19364 A Relationship between Transformational Leadership, Internal Audit and Risk Management Implementation in the Indonesian Public Sector

Authors: Tio Novita Efriani

Abstract:

Public sector organizations work in a complex and risky environment. Since the beginning of 2000s, the public sector has paid attention to the need for an effective risk management. The Indonesian public sector has also concerned about this issue and in 2008 it enacted the Government Regulation that gives mandate for the implementation of risk management in government organizations. This paper investigates risk management implementation in the Indonesian public sector organizations and the role of transformational leadership and internal audit activities. Data was collected via survey. A total of 202 effective responses (30% response rate) from employees in 34 government ministries were statistically analyzed by using Partial least square structural equation modelling (PLS-SEM) and the software was SmartPLS 3.0. All the constructs were lower order, except for the risk management implementation construct, which was treated as a second-order construct. A two-stage approach was employed in the analysis of the higher order component. The findings revealed that transformational leadership positively influence risk management implementation. The findings also found that the core and legitimate roles of internal audit in risk management positively affect the implementation of risk management. The final finding showed that internal auditing mediates a relationship between transformational leadership and risk management implementation. These results suggest that the implementation of risk management in the Indonesian public sector was significantly supported by internal auditors and leadership. The findings confirm the importance of transformational leadership and internal audit in the public sector risk management strategies.

Keywords: Indonesian public sector, internal audit, risk management, transformational leadership

Procedia PDF Downloads 179
19363 Implementation of ISO 26262: Issues and Challenges

Authors: Won Jung, Azianti Ismail

Abstract:

Functional safety is about electrical, electronics, and programmable electronic safety-related system focuses on the potential risk of malfunction which may have a significant impact on the safety of humans and/or the environment based on IEC 61508. In November 2011, the automotive industry has been introduced to automotive functional safety ISO 26262 which addresses the complete safety installation from sensor to actuator with its technical as well as management issues. Nowadays, most of the modern automobiles are equipped with embedded electronic systems which include many Electronic Controller Units (ECUs), electronic sensors, signals, bus systems and coding. Due to upcoming more sophisticated systems installed in automobiles, the need to carry out detailed safety is very crucial. Assimilation of existing practices with this new standard is a major challenge for the automotive industry in reducing redundancy, time and resources. Therefore, this paper will analyze the research trends on pre and post introduction of ISO 26262 through publications as well as to take a glimpse in the activities for implementing this standard by the automotive manufacturers around the world. It is going to highlight issues and challenges which have been discussed among the experts in this field. Even though it will take some time for this standard to be fully implemented, the benefits from this implementation will raise the competitiveness in the global automotive market.

Keywords: ISO 26262, automotive, functional safety, implementation, standard, challenges

Procedia PDF Downloads 382
19362 Construction Project Planning Using Fuzzy Critical Path Approach

Authors: Omar M. Aldenali

Abstract:

Planning is one of the most important phases of the management science and network planning, which represents the project activities relationship. Critical path is one of the project management techniques used to plan and control the execution of a project activities. The objective of this paper is to implement a fuzzy logic approach to arrange network planning on construction projects. This method is used to finding out critical path in the fuzzy construction project network. The trapezoidal fuzzy numbers are used to represent the activity construction project times. A numerical example that represents a house construction project is introduced. The critical path method is implemented on the fuzzy construction network activities, and the results showed that this method significantly affects the completion time of the construction projects.

Keywords: construction project, critical path, fuzzy network project, planning

Procedia PDF Downloads 122
19361 Types of Innovation Management Office and Their Roles and Responsibilities in Supporting the Innovation Management Process from Organisational Strategic Foresight to Managing Innovation Project Portfolios

Authors: Bakr Zade, Paolo Cervera

Abstract:

With the aim of maximising return on innovation investments, organisations create central units to support successful implementation of innovation management initiatives. The support units–referred to in this research as innovation management offices (IMOs)–range from small teams of innovation management champions to fully resourced centres of excellence for innovation management. However, roles and responsibilities of IMOs vary in different organisations. This research investigates the different types of IMO in organisations, based on their different roles and responsibilities in supporting innovation management processes. The research uses grounded theory methodology to uncover an IMO taxonomy from emergent concepts during innovation management maturity assessment exercises in twelve organisations from the United Kingdom and the United Arab Emirates. The taxonomy distinguishes five types of IMO, based on their roles and responsibilities in supporting innovation management processes, from organisational strategic foresight to managing innovation management project portfolios. The IMO taxonomy addresses a gap in research into innovation management support in organisations and offers a practical framework that diverse organisations can appreciate and use in designing IMOs that are aligned with their innovation management visions and strategies.

Keywords: future foresight, future shaping, innovation management, innovation management office, portfolio management

Procedia PDF Downloads 372
19360 Factors That Affect the Effectiveness of Enterprise Architecture Implementation Methodology

Authors: Babak Darvish Rouhani, Mohd Nazri Mahrin, Fatemeh Nikpay, Pourya Nikfard, Maryam Khanian Najafabadi

Abstract:

Enterprise Architecture (EA) is a strategy that is employed by enterprises in order to align their business and Information Technology (IT). EA is managed, developed, and maintained through Enterprise Architecture Implementation Methodology (EAIM). The effectiveness of EA implementation is the degree in which EA helps to achieve the collective goals of the organization. This paper analyzes the results of a survey that aims to explore the factors that affect the effectiveness of EAIM and specifically the relationship between factors and effectiveness of the output and functionality of EA project. The exploratory factor analysis highlights a specific set of five factors: alignment, adaptiveness, support, binding, and innovation. The regression analysis shows that there is a statistically significant and positive relationship between each of the five factors and the effectiveness of EAIM. Consistent with theory and practice, the most prominent factor for developing an effective EAIM is innovation. The findings contribute to the measuring the effectiveness of EA implementation project by providing an indication of the measurement implementation approaches which is used by the Enterprise Architects, and developing an effective EAIM.

Keywords: enterprise architecture, enterprise architecture implementation methodology, implementation methodology, factors, EA, effectiveness

Procedia PDF Downloads 414
19359 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project

Authors: A. Kourou, M. Panoutsopoulou

Abstract:

Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.

Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material

Procedia PDF Downloads 107
19358 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism

Procedia PDF Downloads 352
19357 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 116
19356 Integrated Risk Management as a Framework for Organisational Success

Authors: Olakunle Felix Adekunle

Abstract:

Risk management is recognised as an essential tool to tackle the inevitable uncertainty associated with business and projects at all levels. But it frequently fails to meet expectations, with projects continuing to run late, over budget or under performing, and business is not gaining the expected benefits. The evident disconnect which often occurs between strategic vision and tactical project delivery typically arises from poorly defined project objectives and inadequate attention to the proactive management of risks that could affect those objectives. One of the main failings in the traditional approach to risk management arises from a narrow focus on the downside, restricted to the technical or operational field, addressing tactical threats to processes, performance or people. This shortcoming can be overcome by widening the scope of risk management to encompass both strategic risks and upside opportunities, creating an integrated approach which can bridge the gap between strategy and tactics. Integrated risk management addresses risk across a variety of levels in the organisation, including strategy and tactics, and covering both opportunity and threat. Effective implementation of integrated risk management can produce a number of benefits to the organisation which are not available from the typical limited-scope risk process. This paper explores how to expand risk management to deliver strategic advantage while retaining its use as a tactical tool.

Keywords: risk management, success, organization, strategy, project, tactis, vision

Procedia PDF Downloads 370
19355 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 311
19354 Conceptual Modeling of the Relationship between Project Management Practices and Knowledge Absorptive Capacity Using Interpretive Structural Modeling Method

Authors: Seyed Abdolreza Mosavi, Alireza Babakhan, Elham Sadat Hoseinifard

Abstract:

Knowledge-based firms need to design mechanisms for continuous absorptive and creation of knowledge in order to ensure their survival in the competitive arena and to follow the path of development. Considering the project-oriented nature of product development activities in knowledge-based firms on the one hand and the importance of analyzing the factors affecting knowledge absorptive capacity in these firms on the other, the purpose of this study is to identify and classify the factors affecting project management practices on absorptive knowledge capacity. For this purpose, we have studied and reviewed the theoretical literature in the field of project management and absorptive knowledge capacity so as to clarify its dimensions and indexes. Then, using the ISM method, the relationship between them has been studied. To collect data, 21 questionnaires were distributed in project-oriented knowledge-based companies. The results of the ISM method analysis provide a model for the relationship between project management activities and knowledge absorptive capacity, which includes knowledge acquisition capacity, scope management, time management, cost management, quality management, human resource management, communications management, procurement management, risk management, stakeholders management and integration management. Having conducted the MICMAC analysis, we divided the variables into three groups of independent, relational and dependent variables and came up with no variables to be included in the group of autonomous variables.

Keywords: knowledge absorptive capacity, project management practices, knowledge-based firms, interpretive structural modeling

Procedia PDF Downloads 178
19353 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 458
19352 CMMI Key Process Areas and FDD Practices

Authors: Rituraj Deka, Nomi Baruah

Abstract:

The development of information technology during the past few years resulted in designing of more and more complex software. The outsourcing of software development makes a higher requirement for the management of software development project. Various software enterprises follow various paths in their pursuit of excellence, applying various principles, methods and techniques along the way. The new research is proving that CMMI and Agile methodologies can benefit from using both methods within organizations with the potential to dramatically improve business performance. The paper describes a mapping between CMMI key process areas (KPAs) and Feature-Driven Development (FDD) communication perspective, so as to increase the understanding of how improvements can be made in the software development process.

Keywords: Agile, CMMI, FDD, KPAs

Procedia PDF Downloads 441
19351 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 291
19350 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: project management, academic program, program review, education, higher education institution, strategic management

Procedia PDF Downloads 348
19349 CDIO-Based Teaching Reform for Software Project Management Course

Authors: Liping Li, Wenan Tan, Na Wang

Abstract:

With the rapid development of information technology, project management has gained more and more attention recently. Based on CDIO, this paper proposes some teaching reform ideas for software project management curriculum. We first change from Teacher-centered classroom to Student-centered and adopt project-driven, scenario animation show, teaching rhythms, case study and team work practice to improve students' learning enthusiasm. Results showed these attempts have been well received and very effective; as well, students prefer to learn with this curriculum more than before the reform.

Keywords: CDIO, teaching reform, engineering education, project-driven, scenario animation simulation

Procedia PDF Downloads 413
19348 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 345
19347 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 299
19346 Promoting Non-Formal Learning Mobility in the Field of Youth

Authors: Juha Kettunen

Abstract:

The purpose of this study is to develop a framework for the assessment of research and development projects. The assessment map is developed in this study based on the strategy map of the balanced scorecard approach. The assessment map is applied in a project that aims to reduce the inequality and risk of exclusion of young people from disadvantaged social groups. The assessment map denotes that not only funding but also necessary skills and qualifications should be carefully assessed in the implementation of the project plans so as to achieve the objectives of projects and the desired impact. The results of this study are useful for those who want to develop the implementation of the Erasmus+ Programme and the project teams of research and development projects.

Keywords: non-formal learning, youth work, social inclusion, innovation

Procedia PDF Downloads 278
19345 Classifying ERP Implementation’s Risks in Banking Sectors Based on Different Implementation Phases

Authors: Farnaz Farzadnia, Ahmad Alibabaei

Abstract:

Enterprise Resource Planning (ERP) systems are considered as complicated information systems. Many organizations failed implementing ERP systems because it is a very difficult, time-consuming and expensive process. Enterprise resource planning system is appropriate for organizations in all economic sectors. As banking is currently considered a non-typical area for ERP usage, there are very little studies on ERP implementation in banking. This paper presents a general risks taxonomy. In this research, after identifying implementation risks, a process quality management method has been applied to identify relations between risks of implementation ERP in banking sectors and implementation phases. Oracle application implementation method titled as AIM used in this research for classifying the risks. These findings will help managers to develop better strategies for supervising and controlling ERP implementation projects.

Keywords: AIM implementation, bank, enterprise resource planning, risk, process quality management method

Procedia PDF Downloads 521
19344 The Successful Implementation of Management Accounting Innovations (MAIs) within Jordanian Industrial Sector Using Cross-Case Analysis

Authors: Mahmoud Nassar

Abstract:

This paper was designed for interviews with companies that had implemented Management Accounting Innovations (MAIs) within Jordanian Industrial Sector in full. Each company in this paper was examined as an entity to obtain an understanding of the process of MAIs adoption and implementation as well as the respondents’ opinions and perspectives of each individual company as to what are considered to be the important factors in the company. By firstly using within-case analysis has the potential to aid in-depth views of the issues and their impact on each particular company. Then, cross-case analysis was used to analyse the similarities and differences of the six companies. The study concludes that, the six companies interviewed gradually moved to using MAIs over the last ten years. The length of time required to implement the MAIs varied across the companies. Interviewees revealed several factors from both the demand and supply side that influence implementation of MAIs within the Jordanian industrial companies. Respondents mentioned and emphasised the important effect of the following factors: top management support, education about ABC concept and benefits, training programmes, shortcoming of existing cost system, competition, size of company, professional accounting bodies, management accounting journals, management accounting research and PhD degrees, and cooperation between universities and companies.

Keywords: industrial sector, innovations, Jordan, management accounting

Procedia PDF Downloads 357
19343 Implementation of Lean Production in Business Enterprises: A Literature-Based Content Analysis of Implementation Procedures

Authors: P. Pötters, A. Marquet, B. Leyendecker

Abstract:

The objective of this paper is to investigate different implementation approaches for the implementation of Lean production in companies. Furthermore, a structured overview of those different approaches is to be made. Therefore, the present work is intended to answer the following research question: What differences and similarities exist between the various systematic approaches and phase models for the implementation of Lean Production? To present various approaches for the implementation of Lean Production discussed in the literature, a qualitative content analysis was conducted. Within the framework of a qualitative survey, a selection of texts dealing with lean production and its introduction was examined. The analysis presents different implementation approaches from the literature, covering the descriptive aspect of the study. The study also provides insights into similarities and differences among the implementation approaches, which are drawn from the analysis of latent text contents and author interpretations. In this study, the focus is on identifying differences and similarities among systemic approaches for implementing Lean Production. The research question takes into account the main object of consideration, objectives pursued, starting point, procedure, and endpoint of the implementation approach. The study defines the concept of Lean Production and presents various approaches described in literature that companies can use to implement Lean Production successfully. The study distinguishes between five systemic implementation approaches and seven phase models to help companies choose the most suitable approach for their implementation project. The findings of this study can contribute to enhancing transparency regarding the existing approaches for implementing Lean Production. This can enable companies to compare and contrast the available implementation approaches and choose the most suitable one for their specific project.

Keywords: implementation, lean production, phase models, systematic approaches

Procedia PDF Downloads 77
19342 Youth and International Environmental Voluntary Initiatives: A Case Study of IGreen Project by AIESEC in Bandung

Authors: Yoel Agustheo Rinding

Abstract:

Globalization has made physical borders between countries become more obscure. Due to the free flow of information between countries, issue for instance, environment has become global concern. The concern has grown as the result of endless campaign made by most of the non-governmental organizations (NGOs). By means of this situation, international voluntary initiatives on environmental issues have appeared to be popular among world’s society today especially for youth. AIESEC as international non-governmental organization (INGO) through IGreen Project has initiated environmental international voluntary initiatives concerning in environmental awareness of Bandung’s citizen. Bandung itself is still struggling on solving flood as one of its major problems regardless the fact that Bandung is one of the most developed cities in Indonesia. This paper would like to discuss on how globalization affects AIESEC as an INGO in order to spread its influence and also on how it could build international voluntary initiatives networks. Afterwards, author would like to elaborate how both AIESEC and youth perceive the importance of international voluntary initiatives by using cosmopolitanism approach. In order to get a deep understanding of how this activity works, this paper also would like to explain regarding the management, expected outcomes, and the real impacts of IGreen project towards Bandung. In the end of this paper, author would like to propose solutions on how to utilize international voluntary initiatives as a solution for environmental issues nowadays.

Keywords: AIESEC, cosmopolitanism, environmental issues, globalization, IGreen project, international environmental voluntary initiatives, INGO, youth

Procedia PDF Downloads 206
19341 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: construction management, project objectives, resource planing and scheduling, project completion

Procedia PDF Downloads 386
19340 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 283
19339 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 383
19338 Issues in Implementation of Vertical Greenery System on Existing Government Building in Malaysia

Authors: Jamilah Halina Abdul Halim, Norsiah Hassan, Azlina Aziz, Norhayati Mat Wajid, Mohd Saipul Asrafi

Abstract:

There are various types of vertical greenery system (VGS) in Malaysia, but none is installed at government buildings, although the government is looking into energy efficient building design. This is due to lack of technical information that focus on the maintenance and care, issues, and challenges face by vertical greenery system under tropical climate conditions. This research aim to identify issues in implementation of vertical greenery system on existing government building in Malaysia. The methodology used are literature reviews (desktop study), observation on sites, and case studies. Initial findings indicates that design and maintenance issues of vertical greenery system are the main challenges faced mainly by designer, especially those who involved in decision-making process. It can be concluded that orientation, openings, maintenance, performance, longevity, structural load, access, wind resistance, design failure, system failure, and lack of maintenance foresight are the main factors that need to be considered. These factors should be holistically aligned towards the economic cost, effective time, and quality design in implementation of vertical greenery system on existing government building. A comprehensive implementation of vertical greenery system will lead to greater sustainable investment for government buildings and responsive action to climate change.

Keywords: issues, government building, maintenance, vertical greenery system

Procedia PDF Downloads 72
19337 Research Inspiration for Urban Renewal in Regions with Historical Value in Developed Areas of China: A Case Study of the Hubei Ancient Village

Authors: Qingxiang Zeng

Abstract:

Since the beginning of the 21st century, China's urbanization process has rapidly progressed. Since 2005, China's developed regions have gradually entered the stage of urban conservation and updating. The over-pursuit of economic market benefits in urban construction in China has led to issues such as disrespect for residents' rights, neglect of historical context protection, and gentlemanization, which hinder urban social development in some developed urban areas. This article takes the Hubei Ancient Village renewal project in Shenzhen, China, as an example. The project took eight years to obtain government approval and implementation since its renewal proposal was launched, which has attracted attention from society and urban planning circles. Through an introduction to the project's general situation and renewal process, this article reflects on the issues of planning systems, historical context protection, conflicts between multiple values, and neglect of vulnerable groups in the Hubei Ancient Village renewal and protection project. Based on this reflection, this article summarizes the corresponding experience and provides theoretical help for urban renewal in developed regions in China, providing case references for urban renewal and construction in other developing countries and offering critical thinking and valuable experience for urban planning practitioners and policymakers.

Keywords: urban renewal, Hubei Ancient Village, historical context, public participation

Procedia PDF Downloads 43
19336 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 45
19335 Knowledge Management in Practice: An Exploratory Study Applied to Consulting Firms

Authors: Evgeniya Ivanova

Abstract:

Nowadays, in the literature, there is still no fixed definition of knowledge management that often remains only as an academic discipline. The current market situation is changing very quickly, the need of new technologies is high, and knowledge management is the area that ensures that the know-how has not been lost during market development and adoption. The study examines how knowledge management is being leveraged and practiced in the management consultancy companies and provides not only the tips and best practices of applied knowledge management approaches but also the validation matrix for its successful or unsuccessful implementation. Different knowledge management approaches are explored on the basis of their practical implementation, including related challenges, knowledge sharing process, and barriers that are typical for consulting firms mostly driven by the agile working culture. The relevance of proposed topic is confirmed by the finding that corporate working culture and the exponentially developing technologies have a direct impact on the success of practical implementation of knowledge management.

Keywords: knowledge management, knowledge management in practice, consulting firm, knowledge management success