26 Causes and Impacts of Rework Costs in Construction Projects

Authors: Muhammad Ejaz1

Abstract:

Rework has been defined as: "The unnecessary effort of re-doing a process or activity that was incorrectly implemented the first time." A great threat to the construction industry is rework. By and large due attention has not been given to avoid the causes of reworks, resulting time and cost over runs, in civil engineering projects. Besides these direct consequences, there might also be indirect consequences, such as stress, de-motivation or loss of future clients. When delivered products do not meet the requirements or expectations, work often has to be redone. Rework occurs in various phases of the construction process or in various divisions of a company. Rework can occur on the construction site or in a management department due to for example bad materials management. Rework can also have internal or external origins. Changes in clients’ expectations are an example of an external factor that might lead to rework. Rework can cause many costs to be higher than calculated at the start of the project. Rework events can have many different origins and for this research they have been categorized into four categories; changes, errors, omissions, and damages. The research showed that the major source of reworks were non professional attitude from technical hands and ignorance of total quality management principals by stakeholders. It also revealed that sources of reworks have not major differences among project categories. The causes were further analyzed by interviewing employees. Based on existing literature an extensive list of rework causes was made and during the interviews the interviewees were asked to confirm or deny statements regarding rework causes. The causes that were most frequently confirmed can be grouped into the understanding categories. 56% (max) of the causes are change-related, 30% (max) is error-related and 18% (max) falls into another category. Therefore, by recognizing above mentioned factors, reworks can be reduced to a great extent.

Keywords: total quality management, construction industry, cost overruns, rework, material management, client’s expectations

Procedia PDF Downloads 266
25 Imperfect Production Inventory Model with Inspection Errors and Fuzzy Demand and Deterioration Rates

Authors: Chayanika Rout, Debjani Chakraborty, Adrijit Goswami

Abstract:

Our work presents an inventory model which illustrates imperfect production and imperfect inspection processes for deteriorating items. A cost-minimizing model is studied considering two types of inspection errors, namely, Type I error of falsely screening out a proportion of non-defects, thereby passing them on for rework and Type II error of falsely not screening out a proportion of defects, thus selling those to customers which incurs a penalty cost. The screened items are reworked; however, no returns are entertained due to deteriorating nature of the items. In more practical situations, certain parameters such as the demand rate and the deterioration rate of inventory cannot be accurately determined, and therefore, they are assumed to be triangular fuzzy numbers in our model. We calculate the optimal lot size that must be produced in order to minimize the total inventory cost for both the crisp and the fuzzy models. A numerical example is also considered to exemplify the procedure which is followed by the analysis of sensitivity of various parameters on the decision variable and the objective function.

Keywords: deteriorating items, EPQ, imperfect quality, rework, type I and type II inspection errors

Procedia PDF Downloads 159
24 The Forensic Analysis of Engravers' Handwriting

Authors: Olivia Rybak-Karkosz

Abstract:

The purpose of this paper is to present the result of scientific research using forensic handwriting analysis. It was conducted to verify the stability and lability of handwriting of engravers and check if gravers transfer their traits from handwriting to plates and other surfaces they rework. This research methodology consisted of completing representative samples of signatures of gravers written on a piece of paper using a ballpen and signatures engraved on other surfaces. The forensic handwriting analysis was conducted using the graphic-comparative method (graphic method), and all traits were analysed. The paper contains a concluding statement of the similarities and differences between the samples.

Keywords: artist’s signatures, engraving, forensic handwriting analysis, graphic-comparative method

Procedia PDF Downloads 71
23 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 502
22 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 121
21 Preliminary Investigation of Hospital Buildings Maintenance Management in Malaysia

Authors: Christtestimony Oluwafemi Jesumoroti, AbdulLateef Ashola Olanrewaju, Khor Soo Cheen

Abstract:

The worth of buildings is known by the quality of the maintenance imbibe in them. Maintenance management being carried out in the hospitals has a direct impact on the performance of the hospital buildings, environment, and sustainable infrastructure, and as such, there is a need to give it adequate attention. The media and reports on hospital buildings maintenance management in Malaysia were not favorable. Hospital buildings in Malaysia need to have proper structure for maintenance management and sustainability as this will enhance the good infrastructure for users and the entire nation. The paper reports the preliminary results of the determinants of maintenance in hospital buildings. To achieve the aim of this research, a survey questionnaire was administered to the users of the hospital buildings. The findings of the study revealed that there are lack of maintenance standard, use of poor quality components and materials, Improper response time, Poor complaint reporting system. Hence, the influent of rework, thorough responsibilities of quality performance of hospital buildings, and others are the results of the investigations.

Keywords: sustainable infrastructure, optimum performance, implementation, key performance indicators, maintenance policies

Procedia PDF Downloads 120
20 Taguchi Approach for the Optimization of the Stitching Defects of Knitted Garments

Authors: Adel El-Hadidy

Abstract:

For any industry, the production and quality management or wastages reductions have major impingement on overall factory economy. This work discusses the quality improvement of garment industry by applying Pareto analysis, cause and effect diagram and Taguchi experimental design. The main purpose of the work is to reduce the stitching defects, which will also minimize the rejection and reworks rate. Application of Pareto chart, fish bone diagram and Process Sigma Level/and or Performance Level tools helps solving those problems on priority basis. Among all, only sewing, defects are responsible form 69.3% to 97.3 % of total defects. Process Sigma level has been improved from 0.79 to 1.3 and performance rate improved, from F to D level. The results showed that the new set of sewing parameters was superior to the original one. It can be seen that fabric size has the largest effect on the sewing defects and that needle size has the smallest effect on the stitching defects.

Keywords: garment, sewing defects, cost of rework, DMAIC, sigma level, cause and effect diagram, Pareto analysis

Procedia PDF Downloads 136
19 An Analytical Survey of Construction Changes: Gaps and Opportunities

Authors: Ehsan Eshtehardian, Saeed Khodaverdi

Abstract:

This paper surveys the studies on construction change and reveals some of the potential future works. A full-scale investigation of change literature, including change definitions, types, causes and effects, and change management systems, is accomplished to explore some of the coming change trends. It is tried to pick up the critical works in each section to deduct a true timeline of construction changes. The findings show that leaping from best practice guides in late 1990s and generic process models in the early 2000s to very advanced modeling environments in the mid-2000s and the early 2010s have made gaps along with opportunities for change researchers in order to develop some more easy and applicable models. Another finding is that there is a compelling similarity between the change and risk prediction models. Therefore, integrating these two concepts, specifically from proactive management point of view, may lead to a synergy and help project teams avoid rework. Also, the findings show that exploitation of cause-effect relationship models, in order to facilitate the dispute resolutions, seems to be an interesting field for future works.

Keywords: construction change, change management systems, dispute resolutions, change literature

Procedia PDF Downloads 269
18 The Role of Urban Design in Creating Cohesive and People’s Public Spaces

Authors: Hazem Abuorf

Abstract:

From the perspective of viewing urban design as the architecture of public spaces, the latter has many advantages; for example, in achieving attractive and vibrant public spaces, ensuring safety and amenity, supporting a strong sense of place and local character. Besides all advantages, such spaces nevertheless trigger numerous dilemmas, how to design urban spaces preserving the quality of life in the long term while equally achieving cohesion between new urban developments and the already existing urban structure without causing a split in history through the cause of functional and aesthetic degradation. Analysis of this article seeks to propose a methodology deemed essential for assessing and stimulating design criteria of the public spaces when rehabilitating urban sites. The method’s utility is shown by analyzing rehabilitation projects in Gaza Strip, whose design of the public spaces has mainly focused on the physical aspect ignoring the place’s local identity, users’ needs, and history. The proposed methodology serves as a guide for municipal authorities and technical teams to deal with interventions that would rework the role of urban design towards making sense of place.

Keywords: urban design, public realm, rehabilitation projects, quality of life

Procedia PDF Downloads 121
17 The Impact of Digital Transformation on the Construction Industry in Kuwait

Authors: M. Aladwani, Y. Alarfaj

Abstract:

The construction industry is currently experiencing a shift towards digitisation. This transformation is driven by adopting technologies like Building Information Modelling (BIM), drones, and augmented reality (AR). These advancements are revolutionizing the process of designing, constructing, and operating projects. BIM, for instance, is a new way of communicating and exploiting technology such as software and machinery. It enables the creation of a replica or virtual model of buildings or infrastructure projects. It facilitates simulating construction procedures, identifying issues beforehand, and optimizing designs accordingly. Drones are another tool in this revolution, as they can be utilized for site surveys, inspections, and even deliveries. Moreover, AR technology provides real-time information to workers involved in the project. Implementing these technologies in the construction industry has brought about improvements in efficiency, safety measures, and sustainable practices. BIM helps minimize rework and waste materials, while drones contribute to safety by reducing workers' exposure to areas. Additionally, AR plays a role in worker safety by delivering instructions and guidance during operations. Although the digital transformation within the construction industry is still in its early stages, it holds the potential to reshape project delivery methods entirely. By embracing these technologies, construction companies can boost their profitability while simultaneously reducing their environmental impact and ensuring safer practices.

Keywords: BIM, digital construction, construction technologies, digital transformation

Procedia PDF Downloads 48
16 Life Prediction of Cutting Tool by the Workpiece Cutting Condition

Authors: Noemia Gomes de Mattos de Mesquita, José Eduardo Ferreira de Oliveira, Arimatea Quaresma Ferraz

Abstract:

Stops to exchange cutting tool, to set up again the tool in a turning operation with CNC or to measure the workpiece dimensions have a direct influence on production. The premature removal of the cutting tool results in high cost of machining since the parcel relating to the cost of the cutting tool increases. On the other hand, the late exchange of cutting tool also increases the cost of production because getting parts out of the preset tolerances may require rework for its use when it does not cause bigger problems such as breaking of cutting tools or the loss of the part. Therefore, the right time to exchange the tool should be well defined when wanted to minimize production costs. When the flank wear is the limiting tool life, the time predetermination that a cutting tool must be used for the machining occurs within the limits of tolerance can be done without difficulty. This paper aims to show how the life of the cutting tool can be calculated taking into account the cutting parameters (cutting speed, feed and depth of cut), workpiece material, power of the machine, the dimensional tolerance of the part, the finishing surface, the geometry of the cutting tool and operating conditions of the machine tool, once known the parameters of Taylor algebraic structure. These parameters were raised for the ABNT 1038 steel machined with cutting tools of hard metal.

Keywords: machining, productions, cutting condition, design, manufacturing, measurement

Procedia PDF Downloads 605
15 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 189
14 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 124
13 The Impact of Artificial Intelligence on Digital Construction

Authors: Omil Nady Mahrous Maximous

Abstract:

The construction industry is currently experiencing a shift towards digitisation. This transformation is driven by adopting technologies like Building Information Modelling (BIM), drones, and augmented reality (AR). These advancements are revolutionizing the process of designing, constructing, and operating projects. BIM, for instance, is a new way of communicating and exploiting technology such as software and machinery. It enables the creation of a replica or virtual model of buildings or infrastructure projects. It facilitates simulating construction procedures, identifying issues beforehand, and optimizing designs accordingly. Drones are another tool in this revolution, as they can be utilized for site surveys, inspections, and even deliveries. Moreover, AR technology provides real-time information to workers involved in the project. Implementing these technologies in the construction industry has brought about improvements in efficiency, safety measures, and sustainable practices. BIM helps minimize rework and waste materials, while drones contribute to safety by reducing workers' exposure to areas. Additionally, AR plays a role in worker safety by delivering instructions and guidance during operations. Although the digital transformation within the construction industry is still in its early stages, it holds the potential to reshape project delivery methods entirely. By embracing these technologies, construction companies can boost their profitability while simultaneously reducing their environmental impact and ensuring safer practices.

Keywords: architectural education, construction industry, digital learning environments, immersive learning BIM, digital construction, construction technologies, digital transformation artificial intelligence, collaboration, digital architecture, digital design theory, material selection, space construction

Procedia PDF Downloads 8
12 Improving Sample Analysis and Interpretation Using QIAGENs Latest Investigator STR Multiplex PCR Assays with a Novel Quality Sensor

Authors: Daniel Mueller, Melanie Breitbach, Stefan Cornelius, Sarah Pakulla-Dickel, Margaretha Koenig, Anke Prochnow, Mario Scherer

Abstract:

The European STR standard set (ESS) of loci as well as the new expanded CODIS core loci set as recommended by the CODIS Core Loci Working Group, has led to a higher standardization and harmonization in STR analysis across borders. Various multiplex PCRs assays have since been developed for the analysis of these 17 ESS or 23 CODIS expansion STR markers that all meet high technical demands. However, forensic analysts are often faced with difficult STR results and the questions thereupon. What is the reason that no peaks are visible in the electropherogram? Did the PCR fail? Was the DNA concentration too low? QIAGEN’s newest Investigator STR kits contain a novel Quality Sensor (QS) that acts as internal performance control and gives useful information for evaluating the amplification efficiency of the PCR. QS indicates if the reaction has worked in general and furthermore allows discriminating between the presence of inhibitors or DNA degradation as a cause for the typical ski slope effect observed in STR profiles of such challenging samples. This information can be used to choose the most appropriate rework strategy.Based on the latest PCR chemistry called FRM 2.0, QIAGEN now provides the next technological generation for STR analysis, the Investigator ESSplex SE QS and Investigator 24plex QS Kits. The new PCR chemistry ensures robust and fast PCR amplification with improved inhibitor resistance and easy handling for a manual or automated setup. The short cycling time of 60 min reduces the duration of the total PCR analysis to make a whole workflow analysis in one day more likely. To facilitate the interpretation of STR results a smart primer design was applied for best possible marker distribution, highest concordance rates and a robust gender typing.

Keywords: PCR, QIAGEN, quality sensor, STR

Procedia PDF Downloads 464
11 A Preparatory Method for Building Construction Implemented in a Case Study in Brazil

Authors: Aline Valverde Arroteia, Tatiana Gondim do Amaral, Silvio Burrattino Melhado

Abstract:

During the last twenty years, the construction field in Brazil has evolved significantly in response to its market growing and competitiveness. However, this evolving path has faced many obstacles such as cultural barriers and the lack of efforts to achieve quality at the construction site. At the same time, the greatest amount of information generated on the designing or construction phases is lost due to the lack of an effective coordination of these activities. Face this problem, the aim of this research was to implement a French method named PEO which means preparation for building construction (in Portuguese) seeking to understand the design management process and its interface with the building construction phase. The research method applied was qualitative, and it was carried out through two case studies in the city of Goiania, in Goias, Brazil. The research was divided into two stages called pilot study at Company A and implementation of PEO at Company B. After the implementation; the results demonstrated the PEO method's effectiveness and feasibility while a booster on the quality improvement of design management. The analysis showed that the method has a purpose to improve the design and allow the reduction of failures, errors and rework commonly found in the production of buildings. Therefore, it can be concluded that the PEO is feasible to be applied to real estate and building companies. But, companies need to believe in the contribution they can make to the discovery of design failures in conjunction with other stakeholders forming a construction team. The result of PEO can be maximized when adopting the principles of simultaneous engineering and insertion of new computer technologies, which use a three-dimensional model of the building with BIM process.

Keywords: communication, design and construction interface management, preparation for building construction (PEO), proactive coordination (CPA)

Procedia PDF Downloads 132
10 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 239
9 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 237
8 MB-Slam: A Slam Framework for Construction Monitoring

Authors: Mojtaba Noghabaei, Khashayar Asadi, Kevin Han

Abstract:

Simultaneous Localization and Mapping (SLAM) technology has recently attracted the attention of construction companies for real-time performance monitoring. To effectively use SLAM for construction performance monitoring, SLAM results should be registered to a Building Information Models (BIM). Registring SLAM and BIM can provide essential insights for construction managers to identify construction deficiencies in real-time and ultimately reduce rework. Also, registering SLAM to BIM in real-time can boost the accuracy of SLAM since SLAM can use features from both images and 3d models. However, registering SLAM with the BIM in real-time is a challenge. In this study, a novel SLAM platform named Model-Based SLAM (MB-SLAM) is proposed, which not only provides automated registration of SLAM and BIM but also improves the localization accuracy of the SLAM system in real-time. This framework improves the accuracy of SLAM by aligning perspective features such as depth, vanishing points, and vanishing lines from the BIM to the SLAM system. This framework extracts depth features from a monocular camera’s image and improves the localization accuracy of the SLAM system through a real-time iterative process. Initially, SLAM can be used to calculate a rough camera pose for each keyframe. In the next step, each SLAM video sequence keyframe is registered to the BIM in real-time by aligning the keyframe’s perspective with the equivalent BIM view. The alignment method is based on perspective detection that estimates vanishing lines and points by detecting straight edges on images. This process will generate the associated BIM views from the keyframes' views. The calculated poses are later improved during a real-time gradient descent-based iteration method. Two case studies were presented to validate MB-SLAM. The validation process demonstrated promising results and accurately registered SLAM to BIM and significantly improved the SLAM’s localization accuracy. Besides, MB-SLAM achieved real-time performance in both indoor and outdoor environments. The proposed method can fully automate past studies and generate as-built models that are aligned with BIM. The main contribution of this study is a SLAM framework for both research and commercial usage, which aims to monitor construction progress and performance in a unified framework. Through this platform, users can improve the accuracy of the SLAM by providing a rough 3D model of the environment. MB-SLAM further boosts the application to practical usage of the SLAM.

Keywords: perspective alignment, progress monitoring, slam, stereo matching.

Procedia PDF Downloads 179
7 Integrated Information Approach to Inbound Logistics in Indian Steel Sector

Authors: N. Jena, Nitin Seth

Abstract:

Globalization and free trade has forced the organizations to continuously rethink and rework on the increasing cost of logistics. World wide, it is visualized that on one side the steel sector is witnessing rapid growth and on the other side it is facing huge challenges in terms of availability of raw materials for uninterrupted production. Inbound logistics also gains significant importance for ensuring the timely availability of raw materials. It is seen that in Indian steel sector logistic cost is still very large and challenging. Effectively managing the inbound logistics in steel decides the profitability and serviceability of the organization. Effective management of inbound logistics also has a major role on the inventory of the organization. Since, the logistics for the steel industry in India is evolving rapidly and it is the interplay of infrastructure, technology and new types of service providers that will define whether the industry is able to help its customers to reduce their logistics costs. Integration of Logistics has been treated as one of the most potential area for the companies to provide a base for cost reduction. In spite of the proven area for benefits for the industry, it is very surprising that none of the researchers have explored this area. Although, many researchers explored the subject of logistics in steel industry, but their perspective varied from exploring and understanding the associated cost and finding out the relations between them. Visualizing a potential gap, the present research is under taken to explore the integration opportunities in inbound logistics for steel sector. Typically in Indian steel sector where in most of the manufacturers depend on imported materials for processing the logistics is very challenging and accounts for transactions at supplier – who is situated in different country, shipper- who is transporting the material to the host country, regulators in both countries-that include customs and various clearing agents, local logistics service providers and local transporters/handlers. It is seen that In bound logistics cost in the steel sector is very high and accounts for about 15-16% of the turn over, integration of information across different channels provides and opportunity for improvements and growth of the organization. In the present paper, a case of leading steel manufacturer has been taken and the potentials for integration of information across various partners have been identified. The paper provides the identification of grey area in steel sector for major improvements in cycle time and lowering the inventories by integration of information. Finally, based on integration of information, the paper presents a business information framework for steel sector.

Keywords: integration, steel sectors, suppliers, shippers, customs and cargo agents, transporters

Procedia PDF Downloads 315
6 Establishing a Sustainable Construction Industry: Review of Barriers That Inhibit Adoption of Lean Construction in Lesotho

Authors: Tsepiso Mofolo, Luna Bergh

Abstract:

The Lesotho construction industry fails to embrace environmental practices, which has then lead to excessive consumption of resources, land degradation, air and water pollution, loss of habitats, and high energy usage. The industry is highly inefficient, and this undermines its capability to yield the optimum contribution to social, economic and environmental developments. Sustainable construction is, therefore, imperative to ensure the cultivation of benefits from all these intrinsic themes of sustainable development. The development of a sustainable construction industry requires a holistic approach that takes into consideration the interaction between Lean Construction principles, socio-economic and environmental policies, technological advancement and the principles of construction or project management. Sustainable construction is a cutting-edge phenomenon, forming a component of a subjectively defined concept called sustainable development. Sustainable development can be defined in terms of attitudes and judgments to assist in ensuring long-term environmental, social and economic growth in society. The key concept of sustainable construction is Lean Construction. Lean Construction emanates from the principles of the Toyota Production System (TPS), namely the application and adaptation of the fundamental concepts and principles that focus on waste reduction, the increase in value to the customer, and continuous improvement. The focus is on the reduction of socio-economic waste, and protestation of environmental degradation by reducing carbon dioxide emission footprint. Lean principles require a fundamental change in the behaviour and attitudes of the parties involved in order to overcome barriers to cooperation. Prevalent barriers to adoption of Lean Construction in Lesotho are mainly structural - such as unavailability of financing, corruption, operational inefficiency or wastage, lack of skills and training and inefficient construction legislation and political interferences. The consequential effects of these problems trigger down to quality, cost and time of the project - which then result in an escalation of operational costs due to the cost of rework or material wastage. Factor and correlation analysis of these barriers indicate that they are highly correlated, which then poses a detrimental potential to the country’s welfare, environment and construction safety. It is, therefore, critical for Lesotho’s construction industry to develop a robust governance through bureaucracy reforms and stringent law enforcement.

Keywords: construction industry, sustainable development, sustainable construction industry, lean construction, barriers to sustainable construction

Procedia PDF Downloads 250
5 Process Improvement and Redesign of the Immuno Histology (IHC) Lab at MSKCC: A Lean and Ergonomic Study

Authors: Samantha Meyerholz

Abstract:

MSKCC offers patients cutting edge cancer care with the highest quality standards. However, many patients and industry members do not realize that the operations of the Immunology Histology Lab (IHC) are the backbone for carrying out this mission. The IHC lab manufactures blocks and slides containing critical tissue samples that will be read by a Pathologist to diagnose and dictate a patient’s treatment course. The lab processes 200 requests daily, leading to the generation of approximately 2,000 slides and 1,100 blocks each day. Lab material is transported through labeling, cutting, staining and sorting manufacturing stations, while being managed by multiple techs throughout the space. The quality of the stain as well as wait times associated with processing requests, is directly associated with patients receiving rapid treatments and having a wider range of care options. This project aims to improve slide request turnaround time for rush and non-rush cases, while increasing the quality of each request filled (no missing slides or poorly stained items). Rush cases are to be filled in less than 24 hours, while standard cases are allotted a 48 hour time period. Reducing turnaround times enable patients to communicate sooner with their clinical team regarding their diagnosis, ultimately leading faster treatments and potentially better outcomes. Additional project goals included streamlining tech and material workflow, while reducing waste and increasing efficiency. This project followed a DMAIC structure with emphasis on lean and ergonomic principles that could be integrated into an evolving lab culture. Load times and batching processes were analyzed using process mapping, FMEA analysis, waste analysis, engineering observation, 5S and spaghetti diagramming. Reduction of lab technician movement as well as their body position at each workstation was of top concern to pathology leadership. With new equipment being brought into the lab to carry out workflow improvements, screen and tool placement was discussed with the techs in focus groups, to reduce variation and increase comfort throughout the workspace. 5S analysis was completed in two phases in the IHC lab, helping to drive solutions that reduced rework and tech motion. The IHC lab plans to continue utilizing these techniques to further reduce the time gap between tissue analysis and cancer care.

Keywords: engineering, ergonomics, healthcare, lean

Procedia PDF Downloads 193
4 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach

Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis

Abstract:

The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.

Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company

Procedia PDF Downloads 81
3 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 216
2 The Current Application of BIM - An Empirical Study Focusing on the BIM-Maturity Level

Authors: Matthias Stange

Abstract:

Building Information Modelling (BIM) is one of the most promising methods in the building design process and plays an important role in the digitalization of the Architectural, Engineering, and Construction (AEC) Industry. The application of BIM is seen as the key enabler for increasing productivity in the construction industry. The model-based collaboration using the BIM method is intended to significantly reduce cost increases, schedule delays, and quality problems in the planning and construction of buildings. Numerous qualitative studies based on expert interviews support this theory and report perceived benefits from the use of BIM in terms of achieving project objectives related to cost, schedule, and quality. However, there is a large research gap in analysing quantitative data collected from real construction projects regarding the actual benefits of applying BIM based on representative sample size and different application regions as well as different project typologies. In particular, the influence of the project-related BIM maturity level is completely unexplored. This research project examines primary data from 105 construction projects worldwide using quantitative research methods. Projects from the areas of residential, commercial, and industrial construction as well as infrastructure and hydraulic engineering were examined in application regions North America, Australia, Europe, Asia, MENA region, and South America. First, a descriptive data analysis of 6 independent project variables (BIM maturity level, application region, project category, project type, project size, and BIM level) were carried out using statistical methods. With the help of statisticaldata analyses, the influence of the project-related BIM maturity level on 6 dependent project variables (deviation in planning time, deviation in construction time, number of planning collisions, frequency of rework, number of RFIand number of changes) was investigated. The study revealed that most of the benefits of using BIM perceived through numerous qualitative studies have not been confirmed. The results of the examined sample show that the application of BIM did not have an improving influence on the dependent project variables, especially regarding the quality of the planning itself and the adherence to the schedule targets. The quantitative research suggests the conclusion that the BIM planning method in its current application has not (yet) become a recognizable increase in productivity within the planning and construction process. The empirical findings indicate that this is due to the overall low level of BIM maturity in the projects of the examined sample. As a quintessence, the author suggests that the further implementation of BIM should primarily focus on an application-oriented and consistent development of the project-related BIM maturity level instead of implementing BIM for its own sake. Apparently, there are still significant difficulties in the interweaving of people, processes, and technology.

Keywords: AEC-process, building information modeling, BIM maturity level, project results, productivity of the construction industry

Procedia PDF Downloads 48
1 An Approach on Intelligent Tolerancing of Car Body Parts Based on Historical Measurement Data

Authors: Kai Warsoenke, Maik Mackiewicz

Abstract:

To achieve a high quality of assembled car body structures, tolerancing is used to ensure a geometric accuracy of the single car body parts. There are two main techniques to determine the required tolerances. The first is tolerance analysis which describes the influence of individually tolerated input values on a required target value. Second is tolerance synthesis to determine the location of individual tolerances to achieve a target value. Both techniques are based on classical statistical methods, which assume certain probability distributions. To ensure competitiveness in both saturated and dynamic markets, production processes in vehicle manufacturing must be flexible and efficient. The dimensional specifications selected for the individual body components and the resulting assemblies have a major influence of the quality of the process. For example, in the manufacturing of forming tools as operating equipment or in the higher level of car body assembly. As part of the metrological process monitoring, manufactured individual parts and assemblies are recorded and the measurement results are stored in databases. They serve as information for the temporary adjustment of the production processes and are interpreted by experts in order to derive suitable adjustments measures. In the production of forming tools, this means that time-consuming and costly changes of the tool surface have to be made, while in the body shop, uncertainties that are difficult to control result in cost-intensive rework. The stored measurement results are not used to intelligently design tolerances in future processes or to support temporary decisions based on real-world geometric data. They offer potential to extend the tolerancing methods through data analysis and machine learning models. The purpose of this paper is to examine real-world measurement data from individual car body components, as well as assemblies, in order to develop an approach for using the data in short-term actions and future projects. For this reason, the measurement data will be analyzed descriptively in the first step in order to characterize their behavior and to determine possible correlations. In the following, a database is created that is suitable for developing machine learning models. The objective is to create an intelligent way to determine the position and number of measurement points as well as the local tolerance range. For this a number of different model types are compared and evaluated. The models with the best result are used to optimize equally distributed measuring points on unknown car body part geometries and to assign tolerance ranges to them. The current results of this investigation are still in progress. However, there are areas of the car body parts which behave more sensitively compared to the overall part and indicate that intelligent tolerancing is useful here in order to design and control preceding and succeeding processes more efficiently.

Keywords: automotive production, machine learning, process optimization, smart tolerancing

Procedia PDF Downloads 82