3908 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects
Authors: Preeda Sansakorn, Min An
Abstract:
In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects
Procedia PDF Downloads 4893907 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa
Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq
Abstract:
The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa
Procedia PDF Downloads 1033906 Innovative Three Wire Capacitor Circuit System for Efficiency and Comfort Improvement of Ceiling Fans
Authors: R. K. Saket, K. S. Anand Kumar
Abstract:
This paper presents an innovative 3-wire capacitor circuit system used to increase the efficiency and comfort improvement of permanent split-capacitor ceiling fan. In this innovative circuit, current has been reduced to save electrical power. The system could be used to replace standard single phase motor 2-wire capacitor configuration by cost effective split value X rated of optimized AC capacitors with the auxiliary winding to provide reliable ceiling fan operation and improved machine performance to save power. In basic system operations, comparisons with conventional ceiling fan are described.Keywords: permanent split-capacitor motor, innovative 3-wire capacitor circuit system, standard 2-wire capacitor circuit system, metalized film X-rated capacitor
Procedia PDF Downloads 5203905 Airport Investment Risk Assessment under Uncertainty
Authors: Elena M. Capitanul, Carlos A. Nunes Cosenza, Walid El Moudani, Felix Mora Camino
Abstract:
The construction of a new airport or the extension of an existing one requires massive investments and many times public private partnerships were considered in order to make feasible such projects. One characteristic of these projects is uncertainty with respect to financial and environmental impacts on the medium to long term. Another one is the multistage nature of these types of projects. While many airport development projects have been a success, some others have turned into a nightmare for their promoters. This communication puts forward a new approach for airport investment risk assessment. The approach takes explicitly into account the degree of uncertainty in activity levels prediction and proposes milestones for the different stages of the project for minimizing risk. Uncertainty is represented through fuzzy dual theory and risk management is performed using dynamic programming. An illustration of the proposed approach is provided.Keywords: airports, fuzzy logic, risk, uncertainty
Procedia PDF Downloads 4133904 Knowledge Acquisition as Determinant of Outputs of Innovative Business in Regions of the Czech Republic
Authors: P. Hajek, J. Stejskal
Abstract:
The aim of this paper is to analyze the ability to identify and acquire knowledge from external sources at the regional level in the Czech Republic. The results show that the most important sources of knowledge for innovative activities are sources within the businesses themselves, followed by customers and suppliers. Furthermore, the analysis of relationships between the objective of the innovative activity and the ability to identify and acquire knowledge implies that knowledge obtained from a) customers aims at replacing outdated products and increasing product quality; b) suppliers aims at increasing capacity and flexibility of production; and c) competing businesses aims at growing market share and increasing the flexibility of production and services. Regions should therefore direct their support especially into development and strengthening of networks within the value chain.Keywords: knowledge, acquisition, innovative business, Czech republic, region
Procedia PDF Downloads 3713903 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making
Authors: Sasan Aryaee, Mahdi Ravanshadnia
Abstract:
Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks
Procedia PDF Downloads 1563902 The Moderation Effect of Smart Phone Addiction in Relationship between Self-Leadership and Innovative Behavior
Authors: Gi-Ryun Park, Gye-Wan Moon, Dong-Hoon Yang
Abstract:
This study aims to explore the positive effects of self-leadership and innovative behavior that'd been proven in the existing researches proactively and understand the regulation effects of smartphone addiction which has recently become an issue in Korea. This study conducted a convenient sampling of college students attending the four colleges located at Daegu. A total of 210 questionnaires in 5-point Likert scale were distributed to college students. Among which, a total of 200 questionnaires were collected for our final analysis data. Both correlation analysis and regression analysis were carried out to verify those questionnaires through SPSS 20.0. As a result, college students' self-leadership had a significantly positive impact on innovative behavior (B= .210, P= .003). In addition, it is found that the relationship between self-leadership and innovative behavior can be adjusted depending on the degree of smartphone addiction in college students (B= .264, P= .000). This study could first understand the negative effects of smartphone addiction and find that if students' self-leadership is improved in terms of self-management and unnecessary use of smartphone is controlled properly, innovative behavior can be improved. In addition, this study is significant in that it attempts to identify a new impact of smartphone addiction with the recent environmental changes, unlike the existing researches that'd been carried out from the perspective of organizational behavior theory.Keywords: innovative behavior, revolutionary behavior, self-leadership, smartphone addiction
Procedia PDF Downloads 2583901 Analysis Mechanized Boring (TBM) of Tehran Subway Line 7
Authors: Shahin Shabani, Pouya Pourmadadi
Abstract:
Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and water diversion. Several mining projects have seen the successful and economic beneficial use of TBMs, and there is an increasing awareness of the benefits of TBMs for mining projects. Key technical considerations for the use of TBMs for the construction of tunnels for mining projects include geological issues (rock type, rock alteration, rock strength, rock abrasivity, durability, ground water inflows), depth of cover and the potential for overstressing/rockbursts, site access and terrain, portal locations, TBM constraints, minimum tunnel size, tunnel support requirements, contractor and labor experience, and project schedule demands. This study focuses on tunnelling mining, with the goal to develop methods and tools to be used to gain understanding of these processes, and to analyze metro of Tehran. The Metro Line 7 of Tehran is one of the Longest (26 Km) and deepest (27m) of projects that’s under implementation. Because of major differences like passing under all geotechnical layers of the town and encountering part of it with underground water table and also using mechanized excavation system, is one of special metro projects.Keywords: TBM, tunnel boring machines economic, metro, line 7
Procedia PDF Downloads 3833900 Importance of Knowledge in the Interdisciplinary Production Processes of Innovative Medical Tools
Authors: Katarzyna Mleczko
Abstract:
Processes of production of innovative medical tools have interdisciplinary character. They consist of direct and indirect close cooperation of specialists of different scientific branches. The Knowledge they have seems to be important for undertaken design, construction and manufacturing processes. The Knowledge exchange between participants of these processes is therefore crucial for the final result, which are innovative medical products. The paper draws attention to the necessity of feedback from the end user to the designer / manufacturer of medical tools which will allow for more accurate understanding of user needs. The study describes prerequisites of production processes of innovative medical (surgical) tools including participants and category of knowledge resources occurring in these processes. They are the result of research in selected Polish organizations involved in the production of medical instruments and are the basis for further work on the development of knowledge sharing model in interdisciplinary teams geographically dispersed.Keywords: interdisciplinary production processes, knowledge exchange, knowledge sharing, medical tools
Procedia PDF Downloads 4403899 The Importance of Localization in Large Constraction Projects
Authors: Ali Mohammadi
Abstract:
The basis for the construction of any project is a map, a map where the surveyor can determine the coordinates of the points on the ground by using the coordinates and using the total station, projects such as dams, roads, tunnels and pipelines, if the base points are determined using GPS prepared can create challenges for the surveyor to control. First, we will examine some map projection on which the maps are designed, and a summary of their differences and the challenges that surveyors face in order to control them, because in order to build projects, we need real lengths and angles, so we have to use coordinates that provide us with the results of the calculations. We will examine some examples to understand the concept of localization so that the surveyor knows if he is facing a challenge or not and if he is faced with this challenge, how should he solve this problem.Keywords: UTM, scale factor, cartesian, traverse
Procedia PDF Downloads 783898 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships
Authors: Guanqun Shi, Xueqing Zhang
Abstract:
The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.Keywords: public private partnerships, insurance, contract, risk
Procedia PDF Downloads 2823897 Uneven Habitat Characterisation by Using Geo-Gebra Software in the Lacewings (Insecta: Neuroptera), Knowing When to Calculate the Habitat: Creating More Informative Ecological Experiments
Authors: Hakan Bozdoğan
Abstract:
A wide variety of traditional methodologies has been enhanced for characterising smooth habitats in order to find out different environmental objectives. The habitats were characterised based on size and shape by using Geo-Gebra Software. In this study, an innovative approach to researching habitat characterisation in the lacewing species, GeoGebra software is utilised. This approach is demonstrated using the example of ‘surface area’ as an analytical concept, wherein the goal was to increase clearness for researchers, and to improve the quality of researching in survey area. In conclusion, habitat characterisation using the mathematical programme provides a unique potential to collect more comprehensible and analytical information about in shapeless areas beyond the range of direct observations methods. This research contributes a new perspective for assessing the structure of habitat, providing a novel mathematical tool for the research and management of such habitats and environments. Further surveys should be undertaken at additional sites within the Amanos Mountains for a comprehensive assessment of lacewings habitat characterisation in an analytical plane. This paper is supported by Ahi Evran University Scientific Research Projects Coordination Unit, Projects No:TBY.E2.17.001 and TBY.A4.16.001.Keywords: uneven habitat shape, habitat assessment, lacewings, Geo-Gebra Software
Procedia PDF Downloads 2833896 The Case of ESPRIT (HigherSchool of Engineering)
Authors: Amira Potter
Abstract:
Since three years, ESPRIT has adopted project-based learning across its curricula. The philosophy behind this reform is to prepare its future engineers to become more operational once they integrate the workplace. It allows them to learn all the required skills expected from them by their future employers. This learner-centered method helps the students take responsibility for their own learning, solve real-world problems and carry out muli-faceted projects. Therefore, the teacher who used to be considered as the detainer of the knowledge has become more of a facilitator and a coach, encouraging their students’ learning process. This innovative way to English teaching has enabled the students to learn the English language differently. The target language is learnt cooperatively through group work, presentations, debating and many other communicative activities. The speaking skill in English language remains by far the most challenging skill for Tunisian students with an educational background based on Arabic as a first language and French as a second language. The student’s initial resistance to speak English in front of their classmates and the way they end up performing their work, shows the real progress they managed to achieve through PBL approach. The article will focus on the positive impact PBL has had on oral fluency among Esprit engineering students and how it has been achieved. It will also describe how speaking skill is taught and assessed at ESPRIT.Keywords: cooperative, engineer, innovative, project-based learning
Procedia PDF Downloads 3173895 The Impact of Perception of Transformational Leadership and Factors of Innovation Culture on Innovative Work Behavior in Junior High School's Teacher
Authors: Galih Mediana
Abstract:
Boarding school can helps students to turn all good qualities into habits. The process of forming one's personality can be done in various ways. In addition to gaining general knowledge at school during learning hours, teachers can instill values in students which can be done while in the dormitory when the learning process has ended. This shows the important role that must be played by boarding school’s teachers. Transformational leadership and a culture of innovation are things that can instill innovative behavior in teachers. This study aims to determine the effect of perceptions of transformational leadership and a culture of innovation on innovative work behavior among Islamic boarding school teachers. Respondents in this study amounted to 70 teachers. To measure transformational leadership, a modified measuring tool is used, namely the Multifactor Leadership Questionnaire (MLQ) by Bass (1985). To measure innovative work behavior, a measurement tool based on dimensions from Janssen (2000) is used. The innovation culture in this study will be measured using the innovation culture factor from Dobni (2008). This study uses multiple regression analysis to test the hypothesis. The results of this study indicate that there is an influence of perceptions of transformational leadership and innovation culture factors on innovative work behavior in Islamic boarding school’s teachers by 57.7%.Keywords: transformational leadership, innovative work behavior, innovation culture, boarding school, teacher
Procedia PDF Downloads 1073894 Promoting Teaching and Learning Structures Based on Innovation and Entrepreneurship in Valahia University of Targoviste
Authors: Gabriela Teodorescu, Ioana Daniela Dulama
Abstract:
In an ever-changing society, the education system needs to constantly evolve to meet market demands. During its 30 years of existence, Valahia University of Targoviste (VUT) tried to offer its students a series of teaching-learning schemes that would prepare them for a remarkable career. In VUT, the achievement of performance through innovation can be analyzed by reference to several key indicators (i.e., university climate, university resources, and innovative methods applied to classes), but it is possible to differentiate between activities in the classic format: participate to courses; interactive seminars and tutorials; laboratories, workshops, project-based learning; entrepreneurial activities, through simulated enterprises; mentoring activities. Thus, VUT has implemented over time a series of schemes and projects based on innovation and entrepreneurship, and in this paper, some of them will be briefly presented. All these schemes were implemented by facilitating an effective dialog with students and the opportunity to listen to their views at all levels of the University and in all fields of study, as well as by developing a partnership with students to set out priority areas. VUT demonstrates innovation and entrepreneurial capacity through its new activities for higher education, which will attract more partnerships and projects dedicated to students.Keywords: Romania, project-based learning, entrepreneurial activities, simulated enterprises
Procedia PDF Downloads 1613893 Contractors Perspective on Causes of Delays in Power Transmission Projects
Authors: Goutom K. Pall
Abstract:
At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.Keywords: delay, project delay, power transmission projects, time-overruns
Procedia PDF Downloads 1773892 Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective
Authors: Charles Mothobiso
Abstract:
This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.Keywords: construction clients, design team, green buildings, procurement
Procedia PDF Downloads 2953891 Risk Assessment of Building Information Modelling Adoption in Construction Projects
Authors: Amirhossein Karamoozian, Desheng Wu, Behzad Abbasnejad
Abstract:
Building information modelling (BIM) is a new technology to enhance the efficiency of project management in the construction industry. In addition to the potential benefits of this useful technology, there are various risks and obstacles to applying it in construction projects. In this study, a decision making approach is presented for risk assessment in BIM adoption in construction projects. Various risk factors of exerting BIM during different phases of the project lifecycle are identified with the help of Delphi method, experts’ opinions and related literature. Afterward, Shannon’s entropy and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Situation) are applied to derive priorities of the identified risk factors. Results indicated that lack of knowledge between professional engineers about workflows in BIM and conflict of opinions between different stakeholders are the risk factors with the highest priority.Keywords: risk, BIM, fuzzy TOPSIS, construction projects
Procedia PDF Downloads 2283890 Socioeconomic Impacts of Innovative Housing Construction Technologies in Slum Upgrading: Case of Mathare Valley Nairobi, Kenya
Authors: Edmund M. Muthigani
Abstract:
Background: Adequate, decent housing is a universal human right integral component. Resources’ costs and intensified rural-urban migration have increased the demand for affordable housing in urban areas. Modern knowledge-based economy uses innovation. The construction industry uses product and process innovation to provide adequate and decent low-cost housing. Kenya adopted innovation practices in slum upgrading that used cost-effectively locally available building materials. This study objectively looked at the outcomes, social and economic impacts of innovative housing technologies construction in the Mathare valley slums upgrading project. Methods: This post-occupancy study used an exploratory-descriptive research design. Random sampling was used to sample 384 users of low-cost housing projects in Mathare Valley, Nairobi County. Research instruments included semi-structured questionnaires and interview guides. Pilot study, validity and reliability tests ensured the quality of a study. Ethical considerations included university approval and consent. Statistical package for social sciences (SPSS) software version 21 was applied to compute the descriptive and inferential statistics. Findings: Slum-upgrading had a significant-positive outcome on improved houses and community. Social impacts included communal facilities, assurance of security of tenure, and retained frameworks of establishments. Economic impacts included employment; affordable and durable units (p values <0.05). The upgrading process didn’t influence rent fees, was corrupt and led to the displacement of residents. Conclusion: Slum upgrading process impacted positively. Similar projects should consider residents in decision-making.Keywords: innovation, technologies, slum upgrading, Mathare valley slum, social impact, economic impact
Procedia PDF Downloads 1663889 Influence of Procurement Methods on Cost Performance of Building Projects in Gombe State, Nigeria
Authors: S. U. Kunya, S. Abdulkadir, M. A. Anas, L. Z. Adam
Abstract:
Procurement methods is described as systems of contractual arrangements used by the contractor in order to secure the design and construction services based on the stipulated cost and within the required time and quality. Despite that, major projects in the Nigerian construction industry failed because of wrong procurement methods with major consequences leads to cost overrun which needs to find lasting solution. The aim of the study is to evaluate the influence of procurement methods on cost performance of building projects in Gombe State, Nigeria. Study adopts descriptive and explorative design approach. Data were collected through administering of one hundred questionnaire using convenient sampling techniques. Data analyses using percentages, mean value and Anova analysis. Major finding show that more than fifty percent (50%) of procurement methods available are mainly utilized in the study area and the top procurement methods that have high impacts on cost performance as compare with the other methods is project management and direct labour procurement methods. The results of hypothesis’ tests with pvalue 0.12 and 0.07 validated that there was no significant variation in the perception of stakeholders’ on the impacts of procurements methods on cost performance. Therefore, the study concluded that projects management and direct labour are the most appropriate procurement methods that will ensure successful completion of project at stipulated cost in building projects.Keywords: cost, effects, performance, procurement, projects
Procedia PDF Downloads 2213888 A Project-Based Learning Approach in the Course of 'Engineering Skills' for Undergraduate Engineering Students
Authors: Armin Eilaghi, Ahmad Sedaghat, Hayder Abdurazzak, Fadi Alkhatib, Shiva Sadeghi, Martin Jaeger
Abstract:
A summary of experiences, recommendations, and lessons learnt in the application of PBL in the course of “Engineering Skills” in the School of Engineering at Australian College of Kuwait in Kuwait is presented. Four projects were introduced as part of the PBL course “Engineering Skills” to 24 students in School of Engineering. These students were grouped in 6 teams to develop their skills in 10 learning outcomes. The learning outcomes targeted skills such as drawing, design, modeling, manufacturing and analysis at a preliminary level; and also some life line learning and teamwork skills as these students were exposed for the first time to the PBL (project based learning). The students were assessed for 10 learning outcomes of the course and students’ feedback was collected using an anonymous survey at the end of the course. Analyzing the students’ feedbacks, it is observed that 67% of students preferred multiple smaller projects than a single big project because it provided them with more time and attention focus to improve their “soft skills” including project management, risk assessment, and failure analysis. Moreover, it is found that 63% of students preferred to work with different team members during the course to improve their professional communication skills. Among all, 62% of students believed that working with team members from other departments helped them to increase the innovative aspect of projects and improved their overall performance. However, 70% of students counted extra time needed to regenerate momentum with the new teams as the major challenge. Project based learning provided a suitable platform for introducing students to professional engineering practice and meeting the needs of students, employers and educators. It was found that students achieved their 10 learning outcomes and gained new skills developed in this PBL unit. This was reflected in their portfolios and assessment survey.Keywords: project-based learning, engineering skills, undergraduate engineering, problem-based learning
Procedia PDF Downloads 1643887 Time Overrun in Pre-Construction Planning Phase of Construction Projects
Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui
Abstract:
Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun
Procedia PDF Downloads 2533886 Optimisation Model for Maximising Social Sustainability in Construction Scheduling
Authors: Laura Florez
Abstract:
The construction industry is labour intensive, and the behaviour and management of workers have a direct impact on the performance of construction projects. One of the issues it currently faces is how to recruit and maintain its workers. Construction is known as an industry where workers face the problem of short employment durations, frequent layoffs, and periods of unemployment between jobs. These challenges not only creates pressures on the workers but also project managers have to constantly train new workers, face skills shortage, and uncertainty on the quality of the workers it will attract. To consider worker’s needs and project managers expectations, one practice that can be implemented is to schedule construction projects to maintain a stable workforce. This paper proposes a mixed integer programming (MIP) model to schedule projects with the objective of maximising social sustainability of construction projects, that is, maximise labour stability. Aside from the social objective, the model accounts for equipment and financial resources required by the projects during the construction phase. To illustrate how the solution strategy works, a construction programme comprised of ten projects is considered. The projects are scheduled to maximise labour stability while simultaneously minimising time and minimising cost. The tradeoff between the values in terms of time, cost, and labour stability allows project managers to consider their preferences and identify which solution best suits their needs. Additionally, the model determines the optimal starting times for each of the projects, working patterns for the workers, and labour costs. This model shows that construction projects can be scheduled to not only benefit the project manager, but also benefit current workers and help attract new workers to the industry. Due to its practicality, it can be a valuable tool to support decision making and assist construction stakeholders when developing schedules that include social sustainability factors.Keywords: labour stability, mixed-integer programming (MIP), scheduling, workforce management
Procedia PDF Downloads 2523885 Thailand’s Education Cooperation with Neighboring Countries: The Key Factors to Strengthen the “Soft Power” Relationship
Authors: Rungrot Trongsakul
Abstract:
This paper was aimed to study the model of education cooperation during Thailand and neighbor countries, especially the countries which the territory-cohesion border with Thailand used “Soft Power” to enhance the good relationship. This research employed qualitative method, analyzed and synthesized the content of cooperation projects, policies, laws, relevant theories, relevant research papers and documents and used SWOT analysis. The research findings revealed that Thailand’s education cooperation projects with neighbor countries had two characteristics: 1) education cooperation projects/programs were a part in economic cooperation projects, and 2) there were directly education cooperation projects. The suggested education cooperation model was based on the concept of “Soft Power”, thus the determination of action plans or projects as key factors of public and private organizations should be based on sincere participation among people, communities and relevant organizations of the neighbor countries. Adoption of education-cultural exchange, learning and sharing process is a key to strengthen good relationship of the countries’ cooperation. The roles of education in this included sharing and acceptance of culture and local wisdom, human resource development, knowledge management, integration and networking building could enhance relationship between agents of related organizations of Thailand and neighbors countries.Keywords: education, soft-power, relationship, cooperation, Thailand neighboring countries
Procedia PDF Downloads 3593884 Guidelines for Sustainable Urban Mobility in Historic Districts from International Experiences
Authors: Tamer ElSerafi
Abstract:
In recent approaches to heritage conservation, the whole context of historic areas becomes as important as the single historic building. This makes the provision of infrastructure and network of mobility an effective element in the urban conservation. Sustainable urban conservation projects consider the high density of activities, the need for a good quality access system to the transit system, and the importance of the configuration of the mobility network by identifying the best way to connect the different districts of the urban area through a complex unique system that helps the synergic development to achieve a sustainable mobility system. A sustainable urban mobility is a key factor in maintaining the integrity between socio-cultural aspects and functional aspects. This paper illustrates the mobility aspects, mobility problems in historic districts, and the needs of the mobility systems in the first part. The second part is a practical analysis for different mobility plans. It is challenging to find innovative and creative conservation solutions fitting modern uses and needs without risking the loss of inherited built resources. Urban mobility management is becoming an essential and challenging issue in the urban conservation projects. Depending on literature review and practical analysis, this paper tries to define and clarify the guidelines for mobility management in historic districts as a key element in sustainability of urban conservation and development projects. Such rules and principles could control the conflict between the socio–cultural and economic activities, and the different needs for mobility in these districts in a sustainable way. The practical analysis includes a comparison between mobility plans which have been implemented in four different cities; Freiburg in Germany, Zurich in Switzerland and Bray Town in Ireland. This paper concludes with a matrix of guidelines that considers both principles of sustainability and livability factors in urban historic districts.Keywords: sustainable mobility, urban mobility, mobility management, historic districts
Procedia PDF Downloads 1573883 Public-Private Partnership Transportation Projects: An Exploratory Study in the US
Authors: Medya Fathi
Abstract:
When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, known as Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output's list are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient PPP research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results and conclusions will be provided. This study can assist practitioners in applying PPP for transportation projects by showing its ability to save time and/or cost.Keywords: cost, delivery method, highway, public-private partnership, schedule, transportation
Procedia PDF Downloads 1753882 Idiocenntrism to innovative action, multi-level perspective on moderating effects of emotional self-regulation, trust and CSR
Authors: Shuhong Wang, Xiang Yi
Abstract:
Through a survey of approximately 340 employees from four Chinese companies and employing cross-level analysis, this study reveals that certain cultural syndromes may exert both direct and indirect influences on such behaviors. Notably, individuals with a strong individualistic self-concept are more inclined towards innovative actions compared to their less individualistic counterparts. This research also identifies several moderating factors. For instance, trust amplifies the positive relationship between individualism and innovative actions, particularly at higher trust levels. The paper concludes by highlighting its theoretical contributions, and practical implications, and suggesting directions for future research.Keywords: Innovation, Self-Determination Theory, Trust, Team dynamic, Allocentrism
Procedia PDF Downloads 583881 The Mineral and Petroleum Sectors of Papua New Guinea: An Overview
Authors: James Wapyer, Simon A. Kawagle
Abstract:
The current downturn in the metal and oil prices has significantly affected the mineral and petroleum sectors of Papua New Guinea. The sectors have not grown substantially in the last three years compared to previous years. Resources of several projects have not been proved up as well as feasibility studies not undertaken on advanced projects. In the 2012-2015 periods, however, development licences for four projects have been granted - the Solwara-1 project in the Manus Basin, the Woodlark project, the Crater Mountains project and the Stanley gas-condensate project. There has been some progress on three advanced projects – Frieda River copper-gold porphyry, Mount Kare gold, and the Wafi-Golpu projects. The oilfields are small by world standard but have been high rates of production. The developments of liquefied natural gas projects are progressing well and the first LNG project with ExxonMobil and partners shipped its first cargo in May 2014, the second with Total and partners involving Elk-Antelope gas-condensate fields is in its development stage, and the third with Horizon Oil and partners involving gas fields in the western Papuan basin is in the planning stage. Significantly, in the years 2012-2015, the country has exported liquefied natural gas, nickel, cobalt and chromium, and has granted exploration licences for iron-sands and coal measures for the first time.Keywords: exploration, mineral, Papua New Guinea, petroleum
Procedia PDF Downloads 2693880 Realizing the National Disaster Management Policy of Sri Lanka through Public Private Partnerships
Authors: K. W. A. M. Kokila, Matsui Kenichi
Abstract:
Sri Lanka’s disaster management policy aims to protect lives and developments in disaster affected areas by effectively using resources for disaster risk reduction, emergency management, and community awareness. However, funding for these action programs has posed a serious challenge to the country’s economy. This paper examines the extent to which private-public partnerships (PPPs) can facilitate and expedite disaster management works. In particular, it discusses the results of the questionnaire survey among policymakers, government administrators, NGOs, and private businesses. This questionnaire was conducted in 2017. All respondents were selected based on their experience in PPP projects in the past. The survey focused on clarifying the effectiveness of past PPP projects as well as their efficiency and transparency. The respondents also provided their own opinions and suggestions to improve the future PPP projects in Sri Lanka. The questionnaire was distributed to fifteen persons. The results show that almost all respondents think that PPP projects are beneficial and important for future disaster risk management in Sri Lanka. The respondents, however, showed some reservation about effectiveness and transparency of the PPP process. This paper also discusses the results on the respondents’ perceptions about their capacity regarding human resources and management. This paper, overall, sheds light on technological, financial and human resource management practices in developed countries as well as policy and legislation provisions regarding PPP projects.Keywords: disaster management, policy, private public partnership, projects
Procedia PDF Downloads 1683879 Level of Sustainability, Environmental Assessment and Life Cycle Assessment of Industrial Technology Research Projects in Carlos Hilado Memorial State College, Alijis Campus, Bacolod City, Negros Occidental, Philippines
Authors: Rene A. Salmingo
Abstract:
In pursuing higher educational institution’s transition to sustainable future, this research initiative was conducted. The study aimed to determine the level of sustainability, environmental impact and life cycle phase assessment of the industrial technology research projects at the Institute of Information Technology, Carlos Hilado Memorial State College (CHMSC), Alijis Campus, Bacolod City, Negros Occidental, Philippines. The research method was descriptive utilizing a researcher made questionnaire to assess the ten (10) industrial technology completed research projects. Mean was used to treat the data and instrument for Good and Scates’ validity through revisions and consultations from the environmental experts, technology specialists; and Cronbach Alpha was used to measure reliability. Results indicated that the level of sustainability and life cycle phase assessment was very high while the environmental impact of the industrial research projects was rated low. Moreover, the current research projects and environmental education courses in the college were relevant to support sustainable industrial technology research projects in the future. Hence, this research initiative will contribute to the transformation of CHMSC as a greening higher educational institution and as a center for sustainable development in the region.Keywords: environmental impact, industrial technology research projects, life cycle phase assessment, sustainability
Procedia PDF Downloads 186