Search results for: construction safety
6000 Causes and Impacts of Rework Costs in Construction Projects
Authors: Muhammad Ejaz1
Abstract:
Rework has been defined as: "The unnecessary effort of re-doing a process or activity that was incorrectly implemented the first time." A great threat to the construction industry is rework. By and large due attention has not been given to avoid the causes of reworks, resulting time and cost over runs, in civil engineering projects. Besides these direct consequences, there might also be indirect consequences, such as stress, de-motivation or loss of future clients. When delivered products do not meet the requirements or expectations, work often has to be redone. Rework occurs in various phases of the construction process or in various divisions of a company. Rework can occur on the construction site or in a management department due to for example bad materials management. Rework can also have internal or external origins. Changes in clients’ expectations are an example of an external factor that might lead to rework. Rework can cause many costs to be higher than calculated at the start of the project. Rework events can have many different origins and for this research they have been categorized into four categories; changes, errors, omissions, and damages. The research showed that the major source of reworks were non professional attitude from technical hands and ignorance of total quality management principals by stakeholders. It also revealed that sources of reworks have not major differences among project categories. The causes were further analyzed by interviewing employees. Based on existing literature an extensive list of rework causes was made and during the interviews the interviewees were asked to confirm or deny statements regarding rework causes. The causes that were most frequently confirmed can be grouped into the understanding categories. 56% (max) of the causes are change-related, 30% (max) is error-related and 18% (max) falls into another category. Therefore, by recognizing above mentioned factors, reworks can be reduced to a great extent.Keywords: total quality management, construction industry, cost overruns, rework, material management, client’s expectations
Procedia PDF Downloads 2935999 Methodology for Obtaining Food Licenses in India
Authors: Rathna Malhotra Gaur
Abstract:
Owing to multiplicity and competition in the Indian food industry, it was always important for the government of India to bring in reforms that would protect the interest of the consumer and also the food operator. To further this objective, Food Safety, and Standards Act, 2006 (hereinafter referred to as FSSAI) was enacted for laying down science-based standards for articles and food and to regulate their storage, distribution, manufacture, same and import and to ensure safe food availability to the citizens of India. One of the safeguards towards consumer interest is the enactment of Food Safety and Standards (Licensing and Registration of Food Businesses, Regulation, 2011 within the mandate of FSSAI. It is mandatory for every food operator in India to get the registration certificate and procurement of food Licenses before starting operations in the country. All the nuances pertaining to the procurement of licenses are dealt with under these regulations. These regulations also lay down detailed provisions with regard to the conditions that the operator has to adhere to once the License is procured, going to the integrities of the safety and hygiene standards to be maintained by the food operators. This paper is an exhaustive effort to examine the provisions of obtaining the registration and License in India and the conditions that need to be fulfilled subsequently and further on the validity and renewal of these Food Licenses.Keywords: food laws, food licenses, food registration, penalty
Procedia PDF Downloads 1795998 The Requirements of Developing a Framework for Successful Adoption of Quality Management Systems in the Construction Industry
Authors: Mohammed Ali Ahmed, Vaughan Coffey, Bo Xia
Abstract:
Quality management systems (QMSs) in the construction industry are often implemented to ensure that sufficient effort is made by companies to achieve the required levels of quality for clients. Attainment of these quality levels can result in greater customer satisfaction, which is fundamental to ensure long-term competitiveness for construction companies. However, the construction sector is still lagging behind other industries in terms of its successful adoption of QMSs, due to the relative lack of acceptance of the benefits of these systems among industry stakeholders, as well as from other barriers related to implementing them. Thus, there is a critical need to undertake a detailed and comprehensive exploration of adoption of QMSs in the construction sector. This paper comprehensively investigates in the construction sector setting, the impacts of all the salient factors surrounding successful implementation of QMSs in building organizations, especially those of external factors. This study is part of an ongoing PhD project, which aims to develop a new framework that integrates both internal and external factors affecting QMS implementation. To achieve the paper aim and objectives, interviews will be conducted to define the external factors influencing the adoption of QMSs, and to obtain holistic critical success factors (CSFs) for implementing these systems. In the next stage of data collection, a questionnaire survey will be developed to investigate the prime barriers facing the adoption of QMSs, the CSFs for their implementation, and the external factors affecting the adoption of these systems. Following the survey, case studies will be undertaken to validate and explain in greater detail the real effects of these factors on QMSs adoption. Specifically, this paper evaluates the effects of the external factors in terms of their impact on implementation success within the selected case studies. Using findings drawn from analyzing the data obtained from these various approaches, specific recommendations for the successful implementation of QMSs will be presented, and an operational framework will be developed. Finally, through a focus group, the findings of the study and the new developed framework will be validated. Ultimately, this framework will be made available to the construction industry to facilitate the greater adoption and implementation of QMSs. In addition, deployment of the applicable recommendations suggested by the study will be shared with the construction industry to more effectively help construction companies to implement QMSs, and overcome the barriers experienced by businesses, thus promoting the achievement of higher levels of quality and customer satisfaction.Keywords: barriers, critical success factors, external factors, internal factors, quality management systems
Procedia PDF Downloads 1875997 Assessment of the Effectiveness of the Anti-Debris Flow Engineering Constructed to Reduce the Risk of Expected Debris Flow in the River Mletiskhevi by Computer Program RAMMS
Authors: Sopio Gogilava, Goga Chakhaia, Levan Tsulukidze, Zurab Laoshvili, Irina Khubulava, Shalva Bosikashvili, Teimuraz Gugushvili
Abstract:
Geoinformatics systems (GIS) integrated computer program RAMMS is widely used for forecasting debris flows and accordingly for the determination of anticipating risks with 85% accuracy. In view of the above, the work introduces new capabilities of the computer program RAMMS, which evaluates the effectiveness of anti-debris flow engineering construction, namely: the possibility of decreasing the expected velocity, kinetic energy, and output cone volume in the Mletiskhevi River. As a result of research has been determined that the anti-debris flow engineering construction designed to reduce the expected debris flow risk in the Mletiskhevi River is an effective environmental protection technology, that's why its introduction is promising.Keywords: construction, debris flow, geoinformatics systems, program RAMMS
Procedia PDF Downloads 1475996 Seismic Safety Evaluation of Weir Structures Using the Finite and Infinite Element Method
Authors: Ho Young Son, Bu Seog Ju, Woo Young Jung
Abstract:
This study presents the seismic safety evaluation of weir structure subjected to strong earthquake ground motions, as a flood defense structure in civil engineering structures. The seismic safety analysis procedure was illustrated through development of Finite Element (FE) and InFinite Element (IFE) method in ABAQUS platform. The IFE model was generated by CINPS4, 4-node linear one-way infinite model as a sold continuum infinite element in foundation areas of the weir structure and then nonlinear FE model using friction model for soil-structure interactions was applied in this study. In order to understand the complex behavior of weir structures, nonlinear time history analysis was carried out. Consequently, it was interesting to note that the compressive stress gave more vulnerability to the weir structure, in comparison to the tensile stress, during an earthquake. The stress concentration of the weir structure was shown at the connection area between the weir body and stilling basin area. The stress both tension and compression was reduced in IFE model rather than FE model of weir structures.Keywords: seismic, numerical analysis, FEM, weir, boundary condition
Procedia PDF Downloads 4535995 Urban Security and Social Sustainability in Cities of Developing Countries
Authors: Taimaz Larimian, Negin Sadeghi
Abstract:
Very little is known about the impacts of urban security on the level of social sustainability within the cities of developing countries. Urban security is still struggling to find its position in the social sustainability agenda, despite the significant role of safety and security on different aspects of peoples’ lives. This paper argues that urban safety and security should be better integrated within the social sustainability framework. With this aim, this study investigates the hypothesized relationship between social sustainability and Crime Prevention through Environmental Design (CPTED) approach at the neighborhood scale. This study proposes a model of key influential dimensions of CPTED analyzed into localized factors and sub-factors. These factors are then prioritized using pairwise comparison logic and fuzzy group Analytic Hierarchy Process (AHP) method in order to determine the relative importance of each factor on achieving social sustainability. The proposed model then investigates social sustainability in six case study neighborhoods of Isfahan city based on residents’ perceptions of safety within their neighborhood. Mixed method of data collection is used by using a self-administered questionnaire to explore the residents’ perceptions of social sustainability in their area of residency followed by an on-site observation to measure the CPTED construct. In all, 150 respondents from selected neighborhoods were involved in this research. The model indicates that CPTED approach has a significant direct influence on increasing social sustainability in neighborhood scale. According to the findings, among different dimensions of CPTED, ‘activity support’ and ‘image/ management’ have the most influence on people’s feeling of safety within studied areas. This model represents a useful designing tool in achieving urban safety and security during the development of more socially sustainable and user-friendly urban areas.Keywords: crime prevention through environmental design (CPTED), developing countries, fuzzy analytic hierarchy process (FAHP), social sustainability
Procedia PDF Downloads 3085994 Evaluation of Urban Parks Based on POI Data: Taking Futian District of Shenzhen as an Example
Authors: Juanling Lin
Abstract:
The construction of urban parks is an important part of eco-city construction, and the intervention of big data provides a more scientific and rational platform for the assessment of urban parks by identifying and correcting the irrationality of urban park planning from the macroscopic level and then promoting the rational planning of urban parks. The study builds an urban park assessment system based on urban road network data and POI data, taking Futian District of Shenzhen as the research object, and utilizes the GIS geographic information system to assess the park system of Futian District in five aspects: park spatial distribution, accessibility, service capacity, demand, and supply-demand relationship. The urban park assessment system can effectively reflect the current situation of urban park construction and provide a useful exploration for realizing the rationality and fairness of urban park planning.Keywords: urban parks, assessment system, POI, supply and demand
Procedia PDF Downloads 445993 Providing a Road Pricing and Toll Allocation Method for Toll Roads
Authors: Ali Babaei
Abstract:
There is a worldwide growing tendency toward construction of infrastructures with the possibility of private sector participation instead of free exploitation of public infrastructures. The construction and development of roads through private sector participation is performed by different countries because of appropriate results and benefits such as compensation of public budget deficit in road construction and maintenance and responding to traffic growth (demand). Toll is the most definite form of budget provision in road development. There are two issues in the toll rate assignment: A. costing of transport, B. Cost allocation and distribution of cost between different types of vehicles as each vehicle pay its own share. There can be different goals in toll collection and its extent is variable according to the strategy of toll collection. Costing principles in different countries are based on inclusion of the whole transport and not peculiar to the toll roads. For example, fuel tax policy functions where the road network users pay transportation cost (not just users of toll road). Whereas transportation infrastructures in Iran are free, these methods are not applicable. In Iran, different toll freeways have built by public investment and government provides participation in the road construction through encouragement of financial institutions. In this paper, the existing policies about the toll roads are studied and then the appropriate method of costing and cost allocation to different vehicles is introduced.Keywords: toll allocation, road pricing, transportation, financial and industrial systems
Procedia PDF Downloads 3645992 Multidisciplinary Approach for a Tsunami Reconstruction Plan in Coquimbo, Chile
Authors: Ileen Van den Berg, Reinier J. Daals, Chris E. M. Heuberger, Sven P. Hildering, Bob E. Van Maris, Carla M. Smulders, Rafael Aránguiz
Abstract:
Chile is located along the subduction zone of the Nazca plate beneath the South American plate, where large earthquakes and tsunamis have taken place throughout history. The last significant earthquake (Mw 8.2) occurred in September 2015 and generated a destructive tsunami, which mainly affected the city of Coquimbo (71.33°W, 29.96°S). The inundation area consisted of a beach, damaged seawall, damaged railway, wetland and old neighborhood; therefore, local authorities started a reconstruction process immediately after the event. Moreover, a seismic gap has been identified in the same area, and another large event could take place in the near future. The present work proposed an integrated tsunami reconstruction plan for the city of Coquimbo that considered several variables such as safety, nature & recreation, neighborhood welfare, visual obstruction, infrastructure, construction process, and durability & maintenance. Possible future tsunami scenarios are simulated by means of the Non-hydrostatic Evolution of Ocean WAVEs (NEOWAVE) model with 5 nested grids and a higher grid resolution of ~10 m. Based on the score from a multi-criteria analysis, the costs of the alternatives and a preference for a multifunctional solution, the alternative that includes an elevated coastal road with floodgates to reduce tsunami overtopping and control the return flow of a tsunami was selected as the best solution. It was also observed that the wetlands are significantly restored to their former configuration; moreover, the dynamic behavior of the wetlands is stimulated. The numerical simulation showed that the new coastal protection decreases damage and the probability of loss of life by delaying tsunami arrival time. In addition, new evacuation routes and a smaller inundation zone in the city increase safety for the area.Keywords: tsunami, Coquimbo, Chile, reconstruction, numerical simulation
Procedia PDF Downloads 2415991 The Digitalization of Occupational Health and Safety Training: A Fourth Industrial Revolution Perspective
Authors: Deonie Botha
Abstract:
Digital transformation and the digitization of occupational health and safety training have grown exponentially due to a variety of contributing factors. The literature suggests that digitalization has numerous benefits but also has associated challenges. The aim of the paper is to develop an understanding of both the perceived benefits and challenges of digitalization in an occupational health and safety context in an effort to design and develop e-learning interventions that will optimize the benefits of digitalization and address the associated challenges. The paper proposes, deliberate and tests the design principles of an e-learning intervention to ensure alignment with the requirements of a digitally transformed environment. The results of the research are based on a literature review regarding the requirements and effect of the Fourth Industrial Revolution on learning and e-learning in particular. The findings of the literature review are enhanced with empirical research in the form of a case study conducted in an organization that designs and develops e-learning content in the occupational health and safety industry. The primary findings of the research indicated that: (i) The requirements of learners and organizations in respect of e-learning are different than previously (i.e., a pre-Fourth Industrial Revolution related work setting). (ii) The design principles of an e-learning intervention need to be aligned with the entire value chain of the organization. (iii) Digital twins support and enhance the design and development of e-learning. (iv)Learning should incorporate a multitude of sensory experiences and should not only be based on visual stimulation. (v) Data that are generated as a result of e-learning interventions should be incorporated into big data streams to be analyzed and to become actionable. It is therefore concluded that there is general consensus on the requirements that e-learning interventions need to adhere to in a digitally transformed occupational health and safety work environment. The challenge remains for organizations to incorporate data generated as a result of e-learning interventions into the digital ecosystem of the organization.Keywords: digitalization, training, fourth industrial revolution, big data
Procedia PDF Downloads 1565990 Supply Chain Optimization through Vulnerability Control and Risk Prevention in Chicken Meat Use
Authors: Moise A. E., State G., Tudorache M., Custură I., Enea D. N., Osman (Defta) A., Drăgotoiu D.
Abstract:
This scientific paper explores risk management strategies in the food supply chain, with a focus on chicken raw materials, in the context of a company sourcing from the EU and non-EU. The aim of the paper is to adapt the requirements of international standards (IFS, BRC, QS, ITW, FSSC, ISO), proposing efficient methods to identify and remediate non-conformities and corrective and preventive actions. Defining the supply flow and acceptance steps promotes collaboration with suppliers to ensure the quality and safety of raw materials. To assess the risks of suppliers and raw materials, objective criteria are developed and vulnerabilities in the supply chain are analyzed, including the risk of fraud. Active monitoring of international alerts through RASFF helps to identify emerging risks quickly, and regular analysis of international trends and company performance enables continuous adaptation of risk management strategies. Implementing these measures strengthens food safety and consumer confidence in the final products supplied.Keywords: food supply chain, international standards, quality and safety of raw materials, RASFF
Procedia PDF Downloads 515989 “Towards Creating a Safe Future”: An Assessment of the Causes of Flooding in Nsanje District, Lower Shire Malawi
Authors: Davie Hope Moyo
Abstract:
The environment is a combination of two things: resources and hazards. One of the hazards that is a result of environmental changes is the occurrence of flooding. Floods are one of the disasters that are highly feared by people because they have a huge impact on the human population and their environment. In recent years, flooding disasters in the Nsanje district are increasing in both frequency and magnitude. This study aims to understand the root causes of this phenomenon. To understand the causes of flooding, this study focused on the case of TA Ndamera in the Nsanje district, southern Malawi. People in the Nsanje district face disruption in their day-to-day life because of floods that affect their communities. When floods happen, people lose their property, land, livestock, and even lives. The study was carried out in order to have a better understanding of the root causes of floods. The findings of this study may help the government and other development agencies to put in place mitigation measures that will make Nsanje District resilient to the occurrence of future flood hazards. Data was collected from the area of TA Ndamera in order to assess the causes of flooding in the district. Interviews, transect walks, and researcher observation was done to appreciate the topography of the district and evaluate other factors that are making the people become vulnerable to the impacts of flooding in the district. It was found that flooding in the district is mainly caused by heavy rainfall in the upper shire, settlements along river banks, deforestation, and the topography of the district in general. The research study ends by providing recommendation strategies that need to be put in place to increase the resilience of the communities to future flood hazards. The research recommends the development of indigenous knowledge systems to alert people of incoming floods, construction of evacuation centers to ease pressure on schools, savings, and insurance schemes, construction of dykes, desilting rivers, and afforestation.Keywords: disaster causes, mitigation, safety measures, Nsanje Malawi
Procedia PDF Downloads 855988 The Power of a Vulnerable State: The Rights Revolution and the Emergence of Human Resources Management Departments
Authors: Soheila Ghanbari
Abstract:
After the Civil Rights Act of 1964 was enacted, federal policy transformed employment rights. Equal employment opportunity law, legislation for occupational safety and health, and regulations for fringe benefits were established to ensure that employees have rights to equal protection, health and safety, and the benefits guaranteed by employers. In research analyzing data from 279 organizations over time, it was discovered that legal changes prompted organizations to establish personnel, antidiscrimination, safety, and benefits departments to ensure compliance. However, as the process of institutionalization advanced, middle managers began to separate these fresh offices from policy and rationalize them solely in economic terms as a component of the new human resources management model. This common occurrence is seen in the United States, where the Constitution represents government control of business as unlawful. It could potentially clarify the extended lack of a state theory in organizational analysis and shed light on a puzzle pointed out by state theorists: the federal state is weak in terms of administration but strong in terms of norms.Keywords: management, state, human, resources, employment
Procedia PDF Downloads 555987 Identification of Factors Influencing Costs in Green Projects
Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi
Abstract:
Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.Keywords: green project, factors influencing cost, hard cost, soft cost
Procedia PDF Downloads 3475986 Study on Connecting Method of Box Pontoons
Authors: Young-Jun You, Youn-Ju Jeong, Min-Su Park, Du-Ho Lee
Abstract:
Due to a lot of limited conditions, a large box type floating structure is inevitably constructed by connecting many pontoons. When a floating structure is made with concrete, concrete shear key with saw-teeth shape is often used to carry shear force. Match casting for the shear key and precise construction on a sea are very important for making separated two pontoons as one body but those are not easy work and may increase construction time and cost. To solve this problem, one-way shear key is studied in this paper for a connected part where there is some difference between upward and downward shear force. It has only one inclined plane and can resist shear force in one direction. Big shear force is resisted by concrete which forms an inclined plane and small shear force is resisted by steel bar. This system can reduce manufacturing cost of individual pontoon and construction time and cost for constructing a floating structure on a sea. In this paper, the feasibility study about one-way shear key system is performed by comparing with design example.Keywords: connection, floating container terminal, pontoon, pre-stressing, shear key
Procedia PDF Downloads 3195985 Usage of Palm Oil Industrial Wastes as Construction Materials
Authors: Mohammad Momeenul Islam, U. Johnson Alengaram, Mohd Zamin Jumaat, Iftekhair Ibnul Bashar
Abstract:
Palm oil industry produces millions of tonnes of industrial wastes and these wastes create huge storage and environmental problems. In order to solve these problems various research works have been performed for past decades. The commonly available wastes are Oil palm shells (OPS) and Palm oil fuel ash (POFA). These materials have already acquired well recognition as alternate of conventional construction materials. OPS has been used as coarse aggregate and compressive strength was found up to 56 MPa for 56-day. It is said that 30 grade Oil Palm shell concrete (OPSC) is possible without adding any cementitious materials. The maximum modulus of elasticity for OPSC was found 18.6 GPa. The Oil palm shell concrete (OPSC) are used in country areas and nearby areas where the palm oil factories are located for houses, road-kerbs, drain blocks, etc. In case of superstructure like beams and slab are also produced by utilizing OPS. Many experimental works have been performed to establish POFA as a substituting binding material in replace of Ordinary Portland cement (OPC). Throughout the research it has been showed that up to 20% of cement by mass can be replaced by POFA. POFA is one of the most enriched pozzolanic materials. The main purpose of this review is to discuss the usage and opportunity of the palm oil industrial wastes as construction materials following the previous experimental research work.Keywords: construction materials, oil palm shells (OPS), palm oil fuel ash (POFA), aggregates
Procedia PDF Downloads 3565984 Fuzzy Decision Making to the Construction Project Management: Glass Facade Selection
Authors: Katarina Rogulj, Ivana Racetin, Jelena Kilic
Abstract:
In this study, the fuzzy logic approach (FLA) was developed for construction project management (CPM) under uncertainty and duality. The focus was on decision making in selecting the type of the glass facade for a residential-commercial building in the main design. The adoption of fuzzy sets was capable of reflecting construction managers’ reliability level over subjective judgments, and thus the robustness of the system can be achieved. An α-cuts method was utilized for discretizing the fuzzy sets in FLA. This method can communicate all uncertain information in the optimization process, taking into account the values of this information. Furthermore, FLA provides in-depth analyses of diverse policy scenarios that are related to various levels of economic aspects when it comes to the construction projects' valid decision making. The developed approach is applied to CPM to demonstrate its applicability. Analyzing the materials of glass facades, variants were defined. The development of the FLA for the CPM included relevant construction projec'ts stakeholders that were involved in the criteria definition to evaluate each variant. Using fuzzy Decision-Making Trial and Evaluation Laboratory Method (DEMATEL) comparison of the glass facade was conducted. This way, a rank, according to the priorities for inclusion into the main design, of variants is obtained. The concept was tested on a residential-commercial building in the city of Rijeka, Croatia. The newly developed methodology was then compared with the existing one. The aim of the research was to define an approach that will improve current judgments and decisions when it comes to the material selection of buildings facade as one of the most important architectural and engineering tasks in the main design. The advantage of the new methodology compared to the old one is that it includes the subjective side of the managers’ decisions, as an inevitable factor in each decision making. The proposed approach can help construction projects managers to identify the desired type of glass facade according to their preference and practical conditions, as well as facilitate in-depth analyses of tradeoffs between economic efficiency and architectural design.Keywords: construction projects management, DEMATEL, fuzzy logic approach, glass façade selection
Procedia PDF Downloads 1375983 The Concept of Anchor Hazard Potential Map
Authors: Sao-Jeng Chao, Chia-Yun Wei, Si-Han Lai, Cheng-Yu Huang, Yu-Han Teng
Abstract:
In Taiwan, the landforms are mainly dominated by mountains and hills. Many road sections of the National Highway are impossible to avoid problems such as slope excavation or slope filling. In order to increase the safety of the slope, various slope protection methods are used to stabilize the slope, especially the soil anchor technique is the most common. This study is inspired by the soil liquefaction potential map. The concept of the potential map is widely used. The typhoon, earth-rock flow, tsunami, flooded area, and the recent discussion of soil liquefaction have safety potential concepts. This paper brings the concept of safety potential to the anchored slope. Because the soil anchor inspection is only the concept of points, this study extends the concept of the point to the surface, using the Quantum GIS program to present the slope damage area, and depicts the slope appearance and soil anchor point with the slope as-built drawing. The soil anchor scores are obtained by anchor inspection data, and the low, medium and high potential areas are remitted by interpolation. Thus, the area where the anchored slope may be harmful is judged and relevant maintenance is provided. The maintenance units can thus prevent judgment and deal with the anchored slope as soon as possible.Keywords: anchor, slope, potential map, lift-off test, existing load
Procedia PDF Downloads 1415982 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages
Authors: Kawalpreet Kaur, Panagiotis Mitropoulos
Abstract:
The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.Keywords: work structuring, bid packages, work breakdown, project participants
Procedia PDF Downloads 795981 Analysis of Kilistra (Gokyurt) Settlement within the Context of Traditional Residential Architecture
Authors: Esra Yaldız, Tugba Bulbul Bahtiyar, Dicle Aydın
Abstract:
Humans meet their need for shelter via housing which they structure in line with habits and necessities. In housing culture, traditional dwelling has an important role as a social and cultural transmitter. It provides concrete data by being planned in parallel with users’ life style and habits, having their own dynamics and components as well as their designs in harmony with nature, environment and the context they exist. Textures of traditional dwelling create a healthy and cozy living environment by means of adaptation to natural conditions, topography, climate, and context; utilization of construction materials found nearby and usage of traditional techniques and forms; and natural isolation of construction materials used. One of the examples of traditional settlements in Anatolia is Kilistra (Gökyurt) settlement of Konya province. Being among the important centers of Christianity in the past, besides having distinctive architecture, culture, natural features, and geographical differences (climate, geological structure, material), Kilistra can also be identified as a traditional settlement consisting of family, religious and economic structures as well as cultural interaction. The foundation of this study is the traditional residential texture of Kilistra with its unique features. The objective of this study is to assess the conformity of traditional residential texture of Kilistra with present topography, climatic data, and geographical values within the context of human scale construction, usage of green space, indigenous construction materials, construction form, building envelope, and space organization in housing.Keywords: traditional residential architecture, Kilistra, Anatolia, Konya
Procedia PDF Downloads 4135980 Review of Capitalization of Construction Industry on Sustainable Risk Management in Nigeria
Authors: Nnadi Ezekiel Ejiofor
Abstract:
The construction industry plays a decisive role in the healthy development of any nation. Not only large but even small construction projects contribute to a country’s economic growth. There is a need for good management to ensure successful delivery and sustainability because of the plethora of risks that have resulted in low-profit margins for contractors, cost and schedule overruns, poor quality delivery, and abandoned projects. This research reviewed Capitalization on Sustainable Risk Management. Questionnaires and oral interviews conducted were utilized as means of data collection. One hundred and ninety-eight (198) large construction firms in Nigeria form the population of this study. 15 (fifteen) companies that emanated from merger and acquisition were used for the study. The instruments used for data collection were a researcher-developed structured questionnaire based on a five-point rating scale, interviews, focus group discussion, and secondary sources (bill of quantities and stock and exchange commission). The instrument was validated by two experts in the field. The reliability of the instrument was established by applying the split-half method. Kendall’s coefficient of concordance was used to test the data, and a degree of agreement was obtained. Data were subjected to descriptive statistics and analyzed using analysis of variance, t-test, and SPSS. The identified impacts of capitalization were an increase in turnover (24.5%), improvement in the image (24.5%), risk reduction (20%), business expansion (17.3%), and geographical spread (13.6%). The study strongly advocates the inclusion of risk management evaluation as part of the construction procurement process.Keywords: capitalization, project delivery, risks, risk management, sustainability
Procedia PDF Downloads 615979 Loading by Number Strategy for Commercial Vehicles
Authors: Ramalan Musa Yerima
Abstract:
The paper titled “loading by number” explained a strategy developed recently by Zonal Commanding Officer of the Federal Road Safety Corps of Nigeria, covering Sokoto, Kebbi and Zamfara States of Northern Nigeria. The strategy is aimed at reducing competition, which will invariably leads to the reduction in speed, reduction in dangerous driving, reduction in crash rate, reduction in injuries, reduction in property damages and reduction in death through road traffic crashes (RTC). This research paper presents a study focused on enhancing the safety of commercial vehicles. The background of this study highlights the alarming statistics related to commercial vehicle crashes in Nigeria with focus on Sokoto, Kebbi and Zamfara States, which often result in significant damage to property, loss of lives, and economic costs. The significance and aims is to investigate and propose effective strategy to enhance the safety of commercial vehicles. The study recognizes the pressing need for heightened safety measures in commercial transportation, as it impacts not only the well-being of drivers and passengers but also the overall public safety. To achieve the objectives, an examination of accident data, including causes and contributing factors, was performed to identify critical areas for improvement. The major finding of the study reveals that when competition comes into play within the realm of commercial driving, it has detrimental effects on road safety and resource management. Commercial drivers are pushed to complete their routes quickly, deliver goods on time or they pushed themselves to arrive quickly for more passengers and new contracts. This competitive environment, fuelled by internal and external pressures such as tight deadlines, poverty and greed, often leads to sad endings. The study recommend that if a strategy called loading by number is integrated with other multiple safety measures such as driver training programs, regulatory enforcement, and infrastructure improvements, commercial vehicle safety can be significantly enhanced. "Loading by Number” approach is design to ensure that the sequence of departure of drivers from motor park ‘A’ would be communicated to motor park officials of park ‘B’, which would be considered sequentially when giving them returning passengers, regardless of the first to arrive. In conclusion, this paper underscores the significance of improving the safety measures of commercial vehicles, as they are often larger and heavier than other vehicles on the road. Whenever they are involved in accidents, the consequences can be more severe. Commercial vehicles are also frequently involved in long-haul or interstate transportation, which means they cover longer distances and spend more time on the road. This increased exposure to driving conditions increases the probability of accidents occurring. By implementing the suggested measures, policymakers, transportation authorities, and industry stakeholders can work collectively towards ensuring a safer commercial transportation system.Keywords: commercial, safety, strategy, transportation
Procedia PDF Downloads 625978 Strategy of Loading by Number for Commercial Vehicles
Authors: Ramalan Musa Yerima
Abstract:
The paper titled “Loading by number” explained a strategy developed recently by the Zonal Commanding Officer of the Federal Road Safety Corps of Nigeria, covering Sokoto, Kebbi and Zamfara States of Northern Nigeria. The strategy is aimed at reducing competition, which will invariably lead to a reduction in speed, reduction in dangerous driving, reduction in crash rate, reduction in injuries, reduction in property damages and reduction in death through road traffic crashes (RTC). This research paper presents a study focused on enhancing the safety of commercial vehicles. The background of this study highlights the alarming statistics related to commercial vehicle crashes in Nigeria with a focus on Sokoto, Kebbi and Zamfara States, which often result in significant damage to property, loss of lives, and economic costs. The significance and aims is to investigate and propose an effective strategy to enhance the safety of commercial vehicles. The study recognizes the pressing need for heightened safety measures in commercial transportation, as it impacts not only the well-being of drivers and passengers but also the overall public safety. To achieve the objectives, an examination of accident data, including causes and contributing factors, was performed to identify critical areas for improvement. The major finding of the study reveals that when competition comes into play within the realm of commercial driving, it has detrimental effects on road safety and resource management. Commercial drivers are pushed to complete their routes quickly and deliver goods on time, or they push themselves to arrive quickly for more passengers and new contracts. This competitive environment, fuelled by internal and external pressures such as tight deadlines, poverty and greed, often leads to sad endings. The study recommends that if a strategy called loading by number is integrated with other multiple safety measures, such as driver training programs, regulatory enforcement, and infrastructure improvements, commercial vehicle safety can be significantly enhanced. "Loading by Number” approach is designed to ensure that the sequence of departure of drivers from the motor park ‘A’ would be communicated to motor park officials of park ‘B’, which would be considered sequentially when giving them returning passengers, regardless of the first to arrive. In conclusion, this paper underscores the significance of improving the safety measures of commercial vehicles, as they are often larger and heavier than other vehicles on the road. Whenever they are involved in accidents, the consequences can be more severe. Commercial vehicles are also frequently involved in long-haul or interstate transportation, which means they cover longer distances and spend more time on the road. This increased exposure to driving conditions increases the probability of accidents occurring. By implementing the suggested measures, policymakers, transportation authorities, and industry stakeholders can work collectively toward ensuring a safer commercial transportation system.Keywords: commercial, safety, strategy, transport
Procedia PDF Downloads 645977 Exploring Mental Health Triggers, Challenges, and Support Across Different Roles in the UK Construction Industry: Perspectives from Clients, Consultants, and Contractors
Authors: Abigail Amoah, George Ofori, George Agyekum-Mensah, Matthew Brian Wright, Job Momoh
Abstract:
The objective of this study was to examine the mental health triggers, challenges, and support for mental health needs within the UK construction industry, which is seen as one of the high-pressure working environments with jobs that can be physically demanding and, traditionally, suffer from ‘Macho’ culture. The sector makes a substantial contribution to the UK’s economy, but despite this economic significance, mental health issues are still thoroughly attended to due to stigmatisation. Through semi-structured interviews with clients, consultants, and contractors, the research helps to understand better how mental health is perceived by these key stakeholders in the UK construction industry. Clients identify high-pressure deadlines and financial risks as major stressors, consultants point to the incessant workload culture coupled with project constraints, and contractors emphasize insufficient resource concerns and physical demands. this study reveals significant organisational and cultural barriers to mental health. The study proposes the following recommendations: the need to implement bespoke mental health programmes for the industry, better communication channels, and implementing industry-standard policies to enhance a supportive environment. These specifications provide actionable insights to support well-being and productivity within the sector.Keywords: construction industry, mental health, supportive mechanisms, workplace stress
Procedia PDF Downloads 335976 Judicial Review of Indonesia's Position as the First Archipelagic State to implement the Traffic Separation Scheme to Establish Maritime Safety and Security
Authors: Rosmini Yanti, Safira Aviolita, Marsetio
Abstract:
Indonesia has several straits that are very important as a shipping lane, including the Sunda Strait and the Lombok Strait, which are the part of the Indonesian Archipelagic Sea Lane (IASL). An increase in traffic on the Marine Archipelago makes the task of monitoring sea routes increasingly difficult. Indonesia has proposed the establishment of a Traffic Separation Scheme (TSS) in the Sunda Strait and the Lombok Strait and the country now has the right to be able to conceptualize the TSS as well as the obligation to regulate it. Indonesia has the right to maintain national safety and sovereignty. In setting the TSS, Indonesia needs to issue national regulations that are in accordance with international law and the general provisions of the IMO (International Maritime Organization) can then be used as guidelines for maritime safety and security in the Sunda Strait and the Lombok Strait. The research method used is a qualitative method with the concept of linguistic and visual data collection. The source of the data is the analysis of documents and regulations. The results show that the determination of TSS was justified by International Law, in accordance with article 22, article 41, and article 53 of the United Nations Convention on the Law of the Sea (UNCLOS) 1982. The determination of TSS by the Indonesian government would be in accordance with COLREG (International Convention on Preventing Collisions at Sea) 10, which has been designed to follow IASL. Thus, TSS can provide a function as a safety and monitoring medium to minimize ship accidents or collisions, including the warship and aircraft of other countries that cross the IASL.Keywords: archipelago state, maritime law, maritime security, traffic separation scheme
Procedia PDF Downloads 1295975 Measuring the Embodied Energy of Construction Materials and Their Associated Cost Through Building Information Modelling
Authors: Ahmad Odeh, Ahmad Jrade
Abstract:
Energy assessment is an evidently significant factor when evaluating the sustainability of structures especially at the early design stage. Today design practices revolve around the selection of material that reduces the operational energy and yet meets their displinary need. Operational energy represents a substantial part of the building lifecycle energy usage but the fact remains that embodied energy is an important aspect unaccounted for in the carbon footprint. At the moment, little or no consideration is given to embodied energy mainly due to the complexity of calculation and the various factors involved. The equipment used, the fuel needed, and electricity required for each material vary with location and thus the embodied energy will differ for each project. Moreover, the method and the technique used in manufacturing, transporting and putting in place will have a significant influence on the materials’ embodied energy. This anomaly has made it difficult to calculate or even bench mark the usage of such energies. This paper presents a model aimed at helping designers select the construction materials based on their embodied energy. Moreover, this paper presents a systematic approach that uses an efficient method of calculation and ultimately provides new insight into construction material selection. The model is developed in a BIM environment targeting the quantification of embodied energy for construction materials through the three main stages of their life: manufacturing, transportation and placement. The model contains three major databases each of which contains a set of the most commonly used construction materials. The first dataset holds information about the energy required to manufacture any type of materials, the second includes information about the energy required for transporting the materials while the third stores information about the energy required by tools and cranes needed to place an item in its intended location. The model provides designers with sets of all available construction materials and their associated embodied energies to use for the selection during the design process. Through geospatial data and dimensional material analysis, the model will also be able to automatically calculate the distance between the factories and the construction site. To remain within the sustainability criteria set by LEED, a final database is created and used to calculate the overall construction cost based on R.M.S. means cost data and then automatically recalculate the costs for any modifications. Design criteria including both operational and embodied energies will cause designers to revaluate the current material selection for cost, energy, and most importantly sustainability.Keywords: building information modelling, energy, life cycle analysis, sustainablity
Procedia PDF Downloads 2705974 Ground Improvement Using Deep Vibro Techniques at Madhepura E-Loco Project
Authors: A. Sekhar, N. Ramakrishna Raju
Abstract:
This paper is a result of ground improvement using deep vibro techniques with combination of sand and stone columns performed on a highly liquefaction susceptible site (70 to 80% sand strata and balance silt) with low bearing capacities due to high settlements located (earth quake zone V as per IS code) at Madhepura, Bihar state in northern part of India. Initially, it was envisaged with bored cast in-situ/precast piles, stone/sand columns. However, after detail analysis to address both liquefaction and improve bearing capacities simultaneously, it was analyzed the deep vibro techniques with combination of sand and stone columns is excellent solution for given site condition which may be first time in India. First after detail soil investigation, pre eCPT test was conducted to evaluate the potential depth of liquefaction to densify silty sandy soils to improve factor of safety against liquefaction. Then trail test were being carried out at site by deep vibro compaction technique with sand and stone columns combination with different spacings of columns in triangular shape with different timings during each lift of vibro up to ground level. Different spacings and timing was done to obtain the most effective spacing and timing with vibro compaction technique to achieve maximum densification of saturated loose silty sandy soils uniformly for complete treated area. Then again, post eCPT test and plate load tests were conducted at all trail locations of different spacings and timing of sand and stone columns to evaluate the best results for obtaining the required factor of safety against liquefaction and the desired bearing capacities with reduced settlements for construction of industrial structures. After reviewing these results, it was noticed that the ground layers are densified more than the expected with improved factor of safety against liquefaction and achieved good bearing capacities for a given settlements as per IS codal provisions. It was also worked out for cost-effectiveness of lightly loaded single storied structures by using deep vibro technique with sand column avoiding stone. The results were observed satisfactory for resting the lightly loaded foundations. In this technique, the most important is to mitigating liquefaction with improved bearing capacities and reduced settlements to acceptable limits as per IS: 1904-1986 simultaneously up to a depth of 19M. To our best knowledge it was executed first time in India.Keywords: ground improvement, deep vibro techniques, liquefaction, bearing capacity, settlement
Procedia PDF Downloads 1975973 Assessing Knowledge and Compliance of Motor Riders on Road Safety Regulations in Hohoe Municipality of Ghana: A Cross-Sectional Quantitative Study
Authors: Matthew Venunye Fianu, Jerry Fiave, Ebenezer Kye-Mensah, Dacosta Aboagye, Felix Osei-Sarpong
Abstract:
Introduction: Road traffic accidents involving motorbikes are a priority public health concern in Ghana. While there are local initiatives to address this public health challenge, little is known about motor riders’ knowledge and compliance with road safety regulations (RSR) and their association with RTAs. The aim of this study was, therefore, to assess motorbike riders’ knowledge and compliance with RSRs. Methodology: Motorbike riders in Hohoe Municipality were randomly sampled in a cross-sectional study in June 2022. Data were collected from 237 riders using a questionnaire designed in Kobocollect and administered by ten research assistants. A score of 70% or less is considered low for knowledge and compliance. The data were exported into Excel and imported into STATA 17 for analysis. A chi-square test was performed to generate descriptive and inferential statistics to establish the association between independent and dependent variables. Results: All 237 respondents were male, and each of them completed the questionnaire representing a 100% response rate. Participants who had knowledge about speed limit at different segments of the road were 59(24.9%), the use of helmet were 124 (52.3%), and alcohol use were 152 (64.1%). Participants who complied with regulations on speed limits, helmet use, and alcohol use were 108 (45.6%), 179(75.5%), and 168(70.8%), respectively. Riders who had at least junior high school education were 2.43 times more likely to adhere to RSR [cOR =2.43(95%CI= 1.15-6.33) p= 0.023] than those who had less education. Similarly, riders who had high knowledge about RSR were 2.07 times more likely to comply with RSR than those who had less knowledge [AOR= -2.07 (95% CI= 0.34-0.97), p=0.038]. Conclusion: Motor riders in the Hohoe Municipality had low knowledge as well as low compliance with road safety regulations. This could be a contributor to road traffic accidents. It is therefore recommended that road safety regulatory authorities and relevant stakeholders enhance the enforcement of RSR. There should also be country-specific efforts to increase awareness among all motor riders, especially those with less than junior high school education.Keywords: compliance, motor riders, road safety regulations, road traffic accident
Procedia PDF Downloads 905972 Factors for Entry Timing Choices Using Principal Axis Factorial Analysis and Logistic Regression Model
Authors: C. M. Mat Isa, H. Mohd Saman, S. R. Mohd Nasir, A. Jaapar
Abstract:
International market expansion involves a strategic process of market entry decision through which a firm expands its operation from domestic to the international domain. Hence, entry timing choices require the needs to balance the early entry risks and the problems in losing opportunities as a result of late entry into a new market. Questionnaire surveys administered to 115 Malaysian construction firms operating in 51 countries worldwide have resulted in 39.1 percent response rate. Factor analysis was used to determine the most significant factors affecting entry timing choices of the firms to penetrate the international market. A logistic regression analysis used to examine the firms’ entry timing choices, indicates that the model has correctly classified 89.5 per cent of cases as late movers. The findings reveal that the most significant factor influencing the construction firms’ choices as late movers was the firm factor related to the firm’s international experience, resources, competencies and financing capacity. The study also offers valuable information to construction firms with intention to internationalize their businesses.Keywords: factors, early movers, entry timing choices, late movers, logistic regression model, principal axis factorial analysis, Malaysian construction firms
Procedia PDF Downloads 3785971 Site Selection and Construction Mechanism of the Island Settlements in China Based on CFD-GIS Technology
Authors: Weng Jiantao, Wu Yiqun
Abstract:
The efficiency of natural ventilation, wind pressure distribution on building surface, wind comfort for pedestrians and buildings’ wind tolerance in traditional settlements are closely related to the pattern of terrain. On the basis of field research on the typical island terrain in China, the physical and mathematical models are established by using CFD software, and then the simulation results of the wind field are exported. We discuss the relationship between wind direction and wind field results. Furthermore simulation results are imported into ArcGIS platform. The evaluation model of island site selection is established with considering slope factor. We realize the visual model of site selection on complex island terrain. The multi-plans of certain residential are discussed based on wind simulation; at last the optimal project is selected. Results can provide the theory guidance for settlement planning and construction in China's traditional island.Keywords: CFD, island terrain, site selection, construction mechanism
Procedia PDF Downloads 512