efficiency. For the research to achieve the aims of this study, it was acknowledged that the productive dynamics of teams and strong group cohesiveness are crucial for effectively managing conflicts in a beneficial and forward-thinking manner. Addressing the identified human influence will contribute to a more sustainable project management approach and offer opportunities for exploration and potential contributions to both academia and practical project management.Keywords: human dimension, project management, team dynamics, conflict resolution
Procedia PDF Downloads 10516164 Selecting The Contractor using Multi Criteria Decision Making in National Gas Company of Lorestan Province of Iran
Authors: Fatemeh Jaferi, Moslem Parsa, Heshmatolah Shams Khorramabadi
Abstract:
In this modern fluctuating world, organizations need to outsource some parts of their activities (project) to providers in order to show a quick response to their changing requirements. In fact, a number of companies and institutes have contractors do their projects and have some specific criteria in contractor selection. Therefore, a set of scientific tools is needed to select the best contractors to execute the project according to appropriate criteria. Multi-criteria decision making (MCDM) has been employed in the present study as a powerful tool in ranking and selecting the appropriate contractor. In this study, devolving second-source (civil) project to contractors in the National Gas Company of Lorestan Province (Iran) has been found and therefore, 5 civil companies have been evaluated. Evaluation criteria include executive experience, qualification of technical staff, good experience and company's rate, technical interview, affordability, equipment and machinery. Criteria's weights are found through experts' opinions along with AHP and contractors ranked through TOPSIS and AHP. The order of ranking contractors based on MCDM methods differs by changing the formula in the study. In the next phase, the number of criteria and their weights has been sensitivity analysed through using AHP. Adding each criterion changed contractors' ranking. Similarly, changing weights resulted in a change in ranking. Adopting the stated strategy resulted in the facts that not only is an appropriate scientific method available to select the most qualified contractors to execute gas project, but also a great attention is paid to picking needed criteria for selecting contractors. Consequently, executing such project is undertaken by most qualified contractors resulted in optimum use of limited resource, accelerating the implementation of project, increasing quality and finally boosting organizational efficiency.Keywords: multi-criteria decision making, project, management, contractor selection, gas company
Procedia PDF Downloads 40316163 Human Capital Mobility of a Skilled Workforce: A Need for a Future of Europe
Authors: Tiron-Tudor Adriana, Farcas Teodora Viorica, Ciolomic Ioana Andreea
Abstract:
The issue of human capital mobility inside Europe is still an open one. Even though there were created some tools in order to better move from one country to another to work and study the number of the people doing this is very low because of various factors presented in this paper. The "rethinking educational" agenda of the European Commission has open the floor for new projects which can create steps towards a European language for skills and competences, qualifications. One of these projects is the Partnership for Exchange of experience in Student on-the-job Training. As part of this project, we are interested to see the situation of the human capital inside EU and the elements that were created until now to support this mobility. Also, the main objective of the project is to make a comparison between the four countries involved in PEST project (Romania, Hungary, Finland, and Estonia), at the education and internship level. The results are helpful for the follow of the project, for identifying where changes can be done and need to be done.Keywords: ECVET, human capital mobility, partnership exchange, students on the job mobility, vocational education and training
Procedia PDF Downloads 42316162 Agile Manifesto Construct for the Film Industry
Authors: Kiri Trier, Theresa Treffers
Abstract:
In the course of continuous volatility like production stops due to the COVID-19 pandemic, video-on-demand player monopolizing the film industry, filmmakers are stuck in traditional, linear content development processes. The industry has to become more agile in order to react quickly and easily to changes. Since content development in agile project management is scientifically–empirically not at all recorded, and a lack beyond the software development in terms of agile methods consists, we examined if the agile manifesto values and principles from the software development can be adapted to the film industry to enable agility and digitalization of content development in the industry. We conducted an online questionnaire with 184 German filmmakers (producers, authors, directors, actors, film financiers) for a first cross-sectional assessment for adaptability of the agile manifesto from the software development to the film industry, factor analysis was used to validate the construct. Our results show that it is crucial to digitalize traditional content development to agile content development end-to-end, with tools, lean processes, new collaboration structures, and holacracy to prepare for any volatility. Overall, we examined the first construct for an agile manifesto for the film industry with four values related to nine own principles. Our findings help to get a better understanding of the agile manifesto beyond the software development as a guideline for implementing agility in the film industry.Keywords: agile manifesto, agile project management, agility, film industry
Procedia PDF Downloads 19816161 Integration of LCA and BIM for Sustainable Construction
Authors: Laura Álvarez Antón, Joaquín Díaz
Abstract:
The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability
Procedia PDF Downloads 45116160 Audit Is a Production Performance Tool
Authors: Lattari Samir
Abstract:
The performance of a production process is the result of proper operation where the management tools appear as the key to success through process management which consists of managing and implementing a quality policy, organizing and planning the manufacturing, and thus defining an efficient logic as the main areas covered by production management. To carry out this delicate mission, which requires reconciling often contradictory objectives, the auditor is called upon, who must be able to express an opinion on the effectiveness of the operation of the "production" function. To do this, the auditor must structure his mission in three phases, namely, the preparation phase to assimilate the particularities of this function, the implementation phase and the conclusion phase. The audit is a systematic and independent examination of all the stages of a manufacturing process intended to determine whether the pre-established arrangements for the combination of production factors are respected, whether their implementation is effective and whether they are relevant in relation to the goals.Keywords: audit, performance of process, independent examination, management tools, audit of accounts
Procedia PDF Downloads 7516159 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory
Abstract:
Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.Keywords: Bayesian theory, integrated project delivery, project risks, project performances
Procedia PDF Downloads 30016158 Critical Activity Effect on Project Duration in Precedence Diagram Method
Authors: Salman Ali Nisar, Koshi Suzuki
Abstract:
Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.Keywords: construction project management, critical path method, project scheduling, precedence diagram method
Procedia PDF Downloads 51016157 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area
Authors: Yousef S. Al-Othman
Abstract:
The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.Keywords: oil and gas, risk management, construction projects, project lead time
Procedia PDF Downloads 10716156 A New Intelligent, Dynamic and Real Time Management System of Sewerage
Authors: R. Tlili Yaakoubi, H.Nakouri, O. Blanpain, S. Lallahem
Abstract:
The current tools for real time management of sewer systems are based on two software tools: the software of weather forecast and the software of hydraulic simulation. The use of the first ones is an important cause of imprecision and uncertainty, the use of the second requires temporal important steps of decision because of their need in times of calculation. This way of proceeding fact that the obtained results are generally different from those waited. The major idea of this project is to change the basic paradigm by approaching the problem by the "automatic" face rather than by that "hydrology". The objective is to make possible the realization of a large number of simulations at very short times (a few seconds) allowing to take place weather forecasts by using directly the real time meditative pluviometric data. The aim is to reach a system where the decision-making is realized from reliable data and where the correction of the error is permanent. A first model of control laws was realized and tested with different return-period rainfalls. The gains obtained in rejecting volume vary from 19 to 100 %. The development of a new algorithm was then used to optimize calculation time and thus to overcome the subsequent combinatorial problem in our first approach. Finally, this new algorithm was tested with 16- year-rainfall series. The obtained gains are 40 % of total volume rejected to the natural environment and of 65 % in the number of discharges.Keywords: automation, optimization, paradigm, RTC
Procedia PDF Downloads 29916155 The Implementation of the Lean Six Sigma Production Process in a Telecommunications Company in Brazil
Authors: Carlos Fontanillas
Abstract:
The implementation of the lean six sigma methodology aims to implement practices to systematically improve processes by eliminating defects, making them cheaper. The implementation of projects with the methodology uses a division into five phases: definition, measurement, analysis, implementation, and control. In this process, it is understood that the implementation of said methodology generates benefits to organizations that adhere through the improvement of their processes. In the case of a telecommunications company, it was realized that the implementation of a lean six sigma project contributed to the improvement of the presented process, generating a financial return with the avoided cost. However, such study has limitations such as a specific segment of performance and procedure, i.e., it can not be defined that return under other circumstances will be the same. It is also concluded that lean six sigma projects tend to contribute to improved processes evaluated due to their methodology that is based on statistical analysis and quality management tools and can generate a financial return. It is hoped that the present study can be used to provide a clearer view of the methodology for entrepreneurs who wish to implement process improvement actions in their companies, as well as to provide a foundation for professionals working with lean six sigma projects. After the review of the processes, the completion of the project stages and the monitoring for three months in partnership with the owner of the process to ensure the effectiveness of the actions, the project was completed with the objective reached. There was an average of 60% reduction with the issuance of undue invoices generated after the deactivation and it was possible to extend the project to other companies, which allowed a reduction well above the initially stipulated target.Keywords: quality, process, lean six sigma, organization
Procedia PDF Downloads 12916154 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria
Authors: Ezeabasili Chibuike Patrick
Abstract:
The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.Keywords: strategies, risk management, contingency theory, Nigeria
Procedia PDF Downloads 12916153 BIM Application and Construction Schedule Simulation for the Horizontal Work Area
Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang
Abstract:
The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.Keywords: BIM, 4D CAD, linear 4D simulation, VR
Procedia PDF Downloads 40016152 The Role of Quality Management Tools and Knowledge Sharing in Improving the Level of Academic Staff: An Empirical Investigation of the Jordanian Universities
Authors: Tasneem Alfalah, Salsabeel Alfalah, Jannat Alfalah
Abstract:
The quality of higher education as a service is fundamental to a country’s development because universities prepare the professionals who will work as managers in companies and manage public and private resources and care for the health and education of new generations. Knowledge sharing involves the interaction of all activities between individuals. Thus, the higher education institutions are aiming to improve and assist their academics in generating new ideas by encouraging them to work as a team, to simplify the exchange of the new knowledge and to further improve the learning process and achieving institutional aims. Moreover, the sources of competitive advantage in universities derive from intellectual capital and innovations in which innovation comes through knowledge sharing. Using quality tools is to define the exact requirements needed to create the concept of knowledge sharing and what are the barriers to achieve this in universities. The purpose of this research is critically evaluating the role of using quality tools to facilitate the concept of knowledge sharing and improve the academic staff level in the Jordanian universities.Keywords: higher education, knowledge sharing, quality, management tools
Procedia PDF Downloads 46316151 The Use of Budgeting as an Effective Management Tool for Small, Medium and Micro Enterprises during COVID-19 Pandemic: A Perspective from South Africa
Authors: Abongile Zweni, Grate Moyo, Ricardo Peters, Bingwen Yan
Abstract:
Budgets are one of the most important tools that organisations, big or small, need to use as management tools. When organisations, particularly Small, Medium and Micro Enterprises (SMMEs), do not use budgets, they are bound to fail in their infancy stage. The aim of this study was to assess whether or not SMMEs in South Africa used budgets as an effective management tool during the COVID-19 pandemic. For the purposes of this study, data was collected using an online questionnaire (survey). This study used the quantitative research approach. The study used descriptive statistics to analyse the research question. The study found that most SMMEs did not use budgets during the COVID-19 pandemic; one of the reasons, amongst others, was that most of them had to close down during the lockdown, and some of them did not even qualify for government bailout or government grants.Keywords: budget management, SMMEs, COVID-19, South Africa
Procedia PDF Downloads 19216150 Cross-Cultural Collaboration Shaping Co-Creation Methodology to Enhance Disaster Risk Management Approaches
Authors: Jeannette Anniés, Panagiotis Michalis, Chrysoula Papathanasiou, Selby Knudsen
Abstract:
RiskPACC project aims to bring together researchers, practitioners, and first responders from nine European countries following a co-creation approach aiming to develop customised solutions to meet the needs of end-users. The co-creation workshops target to enhance the communication pathways between local civil protection authorities (CPAs) and citizens, in an effort to close the risk perception-action gap (RPAG). The participants in the workshops include a variety of stakeholders, as well as citizens, fostering the dialogue between the groups and supporting citizen participation in disaster risk management (DRM). The co-creation methodology in place implements co-design elements due to the integration of four ICT tools. Such ICT tools include web-based and mobile application technical solutions in different development stages, ranging from formulation and validation of concepts to pilot demonstrations. In total, seven different case studies are foreseen in RiskPACC. The workflow of the workshops is designed to be adaptive to every of the seven case study countries and their cultures’ particular needs. This work aims to provide an overview of the the preparation and the conduction of the workshops in which researchers and practitioners focused on mapping these different needs from the end users. The latter included first responders but also volunteers and citizens who actively participated in the co-creation workshops. The strategies to improve communication between CPAs and citizens themselves differ in the countries, and the modules of the co-creation methodology are adapted in response to such differences. Moreover, the project partners experienced how the structure of such workshops is perceived differently in the seven case studies. Therefore, the co-creation methodology itself is a design method underlying several iterations, which are eventually shaped by cross-cultural collaboration. For example, some case studies applied other modules according to the participatory group recruited. The participants were technical experts, teachers, citizens, first responders, or volunteers, among others. This work aspires to present the divergent approaches of the seven case studies implementing the co-creation methodology proposed, in response to different perceptions of the modules. An analysis of the adaptations and implications will also be provided to assess where the case studies’ objective of improving disaster resilience has been obtained.Keywords: citizen participation, co-creation, disaster resilience, risk perception, ICT tools
Procedia PDF Downloads 8816149 Industrial Investment and Contract Models in Subway Projects: Case Study
Authors: Seyed Habib A. Rahmati, Parsa Fallah Sheikhlari, Morteza Musakhani
Abstract:
This paper studies the structure of financial investment and efficiency on the subway would be created between Hashtgerd and Qazvin in Iran. Regarding ascending rate of transportation between Tehran and Qazvin which directly air pollution, it clearly implies to public transportation requirement between these two cities near Tehran. The railway transportation like subway can help each country to terminate traffic jam which has some advantages such as speed, security, non-pollution, low cost of public transport, etc. This type of transportation needs national infrastructures which require enormous investment. It couldn’t implement without leading and managing funds and investments properly. In order to response 'needs', clear norms or normative targets have to be agreed and obviously it is important to distinguish costs from investment requirements critically. Implementation phase affects investment requirements and financing needs. So recognizing barrier related to investment and the quality of investment (what technologies and services are invested in) is as important as the amounts of investment. Different investment methods have mentioned as follows loan, leasing, equity participation, Line of financing, finance, usance, bay back. Alternatives survey before initiation and analyzing of risk management is one of the most important parts in this project. Observation of similar project cities each country has the own specification to choose investment method.Keywords: subway project, project investment, project contract, project management
Procedia PDF Downloads 48016148 Designing and Making Sustainable Architectural Clothing Inspired by Reconstruction of Bam’s Bazaar
Authors: Marzieh Khaleghi Baygi, Maryam Khaleghy Baygy
Abstract:
The main aim of this project was designing and making sustainable architectural wearable dress inspired by reconstruction project of Bam’s Bazar in Iran. To achieve the goals of this project, Bam Bazar became the architectural reference. A mixed research method (including applied, qualitative and case studies methods) was used. After research, data gathering and considering related intellectual, mental and cultural background, the garment was modeled by using 3ds Max's modeling tools and Marvelous. After making the pattern, the wearable architecture was built and an architectural and historical building converted to a clothing. The implementation of sustainable architectural clothing, took seventeen months. The result of this project was a cloth in a new form that had been worn on its architect body. The comparison between present project and previous research were focusing on the same subjects (architectural clothing) shows some dramatic differentiations, including, the architect, designer and executive of this project was the same person who was the main researcher. Also, in this research, special attention was paid to the sustainability, volume and forms. Most projects in this subject (especially pervious related Iranian research) relied on painting and not on the volumes and forms. The sustainable immovable architecture had worn on its architect, became a cloth on a human's body that was moving.Keywords: wearable architecture, clothing, bam bazar, space, sustainability
Procedia PDF Downloads 6116147 Unified Structured Process for Health Analytics
Authors: Supunmali Ahangama, Danny Chiang Choon Poo
Abstract:
Health analytics (HA) is used in healthcare systems for effective decision-making, management, and planning of healthcare and related activities. However, user resistance, the unique position of medical data content, and structure (including heterogeneous and unstructured data) and impromptu HA projects have held up the progress in HA applications. Notably, the accuracy of outcomes depends on the skills and the domain knowledge of the data analyst working on the healthcare data. The success of HA depends on having a sound process model, effective project management and availability of supporting tools. Thus, to overcome these challenges through an effective process model, we propose an HA process model with features from the rational unified process (RUP) model and agile methodology.Keywords: agile methodology, health analytics, unified process model, UML
Procedia PDF Downloads 50616146 Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework
Authors: Faris Elghaish, Sepehr Abrishami, Mark Gaterell, Richard Wise
Abstract:
The collaboration and integration between all building information management (BIM) processes and tasks are necessary to ensure that all project objectives can be delivered. The literature review has been used to explore the state of the art BIM technologies to manage construction materials as well as the challenges which have faced the construction process using traditional methods. Thus, this paper aims to articulate a framework to integrate traditional material planning methods such as ABC analysis theory (Pareto principle) to analyse and categorise the project materials, as well as using independent material planning methods such as Economic Order Quantity (EOQ) and Fixed Order Point (FOP) into the BIM 4D, and 5D capabilities in order to articulate a dependent material planning cycle into BIM, which relies on the constructability method. Moreover, we build a model to connect between the material planning outputs and the BIM 4D and 5D data to ensure that all project information will be accurately presented throughout integrated and complementary BIM reporting formats. Furthermore, this paper will present a method to integrate between the risk management output and the material management process to ensure that all critical materials are monitored and managed under the all project stages. The paper includes browsers which are proposed to be embedded in any 4D BIM platform in order to predict the EOQ as well as FOP and alarm the user during the construction stage. This enables the planner to check the status of the materials on the site as well as to get alarm when the new order will be requested. Therefore, this will lead to manage all the project information in a single context and avoid missing any information at early design stage. Subsequently, the planner will be capable of building a more reliable 4D schedule by allocating the categorised material with the required EOQ to check the optimum locations for inventory and the temporary construction facilitates.Keywords: building information management, BIM, economic order quantity, EOQ, fixed order point, FOP, BIM 4D, BIM 5D
Procedia PDF Downloads 17216145 An Analysis Study of a Participatory Design Workshop from the Perspectives of Communication Strategies and Tools
Authors: Meng-Yu Wun, Jiunde Lee
Abstract:
Participatory design transfers the role of design team becoming the facilitator who manages to work collaboratively with the 'partners of innovation': users. This facilitator role not just concerns the users’ behaviors or insights under the common practice of user-centered design, it emphasizes the importance of communication experience conducted by various strategies and tools in a workshop session which could profoundly impact the quality of the co-creation process. To investigate the communication experience in the participatory design, this study proposed a qualitative research to analyze communication strategies and tools. A participatory design workshop and following in-depth interviews were carried out to explore how participants (facilitators, users) might apply different strategies and tools to enhance the communication process. The major study findings are as follows: (a) roles had influence on communication experience; facilitators’ principles and methods influenced the usage of facilitation strategies in various situations, while users put more emphasis on communication activities and goals aimed to complete the design tasks, (b) communication tools should be both fixed and changeable: participants had fixed cognition on different forms of communication tools; with the fundamental cognition, they could choose and make use of tools according to their needs, (c) the management of workshop communication should be flexible: controlling the schedule, stimulating innovations, and creating the space for conversation are crucial to facilitate in a participatory workshop.Keywords: communication experience, facilitation, participatory design, workshop
Procedia PDF Downloads 15716144 An Overview of the SIAFIM Connected Resources
Authors: Tiberiu Boros, Angela Ionita, Maria Visan
Abstract:
Wildfires are one of the frequent and uncontrollable phenomena that currently affect large areas of the world where the climate, geographic and social conditions make it impossible to prevent and control such events. In this paper we introduce the ground concepts that lie behind the SIAFIM (Satellite Image Analysis for Fire Monitoring) project in order to create a context and we introduce a set of newly created tools that are external to the project but inherently in interventions and complex decision making based on geospatial information and spatial data infrastructures.Keywords: wildfire, forest fire, natural language processing, mobile applications, communication, GPS
Procedia PDF Downloads 581